March 2017
Quarterly Portfolio Update as of 31 December 2016 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011.
In preparing our country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
CONTENTS
Page
Sovereign Loan and Grant Portfolio 1 ADB Sovereign Portfolio Management Indicators 2 Sovereign Loans Approved 3 Grants Approved 7 Technical Assistance Grants Approved 9 Loans Not Yet Signed 18 Grants Not Yet Signed 21 Loans That Became Effective 23 Grants That Became Effective 27 Loans Awaiting Effectiveness 30 Grants Awaiting Effectiveness 32 Loans Closed 34 Loans Closed in the Previous Year but Reported Only in the Current Year 37 Grants Closed 38 TAs Active 90 Days after Completion Date 40 Project Loan Contract Awards/Commitments 41 Project Grant Contract Awards 42 Project and Policy-Based Loan Disbursements 43 Project Loan Disbursements 44 Policy-Based Loan Disbursements 45 Project and Policy-Based Grant Disbursements 46 Project Grant Disbursements 47 Policy-Based Grant Disbursements 48 Status of Policy-Based Loan Tranche Releases 49 Status of Policy-Based Grant Tranche Releases 52 Loans and Grants with Cost Overruns 53 Cancellation of Loan/Grant Proceeds 55 Portfolio Ratings 60 Portfolio Ratings by Indicator 61 Loan Projects with Changes 62 Grant Projects with Changes 67 TAs with Major Change in Scope, Implementation Arrangements, or Both 70 Multitranche Financing Facility with Changes 71 2015 Project Completion Report (PCR/XARR) Program 72 2015 Technical Assistance Completion (TCR) Program 73 Project Administration Missions 75 Technical Assistance Administration Missions 76
ogram prods
1 Excludes partially administered grants (31, 32, 93[UK], 103, 145, 192, 273, 342, 358).
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
a Exclude (i) cofinanced loans; (ii) loan-related grants; and (iii) TAs.
Note: Totals may not add up due to rounding.
SOVEREIGN LOAN AND GRANT PORTFOLIOa
(as of 31 December 2016)
CWRD $15,961
23%
EARD $11,811
17%
PARD $1,625
2%
SARD $24,918
36%
SERD $15,021
22%
Active Loans (amounts in million)
Total: $69,336
CWRD $4,543
66%
EARD $97 1%
PARD $589 9%
SARD $800 12%
SERD $886 13%
Active Grants (amounts in million)
Total: $6,915
0
2,000
4,000
6,000
8,000
10,000
12,000
Actual
$ m
illio
n
Historical Loan Disbursements Performance (2012 - 2016)
2012 2013 2014 2015 2016
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
Actual
$ m
illio
n
Historical Loan Contract Awards/Commitments Performance (without Policy-Based Loans, 2012 - 2016)
2012 2013 2014 2015 2016
1,156
2,527
4,465
8,372
1,581
4,060
5,892
9,256
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
10,000
Qtr1 Qtr2 Qtr3 Qtr4
$ m
illio
n
2016 Contract Awards and Commitments (without Policy-Based Loans and Grants)
Projections Actual
1,706
3,711
5,820
9,896
1,815
4,273
6,439
10,995
-
2,000
4,000
6,000
8,000
10,000
12,000
Qtr1 Qtr2 Qtr3 Qtr4
$ m
illio
n
2016 Disbursement Performance1
(with Policy-Based Loans and Grants)
Projections Actual
3 3
10
6
8
10% 10%
33%
20%
27%
0%
5%
10%
15%
20%
25%
30%
35%
0
3
6
9
12
15
CWRD SARD EARD PARD SERD
Perc
enta
ge
Num
ber
Actual Problem Projects ADB: 30 projects
85% 87% 69%
65% 81% 80%
13% 12%
21% 24%
14% 15%
2% 1% 10% 11% 5% 5%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
CWRD SARD EARD PARD SERD ADB
Portfolio Performance Ratings
On Track Potential Problem Actual Problem
1
I. LoansA. Loan Portfolio
1 Active Loan Portfolio No.| $mn 573 | 55,317.2 594 | 57,358.5 624 | 60,333.6 657 | 66,675.1 696 | 69,336.2(a) Project Loans No.| $mn 523 | 50,074.6 539 | 52,319.0 572 | 54,942.3 593 | 56,976.9 625 | 60,304.7(b) Policy-Based Loans No.| $mn 32 | 3,743.9 31 | 2,690.0 26 | 2,744.7 29 | 5,418.3 28 | 3,415.6(c) Financial Intermediation Loans No.| $mn 15 | 1,194.8 20 | 1,863.6 16 | 1,464.7 19 | 2,039.2 20 | 2,595.0(d) Combined Project and Financial Intermediation Loans No.| $mn 3 | 303.9 4 | 485.9 4 | 485.4 6 | 435.0 9 | 708.1(e) Results-Based Lending No.| $mn 6 | 696.5 10 | 1,805.6 14 | 2,312.8
2 Average Age of the Active Loan Portfolio Years 3.3 3.3 3.4 3.5 3.6B. Start-Up Compliance
1 Loans Approved During the Year a No. | $mn 111 | 10,610.7 102 | 11,768.1 108 | 11,205.0 103 | 13,304.1 121 | 13,942.92 Loans Not Yet Signed No. 74 59 54 43 573 Loans Awaiting Effectiveness No. 19 25 26 38 324 Average Time from Approval to Signing Months 3.8 3.7 3.5 3.5 3.55 Months 3.4 3.4 3.4 3.4 3.26 No.| % 243 | 50.6 250 | 49.0 252 | 46.3 260 | 45.1 257 | 42.3
C. Financial Performance1 Contract/Commitment Achievement (without policy-based loans) $mn 6,587.8 5,777.2 7,591.7 7,450.3 8,153.22 Contract/Commitment Ratio b (without policy-based loans) % 24.2 19.7 24.3 22.9 23.73 Disbursement Achievement $mn 7,497.6 7,152.0 8,483.4 10,270.2 10,273.44 Disbursement Ratio c % 22.9 20.3 22.6 26.4 25.15 Loan Service Payments $mn 5,007.9 7,269.7 5,782.3 5,025.4 5,956.56 Net Resource Transfer $mn 2,489.7 (116.7) 2,701.0 5,244.9 4,317.0
D. Portfolio Ratingsd
1 On Track No.| % 397 | 68.6 463 | 79.0 478 | 80.2 464 | 75.8 511 | 80.32 Potential Problem No.| % 117 | 20.2 80 | 13.7 88 | 14.8 106 | 17.3 95 | 14.93 Actual Problem No.| % 65 | 11.2 43 | 7.3 30 | 5.0 42 | 6.9 30 | 4.7
E. Portfolio Supervision1 Average Supervision Intensity (staff-days/project) e days 23.4 21.8 20.6 21.4 19.72 Loans with Extensions No. 161 169 181 182 1873 Loan Cancellations $mn 468.7 1,155.0 732.9 700.4 952.1
II. Grants f
A. Grant Portfolio 1 Active Grant Portfolio No.| $mn 318 | 5,527.3 316 | 5,926.4 312 | 6,151.6 318 | 6,595.5 336 | 6,914.5
(a) Project Grants No.| $mn 304 | 5,212.6 304 | 5,740.2 305 | 6,019.2 314 | 6,507.1 330 | 6,850.3(b) Policy-Based Grants No.| $mn 14 | 314.7 12 | 186.3 7 | 132.5 4 | 88.4 6 | 64.2
2 Average Age of the Active Grant Portfolio Years 3.0 3.2 3.5 3.5 3.5 B. Start-Up Compliance
1 Grants Approved During the Year a No. | $mn 66 | 969.8 54 | 1,323.2 48 | 632.3 57 j | 898.0 j 67 | 1,077.42 Grants Not Yet Signed a No. 34 29 22 25 263 Grants Awaiting Effectiveness No. 4 8 6 16 204 Average Time from Approval to Signing Months 3.0 3.2 3.2 3.1 3.05 Months 2.0 2.2 2.3 2.4 2.46 No.| % 81 | 28.9 86 | 30.9 91 | 32.0 93 | 33.3 97 | 33.3
C. Financial Performance 1 Contract/Commitment Achievement (without policy-based grants) $mn 904.7 647.6 583.6 696.2 1102.82 Contract/Commitment Ratio b (without policy-based grants) % 31.6 21.3 19.7 22.7 30.73 Disbursement Achievement g $mn 673.2 696.1 571.9 681.4 721.94 Disbursement Ratio c % 20.8 20.0 14.4 17.1 17.35 Net Resource Transfer h $mn 541.6 581.6 438.0 509.8 472.86 Grant Cancellations $mn 49.5 134.8 37.7 20.3 70.7
III. Technical Assistance (includes nonsovereign TAs)1 Active TA Portfolio No.|$mn 991 i | 1,379.2 1,069 | 1,626.5 1,070 | 1,665.1 965 | 1,599.0 897 | 1,594.0 2 Average Time from Approval to Signing of TA Agreement Months 2.4 2.6 2.6 2.6 2.5
a Includes supplementary approvals.b Contract/Commitment Award Ratio is defined as the ratio of Contract Awarded/Actual Commitment during the year over the value available for contract/commitment awards at the beginning of the year.c Disbursement ratio is the ratio of total disbursement in a given year/period (including disbursements from newly approved during the year) over the undisbursed beginning balance (based on approval).d Covers all loan and grant projects (including cofinancing).e Includes grant and JFPR missions.f Exclude (i) loan-related grants approved prior to 31 Mar 2005; and (ii) one nonsovereign grant. g Excludes partially administered grants (GR0145-LAO, 0192-CAM, 0273-VAN, 0342-NEP, and 358-NEP) and manually-monitored grants.h Covers grants funded by ADF and Other Special Funds. i Excludes TA 7157-BHU closed through Oracle adjustment.j Excludes $1.0 million grant substitution from GR 0261-AFG funded by ADF to GR 0262-AFG funded by AITF value dated 08 December 2015. Approval on substitution was only advised on 02 February 2016
and not included in the 2015 year-end run of Grant Financial Information System.
ADB SOVEREIGN PORTFOLIO MANAGEMENT INDICATORS
UNIT 20162012 201520142013
Grants that Became Effective more than 90 Days after Signing
INDICATORS
Average Time from Signing to Effectivity Loans that Became Effective more than 90 Days after Signing
Average Time from Signing to Effectivity
2
SOVEREIGN LOANS APPROVED(1 January - 31 December 2016)
($ million)
DateProject Name Loan No. DMC OCR ADF Total Approved
SOVEREIGN1 Armenia-Georgia Border Regional Road (M6 Vanadzor-
Bagratashen) Improvement3449 ARM 50.00 - 50.00 28 Oct
2 Infrastructure Sustainability Support Program (Phase 2) 3453 ARM 90.00 - 90.00 10 NovSubtotal 140.00 - 140.00
3 Power Distribution Enhancement Investment Program – Tranche 1
3407 AZE 250.00 - 250.00 19 Jul
4 Water Supply and Sanitation Investment Program – Tranche 4 3411 AZE 75.00 - 75.00 9 Aug
5 Countercyclical Support Facility Program 3486 AZE 500.00 - 500.00 7 DecSubtotal 825.00 - 825.00
6 Second Small and Medium-Sized Enterprise Development 3367 BAN 200.00 - 200.00 19 Jan7 Railway Sector Investment Program – Tranche 4 3376 BAN 50.00 - 50.00 18 Mar8 Dhaka Water Supply Network Improvement 3397 BAN 275.00 - 275.00 24 Jun9 South Asia Subregional Economic Cooperation Chittagong-Cox's
Bazar Railway Phase 1 – Tranche 13438/3439 BAN 210.00 90.00 300.00 30 Sep
10 Natural Gas Infrastructure and Efficiency Improvement 3461/3462 BAN 100.00 67.00 167.00 18 Nov11 Skills for Employment Investment Program – Tranche 2 3468 BAN - 100.00 100.00 24 Nov12 Rural Infrastructure Maintenance Program 6007 BAN - 2.00 2.00 7 Jun13 City Region Development II 6010 BAN - 5.00 5.00 15 Dec
Subtotal 835.00 264.00 1,099.00
14 South Asia Subregional Economic Cooperation Transport, Trade Facilitation, and Logistics
3421 BHU - 14.61 14.61 31 Aug
Subtotal - 14.61 14.61
15 Decentralized Public Service and Financial Management Sector Development Program (Subprogram 2)
CAM 18 Aug
- Project Loan 3414 - 20.00 20.00 - Policy-Based Loan 3415 - 15.00 15.00
16 Upper Secondary Education Sector Development Program CAM 23 Sep- Policy-Based Loan 3426 - 15.00 15.00 - Project Loan 3427 - 30.00 30.00
17 Strengthening Public Financial Management Program (Subprogram 1)
CAM 26 Sep
- Policy-Based Loan 3428 - 26.50 26.50 - TA Loan 3429 - 3.50 3.50
18 Second Rural Water Supply and Sanitation Sector - Additional Financing
3433 CAM - 15.00 15.00 22 Sep
19 Provincial Roads Improvement - Additional Financing 3442 CAM - 6.00 6.00 18 Oct20 Inclusive Financial Sector Development Program
(Subprogram 1)3460 CAM - 40.00 40.00 17 Nov
21 Greater Mekong Subregion Health Security 3464 CAM - 21.00 21.00 22 NovSubtotal - 192.00 192.00
22 Disaster Resilience Program 3479 COO 10.00 - 10.00 2 DecSubtotal 10.00 - 10.00
23 Emergency Assistance for Recovery from Tropical Cyclone Winston
3403 FIJ 50.00 - 50.00 30 Jun
24 Urban Water Supply and Wastewater Management Investment Program – Tranche 1
3512 FIJ 42.11 - 42.11 20 Dec
Subtotal 92.11 - 92.11
25 Improving Domestic Resource Mobilization for Inclusive Growth Program (Subprogram 3)
3417/3418 GEO 50.00 50.00 100.00 31 Aug
26 Urban Services Improvement Investment Program – Tranche 6 3441 GEO 99.00 - 99.00 4 Oct
Subtotal 149.00 50.00 199.00
27 Uttar Pradesh Major District Roads Improvement 3386 IND 300.00 - 300.00 14 Apr28 Climate Adaptation in Vennar Subbasin in Cauvery Delta 3394 IND 100.00 - 100.00 7 Jun29 Bihar New Ganga Bridge 3396 IND 500.00 - 500.00 24 Jun
3
SOVEREIGN LOANS APPROVED(1 January - 31 December 2016)
($ million)
DateProject Name Loan No. DMC OCR ADF Total Approved
30 Kolkata Environmental Improvement Investment Program – Tranche 2
3413 IND 200.00 - 200.00 16 Aug
31 Visakhapatnam–Chennai Industrial Corridor Development Program
3424 IND 125.00 - 125.00 20 Sep
32 Visakhapatnam–Chennai Industrial Corridor Development Program – Tranche 1
3430 IND 245.00 - 245.00 26 Sep
33 Demand-Side Energy Efficiency Sector 3436 IND 200.00 - 200.00 30 Sep34 Madhya Pradesh District Roads II Sector 3437 IND 350.00 - 350.00 30 Sep35 Rajasthan Renewable Energy Transmission Investment Program
– Tranche 23482 IND 238.00 - 238.00 5 Dec
Subtotal 2,258.00 - 2,258.00
36 Stepping Up Investments for Growth Acceleration Program (Subprogram 2)
3402 INO 500.00 - 500.00 28 Jun
37 Flood Management in Selected River Basins Sector 3440 INO 108.70 - 108.70 30 Sep38 Fiscal and Public Expenditure Management Program
(Subprogram 1)3454 INO 500.00 - 500.00 10 Nov
39 Accelerating Infrastructure Delivery through Better Engineering Services
3455 INO 148.20 - 148.20 10 Nov
Subtotal 1,256.90 - 1,256.90
40 CAREC Corridors 1 and 6 Connector Road (Aktobe–Makat) Reconstruction
3416 KAZ 240.30 - 240.30 26 Aug
41 Supporting Resilience of Micro, Small, and Medium-Sized Enterprises Finance
3447 KAZ 200.00 - 200.00 27 Oct
Subtotal 440.30 - 440.30
42 Second Investment Climate Improvement Program (Subprogram 2)
3410 KGZ - 12.50 12.50 29 Jul
43 Toktogul Rehabilitation Phase 3 3422 KGZ - 60.00 60.00 8 Sep44 Central Asia Regional Economic Cooperation Corridors 1 and 3
Connector Road3432 KGZ - 58.39 58.39 27 Sep
Subtotal - 130.89 130.89
45 Road Sector Governance and Maintenance 3368 LAO - 27.00 27.00 28 Jan46 Second Strengthening Higher Education 3435 LAO - 16.45 16.45 29 Sep47 Greater Mekong Subregion Health Security 3465 LAO - 4.00 4.00 22 Nov
Subtotal - 47.45 47.45
48 Strengthening Institutional Framework and Management Capacity
3385 MON 35.00 - 35.00 31 Mar
49 Regional Improvement of Border Services 3387 MON - 27.00 27.00 22 Apr50 Southeast Gobi Urban and Border Town Development -
Additional Financing3388 MON - 19.43 19.43 22 Apr
Subtotal 35.00 46.43 81.43
51 Greater Mekong Subregion Health Security 3466 MYA - 12.00 12.00 22 Nov52 Equipping Youth for Employment 3472 MYA - 98.49 98.49 28 Nov53 Irrigated Agriculture Inclusive Development 3477 MYA - 75.00 75.00 28 Nov
Subtotal - 185.49 185.49
54 Supporting School Sector Development Plan 3452 NEP - 120.00 120.00 2 Nov55 South Asia Subregional Economic Cooperation Roads
Improvement3478 NEP - 186.80 186.80 1 Dec
Subtotal - 306.80 306.80
54 Post-Flood National Highways Rehabilitation 3378 PAK 196.90 - 196.90 29 Mar55 National Motorway M-4 Gojra–Shorkot–Khanewal Section -
Additional Financing3395 PAK 100.00 - 100.00 10 Jun
59 Public Sector Enterprises Reform Program (Subprogram 1) 3398/3399 PAK 200.00 100.00 300.00 28 Jun60 Second Power Transmission Enhancement Investment Program
– Tranche 13419/3420 PAK 115.00 10.00 125.00 31 Aug
56 Supporting Public–Private Partnership Investments in Sindh Province
3469 PAK 100.00 - 100.00 24 Nov
57 Pehur High Level Canal Extension 3470 PAK 86.41 - 86.41 24 Nov
44
SOVEREIGN LOANS APPROVED(1 January - 31 December 2016)
($ million)
DateProject Name Loan No. DMC OCR ADF Total Approved
61 National Disaster Risk Management Fund 3473/3474 PAK 75.00 125.00 200.00 23 Nov58 Access To Clean Energy Investment Program 3476 PAK 325.00 - 325.00 25 Nov62 Jalalpur Irrigation 6006 PAK 5.00 - 5.00 1 Feb63 Karachi Bus Rapid Transit 6008 PAK 9.70 - 9.70 29 Sep64 Peshawar Sustainable Bus Rapid Transit Corridor 6009 PAK 10.00 - 10.00 23 Nov
Subtotal 1,223.01 235.00 1,458.01
65 Social Protection Support - Additional Financing 3369 PHI 400.00 - 400.00 9 Feb66 Angat Water Transmission Improvement 3377 PHI 123.30 - 123.30 18 Mar67 Water District Development Sector 3389 PHI 60.00 - 60.00 22 Apr68 Local Government Finance and Fiscal Decentralization Reform
Program (Subprogram 2)3505 PHI 250.00 - 250.00 13 Dec
Subtotal 833.30 - 833.30
69 Highlands Region Road Improvement Investment Program – Tranche 3
3404/3408 PNG 70.41 38.90 109.31 19 Jul
70 Civil Aviation Development Investment Program – Tranche 3 3496/3497 PNG 213.00 35.00 248.00 8 DecSubtotal 283.41 73.90 357.31
71 Shandong Groundwater Protection 3400 PRC 150.00 - 150.00 29 Jun72 Henan Hebi Qihe River Environmental Improvement and
Ecological Conservation3401 PRC 150.00 - 150.00 29 Jun
73 Qinghai Haidong Urban–Rural Eco Development 3443 PRC 150.00 - 150.00 19 Oct74 Ningxia Liupanshan Poverty Reduction Rural Road Development 3444 PRC 100.00 - 100.00 21 Oct
75 Fujian Farmland Sustainable Utilization and Demonstration 3450 PRC 100.00 - 100.00 7 Nov76 Chongqing Integrated Logistics Demonstration 3459 PRC 150.00 - 150.00 14 Nov77 Shaanxi Accelerated Energy Efficiency and Environment
Improvement Financing3475 PRC 150.00 - 150.00 28 Nov
78 Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement
3485 PRC 150.00 - 150.00 6 Dec
79 Guangxi Regional Cooperation and Integration Promotion Investment Program – Tranche 1
PRC 12 Dec
- Project Loan 3501 66.42 - 66.42 - Financial Intermediation Loan 3508 63.58 - 63.58
80 Air Quality Improvement in the Greater Beijing-Tianjin-Hebei Region—China National Investment and Guaranty Corporation's Green Financing Platform
3504 PRC 499.60 - 499.60 12 Dec
81 Public-Private Partnerships Demonstration Program to Transform Delivery of Elderly Care Services in Yichang, Hubei
3506 PRC 50.00 - 50.00 12 Dec
Subtotal 1,779.60 - 1,779.60
82 Higher Education in the Pacific Investment Program – Tranche 2
3445 REG - 15.40 15.40 21 Oct
Subtotal - 15.40 15.40
83 Sustainable Transport Infrastructure Improvement Program 3392 SOL - 21.00 21.00 27 MaySubtotal - 21.00 21.00
84 Small and Medium-Sized Enterprises Line of Credit 3370 SRI 100.00 - 100.00 15 Feb85 Supporting Electricity Supply Reliability Improvement 3409 SRI 115.00 - 115.00 26 Jul86 Transport Project Preparatory Facility 3425 SRI - 24.42 24.42 22 Sep87 Local Government Enhancement Sector - Additional Financing 3431 SRI - 60.00 60.00 27 Sep
88 Capital Market Development Program 3446 SRI 250.00 - 250.00 26 Oct89 Green Power Development and Energy Efficiency Improvement
Investment Program – Tranche 23483/3484 SRI 95.00 55.00 150.00 5 Dec
Subtotal 560.00 139.42 699.42
90 Water Resources Management in Pyanj River Basin 3434 TAJ - 19.15 19.15 28 Sep91 Central Asia Regional Economic Cooperation Corridors 2, 5, and
6 (Dushanbe Kurgonteppa) Road3451 TAJ - 49.40 49.40 31 Oct
92 Investment Climate Reforms Program (Subprogram 2) 3513 TAJ - 30.76 30.76 22 Dec
5
SOVEREIGN LOANS APPROVED(1 January - 31 December 2016)
($ million)
DateProject Name Loan No. DMC OCR ADF Total Approved
Subtotal - 99.31 99.31
93 Dili to Baucau Highway 3456 TIM - 49.65 49.65 11 NovSubtotal - 49.65 49.65
94 Building Macroeconomic Resilience (Subprogram 1) 3393 TON - 3.00 3.00 30 May95 Outer Island Renewable Energy - Additional Financing 3509 TON - 2.50 2.50 14 Dec
Subtotal - 5.50 5.50
96 Small Business Finance 3405 UZB 100.00 - 100.00 30 Jun97 Tashkent Province Water Supply Development 3457 UZB - 120.90 120.90 11 Nov98 Horticulture Value Chain Development 3471 UZB - 154.00 154.00 25 Nov99 Kashkadarya Regional Road 3481 UZB 198.00 - 198.00 5 Dec
Subtotal 298.00 274.90 572.90
100 Greater Mekong Subregion Ben Luc–Long Thanh Expressway – Tranche 2
3391 VIE 286.00 - 286.00 20 May
101 Greater Mekong Subregion Health Security 3467 VIE - 80.00 80.00 22 Nov102 Second Secondary Education Sector Development Program VIE 8 Dec
- Policy-Based Loan 3493 - 50.00 50.00 - Project Loan 3494 - 50.00 50.00
103 Support to Border Areas Development 3499 VIE - 106.51 106.51 8 Dec104 Improving Public Expenditure Quality Program (Subprogram 1) 3502/3503 VIE 82.70 117.30 200.00 13 Dec
Subtotal 368.70 403.81 772.51
Total Amount 11,387.32 2,555.56 13,942.88
66
GRANTS APPROVED(1 January-31 December 2016)
($ million)
Grant Special DateProject Name No. DMC ADF Funds Source JFPR Others Source Total Approved
1 Preparation of Central Asia Regional Economic Cooperation Corridors 5 and 6 (Salang Corridor)
0490/0491 AFG 15.45 - - 15.92 AITF 31.37 26 Aug
2 Panj-Amu River Basin Sector 0506/0507 AFG 26.00 - - 50.00 European Union 76.00 26 Oct3 Road Asset Management 0508 AFG 25.50 - - - 25.50 31 Oct4 Energy Supply Improvement Investment Program –
Tranche 20521-0523 AFG 188.23 - - 226.77 AITF/PRC RPRF 415.00 5 Dec
Subtotal 255.18 - - 292.69 547.87
5 Skills for Employment Investment Program – Tranche 2 0517 BAN - - - 4.50 Switzerland 4.50 24 Nov6 Coastal Towns Environmental Infrastructure Project
(CTEIP)0524 BAN - - - 6.00 UCCRTF 6.00 5 Dec
Subtotal - - - 10.50 10.50
7 Air Transport Connectivity Enhancement - Additional Financing
0484 BHU 4.00 - - - 4.00 29 Jun
8 South Asia Subregional Economic Cooperation Transport, Trade Facilitation, and Logisticsa
0492 BHU 5.00 - - - 5.00 31 Aug
9 Thimphu Road Improvement 0499 BHU 4.26 - - - 4.26 29 SepSubtotal 13.26 - - - 13.26
10 Second Rural Water Supply and Sanitation Sector - Additional Financinga
0497 CAM - - - 1.50 BMGF 1.50 22 Sep
Subtotal - - - 1.50 1.50
11 Renewable Energy Sector - Additional Financing 0493 COO - - - 4.26 GEF 4.26 29 AugSubtotal - - - 4.26 4.26
12 Fiji Cyclone Emergency Response 0466 FIJ - 2.00 - - 2.00 24 Feb13 Urban Water Supply and Wastewater Management
Investment Program – Tranche 1a0531 FIJ - - - 31.04 GCF 31.04 20 Dec
Subtotal - 2.00 - 31.04 33.04
14 Visakhapatnam–Chennai Industrial Corridor Development Program – Tranche 1a
0495 IND - - - 5.00 UCCRTF 5.00 26 Sep
Subtotal - - - 5.00 5.00
15 Community-Focused Investments to Address Deforestation and Forest Degradation
0501 INO - - - 17.00 SCF-FIP 17.00 30 Sep
Subtotal - - - 17.00 17.00
16 Second Investment Climate Improvement Program (Subprogram 2)a
0487 KGZ 12.50 - - - 12.50 29 Jul
17 Toktogul Rehabilitation Phase 3a 0494 KGZ 50.00 - - - 50.00 8 Sep18 Central Asia Regional Economic Cooperation Corridors 1
and 3 Connector Roada0496 KGZ 36.72 - - - 36.72 27 Sep
Subtotal 99.22 - - - 99.22
19 South Tarawa Sanitation Improvement Sector - Additional Financing
0502 KIR 2.80 - - - 2.80 17 Oct
20 Road Rehabilitation - Additional Financing 0527 KIR 9.00 - - - 9.00 12 DecSubtotal 11.80 - - - 11.80
21 Greater Mekong Subregion Biodiversity Conservation Corridors - Additional Financing
0488 LAO - - - 12.84 SCF-FIP 12.84 9 Aug
22 Second Strengthening Higher Educationa 0500 LAO 23.47 - - - 23.47 29 Sep23 Second Strengthening Technical and Vocational
Education and Training0503 LAO 25.00 - - - 25.00 18 Oct
24 Greater Mekong Subregion Health Securitya 0516 LAO 8.00 - - - 8.00 22 NovSubtotal 56.47 - - 12.84 69.31
25 Kulhudhuffushi Harbor Expansion 0489 MLD 9.69 - - - 9.69 16 AugSubtotal 9.69 - - - 9.69
26 Dzud Disaster Response 0475 MON - 2.00 - - 2.00 6 Apr27 Strengthening Community Resilience to Dzud and Forest
and Steppe Fires9187 MON - - 3.00 - 3.00 14 Sep
28 Managing Soil Pollution in Ger Areas through Improved On-Site Sanitation
9189 MON - - 2.80 - 2.80 10 Nov
Subtotal - 2.00 5.80 - 7.80
29 Emergency Support for Chin State Livelihoods Restoration 9185 MYA - - 10.00 - 10.00 22 Apr
Subtotal - - 10.00 - 10.00
30 Fiscal Sustainability Reform Program 0473/0474 NAU 2.00 - - 1.89 Australia 3.89 21 MarSubtotal 2.00 - - 1.89 3.89
31 South Asia Subregional Economic Cooperation Power System Expansion - Additional Financing
0520 NEP - - - 20.00 SCF-SREP 20.00 29 Nov
32 Earthquake Emergency Assistance - Additional Financing 0529 NEP - - - 10.00 USAID 10.00 12 Dec
Subtotal - - - 30.00 30.00
7
GRANTS APPROVED(1 January-31 December 2016)
($ million)
Grant Special DateProject Name No. DMC ADF Funds Source JFPR Others Source Total Approved
33 National Motorway M-4 Gojra–Shorkot–Khanewal Section - Additional Financinga
0482 PAK - - - 34.00 United Kingdom 34.00 10 Jun
34 Supporting Public–Private Partnership Investments in Sindh Provincea
0518 PAK - - - 19.23 United Kingdom 19.23 24 Nov
35 National Disaster Risk Management Funda 0519 PAK - - - 3.36 Australia 3.36 23 NovSubtotal - - - 56.60 56.60
36 KALAHI–CIDSS National Community-Driven Development - Additional Financing
0472 PHI - - - 5.00 TYMTF 5.00 4 Mar
37 Water District Development Sectora 0477 PHI - - - 2.00 UEIF 2.00 22 AprSubtotal - - - 7.00 7.00
38 Highlands Region Road Improvement Investment Program – Tranche 3a
0485 PNG - - - 19.99 European Union 19.99 19 Jul
Subtotal - - - 19.99 19.99
39 Higher Education in the Pacific Investment Program – Tranche 2a
0505 REG - - - 1.50 CEF 1.50 21 Oct
Subtotal - - - 1.50 1.50
40 Third Drought Disaster Response 0476 RMI - 0.20 - - 0.20 27 FebSubtotal - 0.20 - - 0.20
41 Fiscal Resilience Improvement Program (Subprogram 1) 0525 SAM 5.00 - - - 5.00 7 DecSubtotal 5.00 - - - 5.00
42 Economic Growth and Fiscal Reform Program 0478 SOL 5.00 - - - 5.00 27 May43 Solar Power Development 0514/0515 SOL 2.24 - - 6.20 SCF-SREP 8.44 21 Nov
Subtotal 7.24 - - 6.20 13.44
44 Sri Lanka Flood and Landslide Disaster Response 0481 SRI - 2.00 - - 2.00 9 Jun45 Supporting Electricity Supply Reliability Improvementa SRI 26 Jul
- Renewable Energy Micro-Grid 0486 - - - 1.80 CEF 1.80 - Productive Energy Use for Small Isolated Island and Rural Communities
9186 - - 2.00 - 2.00
Subtotal - 2.00 2.00 1.80 5.80
46 Water Resources Management in Pyanj River Basina 0498/9188 TAJ 5.85 - 3.00 - 8.85 28 Sep47 Central Asia Regional Economic Cooperation Corridors 2,
5, and 6 (Dushanbe–Kurgonteppa) Roada0509/0510 TAJ 15.80 - - 2.00 CEF 17.80 31 Oct
48 Investment Climate Reforms Program (Subprogram 2)a 0530 TAJ 19.24 - - - 19.24 22 DecSubtotal 40.89 - 3.00 2.00 45.89
49 Road Network Upgrading - Additional Financing 0504 TIM - - - 22.62 European Union 22.62 19 OctSubtotal - - - 22.62 22.62
50 Nuku'alofa Urban Development Sector - Additional Financing
0265 TON - - - 0.23 Australia 0.23 7 Dec
51 Building Macroeconomic Resilience (Subprogram 1)a 0479 TON 3.00 - - - 3.00 30 May52 Outer Island Renewable Energy - Additional Financinga 0528 TON 2.50 - - - 2.50 14 Dec
Subtotal 5.50 - - 0.23 5.73
53 Outer Island Maritime Infrastructure TUV 16 Nov- Regular ADF 0511 8.30 - - - 8.30 - Disaster Response Facility 0512 3.00 - - - 3.00 - Global Environment Facility 0513 - - - 0.50 GEF 0.50
Subtotal 11.30 - - 0.50 11.80
54 Port Vila Urban Development - Additional Financing 0526 VAN - - - 2.87 GEF 2.87 8 DecSubtotal - - - 2.87 2.87
55 El-Niño Disaster Response 0480 VIE - 3.00 - - 3.00 1 Jun56 Greater Mekong Subregion Flood and Drought Risk
Management and Mitigation - Additional Financing0483 VIE - - - 1.80 IDRMF 1.80 15 Jan
Subtotal - 3.00 - 1.80 4.80
Total 517.55 9.20 20.80 529.82 1,077.37
a Processed in conjunction with a loan.
- = nil, AITF = Afghanistan Infrastructure Trust Fund, ADF = Asian Development Fund, BMGF = Bill and Melinda Gates Foundation, CEF = Clean Energy Fund, GEF = Global Environment Facility, IDRMF = Integrated Disaster Risk Manage Fund, JFPR = Japan Fund for Poverty Reduction, PRC RPRF = People's Republic of China Regional Cooperation and Poverty Reduction Fund, SCF-FIP = Strategic Climate Fund-Forest Investment Program, SCF-SREP = Strategic Climate Fund-Scaling Up Renewable Energy Program in Low Income Countries, TYMTF = Typhoon Yolanda Multi-Donor Trust Fund, UCCRTF = Urban Climate Change Resilience Trust Fund, UEIF = Urban Environmental Infrastructure Fund, USAID = United States Agency for International Development.
88
TECHNICAL ASSISTANCE GRANTS APPROVED(1 January-31 December 2016)
($ thousand)
Type No. TASF CCF FSDPSF RCIF JFPR Others Total
305 161,800.67 1,407.50 3,075.00 2,750.00 39,100.00 108,923.11 317,056.28 Project Preparatory (PP) 98 56,015.00 70.00 225.00 - 6,700.00 24,449.49 87,459.49 Capacity Development (CD) 138 62,705.67 1,337.50 2,850.00 2,750.00 24,200.00 77,314.33 171,157.50 Policy and Advisory (PA) 53 27,735.00 - - - 6,200.00 6,659.29 40,594.29 Research and Development (RD) 16 15,345.00 - - - 2,000.00 500.00 17,845.00
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
1 Energy Development 2014-2023 (Supplementary) 8509 AFG PP 400.00 - - - - - 400.00 14 Jul2 Arghandab Integrated Water Resources Development
Investment Program9273 AFG PP 100.00 - - - 2,000.00 - 2,100.00 8 Dec
3 Supporting Natural Resources Operations (Supplementary) 7994 AFG CD - - - - - 675.00 675.00 11 MaySubtotal 500.00 - - - 2,000.00 675.00 3,175.00
4 Second Water Supply and Sanitation Sector 9254 ARM PP 400.00 - - - 2,000.00 - 2,400.00 5 Dec5 Supporting Implementation of Phase 2 of the Infrastructure
Sustainability Support Program9226 ARM PA 500.00 - - - - - 500.00 10 Nov
Subtotal 900.00 - - - 2,000.00 - 2,900.00
6 Shah Deniz Stage II Investment Plan 9106 AZE PP 1,000.00 - - - - - 1,000.00 26 Apr7 Railway Sector Development Program 9154 AZE PP 1,000.00 - - - - - 1,000.00 4 Jul8 Preparing a Power Sector Financial Recovery Plan 9151 AZE PA 1,200.00 - - - - - 1,200.00 5 Aug9 Improving Public Sector Efficiency 9259 AZE PA 1,200.00 - - - - - 1,200.00 7 Dec
Subtotal 4,400.00 - - - - - 4,400.00
10 Bangladesh Power System Enhancement and Efficiency Improvement
9083 BAN PP 225.00 - - - - - 225.00 9 Mar
11 Market and Value Chain Infrastructure Development 9146 BAN PP 225.00 - - - - - 225.00 28 Jul12 Urban Primary Health Care Services Delivery - Additional
Financing9152 BAN PP 700.00 - - - - 150.00 850.00 5 Aug
13 Information Technology Parks for Employment and Innovation 9160 BAN PP 225.00 - - - - - 225.00 24 Aug14 Khulna 800 MW LNG Based Power Plant 9164 BAN PP 225.00 - - - - - 225.00 1 Sep15 Supporting Fourth Primary Education Development Program 9275 BAN PP - - - - 800.00 - 800.00 13 Dec16 Ganges-Kobadak Irrigation Modernization 9277 BAN PP 225.00 - - - - - 225.00 14 Dec17 City Region Development II 9283 BAN PP 400.00 - - - - 212.50 612.50 15 Dec18 Capacity Building for Portfolio Management (Supplementary) 8426 BAN CD 225.00 - - - - - 225.00 1 Jun19 Enabling Poor Women's Benefits from Enhanced Access to
Energy in Hatiya Island (Supplementary)8927 BAN CD - - - - - 439.00 439.00 10 Nov
20 Strengthening Capacities of Small and Medium-Sized Enterprise Stakeholders to Access Bank Financing and Services
9068 BAN CD - - - - 2,000.00 - 2,000.00 19 Jan
21 Capacity Development for Project Implementation Management
9193 BAN CD 1,000.00 - - - - - 1,000.00 30 Sep
22 Support to Primary Education Development 9276 BAN CD 300.00 - - - - - 300.00 13 Dec23 Enhancing the Institutional Capacity of the Anti-Corruption
Commission9285 BAN CD 500.00 - - - - - 500.00 15 Dec
Subtotal 4,250.00 - - - 2,800.00 801.50 7,851.50
24 Improved Urban Environmental Infrastructure (Supplementary)
8551 BHU PP 200.00 - - - - - 200.00 8 Nov
25 Amochhu Land Development and Township 9140 BHU PP 500.00 - - - - - 500.00 22 Jul26 Education and Skills Development 9281 BHU PP 225.00 - - - - - 225.00 15 Dec27 Supporting Implementation of Strengthening Economic
Management Program II (Supplementary)8901 BHU CD 110.00 - - - - - 110.00 20 Jun
28 Climate-Resilient Hazelnut Value Chain 9092 BHU CD - - - - - 1,300.00 1,300.00 11 Apr29 Enhancing Competitiveness of High-Value Agriculture and
Artisan Products Value Chains9270 BHU CD 500.00 - - - - - 500.00 9 Dec
Subtotal 1,535.00 - - - - 1,300.00 2,835.00
30 Second Road Asset Management (Supplementary) 8784 CAM PP 350.00 - - - - - 350.00 31 Mar31 Strengthening Public Financial Management Program 9069 CAM PP 600.00 - - - - - 600.00 14 Jan32 Tonle Sap Poverty Reduction and Smallholder Development -
Additional Financing9167 CAM PP 425.00 - - - - 150.00 575.00 14 Sep
33 Third Rural Water Supply and Sanitation Services Sector Development Program
9199 CAM PP 1,000.00 - - - - - 1,000.00 7 Oct
34 Second Integrated Urban Environmental Management in the Tonle Sap Basin
9203 CAM PP 50.00 - - - - 1,000.00 1,050.00 14 Oct
35 Mainstreaming Climate Resilience into Development Planning (Supplementary)
8179 CAM CD - - - - - 4,000.00 4,000.00 15 Jan
36 Second Rural Water Supply and Sanitation Sector - Additional Financing
9182 CAM CD - - - - 2,000.00 - 2,000.00 22 Sep
9
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
37 Implementing the Inclusive Financial Sector Development Program
9232 CAM CD 600.00 - - - - - 600.00 17 Nov
38 Accelerating Policy Reforms in Secondary Education 9178 CAM PA 1,000.00 - - - - - 1,000.00 23 SepSubtotal 4,025.00 - - - 2,000.00 5,150.00 11,175.00
39 East-West Highway (Khevi–Ubisa Section) Improvement 9211 GEO PP 1,000.00 - - - - - 1,000.00 21 Oct40 Livable Urban Areas: Integrated Urban Plans for Balanced
Regional Development9220 GEO PA 1,000.00 - - - - - 1,000.00 4 Nov
Subtotal 2,000.00 - - - - - 2,000.00
41 Madhya Pradesh Urban Services Improvement Program (Supplementary)
8816 IND PP 560.00 - - - - - 560.00 9 Dec
42 State-Level Support for National Flagship Urban Programs (Supplementary)
9022 IND PP 1,500.00 - - - - - 1,500.00 11 Nov
43 Supporting Skill Development in Himachal Pradesh (Supplementary)
9060 IND PP 225.00 - - - - - 225.00 17 Jun
44 Interstate Natural Gas Pipeline Investment Program 9076 IND PP 225.00 - - - - - 225.00 8 Feb45 Demand-Side Energy Efficiency Investment 9081 IND PP - - - - - 1,150.00 1,150.00 23 Feb46 Assam Power Transmission Improvement 9240 IND PP 225.00 - - - - - 225.00 24 Nov47 Madhya Pradesh Skills Development 9253 IND PP 225.00 - - - - - 225.00 1 Dec48 Madhya Pradesh Transmission System Expansion and
Strengthening9260 IND PP 225.00 - - - - - 225.00 2 Dec
49 Maharashtra Feeder Separation and High Voltage Distribution System
9282 IND PP 225.00 - - - - - 225.00 15 Dec
50 Transmission Improvement Projects in Odisha and Tamil Nadu
9284 IND PP 225.00 - - - - - 225.00 19 Dec
51 Capacity Development for Project Implementation (Supplementary)
7593 IND CD 750.00 - - - - - 750.00 12 Sep
52 Strengthening Bridge Operation and Management 9125 IND CD 900.00 - - - - - 900.00 24 Jun53 Strengthening Climate Change Resilience in Urban India -
Strengthening Smart Water Management and Urban Climate Change Resilience in Tamil Nadu (Subproject 1)
9129 IND CD - - - - - 1,500.00 1,500.00 4 Jul
54 Strengthening Financial Inclusion through Responsible Finance Practices
9133 IND CD 500.00 - 250.00 - - - 750.00 8 Jul
55 Strengthening Climate Resilience of Kolkata City through Improved Planning and Disaster Risk Management
9157 IND CD - - - - - 1,000.00 1,000.00 16 Aug
56 Capacity Development for Industrial Corridor Management in Andhra Pradesh
9173 IND CD 1,000.00 - - - - - 1,000.00 20 Sep
57 Solar Rooftop Investment Program 9187 IND CD - - - - - 5,000.00 5,000.00 30 Sep58 Strengthening Climate Change Resilience in Urban India -
Supporting Climate Change-Resilient Smart Cities Mission Projects (Subproject 2)
9257 IND CD - - - - - 2,500.00 2,500.00 5 Dec
Subtotal 6,785.00 - 250.00 - - 11,150.00 18,185.00
59 Eastern Indonesia Sustainable Energy Access Sector 9082 INO PP - - - - - 1,400.00 1,400.00 2 Mar60 Banten and South Sulawesi Wind Power Development 9104 INO PP - - - - - 500.00 500.00 8 Apr61 Affordable Healthcare Network Study 9107 INO PP 225.00 - - - - - 225.00 3 May62 Pilot Carbon Capture and Storage Activity in the Natural Gas
Processing Sector9189 INO PP - - - - - 500.00 500.00 29 Sep
63 Sewerage System Development 9198 INO PP 1,160.00 - - - - - 1,160.00 7 Oct64 Sustainable Infrastructure Assistance Program -
Strengthening Fiscal Risk Management of Accelerated Infrastructure Delivery (Subproject 9)
9109 INO CD - - - - - 1,000.00 1,000.00 6 May
65 Sustainable Infrastructure Assistance Program - Strengthening Verification in Results-Based Programs in Indonesia's Power Sector (Subproject 8)
9113 INO CD - - - - - 500.00 500.00 16 May
66 Sustainable Infrastructure Assistance Program - Improving Multimodal Connectivity to Support Integrated Land and Sea Tollway (Subproject 7)
9116 INO CD - - - - - 1,250.00 1,250.00 16 May
67 Strengthening Performance Management System in the Ministry of National Development Planning (BAPPENAS)
9269 INO CD 225.00 - - - - - 225.00 7 Dec
68 Sustainable and Inclusive Energy Program (Supplementary) 8826 INO PA - - - - - 537.38 537.38 28 Jan69 Strengthening Knowledge Sharing in Indonesia
(Supplementary)8858 INO PA - - - - - 1,006.92 1,006.92 22 Nov
Subtotal 1,610.00 - - - - 6,694.29 8,304.29
70 Road Maintenance Sustainability 9134 KAZ PP 1,220.00 - - - - - 1,220.00 14 Jul71 Strengthening Micro, Small, and Medium-Sized Enterprise
Finance9214 KAZ CD - - 500.00 - - - 500.00 27 Oct
Subtotal 1,220.00 - 500.00 - - - 1,720.00
72 Second Investment Climate Improvement Program (Supplementary)
8721 KGZ PP 500.00 - - - - - 500.00 5 Apr
73 Second Issyk-kul Sustainable Development 9169 KGZ PP 650.00 - - - - - 650.00 14 Sep74 Skilling and Entrepreneurship for Inclusive Growth Sector
Development Program9212 KGZ PP 750.00 - - - - - 750.00 22 Oct
1010
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
75 Water Supply and Sanitation Strategy (Supplementary) 8375 KGZ CD - - - - - 50.00 50.00 17 Mar76 Accession to the Eurasian Economic Union—Capturing the
Opportunities and Addressing the Risks (Supplementary)8978 KGZ PA - - - - - 200.00 200.00 17 Nov
Subtotal 1,900.00 - - - - 250.00 2,150.00
77 South Tarawa Water Supply 9200 KIR PP 800.00 - - - - 150.00 950.00 7 Oct78 Enhancing Economic Competitiveness through State-Owned
Enterprise Reform (Supplementary)8478 KIR CD 30.00 - - - - - 30.00 4 Oct
Subtotal 830.00 - - - - 150.00 980.00
79 Strengthening Capacity to Develop the Employment Service System
9115 LAO CD - - - - 1,500.00 - 1,500.00 13 May
80 Strengthening Capacity for Health Sector Governance Reforms
9190 LAO CD - - - - 2,000.00 - 2,000.00 29 Sep
81 Workshop for Selection and Monitoring of a Biodiversity Offset for the Nam Ngiep 1 Hydropower Project
9222 LAO CD 70.00 - - - - - 70.00 7 Nov
Subtotal 70.00 - - - 3,500.00 - 3,570.00
82 Sustainable Harbor Operation and Maintenance 9155 MLD CD 500.00 - - - - - 500.00 16 AugSubtotal 500.00 - - - - - 500.00
83 Sustaining Access to and Quality of Education during Economic Difficulties
9216 MON PP - - - - 800.00 - 800.00 3 Nov
84 Upscaling Renewable Energy Sector 9224 MON PP - - - - - 1,500.00 1,500.00 9 Nov85 Sustainable Tourism Development 9230 MON PP - - - - 1,100.00 - 1,100.00 14 Nov86 Management and Reuse of Sewage Sludge from On-Site
Sanitation Facilities and Decentralized Wastewater Treatment Plants
9100 MON CD - - - - - 1,000.00 1,000.00 22 Apr
87 Strengthening of Public Procurement for Improved Project Implementation
9158 MON CD 750.00 - - - - - 750.00 19 Aug
88 Supporting Financial Sector Development and Stability 9180 MON CD 1,250.00 - - - - 300.00 1,550.00 26 Sep89 Gender-Responsive Sector and Local Development Policies
and Actions9201 MON CD - - - - 700.00 - 700.00 5 Oct
90 Conservation of Forest Genetic Resources 9233 MON CD - - - - 500.00 - 500.00 18 Nov91 Intelligent Transport Systems Development for Mongolia 9131 MON PA - - - - - 500.00 500.00 1 Jul92 Development of Road Safety Policy and Action Plan 9137 MON PA 1,000.00 - - - - - 1,000.00 19 Jul93 Macroeconomic Advisory Support 9261 MON PA 1,000.00 - - - - - 1,000.00 8 Dec
Subtotal 4,000.00 - - - 3,100.00 3,300.00 10,400.00
94 Irrigation Command Area Development (Supplementary) 8583 MYA PP - - - - - 500.00 500.00 18 Jan95 Third Greater Mekong Subregion Corridor Towns
Development (Supplementary)8758 MYA PP - - - - - 125.00 125.00 31 Oct
96 Power Network Development 9179 MYA PP 1,500.00 - - - - - 1,500.00 26 Sep97 Rural Roads and Access 9184 MYA PP 1,000.00 - - - - - 1,000.00 29 Sep98 Environmental Safeguard Institutional Strengthening
(Supplementary)8786 MYA CD 500.00 - - - - - 500.00 5 Dec
99 Strengthening Law, Regulation, and the Legal Profession for a Better Investment Climate (Supplementary)
9026 MYA CD 500.00 - - - - - 500.00 24 Oct
100 Capacity Development for Project Implementation 9074 MYA CD - - - - 2,000.00 - 2,000.00 29 Jan101 Rural Productivity and Ecosystems Services Enhanced in
Central Dry Zone Forest Reserves9248 MYA CD - - - - - 4,790.00 4,790.00 28 Nov
102 Support for Post-Primary Education Development (Supplementary)
8385 MYA PA 700.00 - - - - - 700.00 18 Jan
Subtotal 4,200.00 - - - 2,000.00 5,415.00 11,615.00
103 Strengthening Financial Inclusion and Financial Sector Development
9143 NAU CD - - 350.00 - - - 350.00 25 Jul
Subtotal - - 350.00 - - - 350.00
104 Agriculture Sector Development Program (Supplementary) 8690 NEP PP 200.00 - - - - - 200.00 2 Jun105 Power Transmission and Distribution Efficiency Enhancement 9144 NEP PP - - - - - 1,500.00 1,500.00 22 Jul106 Second Kathmandu Valley Water Supply Improvement 9171 NEP PP 1,000.00 - - - - - 1,000.00 15 Sep107 Capacity Strengthening for Sustainable Road Transport
(Supplementary)8413 NEP CD 500.00 - - - - - 500.00 14 Jul
108 Support for Project Implementation of the Nepal Earthquake Rehabilitation and Reconstruction Program (Supplementary)
8910 NEP CD - - - - - 600.00 600.00 4 Mar
109 Supporting Policies and Implementation in the School Sector 9215 NEP CD 500.00 - - - - - 500.00 2 Nov110 Hydroelectricity Financing 9280 NEP CD 225.00 - - - - - 225.00 14 Dec111 Institutional and Legal Support for Improved Water
Management Systems in Nepal and Formation of the Bagmati River Basin Organization (Supplementary)
8500 NEP PA 500.00 - - - - - 500.00 8 Nov
112 Strengthening Subnational Public Management 9150 NEP PA 500.00 - - - - - 500.00 4 AugSubtotal 3,425.00 - - - - 2,100.00 5,525.00
11
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
113 Punjab Intermediate Cities Improvement Investment Program (Supplementary)
8683 PAK PP 500.00 - - - - - 500.00 18 Feb
114 Power Transmission Enhancement Investment Program II (Supplementary)
8818 PAK PP 600.00 - - - - - 600.00 24 Nov
115 Central Asia Regional Economic Cooperation Corridor Development Investment Program (Supplementary)
8914 PAK PP 200.00 - - - - - 200.00 17 Nov
116 Central Asia Regional Economic Cooperation Railway Connectivity Investment Program
9153 PAK PP 1,000.00 - - - - - 1,000.00 10 Aug
117 Hydropower Development Investment Program 9185 PAK PP 1,750.00 - - - - - 1,750.00 29 Sep118 Khyber Pakhtunkhwa Provincial Roads Improvement 9194 PAK PP 1,000.00 - - - - - 1,000.00 30 Sep119 Enhancing Public–Private Partnerships in Pakistan
(Provincial Support)9239 PAK CD - - - - - 4,750.53 4,750.53 24 Nov
120 Capacity Building of Disaster Risk Management Institutions 9246 PAK CD 1,000.00 - - - - - 1,000.00 23 Nov121 Access to Clean Energy Investment Program 9247 PAK CD 750.00 - - - - - 750.00 25 Nov122 Institutional Transformation of the Punjab Irrigation
Department to a Water Resources Department9255 PAK CD 500.00 - - - 2,000.00 - 2,500.00 5 Dec
123 Scoping Potential Economic Corridors in Pakistan 9094 PAK PA - - - - - 215.00 215.00 16 Mar124 Education Sector Assessment 9207 PAK PA 225.00 - - - - - 225.00 14 Oct125 Provincial Strategy for Inclusive and Sustainable Urban
Growth9223 PAK PA 400.00 - - - 2,000.00 - 2,400.00 7 Nov
Subtotal 7,925.00 - - - 4,000.00 4,965.53 16,890.53
126 Secondary Education Support Program 9071 PHI PP 1,300.00 - - - - - 1,300.00 28 Jan127 Employment Facilitation for Inclusive Growth (Supplementary) 8335 PHI CD 70.00 - - - - - 70.00 18 Jul128 Water District Development Sector 9103 PHI CD - - - - - 1,000.00 1,000.00 22 Apr129 Financial Inclusion Framework Strengthening 9166 PHI CD 600.00 - - - - - 600.00 31 Aug130 Strengthening Social Protection Reforms 9079 PHI PA 1,000.00 - - - - - 1,000.00 9 Feb131 Strengthening Tax and Fiscal Policy Capacity for Inclusive
Growth9250 PHI PA 2,000.00 - - - - - 2,000.00 29 Nov
Subtotal 4,970.00 - - - - 1,000.00 5,970.00
132 Multipartner Financing Facility for the Highlands Highway 9117 PNG PP 1,500.00 - - - - - 1,500.00 13 May133 Supporting Public Financial Management (Phase 3) 9209 PNG CD 1,000.00 - - - - - 1,000.00 19 Oct
Subtotal 2,500.00 - - - - - 2,500.00
134 Heilongjiang Coal-Rich Cities Redevelopment (Supplementary)
8992 PRC PP - - 225.00 - - - 225.00 10 Oct
135 Guizhou High Efficiency Water Utilization Demonstration in Rocky Desertification Area
9072 PRC PP 500.00 70.00 - - - - 570.00 29 Jan
136 Guangxi Modern Technical and Vocational Education and Training Development Program
9096 PRC PP 500.00 - - - - - 500.00 18 Apr
137 Guangxi Regional Cooperation and Integration Promotion Investment Program
9120 PRC PP 950.00 - - - - - 950.00 7 Jun
138 Xinjiang Hetian Comprehensive Urban Development and Environmental Improvement
9141 PRC PP 750.00 - - - - - 750.00 25 Jul
139 Green Financing Platform for Accelerated Air Quality Improvement in the Greater Beijing-Tianjin-Hebei Region
9142 PRC PP 500.00 - - - - - 500.00 25 Jul
140 Qingdao Rural Waste-to-Energy 9186 PRC PP 500.00 - - - - - 500.00 29 Sep141 Shanxi Inclusive Agricultural Value Chain Development 9206 PRC PP 500.00 - - - - - 500.00 14 Oct142 Shandong Spring City Green Modern Trolley Bus
Demonstration9208 PRC PP 500.00 - - - - - 500.00 14 Oct
143 Hubei Yichang Comprehensive Elderly Care Demonstration 9237 PRC PP 500.00 - - - - - 500.00 23 Nov144 Jiaozuo National Pilot Project for the Standardization of
Public Employment Services9114 PRC CD 400.00 - - - - - 400.00 13 May
145 Capacity Building on Operational Knowledge 9165 PRC CD 800.00 - - - - - 800.00 29 Aug146 Strengthening Capacity in the Implementation of the Green
Financing Platform for the Greater Beijing–Tianjin–Hebei Region
9251 PRC CD - - - - - 1,000.00 1,000.00 29 Nov
147 Modeling Urban Low-Carbon Development in Xiangtan (Supplementary)
8948 PRC PA 5.00 - - - - - 5.00 25 Jul
148 Supporting the Reform of the Role of the People's Bank of China
9091 PRC PA 300.00 - - - - - 300.00 8 Apr
149 National Biomass Heat Supply Development Strategy 9112 PRC PA 400.00 - - - - - 400.00 13 May150 Study of the Belt and Road Initiative 9124 PRC PA 400.00 - - - - - 400.00 22 Jun151 Strategies for Involving Social Organizations in Social
Assistance9126 PRC PA 400.00 - - - - - 400.00 27 Jun
152 Rural Economic Transformation and Upgrading by the Integration with Internet Plus
9132 PRC PA 400.00 - - - - - 400.00 11 Jul
153 Facility for Strengthening Policy Reform and Capacity Building
9138 PRC PA 800.00 - - - - - 800.00 19 Jul
154 Poverty Reduction in Liupanshan, Ningxia Hui Autonomous Region
9145 PRC PA 400.00 - - - - - 400.00 25 Jul
155 Mobilizing Pension Fund Financing for Public–Private Partnerships
9163 PRC PA 400.00 - - - - - 400.00 31 Aug
1212
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
156 Remediation of Heavy Metal Contamination in Farmlands of Hunan Province
9177 PRC PA 400.00 - - - - - 400.00 26 Sep
157 Development of Geriatric Nursing Policy Principles and Training Program in Liaoning Province
9188 PRC PA 400.00 - - - - - 400.00 29 Sep
158 Research on Innovative Mechanism for Open Agricultural Investment
9195 PRC PA 400.00 - - - - - 400.00 5 Oct
159 Enhancing Competition in Public Service Delivery 9196 PRC PA 600.00 - - - - - 600.00 5 Oct160 Study on Natural Resource Asset Appraisal and Management
System for the National Key Ecological Function Zones9219 PRC PA 400.00 - - - - - 400.00 28 Oct
161 Vocational Education-Enterprise Collaboration for Student Employment-Based Poverty Reduction in Gansu
9228 PRC PA 400.00 - - - - - 400.00 14 Nov
162 Creating Enabling Environments for Gradual Rural–Urban Migration and Urban Settlements Development in Chuxiong Yi Autonomous Prefecture
9241 PRC PA 400.00 - - - - - 400.00 25 Nov
Subtotal 12,905.00 70.00 225.00 - - 1,000.00 14,200.00
163 Majuro Power Network Strengthening 9225 RMI CD - - - - - 690.00 690.00 9 NovSubtotal - - - - - 690.00 690.00
164 Promoting Economic Use of Customary Land, Phase III (Supplementary)
8481 SAM CD 100.00 - - - - - 100.00 21 Dec
165 Ports Development Master Plan (Supplementary) 8889 SAM PA 750.00 - - - - - 750.00 14 SepSubtotal 850.00 - - - - - 850.00
166 Strengthening the Capacity of the Ministry of Infrastructure Development (MID)
9119 SOL CD - - - - - 4,500.00 4,500.00 27 May
167 Strengthening Solomon Islands’ Maritime Safety and Establishing the Solomon Islands Maritime Safety Authority
9127 SOL CD 800.00 - - - - - 800.00 29 Jun
Subtotal 800.00 - - - - 4,500.00 5,300.00
168 Colombo Suburban Railway (Supplementary) 9021 SRI PP 225.00 - - - - - 225.00 15 Nov169 Wind Power Generation 9085 SRI PP - - - - - 2,000.00 2,000.00 18 Mar170 Capital Market Development Program 9105 SRI PP 500.00 - - - - - 500.00 20 Apr171 Solar Rooftop Power Generation 9278 SRI PP 225.00 - - - - - 225.00 14 Dec172 Cluster Development and Small and Medium-Sized
Enterprise Finance Innovation9080 SRI CD - - - - 2,000.00 - 2,000.00 15 Feb
173 Mobilizing Finance for Sri Lanka 9102 SRI CD - - 500.00 - - - 500.00 22 Apr174 Developing the Capital Market 9213 SRI CD 750.00 - 750.00 - 500.00 - 2,000.00 26 Oct175 National Port Master Plan 9161 SRI PA - - - - 1,500.00 - 1,500.00 29 Aug
Subtotal 1,700.00 - 1,250.00 - 4,000.00 2,000.00 8,950.00
176 CAREC Corridors 2, 5, and 6 Road (Dushanbe–Kurgonteppa) (Supplementary)
8945 TAJ PP 500.00 - - - - - 500.00 12 Apr
177 Achieving Food Security through Climate Resilience Dairy Value Chain Development
9268 TAJ PP 500.00 - - - - - 500.00 9 Dec
178 Water Resources Management in Pyanj River Basin 9183 TAJ CD - - - - 2,000.00 - 2,000.00 28 Sep179 Investment Climate Reforms (Supplementary) 8557 TAJ PA 600.00 - - - - - 600.00 23 Jan
Subtotal 1,600.00 - - - 2,000.00 - 3,600.00
180 Strengthening Integrated Water Resource Planning and Management at River Basin Level
9204 THA CD - - - - 1,000.00 - 1,000.00 14 Oct
Subtotal - - - - 1,000.00 - 1,000.00
181 Electricity System Strengthening and Sustainability Program 9075 TIM PP 1,000.00 - - - - - 1,000.00 29 Jan182 Capacity for Regional Economic Integration 9070 TIM CD 500.00 - - 500.00 - - 1,000.00 28 Jan183 Fiscal Policy for Improved Service Delivery 9122 TIM PA 750.00 - - - - - 750.00 17 Jun184 Support for Preparation of a National Coffee Sector
Development Plan for Timor-Leste9264 TIM PA 225.00 - - - - - 225.00 5 Dec
Subtotal 2,475.00 - - 500.00 - - 2,975.00
185 Power Sector Development 9175 TKM PP 225.00 - - - - - 225.00 22 Sep186 Modernization of Sanitary and Phytosanitary Measures for
Food Safety9084 TKM PA 225.00 - - - - - 225.00 11 Mar
Subtotal 450.00 - - - - - 450.00
187 Institutional Strengthening of the Ministry of Finance and Economic Development (Supplementary)
8100 TUV CD - - - - - 217.00 217.00 2 Jun
Subtotal - - - - - 217.00 217.00
188 Power Generation Efficiency Improvement 9099 UZB PP 1,500.00 - - - - - 1,500.00 19 Apr189 Affordable Rural Housing Program 9108 UZB PP 700.00 - - - - - 700.00 29 Apr190 Electronic Healthcare Development 9148 UZB PP 800.00 - - - - - 800.00 5 Aug191 Horticulture Value Chain Development 9176 UZB PP 225.00 - - - - - 225.00 26 Sep192 Sustainable Hydropower 9236 UZB PP 500.00 - - - - 2,000.00 2,500.00 22 Nov193 Second Solar Power 9262 UZB PP - - - - - 1,000.00 1,000.00 5 Dec194 Western Uzbekistan Water Supply System Development 9286 UZB PP 750.00 - - - - - 750.00 19 Dec195 Strengthening Participating Financial Institutions 9128 UZB CD - - 500.00 - - - 500.00 30 Jun
13
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
196 Skills Strategies for Industrial Modernization and Inclusive Growth
9256 UZB PA - - - - 900.00 - 900.00 5 Dec
Subtotal 4,475.00 - 500.00 - 900.00 3,000.00 8,875.00
197 Institutional Strengthening for Environmental Safeguards in Vanuatu
9073 VAN CD 225.00 - - - - - 225.00 22 Jan
198 Supporting the Vanuatu Project Management Unit and the Ministry of Infrastructure and Public Utilities
9263 VAN CD 225.00 - - - - - 225.00 8 Dec
Subtotal 450.00 - - - - - 450.00
199 Secondary Cities Development Program (Green Cities) (Supplementary)
8671 VIE PP - - - - - 136.99 136.99 2 Mar
200 Basic Infrastructure for Inclusive Growth in the Northeast Provinces Sector (Supplementary)
8957 VIE PP 650.00 - - - - 1,000.00 1,650.00 29 Apr
201 Financial Sector Development and Inclusion Program 9101 VIE PP 900.00 - - - - - 900.00 22 Apr202 Distribution Grid Development Sector for Viet Nam Power
Corporations9139 VIE PP 1,000.00 - - - - - 1,000.00 15 Jul
203 Water Efficiency Improvement in Drought Affected Provinces 9147 VIE PP 800.00 - - - - 250.00 1,050.00 1 Aug204 Ho Chi Minh City Wastewater and Drainage System
Improvement9205 VIE PP - - - - - 5,000.00 5,000.00 14 Oct
205 Greater Mekong Subregion (GMS) Corridor Connectivity Enhancement
9252 VIE PP 1,800.00 - - - - - 1,800.00 29 Nov
206 Improving Operational Performance of the Water Supply Sector (Supplementary)
8357 VIE CD - - - - - 120.00 120.00 2 Dec
207 Support to Strengthening Local Health Care Program 9265 VIE CD 225.00 - - - - - 225.00 9 Dec208 Support for Improving Public Expenditure Quality Program 9272 VIE CD 575.00 - - - - - 575.00 13 Dec209 Supporting Public Financial Management in Viet Nam
(Supplementary)8980 VIE PA 225.00 - - - - - 225.00 29 Apr
210 Strengthening the Policy and Institutional Framework of Social Health Insurance
9221 VIE PA - - - - 1,800.00 - 1,800.00 4 Nov
Subtotal 6,175.00 - - - 1,800.00 6,506.99 14,481.99
211 Empowering the Poor Through Increasing Access to Energy (Supplementary)
7512 REG PP - - - - - 225.00 225.00 11 Feb
212 Business Development and Implementation Support for Non-Sovereign Operations
9078 REG PP 2,250.00 - - - - - 2,250.00 11 Feb
213 Second Greater Mekong Subregion Tourism Infrastructure for Inclusive Growth
9090 REG PP 1,500.00 - - - - 1,000.00 2,500.00 21 Mar
214 Improving the Quality of Basic Education in the North Pacific 9097 REG PP 500.00 - - - - - 500.00 18 Apr215 Fourth Greater Mekong Subregion Corridor Towns
Development9192 REG PP 1,800.00 - - - - - 1,800.00 30 Sep
216 Pacific Renewable Energy Investment Facility 9242 REG PP 2,000.00 - - - - 3,000.00 5,000.00 24 Nov217 Knowledge and Innovation Support for ADB's Water
Financing Program (Supplementary)6498 REG CD - - - - - 245.00 245.00 6 Sep
218 Strengthening Public Financial Management in Pacific Developing Member Countries (Supplementary)
6507 REG CD 40.00 - - - - - 40.00 18 Mar
219 Implementation of Sustainable Transport in Asia and the Pacific - New Approaches to Implement Sustainable Low Carbon Transport in the Asia and Pacific Region (Subproject 5) (Supplementary)
8189 REG CD 400.00 - - - - - 400.00 19 Apr
220 Central Asia Regional Economic Cooperation: Supporting Capacity Development Needs of CAREC 2020 (Supplementary)
8301 REG CD 1,000.00 - - - - 500.00 1,500.00 8 Dec
221 Enhancing Gender Equality Results in South Asia Developing Member Countries (Phase 2) (Subproject 4) (Supplementary)
8311 REG CD 750.00 - - - - - 750.00 9 Dec
222 Promoting Regional Knowledge Sharing Partnerships (Supplementary)
8430 REG CD - - - - - 500.00 500.00 21 Nov
223 Trade Facilitation in South Asia (Supplementary) 8435 REG CD 250.00 - - 500.00 - - 750.00 2 Jun224 Capacity Development for the Supply Chain Finance
Program (Supplementary)8501 REG CD 225.00 - - - - - 225.00 29 Nov
225 National Education Planning and Management (Supplementary)
8552 REG CD - - - - - 436.80 436.80 20 May
226 Supporting the Cities Development Initiative for Asia (Supplementary)
8556 REG CD 500.00 - - - - 400.00 900.00 19 Aug
227 Promoting Ecosystem Services and Forest Carbon Financing in Asia and the Pacific (Supplementary)
8564 REG CD - - - - - 250.00 250.00 1 Aug
228 Pacific Economic Management (Phase 2) (Supplementary) 8565 REG CD 750.00 - - - - - 750.00 15 Jul229 Improving Safeguard Policy Applications in South Asia
Developing Member Countries (Supplementary)8569 REG CD 1,500.00 - - - - - 1,500.00 9 Aug
230 Action on Climate Change in South Asia (Supplementary) 8572 REG CD 500.00 - - - - - 500.00 11 Nov231 Civil Society Participation for Development Effectiveness
(Supplementary)8595 REG CD 600.00 - - - - - 600.00 31 Aug
232 Enhancing Readiness of ADB Developing Member Countries for Scaled Up Climate Finance (Supplementary)
8606 REG CD - 237.50 - - - 500.00 737.50 24 Feb
1414
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
233 Sustainable Environmental Management of Projects in Central and West Asia (Supplementary)
8663 REG CD 750.00 - - - - - 750.00 23 Feb
234 Improving the Capacity and Integrity of Procurement Processes in Central and West Asia (Supplementary)
8665 REG CD 500.00 - - - - - 500.00 10 Aug
235 Strengthening Financial Management in Asia and the Pacific (Supplementary)
8740 REG CD 450.00 - - - - - 450.00 14 Dec
236 Promoting Gender Equality and Women’s Empowerment (Phase 2) (Supplementary)
8797 REG CD 500.00 - - - - 737.00 1,237.00 25 May
237 Enhanced Use of Disaster Risk Information for Decision Making in Southeast Asia (Supplementary)
8812 REG CD - - - - - 2,075.00 2,075.00 30 Sep
238 Sector and Thematic Analyses in Policy Development (Supplementary)
8819 REG CD 225.00 - - - - 40.00 265.00 7 Sep
239 Building Capacity for Enhanced Connectivity in Southeast Asia (Supplementary)
8836 REG CD - - - 500.00 - - 500.00 7 Oct
240 Enhancing Public–Private Partnership Project Development through Support for ADB Transaction Advisory Services in Southeast Asia and the Pacific (Supplementary)
8909 REG CD 1,700.00 - - - - - 1,700.00 1 Jul
241 Strengthening Knowledge Management in Central and West Asia (Supplementary)
8936 REG CD - - - - - 650.00 650.00 18 Nov
242 Promoting Sustainable Energy for All in Asia and the Pacific - Sustainable Energy for All Regional Hub for Asia and the Pacific (Subproject C) (Supplementary)
8953 REG CD - 1,100.00 - - - - 1,100.00 28 Apr
243 Promoting Sustainable Energy for All in Asia and the Pacific - Project Development and Investment Facilitation (Subproject D) (Supplementary)
8954 REG CD - - - - - 300.00 300.00 2 Feb
244 Universal Health Coverage for Inclusive Growth: Supporting the Implementation of the Operational Plan for Health, 2015-2020 (Supplementary)
8983 REG CD - - - - - 500.00 500.00 17 Aug
245 Enhancing Gender Equality Results in the Southeast Asian DMCs (Supplementary)
8991 REG CD 225.00 - - - - - 225.00 7 Oct
246 Strengthening Capacities to Design and Implement Smart Urban Infrastructure (Supplementary)
9050 REG CD 1,500.00 - - - - - 1,500.00 4 Oct
247 Enhancing Regional Capacity for Economic Surveillance and Financial Vulnerability Assessment
9077 REG CD - - - - - 1,200.00 1,200.00 8 Feb
248 Building Project Implementation Capacities in the Pacific 9086 REG CD 2,900.00 - - - - - 2,900.00 18 Mar249 Strengthening Gender-Inclusive Growth in Central and West
Asia9088 REG CD 1,500.00 - - - - - 1,500.00 18 Mar
250 Due Diligence and Capacity Development of Potential and Existing Trade Finance Program Banks (Subproject 2)
9089 REG CD 3,266.67 - - - - - 3,266.67 4 Mar
251 Strengthening Integrated Water Resources Management in Mountainous River Basins
9095 REG CD - - - - 2,000.00 - 2,000.00 12 Apr
252 Strengthening Project Preparation Capacity in Asia and the Pacific - Support for Capacity Development, Knowledge and Networking (Subproject 1)
9098 REG CD 5,000.00 - - - - - 5,000.00 19 Apr
253 Enhancing Public-Private Partnership Project Development through Legal Support for ADB Transaction Advisory Services in Asia and the Pacific
9110 REG CD 1,300.00 - - - - - 1,300.00 28 Apr
254 Strengthening Developing Member Countries’ Capacity in Elderly Care
9111 REG CD - - - - 2,000.00 500.00 2,500.00 13 May
255 Regional Evaluation Capacity Development II 9118 REG CD - - - - - 500.00 500.00 18 May256 Supporting the Adoption of Low Carbon Technologies in
Developing Member Countries9135 REG CD - - - - - 1,500.00 1,500.00 14 Jul
257 Developing Capacity of Public Sector Internal Audit Institutions
9136 REG CD 225.00 - - - - - 225.00 15 Jul
258 Legal Readiness for Climate Finance and Climate Investments
9159 REG CD 225.00 - - - - - 225.00 16 Aug
259 Implementation of Trade Facilitation Initiatives in Central Asia Regional Economic Cooperation Program
9162 REG CD 250.00 - - 750.00 - - 1,000.00 31 Aug
260 Access to Electricity with New Off-Grid Solar Technology in Central Asia
9168 REG CD - - - - - 2,000.00 2,000.00 14 Sep
261 Strengthening the Pacific Islands Forum Secretariat Regional Economic Policy Mandate in the Pacific
9174 REG CD 225.00 - - - - - 225.00 21 Sep
262 Promoting Evidence-Based Policy Making for Gender Equity in the Pacific (Phase 2)
9202 REG CD 500.00 - - - - - 500.00 7 Oct
263 Promoting Urban Climate Change Resilience in Selected Asian Cities - Knowledge Management and Resilience Measurement for Urban Climate Change Resilience (Subproject 2)
9217 REG CD - - - - - 4,985.00 4,985.00 2 Nov
264 Promotion of International Arbitration Reform for Better Investment Climate in the South Pacific
9227 REG CD 500.00 - - - - - 500.00 8 Nov
265 Support to the Association of Southeast Asian Nations Economic Community
9229 REG CD 2,000.00 - - - - - 2,000.00 10 Nov
15
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
266 Regional Project Development Support for the South Asia Subregional Economic Cooperation Operational Plan, 2016-2025
9231 REG CD 2,000.00 - - 500.00 - - 2,500.00 15 Nov
267 Pacific Financial Technical Assistance Centre, 2016-2022 9234 REG CD 800.00 - - - - - 800.00 18 Nov268 Strengthening Tax Policy and Administration Capacity to
Mobilize Domestic Resources9235 REG CD - - - - 1,000.00 - 1,000.00 16 Nov
269 Supporting Implementation of Environment-Related Sustainable Development Goals in Asia and the Pacific
9245 REG CD 1,000.00 - - - - - 1,000.00 24 Nov
270 Strengthening the Conduct of Economic Analysis of Project and Program Investments in Developing Member Countries
9249 REG CD 1,000.00 - - - - - 1,000.00 29 Nov
271 Support for Trade Facilitation in Asia and the Pacific 9258 REG CD 750.00 - - - - - 750.00 7 Dec272 Improving Institutional Capacity on Preparing Energy
Efficiency Investments9266 REG CD - - - - - 2,000.00 2,000.00 6 Dec
273 Promoting and Scaling Up Solar Photovoltaic Power through Knowledge Management and Pilot Testing in Bangladesh and Nepal
9267 REG CD - - - - - 1,314.00 1,314.00 5 Dec
274 Strengthening International Food Safety Standards in Agricultural Value Chains in the Central Asia Regional Economic Cooperation Member Countries
9274 REG CD 500.00 - - - - - 500.00 13 Dec
275 Developing Judicial Capacity for Adjudicating Climate Change and Sustainable Development Issues
9279 REG CD 944.00 - - - - - 944.00 14 Dec
276 Developing Anti-Money Laundering and Combating the Financing of Terrorism Approaches, Methodologies, and Controls - Developing Risk-Based Customer Due Diligence Requirements and Tools (Subproject A)
9287 REG CD 500.00 - - - - - 500.00 22 Dec
277 Strengthening Government and Civil Society Cooperation in Open Government Partnership to Improve Public Services
9288 REG CD - - - - 1,000.00 - 1,000.00 12 Dec
278 Strengthening Project Preparation Capacity in Asia and the Pacific - Support for Ongoing Monitoring and Project Restructuring (Subproject 2)
9290 REG CD 2,860.00 - - - - - 2,860.00 28 Dec
279 Strengthening Project Preparation Capacity in Asia and the Pacific - Support for the Establishment of Enabling Environment for Public-Private Partnerships (Subproject 3)
9291 REG CD 2,140.00 - - - - - 2,140.00 28 Dec
280 Strengthening Project Preparation Capacity in Asia and the Pacific - Supporting Preparation of Infrastructure Projects with Private Sector Participation in Asia Pacific (Subproject 4)
9292 REG CD - - - - - 18,000.00 18,000.00 28 Dec
281 Enhancing Economic Analysis and South-South Learning (Supplementary)
8254 REG PA 1,500.00 - - - - - 1,500.00 29 Jun
282 Establishment of the Pacific Region Infrastructure Facility Coordination Office (Supplementary)
8345 REG PA 1,000.00 - - - - 3,000.00 4,000.00 29 Feb
283 Central Asia Regional Economic Cooperation: Knowledge Sharing and Services in Transport and Transport Facilitation (Supplementary)
8789 REG PA 200.00 - - - - - 200.00 17 Nov
284 Advancing Regional Cooperation and Integration through Brunei Darussalam-Indonesia-Malaysia-Philippines East ASEAN Growth Area and Indonesia-Malaysia-Thailand Growth Triangle (Supplementary)
8814 REG PA - - - - - 700.00 700.00 31 Aug
285 Knowledge Development Support for Southeast Asia (Supplementary)
8977 REG PA 500.00 - - - - - 500.00 7 Oct
286 Connecting the Railways of the Greater Mekong Subregion 9123 REG PA - - - - - 500.00 500.00 21 Jun287 Enhancing Coordination of the Central Asia Regional
Economic Cooperation Program9156 REG PA 2,000.00 - - - - - 2,000.00 17 Aug
288 Strengthening Urban Infrastructure Investment Planning in the Pacific
9181 REG PA 700.00 - - - - - 700.00 29 Sep
289 Public Sector Accounting Standards (Sixth Phase) 9243 REG PA 330.00 - - - - - 330.00 25 Nov290 Strengthening the Enabling Environment for Disaster Risk
Financing (Phase 1) (Supplementary)9007 REG RD 600.00 - - - - - 600.00 26 Jul
291 A Framework for Effective Knowledge Management and Solutions
9087 REG RD 225.00 - - - - - 225.00 22 Mar
292 Scaling Up Private Sector Participation and Use of Market-Based Approaches for Environmental Management
9093 REG RD 1,500.00 - - - - - 1,500.00 12 Apr
293 Asian Economic Integration: Building Knowledge for Policy Dialogue
9121 REG RD 1,200.00 - - - - - 1,200.00 10 Jun
294 Agenda 2030: Supporting the Sustainable Development Goals through Strategic Partnerships and Preparedness
9130 REG RD 1,400.00 - - - - - 1,400.00 1 Jul
295 Asian Development Outlook 2016-2018 - Asian Development Outlook 2017 (Subproject 2)
9149 REG RD 1,200.00 - - - - - 1,200.00 5 Aug
296 Promoting Smart Systems in ADB's Future Cities Program 9170 REG RD - - - - 2,000.00 - 2,000.00 5 Sep297 Selected Evaluation Studies and Outreach for 2017-2018
(Subproject 1)9172 REG RD 2,500.00 - - - - - 2,500.00 15 Sep
298 Building Climate Change Resilience in Asia's Critical Infrastructure
9191 REG RD 1,500.00 - - - - - 1,500.00 30 Sep
1616
TA TA DateProject Name No. DMC Type TASF CCF FSDPSF RCIF JFPR Others Total Approved
299 Creating a Regional Settlement Intermediary in ASEAN+3: Cross-Border Settlement Infrastructure Forum
9197 REG RD - - - - - 500.00 500.00 30 Sep
300 Enhancing Research Alliance and South-South Development Policy Cooperation between Asia and the Pacific and Latin America
9210 REG RD 750.00 - - - - - 750.00 20 Oct
301 Investment Assessment and Application of High-Level Technology for Food Security in Asia and the Pacific
9218 REG RD 1,500.00 - - - - - 1,500.00 28 Oct
302 2017 International Comparison Program for Asia and the Pacific
9238 REG RD 1,000.00 - - - - - 1,000.00 24 Nov
303 Key Indicators for Asia and the Pacific 2018-2020 – Key Indicators for Asia and the Pacific 2018 (Subproject 1)
9244 REG RD 1,000.00 - - - - - 1,000.00 25 Nov
304 Facilitating Small and Medium-Sized Enterprises Foreign Direct Investment Flows: An ASEAN+6 Case Study
9271 REG RD 750.00 - - - - - 750.00 8 Dec
305 Strengthening Policy Compliance Awareness for Good Governance and Development Effectiveness
9289 REG RD 220.00 - - - - - 220.00 6 Dec
Subtotal 72,375.67 1,337.50 - 2,250.00 8,000.00 48,057.80 132,020.97
Total 161,800.67 1,407.50 3,075.00 2,750.00 39,100.00 108,923.11 317,056.28
- = nil, CD = capacity development, CCF = Climate Change Fund, DMC = developing member country, FSDPSF = Financial Sector Development Partnership Special Fund, JFPR = Japan Fund for Poverty Reduction, PA = policy and advisory, PP = project preparatory, RCIF = Regional Cooperation and Integration Fund, RD = research and development, TA = technical assistance, TASF = Technical Assistance Special Fund.
17
PrincipalLoan Amount Date
No. Fund Project Name Dept Div ($ million) Approved (Days) (Months) Remarks
PROJECT LOANS
Azerbaijan1. 3411 AZE OCR Water Supply and Sanitation Investment
Program - Tranche 4CWRD CWUW 75.000 9-Aug-16 144 4.7 Signing expected by Mar 2017.
Bangladesh
2. 3367 BAN OCR Second Small and Medium -Sized Enterprise Development Project
SARD BRM 200.000 19-Jan-16 347 11.4 Signed on 18 Jan 2017.
3. 3438 BAN OCR South Asia Subregional Economic Cooperation Chittagong-Cox's Bazar Railway Project, Phase 1 - Tranche 1
SARD SATC 210.000 30-Sep-16 92 3.0 Signing expected by Q3 2017.
4. 3439 BAN ADF South Asia Subregional Economic Cooperation Chittagong-Cox's Bazar Railway Project, Phase 1 - Tranche 1
SARD SATC 86.540 30-Sep-16 92 3.0 Signing expected by Q3 2017.
5. 3468 BAN ADF Skills for Employment Investment Program - Tranche 2
SARD SAHS 97.578 24-Nov-16 37 1.2 Signing expected by Jan 2017.
6. 6010 BAN ADF City Region Development Investment Program (PDA)
SARD SAUW 4.975 15-Dec-16 16 0.5 Signed and made effective on 1 Feb 2017 (awaiting Loan Milestone Event Dates - LMED).
Cambodia7. 3464 CAM ADF Greater Mekong Subregion Health Security
ProjectSERD SEHS 20.181 22-Nov-16 39 1.3 Signed on 14 Dec 2016.
China, People's Republic of8. 3401 PRC OCR Henan Hebi Qihe River Environmental
Improvement and Ecological Conservation Project
EARD EAER 150.000 29-Jun-16 185 6.1 Signed on 14 Dec 2016.
9. 3443 PRC OCR Qinghai Haidong Urban-Rural Eco Development Project
EARD EASS 150.000 19-Oct-16 73 2.4 Waiting for Qinghai Project Management Office to advise signatories for the project agreements.
10. 3444 PRC OCR Ningxia Liupanshan Poverty Reduction Rural Road Development Project
EARD EATC 100.000 21-Oct-16 71 2.3 Undergoing reforms in the Ministry of Finance. Waiting for new signatories.
11. 3450 PRC OCR Fujian Farmland Sustainable Utilization and Demonstration
EARD EAER 100.000 7-Nov-16 54 1.8 Undergoing reforms in the Ministry of Finance. Waiting for new signatories.
12. 3459 PRC OCR Chongqing Integrated Logistics Demonstration
EARD EATC 150.000 14-Nov-16 47 1.5 Undergoing reforms in the Ministry of Finance. Waiting for new signatories.
13. 3475 PRC OCR Shaanxi Accelerated Energy Efficiency and Environment Improvement Financing Project
EARD EAEN 150.000 28-Nov-16 33 1.1 The legal expert who will prepare the legal agreements is expected to be recruited by Mar 2017. Signing expected by Q3 2017.
14. 3485 PRC OCR Jiangxi Xinyu Kongmu River Watershed Flood Control and Environmental Improvement Project
EARD EAER 150.000 6-Dec-16 25 0.8 Undergoing reforms in the Ministry of Finance. Waiting for new signatories.
15. 3501 PRC OCR Guangxi Regional Cooperation and Integration Promotion Investment Program - Tranche 1
EARD EAPF 66.420 12-Dec-16 19 0.6 Signing expected by Mar 2017.
16. 3504 PRC OCR Air Quality Improvement in the Greater Beijing–Tianjin–Hebei Region—China National Investment and Guaranty Corporation’s Green Financing Platform Project
EARD EAEN 481.816 12-Dec-16 19 0.6 The executing agency is waiting for the State Council's approval to sign the loan agreement. Signing expected by Feb 2017.
17. 3506 PRC OCR Public–Private Partnerships Demonstration Program to Transform Delivery of Elderly Care Services in Yichang, Hubei
EARD EASS 50.000 12-Dec-16 19 0.6 Undergoing reforms in the Ministry of Finance. Waiting for new signatories. The letter of approval was sent on 14 Dec 2016.
18. 3508 PRC OCR Guangxi Regional Cooperation and Integration Promotion Investment Program - Tranche 1
EARD EAPF 63.580 12-Dec-16 19 0.6 Signing expected by Mar 2017.
Fiji19. 3512 FIJ OCR Urban Water Supply and Wastewater
Management Investment Program, Tranche 1
PARD SPSO 42.109 20-Dec-16 11 0.4 Signing expected by Aug 2017.
Loan No.
LOANS NOT YET SIGNED(As of 31 December 2016)
Time Elapsed fromCountry Approval Datea
1818
PrincipalLoan Amount Date
No. Fund Project Name Dept Div ($ million) Approved (Days) (Months) RemarksLoan No.
LOANS NOT YET SIGNED(As of 31 December 2016)
Time Elapsed fromCountry Approval Datea
India20. 3365 IND OCR Green Energy Corridor and Grid
Strengthening ProjectSARD SAEN 500.000 9-Dec-15 388 12.8 Signing expected by Q1 2017. Validity
of loan approval was extended to 9 Mar 2017.
21. 3386 IND OCR Uttar Pradesh Major District Roads Improvement Project
SARD INRM 300.000 14-Apr-16 261 8.6 Signing expected by Q1 2017.
22. 3430 IND OCR Visakhapatnam-Chennai Industrial Corridor Development Program - Project 1
SARD SAUW 245.000 26-Sep-16 96 3.2 Signing expected by Q2 2017.
23. 3436 IND OCR Demand-Side Energy Efficiency Sector Project
SARD SAEN 200.000 30-Sep-16 92 3.0 Signing expected by Q1 2017.
24. 3437 IND OCR Madhya Pradesh District Roads II Sector Project
SARD SATC 350.000 30-Sep-16 92 3.0 Signing expected by Q2 2017.
25. 3482 IND OCR Rajasthan Renewable Energy Transmission Program - Tranche 2
SARD SAEN 238.000 5-Dec-16 26 0.9 Signing expected by Q1 2017.
Kazakhstan26. 3447 KAZ OCR Supporting Resilience of Micro, Small and
Medium-Sized Enterprise Finance ProjectCWRD CWPF 215.776 27-Oct-16 65 2.1 Signing expected by Q1 2017.
Lao People’s Democratic Republic27. 3465 LAO ADF Greater Mekong Subregion Health Security
ProjectSERD SEHS 3.839 22-Nov-16 39 1.3 Signing expected by Q1 2017.
Myanmar28. 3466 MYA ADF Greater Mekong Subregion Health Security
ProjectSERD SEHS 11.583 22-Nov-16 39 1.3 Awaiting cabinet's approval. Signing
expected by Jan 2017.29. 3472 MYA ADF Equipping Youth for Employment Project SERD MYRM 95.181 28-Nov-16 33 1.1 Awaiting cabinet's approval. Signing
expected by Jan 2017.30. 3477 MYA ADF Irrigated Agriculture Inclusive Development
ProjectSERD SEER 72.365 28-Nov-16 33 1.1 Awaiting cabinet's approval. Signing
expected by Jan 2017.
Nepal31. 3478 NEP ADF South Asia Subregional Economic
Cooperation Roads Improvement ProjectSARD SATC 179.906 1-Dec-16 30 1.0 Signed on 18 Jan 2017.
Pakistan32. 3378 PAK OCR Post-Flood National Highways
Rehabilitation ProjectCWRD PRM 196.900 29-Mar-16 277 9.1 Signed on 23 Jan 2017.
33. 3469 PAK OCR Supporting Public-Private Partnership Investments in Sindh Province
CWRD CWPF 100.000 24-Nov-16 37 1.2 Signing expected by Jun 2017.
34. 3470 PAK OCR Pehur High Level Canal Extension (formerly: Khyber Pakhtunkhwa Water Resources Project)
CWRD CWER 86.405 24-Nov-16 37 1.2 Signing expected by Feb 2017.
35. 3476 PAK OCR Access to Clean Energy Investment Program
CWRD CWEN 325.000 25-Nov-16 36 1.2 Signing expected by Q1 2017.
36. 6009 PAK OCR Peshawar Sustainable Bus Rapid Transit Corridor Project Design Advance
CWRD CWUW 10.000 23-Nov-16 38 1.2 Loan signed and became effective on 5 Jan 2017.
Papua New Guinea37. 3496 PNG OCR Civil Aviation Development Investment
Program, Tranche 3PARD PNRM 213.000 8-Dec-16 23 0.8 Signing expected by 3 Feb 2017.
38. 3497 PNG ADF Civil Aviation Development Investment Program, Tranche 3
PARD PNRM 34.763 8-Dec-16 23 0.8 Signing expected by 3 Feb 2017.
Tonga39. 3509 TON ADF Outer Island Renewable Energy Project -
Additional FinancingPARD PATE 2.432 14-Dec-16 17 0.6 Signed on 31 Jan 2017.
Uzbekistan40. 3405 UZB OCR Small Business Finance Project CWRD CWPF 100.000 30-Jun-16 184 6.0 Signing expected by 28 Feb 2017.41. 3457 UZB ADF Tashkent Province Water Supply
Development ProjectCWRD CWUW 116.334 11-Nov-16 50 1.6 Signing expected by Q1 2017.
42. 3471 UZB ADF Horticulture Value Chain Development Project (Formerly: Innovations for Agriculture Modernization Project)
CWRD CWER 150.007 25-Nov-16 36 1.2 Signing expected by Feb 2017.
43. 3481 UZB OCR Kashkadarya Regional Road Project CWRD CWTC 198.000 5-Dec-16 26 0.9 Signing expected by Aug 2017.
19
PrincipalLoan Amount Date
No. Fund Project Name Dept Div ($ million) Approved (Days) (Months) RemarksLoan No.
LOANS NOT YET SIGNED(As of 31 December 2016)
Time Elapsed fromCountry Approval Datea
Viet Nam44. 3340 VIE OCR Urban Environment and Climate Change
Adaptation ProjectSERD SEUW 100.000 27-Nov-15 400 13.2 Validity of loan approval was extended
to 26 Feb 2017. Signing and effectivity expected by Q1 2017.
45. 3363 VIE OCR Ha Noi Metro Line System Project (Line 3: Nhon-Hanoi Station Section) - Additional Financing
SERD VRM 59.000 10-Dec-15 387 12.7 Signed on 8 Nov 2016.
46. 3364 VIE ADF Ha Noi Metro Line System Project (Line 3: Nhon-Hanoi Station Section) - Additional Financing
SERD VRM 5.521 10-Dec-15 387 12.7 Signed on 8 Nov 2016.
47. 3373 VIE OCR Water Sector Investment Program PFR4 SERD VRM 205.000 16-Dec-15 381 12.5 Approval of the loan has lapsed. A brief board information paper is being prepared.
48. 3391 VIE OCR Greater Mekong Subregion Ben Luc–Long Thanh Expressway Project – Tranche 2
SERD SETC 286.000 20-May-16 225 7.4 Signed on 9 Jan 2017.
49. 3467 VIE ADF Greater Mekong Subregion Health Security Project
SERD SEHS 76.554 22-Nov-16 39 1.3 Signed on 24 Jan 2017.
50. 3494 VIE ADF Second Secondary Education Sector Development Program
SERD SEHS 48.005 8-Dec-16 23 0.8 Signing is expected by Q1 2017.
51. 3499 VIE ADF Support to Border Areas Development SERD VRM 103.298 8-Dec-16 23 0.8 Signing expected by Feb 2017.
Average Time ElapsedTotal / Average Project Loans 7,176.068 102 3.3
POLICY-BASED LOANSIndia
52. 3424 IND OCR Visakhapatnam-Chennai Industrial Corridor Development Program
SARD SAUW 125.000 20 Sep 16 102 3.4 Signing expected by Q2 2017.
Philippines53. 3505 PHI OCR Local Government Finance and Fiscal
Decentralization Reform Program, Subprogram 2
SERD SEPF 250.000 13 Dec 16 18 0.6 Signed on 15 Dec 2016.
Tajikistan54. 3513 TAJ ADF Investment Climate Reforms Program -
Subprogram 2CWRD CWPF 30.157 22 Dec 16 9 0.3 Signed on 24 Jan 2017.
Viet Nam55. 3493 VIE ADF Second Secondary Education Sector
Development ProgramSERD SEHS 48.005 8 Dec 16 23 0.8 Signing expected by Q1 2017.
56. 3502 VIE OCR Improving Public Expenditure Quality Program, Subprogram 1
SERD SEPF 82.700 13 Dec 16 18 0.6 Signing expected by Mar 2017.
57. 3503 VIE ADF Improving Public Expenditure Quality Program, Subprogram 1
SERD SEPF 114.917 13 Dec 16 18 0.6 Signing expected by Mar 2017.
Average Time ElapsedTotal / Average Policy-Based Loans 650.779 31 1.0
PROJECT + POLICY-BASED LOANS Average Time ElapsedAsian Development Fund 1,302.141 50 1.7Ordinary Capital Resources 6,524.706 118 3.9Total 7,826.847 94 3.1
a No. of days from approval to cut-off date (31 December 2016).
Sources: Loan Financial Information System (LFIS); eOperations; Regional Departments
2020
DateNo. Project Name Dept Div Approved (Days) (Months) Remarks
A. Project
Bangladesh 1. 0517 BAN Skills for Employment Investment Program -
Tranche 2SARD SAHS 4.500 24-Nov-16 37 1.2 Signing expected by Apr 2017.
2. 0524 BAN Coastal Towns Environmental Infrastructure Project
SARD BRM 6.000 5-Dec-16 26 0.9 Signing expected by Q1 2017.
Fiji 3. 0531 FIJ Urban Water Supply and Wastewater
Management Investment Program, Tranche 1PARD SPSO 31.040 20-Dec-16 11 0.4 No definite date set. Master Agreement
with the Green Climate fund being negotiated at the institutional level.
India 4. 0495 IND Visakhapatnam-Chennai Industrial Corridor
Development Program - Tranche 1SARD SAUW 5.000 26-Sep-16 96 3.2 Signing expected by Q2 2017.
Kiribati5. 0502 KIR South Tarawa Sanitation Improvement Sector
Project - Additional FinancingPARD SPSO 2.800 17-Oct-16 75 2.5 Grant was signed on 12 Dec 2016.
Lao People’s Democratic Republic6. 0516 LAO Greater Mekong Subregion Health Security
ProjectSERD SEHS 8.000 22-Nov-16 39 1.3 Signing expected by Q1 2017.
Mongolia7. 9189 MON Managing Soil Pollution in Ger Areas Through
Improved On-site Sanitation ProjectEARD EAER 2.800 10-Nov-16 51 1.7 Grant was signed on 22 Dec 2016.
Nepal 8. 0520 NEP South Asia Subregional Economic Cooperation
Power System Expansion ProjectSARD SAEN 20.000 29-Nov-16 32 1.1 Grant was signed on 18 Jan 2017.
9. 0529 NEP Earthquake Emergency Assistance Project SARD NRM 10.000 12-Dec-16 19 0.6 OCO is preparing the grant agreement. Signing and effectivity expected by Q1 2017.
Pakistan10. 0518 PAK Supporting Public-Private Partnership Investments
in Sindh ProvinceCWRD CWPF 19.235 24-Nov-16 37 1.2 Signing expected by Jun 2017.
Philippines11. 9169 PHI Agribusiness Development Assistance for
Smallholders in MindanaoSERD SEER 2.000 11-Dec-12 1,481 48.7 Signing expected by Mar 2017. There are
still outstanding issues with the Department of Agrarian Reform and other stakeholders.
Solomon Islands12. 0514 SOL Solar Power Development Project PARD PATE 2.240 21-Nov-16 40 1.3 Grant was signed on 19 Jan 2017.13. 0515 SOL Solar Power Development Project PARD PATE 6.200 21-Nov-16 40 1.3 Grant was signed on 19 Jan 2017.
Sri Lanka14. 0486 SRI Supporting Electricity Supply Reliability
Improvement Project-Renewable Energy Micro-grid
SARD SAEN 1.800 26-Jul-16 158 5.2 Grant was signed on 19 Dec 2016.
15. 9186 SRI Productive Energy Use for Small Isolated Island and Rural Communities
SARD SAEN 2.000 26-Jul-16 158 5.2 Grant was signed on 19 Dec 2016.
Timor-Leste16. 0504 TIM Road Network Upgrading Project-Additional
FinancingPARD PATE 22.620 19-Oct-16 73 2.4 Grant was signed on 22 Nov 2016.
Tonga17. 0265 b TON Nuku'alofa Urban Development Sector Project
(Additional Financing)PARD SPSO 0.226 7-Dec-16 24 0.9 Signing expected by Mar 2017.
18. 0528 TON Outer Island Renewable Energy Project - Additional Financing
PARD PATE 2.500 14-Dec-16 17 0.6 Grant was signed on 31 Jan 2017.
Tuvalu19. 0511 TUV Outer Island Maritime Infrastructure Project PARD PATE 8.300 16-Nov-16 45 1.5 Grant signing and effectiveness expected
by April 2017.20. 0512 TUV Outer Island Maritime Infrastructure Project PARD PATE 3.000 16-Nov-16 45 1.5 Grant signing and effectiveness expected
by April 2017.21. 0513 TUV Outer Island Maritime Infrastructure Project PARD PATE 0.500 16-Nov-16 45 1.5 Grant signing and effectiveness expected
by April 2017.
Vanuatu22. 0526 VAN Port Vila Urban Development Project (additional
financing)PARD PAUS 2.870 8-Dec-16 23 0.8 Signing expected by 2 Feb 2017.
Viet Nam23. 0462 VIE Urban Environment and Climate Change
AdaptationSERD SEUW 4.000 27-Nov-15 400 13.2 Grant validity extended to 26 Feb 2017.
GRANTS NOT YET SIGNED (as of 31 December 2016)
Grant Time Elapsed fromCountry/ Grant No.
Amount Approval Datea
($ million)
21
DateNo. Project Name Dept Div Approved (Days) (Months) Remarks
GRANTS NOT YET SIGNED (as of 31 December 2016)
Grant Time Elapsed fromCountry/ Grant No.
Amount Approval Datea
($ million)
24. 0483 VIE Greater Mekong Subregion Flood and Drought Risk Management and Mitigation Project - Additional Financing
SERD VRM 1.800 15-Jan-16 351 11.5 Signing of grant agreement is expected in April 2017. Extension of grant validity is being processed.
Total Project / Average 169.431 138 4.6
B. Policy-Based
Samoa 25. 0525 SAM Fiscal Resilience Improvement Program,
Subprogram 1PARD SPSO 5.000 7-Dec-16 24 0.8 Grant was signed on 11 Jan 2017.
Tajikistan26. 0530 TAJ Investment Climate Reforms Program -
Subprogram 2CWRD CWPF 19.240 22-Dec-16 9 0.3 Grant was signed on 24 Jan 2017.
Total Policy-Based / Average 24.240 17 0.5
PROJECT + POLICY-BASEDTotal / Average 193.671 129 4.2
a No. of days from approval to cut-off date (31 December 2016). b Additional financing.
Sources: Grant Financial Information System (GFIS) / Regional Departments.
2222
Net Loan Date of Date of Date of Amount Loan Loan LoanNo. Fund Project Name Dept Div ($ million) Approval Signing Effectiveness (Days) (Months)
PROJECT LOANS
Armenia1. 3293 ARM OCR Sustainable Urban Development Investment Program - Tranche 2 CWRD CWUW 112.970 29-Sep-15 13-Oct-15 4-Mar-16 143 4.7
Azerbaijan2. 3407 AZE OCR Power Distribution Enhancement Investment Program - Tranche 1 CWRD CWEN 250.000 19-Jul-16 22-Jul-16 2-Sep-16 42 1.4
Bangladesh3. 3169 BAN OCR South Asia Subregional Economic Cooperation Railway
Connectivity: Akhaura-Laksam Double Track ProjectSARD BRM 400.000 30-Sep-14 28-Jun-15 8-Mar-16 254 8.4
4. 3170 BAN ADF South Asia Subregional Economic Cooperation Railway Connectivity: Akhaura-Laksam Double Track Project
SARD BRM 91.983 30-Sep-14 28-Jun-15 8-Mar-16 254 8.4
5. 3298 BAN OCR SASEC Second Bangladesh–India Electrical Grid Interconnection Project
SARD SAEN 35.000 29-Sep-15 19-Nov-15 8-Jan-16 50 1.6
6. 3299 BAN ADF SASEC Second Bangladesh–India Electrical Grid Interconnection Project
SARD SAEN 82.337 29-Sep-15 19-Nov-15 8-Jan-16 50 1.6
7. 3301 BAN OCR Railway Rolling Stock Project SARD SATC 200.000 30-Sep-15 28-Sep-16 26-Oct-16 28 0.98. 3302 BAN ADF Southwest Area Integrated Water Resources Planning and
Management Project - Additional FinancingSARD BRM 43.397 30-Sep-15 13-Dec-15 6-Jan-16 24 0.8
9. 3350 BAN OCR Power System Expansion and Efficiency Improvement Investment Program - Tranche 3
SARD SAEN 205.000 8-Dec-15 22-Dec-15 5-Jan-16 14 0.5
10. 3376 BAN OCR Railway Sector Investment Program - Tranche 4 SARD BRM 50.000 18-Mar-16 10-Apr-16 30-May-16 50 1.611. 3397 BAN OCR Dhaka Water Supply Network Improvement SARD SAUW 275.000 24-Jun-16 17-Jul-16 22-Nov-16 128 4.212. 6007 BAN ADF Rural Infrastructure Maintenance Program (PDA) SARD SAER 1.922 7-Jun-16 11-Jul-16 11-Jul-16 - -
Bhutan13. 3421 BHU ADF South Asia Subregional Economic Cooperation Transport, Trade
Facilitation and Logistics ProjectSARD SATC 14.070 31-Aug-16 29-Sep-16 21-Dec-16 83 2.7
Cambodia14. 3289 CAM ADF Uplands Irrigation and Water Resources Management Sector
ProjectSERD CARM 58.217 24-Sep-15 10-Nov-15 6-Jan-16 57 1.9
15. 3311 CAM ADF Integrated Urban Environmental Management in the Tonle Sap Basin Project
SERD SEUW 35.463 10-Nov-15 22-Dec-15 2-Mar-16 71 2.3
16. 3314 CAM ADF Second Greater Mekong Subregion Corridor Towns Development Project
SERD SEUW 31.432 13-Nov-15 22-Dec-15 29-Feb-16 69 2.3
17. 3414 CAM ADF Decentralized Public Service and Financial Management Sector Development Program (Subprogram 2) (Project Loan)
SERD SEPF 19.231 18-Aug-16 6-Oct-16 20-Dec-16 75 2.5
18. 3427 CAM ADF Upper Secondary Education Sector Development Program (formerly Strengthening Secondary Education and Teaching of Math and Science)
SERD SEHS 28.910 23-Sep-16 6-Oct-16 5-Dec-16 60 2.0
19. 3433 CAM ADF Second Rural Water Supply and Sanitation Sector Project - Additional Financing
SERD SEUW 14.557 22-Sep-16 6-Oct-16 2-Dec-16 57 1.9
20. 3442 CAM ADF Provincial Roads Improvement Project–Additional Financing SERD SETC 5.735 18-Oct-16 17-Nov-16 6-Dec-16 19 0.6
China, People's Republic of21. 3262 PRC OCR Xinjiang Akesu Integrated Urban Development and Environment
Improvement ProjectEARD EASS 150.000 26-Jun-15 3-Nov-15 14-Mar-16 132 4.3
22. 3263 PRC OCR Xinjiang Tacheng Border Cities and Counties Development Project EARD EASS 150.000 29-Jun-15 3-Nov-15 16-Mar-16 134 4.4
23. 3277 PRC OCR Hubei Enshi Qing River Upstream Environment Rehabilitation Project
EARD PRCM 100.000 11-Sep-15 3-Nov-15 6-Jan-16 64 2.1
24. 3281 PRC OCR Jiangxi Pingxiang Integrated Rural-Urban Infrastructure Development
EARD EASS 150.000 21-Sep-15 16-Mar-16 11-Jul-16 117 3.8
25. 3294 PRC OCR Shaanxi Mountain Road Safety Demonstration Project EARD EATC 200.000 28-Sep-15 8-Dec-15 7-Mar-16 90 3.026. 3296 PRC OCR Henan Sustainable Livestock Farming and Product Safety
Demonstration ProjectEARD EAER 69.000 29-Sep-15 29-Jan-16 7-Jul-16 160 5.3
27. 3308 PRC OCR Chemical Industry Energy Efficiency and Emission Reduction Project
EARD EAEN 100.000 30-Oct-15 29-Jan-16 14-Jun-16 137 4.5
28. 3312 PRC OCR Gansu Featured Agriculture and Financial Services System Development Project
EARD EAER 100.000 12-Nov-15 8-Dec-15 29-Mar-16 112 3.7
29. 3336 PRC OCR Hunan Dongjiang Lake Integrated Environmental Protection and Management Project
EARD EAER 130.000 25-Nov-15 16-Mar-16 14-Jun-16 90 3.0
30. 3352 PRC OCR Guizhou Vocational Education Development Program EARD EASS 150.000 8-Dec-15 16-Mar-16 14-Jun-16 90 3.031. 3358 PRC OCR Qingdao Smart Low-Carbon District Energy Project EARD EAEN 130.000 9-Dec-15 13-Apr-16 2-Aug-16 111 3.6
Fiji32. 3403 FIJ OCR Emergency Assistance for Recovery from Tropical Cyclone
WinstonPARD SPSO 50.000 30-Jun-16 18-Jul-16 4-Aug-16 17 0.6
Georgia33. 3273 GEO OCR Sustainable Urban Transport Investment Program - Tranche 4 CWRD CWUW 20.000 25-Aug-15 26-Oct-15 8-Jan-16 74 2.434. 3291 GEO OCR Urban Services Improvement Investment Program - Tranche 5 CWRD CWUW 43.000 29-Sep-15 26-Oct-15 19-Jan-16 85 2.8
LOANS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
Time ElapsedCountry/ Signing - EffectivityLoan No.
23
Net Loan Date of Date of Date of Amount Loan Loan LoanNo. Fund Project Name Dept Div ($ million) Approval Signing Effectiveness (Days) (Months)
LOANS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
Time ElapsedCountry/ Signing - EffectivityLoan No.
35. 3292 GEO ADF Urban Services Improvement Investment Program - Tranche 5 CWRD CWUW 30.955 29-Sep-15 26-Oct-15 19-Jan-16 85 2.8
India36. 3186 IND OCR Clean Energy Finance Investment Program - Tranche 1 SARD SAPF 200.000 17-Nov-14 27-Oct-15 1-Feb-16 97 3.237. 3265 IND OCR Orissa Integrated Irrigated Agriculture and Water Management
Investment Program - Project 2SARD INRM 120.000 30-Jun-15 7-Jun-16 28-Jun-16 21 0.7
38. 3276 IND OCR Second Jharkhand State Road Project SARD INRM 200.000 9-Sep-15 3-Jun-16 30-Aug-16 88 2.939. 3327 IND OCR Assam Power Sector Investment Program - Tranche 2 SARD INRM 48.000 23-Nov-15 7-Nov-16 21-Dec-16 44 1.440. 3337 IND OCR North Eastern Region Capital Cities Development Investment
Program – Tranche 3SARD INRM 80.000 27-Nov-15 28-Jan-16 27-Apr-16 90 3.0
41. 3394 IND OCR Climate Adaptation in Vennar Subbasin in Cauvery Delta Project SARD SAER 100.000 7-Jun-16 14-Jul-16 2-Sep-16 50 1.6
Indonesia42. 3339 INO OCR Electricity Grid Strengthening—Sumatra Program SERD SEEN 575.000 2-Dec-15 4-Dec-15 1-Feb-16 59 1.943. 3440 INO OCR Flood Management in Selected River Basins Sector Project SERD SEER 108.700 30-Sep-16 2-Nov-16 9-Dec-16 37 1.244. 3455 INO OCR Accelerating Infrastructure Delivery through Better Engineering
ServicesSERD IRM 148.200 10-Nov-16 28-Nov-16 21-Dec-16 23 0.8
Kyrgyz Republic45. 3212 KGZ ADF Toktogul Rehabilitation Phase 2 Project CWRD CWEN 58.720 2-Dec-14 26-Dec-14 1-Apr-16 462 15.2
Lao People's Democratic Republic46. 3250 LAO ADF Vientiane Sustainable Urban Transport Project SERD SETC 31.557 10-Mar-15 12-Mar-15 29-Aug-16 536 17.647. 3315 LAO ADF Second Greater Mekong Subregion Corridor Towns Development
ProjectSERD SEUW 35.484 13-Nov-15 18-Dec-15 16-Mar-16 89 2.9
48. 3368 LAO ADF Road Sector Governance and Maintenance Project SERD SETC 25.702 28-Jan-16 11-Mar-16 6-Jun-16 87 2.9
Mongolia49. 3287 MON OCR Agriculture and Rural Development Project - Additional Financing EARD EAER 35.000 23-Sep-15 28-Oct-15 11-Jan-16 75 2.5
50. 3288 MON ADF Agriculture and Rural Development Project - Additional Financing EARD EAER 14.423 23-Sep-15 28-Oct-15 11-Jan-16 75 2.5
51. 3313 MON ADF Regional Upgrades of Sanitary and Phytosanitary Measures for Trade Project
EARD EAPF 14.378 12-Nov-15 8-Jan-16 28-Mar-16 80 2.6
52. 3338 MON OCR Supporting the Credit Guarantee System for Economic Diversification and Employment Project
EARD EAPF 60.000 27-Nov-15 8-Jan-16 14-Apr-16 97 3.2
53. 3385 MON OCR Strengthening Institutional Framework and Management Capacity Project
EARD EAPF 35.000 31-Mar-16 1-Apr-16 21-Jun-16 81 2.7
54. 3387 MON ADF Regional Improvement of Border Services EARD EAPF 26.072 22-Apr-16 28-Apr-16 11-Jul-16 74 2.455. 3388 MON ADF Southeast Gobi Urban and Border Town Development Project –
Additional FinancingEARD MNRM 18.813 22-Apr-16 28-Apr-16 5-Jul-16 68 2.2
Myanmar56. 3310 MYA ADF Greater Mekong Subregion East-West Economic Corridor Eindu to
Kawkareik Road Improvement ProjectSERD SETC 95.815 10-Nov-15 8-Apr-16 4-Jul-16 87 2.9
57. 3330 MYA ADF Power Transmission Improvement Project SERD SEEN 76.194 23-Nov-15 26-Apr-16 30-Jun-16 65 2.1
Nepal58. 3255 NEP ADF Kathmandu Valley Water Supply Improvement Project - Additional
FinancingSARD SAUW 88.520 24-Apr-15 7-Dec-15 11-Feb-16 66 2.2
59. 3452 NEP ADF Supporting School Sector Development Plan SARD SAHS 115.056 2-Nov-16 2-Dec-16 12-Dec-16 10 0.3
Pakistan60. 3305 PAK OCR Sindh Provincial Road Improvement Project CWRD CWTC 197.850 12-Oct-15 30-Aug-16 5-Oct-16 36 1.261. 3344 PAK OCR Central Asia Regional Economic Cooperation Regional Improving
Border Services ProjectCWRD CWTC 150.000 4-Dec-15 26-Oct-16 15-Dec-16 50 1.6
62. 3345 PAK ADF Central Asia Regional Economic Cooperation Regional Improving Border Services Project
CWRD CWTC 96.261 4-Dec-15 26-Oct-16 15-Dec-16 50 1.6
63. 3351 PAK OCR Punjab Irrigated Agriculture Investment Program – Tranche 4 CWRD PRM 26.570 8-Dec-15 14-Dec-15 11-Jan-16 28 0.964. 3395 PAK OCR National Motorway M-4 Gojra–Shorkot-Khanewal Section Project -
Additional FinancingCWRD CWTC 100.000 10-Jun-16 20-Jun-16 1-Sep-16 73 2.4
65. 3473 PAK OCR National Disaster Risk Management Fund CWRD PRM 75.000 23-Nov-16 2-Dec-16 27-Dec-16 25 0.866. 3474 PAK ADF National Disaster Risk Management Fund CWRD PRM 120.932 23-Nov-16 2-Dec-16 27-Dec-16 25 0.867. 6006 PAK OCR Jalalpur Irrigation PDA CWRD CWER 5.000 1-Feb-16 11-Mar-16 11-Mar-16 0 0.068. 6008 PAK OCR Karachi Bus Rapid Transit Project Design Advance (previous
name Karachi Mass Transit Project Design Advance)CWRD CWUW 9.700 29-Sep-16 17-Nov-16 17-Nov-16 - -
Palau69. 3346 PAL OCR North Pacific Regional Connectivity Investment Project PARD PAUS 16.470 7-Dec-15 7-Mar-16 8-Mar-16 1 0.0370. 3347 PAL ADF North Pacific Regional Connectivity Investment Project PARD PAUS 8.218 7-Dec-15 7-Mar-16 8-Mar-16 1 0.03
Philippines71. 3369 PHI OCR Social Protection Support Project (Additional Financing) SERD SEHS 400.000 9-Feb-16 29-Apr-16 5-Jul-16 67 2.272. 3377 PHI OCR Angat Water Transmission Improvement Project SERD SEUW 123.300 18-Mar-16 27-May-16 26-Oct-16 152 5.0
2424
Net Loan Date of Date of Date of Amount Loan Loan LoanNo. Fund Project Name Dept Div ($ million) Approval Signing Effectiveness (Days) (Months)
LOANS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
Time ElapsedCountry/ Signing - EffectivityLoan No.
Solomon Islands73. 3392 SOL ADF Sustainable Transport Infrastructure Improvement Program PARD PLCO 20.397 27-May-16 1-Jul-16 20-Jul-16 19 0.6
Sri Lanka74. 3325 SRI OCR Integrated Road Investment Program-Tranche 3 SARD SLRM 175.000 23-Nov-15 11-Dec-15 18-Mar-16 98 3.275. 3326 SRI ADF Integrated Road Investment Program-Tranche 3 SARD SLRM 24.684 23-Nov-15 11-Dec-15 18-Mar-16 98 3.276. 3348 SRI OCR Greater Colombo Water and Wastewater Management
Improvement Investment Program - Tranche 3SARD SAUW 123.000 8-Dec-15 11-Aug-16 3-Nov-16 84 2.8
77. 3349 SRI ADF Greater Colombo Water and Wastewater Management Improvement Investment Program - Tranche 3
SARD SAUW 4.813 8-Dec-15 11-Aug-16 3-Nov-16 84 2.8
78. 3370 SRI OCR Small and Medium-Sized Enterprises Line of Credit Project SARD SAPF 100.000 15-Feb-16 23-Feb-16 27-Apr-16 64 2.179. 3425 SRI ADF Transport Project Preparatory Facility SARD SATC 23.487 22-Sep-16 28-Oct-16 21-Dec-16 54 1.8
Tajikistan80. 3309 TAJ ADF Strengthening Technical and Vocational Education and Training CWRD CWSS 14.301 9-Nov-15 16-Nov-15 14-Apr-16 150 4.9
Timor-Leste81. 3341 TIM OCR Road Network Upgrading Sector Project PARD PATE 53.000 3-Dec-15 4-Mar-16 19-May-16 76 2.582. 3342 TIM ADF Road Network Upgrading Sector Project PARD PATE 22.281 3-Dec-15 4-Mar-16 19-May-16 76 2.5
Uzbekistan83. 3275 UZB ADF Djizzak Sanitation System Development Project CWRD CWUW 72.657 8-Sep-15 12-Nov-15 26-Feb-16 106 3.584. 3285 UZB OCR Northwest Region Power Transmission Line Project CWRD CWEN 150.000 22-Sep-15 12-Nov-15 24-May-16 194 6.485. 3286 UZB OCR Advanced Electricity Metering Phase 4 Project CWRD CWEN 300.000 18-Sep-15 12-Nov-15 24-May-16 194 6.486. 3355 UZB OCR CAREC Corridor 2 Road Investment Program II, Tranche 3 CWRD CWTC 150.000 9-Dec-15 2-May-16 24-Nov-16 206 6.8
Vanuatu87. 3331 VAN ADF Cyclone Pam Road Reconstruction Project PARD PLCO 0.952 25-Nov-15 1-Mar-16 3-Mar-16 2 0.188. 3332 VAN ADF Cyclone Pam Road Reconstruction Project PARD PLCO 2.670 25-Nov-15 1-Mar-16 3-Mar-16 2 0.1
Viet Nam89. 3240 VIE OCR SOE Reform and Corporate Governance Facilitation Program -
Tranche 2SERD SEPF 310.000 16-Dec-14 10-Nov-15 9-Feb-16 91 3.0
90. 3242 VIE ADF SOE Reform and Corporate Governance Facilitation Program - Tranche 2
SERD SEPF 9.130 16-Dec-14 10-Nov-15 9-Feb-16 91 3.0
91. 3251 VIE OCR Water Sector Investment Program - Tranche 3 SERD VRM 112.021 27-Mar-15 19-Nov-15 29-Mar-16 131 4.392. 3317 VIE ADF Second Northern Greater Mekong Subregion Transport Network
Improvement Project - Additional FinancingSERD VRM 67.808 16-Nov-15 19-Feb-16 10-May-16 81 2.7
93. 3353 VIE ADF Second Greater Mekong Subregion Corridor Towns Development Project
SERD VRM 95.243 1-Dec-15 21-Mar-16 10-Aug-16 142 4.7
Total Project 8,999.558 86 2.8
POLICY-BASED LOANS
Armenia94. 3453 ARM OCR Infrastructure Sustainability Support Program, Phase 2 CWRD CWPF 90.000 10-Nov-16 11-Nov-16 27-Dec-16 46 1.5
Azerbaijan95. 3486 AZE OCR Countercyclical Support Facility CWRD CWPF 500.000 7-Dec-16 8-Dec-16 23-Dec-16 15 0.5
Cambodia96. 3415 CAM ADF Decentralized Public Service and Financial Management Sector
Development Program (Subprogram 2) (Policy-Based Loan)SERD SEPF 14.382 18-Aug-16 6-Oct-16 20-Dec-16 75 2.47
97. 3426 CAM ADF Upper Secondary Education Sector Development Program (formerly Strengthening Secondary Education and Teaching of Math and Science)
SERD SEHS 14.634 23-Sep-16 6-Oct-16 5-Dec-16 60 1.97
98. 3428 CAM ADF Strengthening Public Financial Management Program SERD CARM 25.777 26-Sep-16 6-Oct-16 8-Dec-16 63 2.07
China, People's Republic of99. 3356 PRC OCR Beijing-Tianjin-Hebei Air Quality Improvement-Hebei Policy
Reforms ProgramEARD EAPF 300.000 10-Dec-15 23-Feb-16 20-May-16 87 2.9
Georgia
100. 3417 GEO OCR Improving Domestic Resource Mobilization for Inclusive Growth Program, Subprogram 3
CWRD CWPF 50.000 31-Aug-16 1-Sep-16 6-Dec-16 96 3.16
101. 3418 GEO ADF Improving Domestic Resource Mobilization for Inclusive Growth Program, Subprogram 3
CWRD CWPF 48.704 31-Aug-16 1-Sep-16 6-Dec-16 96 3.16
Average
25
Net Loan Date of Date of Date of Amount Loan Loan LoanNo. Fund Project Name Dept Div ($ million) Approval Signing Effectiveness (Days) (Months)
LOANS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
Time ElapsedCountry/ Signing - EffectivityLoan No.
Indonesia102. 3402 INO OCR Stepping Up Investments for Growth Acceleration Program
(Subprogram 2)SERD SEPF 500.000 28-Jun-16 14-Jul-16 19-Aug-16 36 1.2
103. 3454 INO OCR Fiscal and Public Expenditure Management Program (Subprogram 1)
SERD SEPF 500.000 10-Nov-16 17-Nov-16 6-Dec-16 19 0.6
Kyrgyz Republic104. 3410 KGZ ADF Second Investment Climate Improvement Program (Subprogram
2)CWRD CWPF 12.018 29-Jul-16 12-Aug-16 13-Dec-16 123 4.0
Pakistan105. 3398 PAK OCR Public Sector Enterprises Reform Program (Subprogram 1) CWRD CWPF 200.000 28-Jun-16 28-Jun-16 29-Jun-16 1 0.03106. 3399 PAK ADF Public Sector Enterprises Reform Program (Subprogram 1) CWRD CWPF 98.630 28-Jun-16 28-Jun-16 29-Jun-16 1 0.03
Philippines107. 3333 PHI OCR Expanding Private Participation in Infrastructure Program,
Subprogram 1SERD SEPF 300.000 26-Nov-15 7-Dec-15 18-Jan-16 42 1.4
108. 3334 PHI OCR Encouraging Investment through Capital Market Reforms Program (Subprogram 1)
SERD SEPF 300.000 26-Nov-15 7-Dec-15 18-Jan-16 42 1.4
Tonga
109. 3393 TON ADF Building Macroeconomic Resilience Subprogram 1 PARD PAUS 2.998 30-May-16 7-Jun-16 14-Jun-16 7 0.2
Viet Nam110. 3335 VIE ADF Financial Sector Deepening Program (Subprogram 2) SERD SEPF 100.417 26-Nov-15 30-Dec-15 21-Mar-16 82 2.7
Total Policy-Based 3,057.560 52 1.7
PROJECT + POLICY-BASED
Asian Development Fund 1,960.337 85 2.8Ordinary Capital Resources 10,096.781 78 2.6Total 12,057.118 81 2.7
Source: Loan Financial Information System (LFIS)
Average
Average
2626
GRANTS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
No.Country/ Grant No. Project Name Dept Div (Days) (Months)
A. PROJECT
Afghanistan1. 0437 AFG Agriculture Market Infrastructure Project - Additional
FinancingCWRD AFRM 11.000 25-Sep-15 29-Nov-15 14-Jan-16 46 1.5
2. 0464 AFG Energy Supply Improvement Investment Program - Tranche 1
CWRD CWEN 200.000 8-Dec-15 19-Dec-15 7-Apr-16 110 3.6
3. 0465 AFG Energy Supply Improvement Investment Program - Tranche 1
CWRD CWEN 75.000 8-Dec-15 19-Dec-15 7-Apr-16 110 3.6
4. 0490 AFG Preparation of Central Asia Regional Economic Cooperation Corridors 5 and 6 (Salang Corridor) Project
CWRD CWTC 15.450 26-Aug-16 24-Sep-16 28-Oct-16 34 1.1
5. 0491 AFG Preparation of Central Asia Regional Economic Cooperation Corridors 5 and 6 (Salang Corridor) Project
CWRD CWTC 15.920 26-Aug-16 24-Sep-16 28-Oct-16 34 1.1
6. 0506 AFG Panj-Amu River Basin Sector Project CWRD CWER 26.000 26-Oct-16 2-Nov-16 9-Dec-16 37 1.27. 0507 AFG Panj-Amu River Basin Sector Project CWRD CWER 50.000 26-Oct-16 2-Nov-16 9-Dec-16 37 1.2
Bangladesh
8. 0441 BAN Southwest Area Integrated Water Resources Planning and Management Project - Additional Financing
SARD BRM 7.000 30-Sep-15 13-Dec-15 6-Jan-16 24 0.8
Bhutan9. 0484 BHU Air Transport Connectivity and Enhancement Project -
Additional FinancingSARD SATC 4.000 29-Jun-16 29-Sep-16 16-Dec-16 78 2.6
10. 0492 BHU South Asia Subregional Economic Cooperation Transport, Trade Facilitation and Logistics Project
SARD SATC 5.000 31-Aug-16 29-Sep-16 21-Dec-16 83 2.7
11. 0499 BHU Thimphu Road Improvement Project SARD SAUW 4.260 29-Sep-16 31-Oct-16 5-Dec-16 35 1.2
Cambodia12. 0448 CAM Second Greater Mekong Subregion Regional
Communicable Diseases Control Project (Additional Cofinancing to Grant 231-CAM)
SERD SEHS 4.000 26-Oct-15 10-Nov-15 4-Jan-16 55 1.8
13. 0454 CAM Integrated Urban Environmental Management in the Tonle Sap Basin
SERD SEUW 5.000 10-Nov-15 22-Dec-15 2-Mar-16 71 2.3
14. 0467 CAM Rural Roads Improvement Project II SERD SETC 9.000 8-Dec-15 30-Dec-15 18-Apr-16 110 3.615. 0468 CAM Medium-Voltage Sub-Transmission Expansion Sector
Project (Additional Financing)SERD SEEN 1.000 9-Dec-15 26-May-16 4-Nov-16 162 5.3
16. 0497 CAM Second Rural Water Supply and Sanitation Sector Project - Additional Financing
SERD SEUW 1.500 22-Sep-16 6-Oct-16 2-Dec-16 57 1.9
Cook Islands17. 0493 COO Renewable Energy Sector Project - Additional
FinancingPARD PATE 4.265 29-Aug-16 14-Sep-16 18-Oct-16 34 1
Fiji18. 0466 FIJ Fiji Cyclone Emergency Response Project PARD SPSO 2.000 24-Feb-16 28-Feb-16 28-Feb-16 - -
Indonesia19. 0501 INO Community-Focused Investments to Address
Deforestation and Forest DegradationSERD SEER 17.000 30-Sep-16 26-Oct-16 6-Dec-16 41 1
Kiribati20. 0470 KIR Road Rehabilitation Project - Additional Financing PARD SPSO 2.400 11-Dec-15 16-Feb-16 1-Mar-16 14 0.5
Kyrgyz Republic21. 0419 KGZ Toktogul Rehabilitation Phase 2 Project CWRD CWEN 44.500 2-Dec-14 26-Dec-14 1-Apr-16 462 15.222. 6002 KGZ Central Asia Regional Economic Cooperation
Corridors 1 and 3 Connector Road Project Design Advance
CWRD CWTC 3.000 2-Jun-15 15-Jun-15 25-Jan-16 224 7.4
Lao People's Democratic Republic23. 0449 LAO Second Greater Mekong Subregion Regional
Communicable Diseases Control Project (Additional Cofinancing to Grant 232-LAO)
SERD SEHS 3.000 26-Oct-15 17-Nov-15 4-Jan-16 48 1.6
24. 0471 LAO Vientiane Sustainable Urban Transport Project SERD SETC 1.840 10-Mar-15 3-Mar-16 29-Aug-16 179 5.9
Marshall Islands25. 0476 RMI Third Drought Disaster Response Project PARD PAUS 0.200 6-Apr-16 26-Apr-16 26-Apr-16 - -
Mongolia26. 0475 MON Dzud Disaster Response EARD MNRM 2.000 6-Apr-16 11-Apr-16 13-Apr-16 2 0.127. 9182 MON Improving School Dormitory Environment for Primary
Students in Western RegionEARD EASS 3.000 26-Nov-15 26-Jan-16 16-Mar-16 50 1.6
28. 9183 MON Integrated Livelihoods Improvement and Sustainable Tourism in Khuvsgul Lake National Park
EARD EAER 3.000 7-Dec-15 26-Jan-16 16-Mar-16 50 1.6
Grant Revised Amount
($ million)
Date of Grant
Approval
Date of Grant
SigningDate of Grant Effectiveness
Time Elapsed Signing - Effectivity
27
GRANTS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
No.Country/ Grant No. Project Name Dept Div (Days) (Months)
Grant Revised Amount
($ million)
Date of Grant
Approval
Date of Grant
SigningDate of Grant Effectiveness
Time Elapsed Signing - Effectivity
Myanmar29. 9184 MYA Economic Empowerment of the Poor and Women in
the East-West Economic CorridorSERD MYRM 3.000 15-Dec-15 17-May-16 17-Aug-16 92 3.0
30. 9185 MYA Emergency Support for Chin State Livelihoods Restoration
SERD SEER 10.000 22-Apr-16 31-Aug-16 21-Oct-16 51 1.7
Nauru31. 0443 NAU Electricity Supply Security and Sustainability -
Additional FinancingPARD PLCO 4.736 16-Oct-15 6-Nov-15 8-Jan-16 63 2.1
Nepal32. 9180 NEP Disaster Risk Reduction and Livelihood Restoration
for Earthquake Affected CommunitiesSARD NRM 15.000 7-Oct-15 8-Dec-15 8-Jan-16 31 1.0
Pakistan33. 0451 PAK National Highway Network Development in
Balochistan Project (Partial Substitution of ADB OCR Loan)
CWRD PRM 72.400 3-Nov-15 14-Jan-16 2-Feb-16 19 0.6
34. 0482 PAK National Motorway M-4 Gojra–Shorkot-Khanewal Section Project - Additional Financing
CWRD CWTC 34.000 10-Jun-16 20-Jun-16 1-Sep-16 73 2.4
35. 0519 PAK National Disaster Risk Management Fund CWRD PRM 3.362 23-Nov-16 2-Dec-16 27-Dec-16 25 0.8
Papua New Guinea36. 0447 PNG Building Resilience to Climate Change in Papua New
GuineaPARD PATE 24.250 21-Oct-15 15-Jan-16 1-Mar-16 46 1.5
37. 0469 PNG Town Electrification Investment Program, Tranche 1 (additional financing)
PARD PNRM 4.766 9-Dec-15 22-Jan-16 15-Apr-16 84 2.8
Philippines38. 0472 PHI KALAHI–CIDSS National Community-Driven
Development Project - Additional FinancingSERD SEHS 5.000 4-Mar-16 21-Mar-16 11-May-16 51 1.7
Samoa39. 0456 SAM Renewable Energy Development and Power Sector
Rehabilitation Project - Additional FinancingPARD SPSO 5.060 18-Nov-15 3-Dec-15 6-Jan-16 34 1.1
40. 0457 SAM Renewable Energy Development and Power Sector Rehabilitation Project - Additional Financing
PARD SPSO 2.490 18-Nov-15 3-Dec-15 6-Jan-16 34 1.1
41. 0458 SAM Samoa Submarine Cable Project PARD PAUS 25.000 20-Nov-15 3-Dec-15 9-Feb-16 68 2.2
Sri Lanka42. 0481 SRI Sri Lanka Flood and Landslide Disaster Response SARD SLRM 2.000 9-Jun-16 13-Jun-16 14-Jun-16 1 0.03
Tajikistan43. 0452 TAJ Strengthening Technical and Vocational Education
and TrainingCWRD CWSS 15.000 9-Nov-15 16-Nov-15 14-Apr-16 150 4.9
44. 0453 TAJ Strengthening Technical and Vocational Education and Training
CWRD CWSS 2.000 9-Nov-15 16-Nov-15 14-Apr-16 150 4.9
Thailand45. 9179 THA Community-Based Flood Risk Management and
Disaster Response in the Chao Phraya BasinSERD TRM 2.000 22-Oct-14 21-Jan-16 21-Jan-16 - -
Vanuatu46. 0459 VAN Cyclone Pam Road Reconstruction Project PARD PLCO 7.000 25-Nov-15 1-Mar-16 3-Mar-16 2 0.147. 0460 VAN Cyclone Pam Road Reconstruction (Disaster
Response Facility)PARD PLCO 2.805 25-Nov-15 1-Mar-16 3-Mar-16 2 0.1
48. 0461 VAN Cyclone Pam Road Reconstruction Project PARD PLCO 2.680 25-Nov-15 1-Mar-16 3-Mar-16 2 0.149. 9181 VAN Cyclone Pam School Reconstruction Project PARD PLCO 5.000 16-Nov-15 20-Nov-15 3-Mar-16 104 3.4
Viet Nam50. 0384 VIE Renewable Energy Development and Network
Expansion and Rehabilitation for Remote Communes Sector Project (Formerly Renewable Energy for Remote Commune
SERD VRM 3.000 9-Apr-14 30-Nov-15 29-Apr-16 151 5.0
51. 0433 VIE Greater Mekong Subregion Biodiversity Conservation Corridors Project - Additional Financing
SERD VRM 3.795 24-Jun-15 4-Sep-15 23-Feb-16 172 5.7
52. 0450 VIE Second Greater Mekong Subregion Regional Communicable Diseases Control Project (Additional Grant Cofinancing to Loan 2699-VIE)
SERD SEHS 2.500 26-Oct-15 19-Feb-16 19-May-16 90 3.0
53. 0480 VIE El-Nino Disaster Response SERD VRM 3.000 1-Jun-16 12-Sep-16 12-Sep-16 - -
Subtotal / Average - Project 780.178 69 2.3
2828
GRANTS THAT BECAME EFFECTIVE(1 January - 31 December 2016)
No.Country/ Grant No. Project Name Dept Div (Days) (Months)
Grant Revised Amount
($ million)
Date of Grant
Approval
Date of Grant
SigningDate of Grant Effectiveness
Time Elapsed Signing - Effectivity
B. POLICY-BASED
Kyrgyz Republic54. 0487 KGZ Second Investment Climate Improvement Program
(Subprogram 2)CWRD CWPF 12.500 29-Jul-16 12-Aug-16 13-Dec-16 123 4.0
Nauru55. 0473 NAU Fiscal Sustainability Reform Program PARD PLCO 2.000 21-Mar-16 1-May-16 8-Jun-16 38 1.256. 0474 NAU Fiscal Sustainability Reform Program PARD PLCO 1.830 28-Apr-16 1-May-16 8-Jun-16 38 1.2
Solomon Islands57. 0478 SOL Economic Growth and Fiscal Reform Program PARD PLCO 5.000 27-May-16 1-Jul-16 20-Jul-16 19 0.6
Tonga58. 0479 TON Building Macroeconomic Resilience Subprogram 1 PARD PAUS 3.000 30-May-16 7-Jun-16 14-Jun-16 7 0.2
Subtotal / Average - Policy-Based 24.330 45 1.5
PROJECT /AVERAGE 780.178 69 2.3POLICY-BASED/ AVERAGE 24.330 45 1.5TOTAL / AVERAGE 804.509 67 2.2
Source: Grant Financial Information System (GFIS).
29
Principal Time ElapsedLoan Approval to
Amount Approval Date SigningNo. Fund Project Name Dept Div ($ million) Date Signed (Days) (Days) (Months) Remarks
PROJECT LOANS
Armenia1. 3449 ARM OCR Armenia-Georgia Border
Regional Road (M6 Vanadzor-Bagratashen) Improvement Project
CWRD CWTC 46.327 28-Oct-16 9-Nov-16 12 52 1.7 Effectivity expected by Q1 2017.
Bangladesh2. 3461 BAN OCR Natural Gas Infrastructure and
Efficiency Improvement ProjectSARD SAEN 100.000 18-Nov-16 29-Dec-16 41 2 0.1 Effectivity expected by Q1 2017.
3. 3462 BAN ADF Natural Gas Infrastructure and Efficiency Improvement Project
SARD SAEN 64.353 18-Nov-16 29-Dec-16 41 2 0.1 Effectivity expected by Q1 2017.
Cambodia4. 3429 CAM ADF Strengthening Public Financial
Management ProgramSERD CARM 3.362 26-Sep-16 6-Oct-16 10 86 2.8 Loan became effective on 25 Jan 2017.
China, People's Republic of 5. 3400 PRC OCR Shandong Groundwater
Protection ProjectEARD EAER 150.000 29-Jun-16 13-Sep-16 76 109 3.6 Loan became effective on 10 Jan 2017.
.Georgia
6. 3441 GEO OCR Urban Services Improvement Investment Program - Tranche 6
CWRD CWUW 99.000 4-Oct-16 15-Dec-16 72 16 0.5 Effectivity expected by 13 Feb 2017.
India7. 3396 IND OCR Bihar New Ganga Bridge Project SARD SATC 500.000 24-Jun-16 15-Nov-16 144 46 1.5 Loan became effective on 26 Jan 2017.8. 3413 IND OCR Kolkata Environmental
Improvement Investment Program - Tranche 2
SARD SAUW 200.000 16-Aug-16 21-Nov-16 97 40 1.3 Loan became effective on 10 Jan 2017.
Kazakhstan9. 3416 KAZ OCR CAREC Corridors 1 and 6
Connector Road (Aktobe–Makat) Reconstruction Project
CWRD CWTC 240.300 26-Aug-16 7-Dec-16 103 24 0.8 Effectivity expected by Q1 2017.
Kyrgyz Republic10. 3422 KGZ ADF Toktogul Rehabilitation Phase 3
ProjectCWRD CWEN 58.113 8-Sep-16 13-Dec-16 96 18 0.6 Effectivity expected by Jun 2017.
11. 3432 KGZ ADF Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project
CWRD CWTC 56.334 27-Sep-16 2-Dec-16 66 29 1.0 Effectivity expected by Q1 2017.
Lao People's Democratic Republic12. 3435 LAO ADF Second Strengthening Higher
Education ProjectSERD SEHS 15.906 29-Sep-16 8-Nov-16 40 53 1.7 Loan became effective on 6 Jan 2017.
Myanmar13. 3316 MYA ADF Mandalay City Urban Services
Improvement ProjectSERD SEUW 57.197 12-Nov-15 9-Sep-16 302 113 3.7 Awaiting legal opinion for Project
Agreement. Legal opinion for loan/grant agreement received on 11 Nov 2016. Effectivity expected by Feb 2017.
Pakistan14. 3328 PAK OCR Second Power Distribution
Enhancement Investment Program – Tranche 1
CWRD CWEN 380.000 25-Nov-15 19-Nov-16 360 42 1.4 Effectivity expected by Q1 2017.
15. 3329 PAK ADF Second Power Distribution Enhancement Investment Program – Tranche 1
CWRD CWEN 19.100 25-Nov-15 19-Nov-16 360 42 1.4 Effectivity expected by Q1 2017.
16. 3419 PAK OCR Second Power Transmission Enhancement Investment Program - Tranche 1
CWRD CWEN 115.000 31-Aug-16 29-Nov-16 90 32 1.1 Legal opinion being reviewed by OGC. Effectiveness expected by Q1 2017.
17. 3420 PAK ADF Second Power Transmission Enhancement Investment Program - Tranche 1
CWRD CWEN 9.674 31-Aug-16 29-Nov-16 90 32 1.1 Legal opinion being reviewed by OGC. Effectiveness expected by Q1 2017.
Papua New Guinea18. 3404 PNG ADF Highlands Region Road
Improvement Investment Program-Tranche 3
PARD PATE 36.925 19-Jul-16 6-Oct-16 79 86 2.8 Draft legal opinion received and revisions sent to the executing agency in Dec 2016.
19. 3408 PNG OCR Highlands Region Road Improvement Investment Program-Tranche 3
PARD PATE 70.410 19-Jul-16 6-Oct-16 79 86 2.8 Draft legal opinion received and revisions sent to the executing agency in Dec 2016.
LOANS AWAITING EFFECTIVENESS(as of 31 December 2016)
Time Elapsed Country / Loan No.
from Signinga
3030
Principal Time ElapsedLoan Approval to
Amount Approval Date SigningNo. Fund Project Name Dept Div ($ million) Date Signed (Days) (Days) (Months) Remarks
LOANS AWAITING EFFECTIVENESS(as of 31 December 2016)
Time Elapsed Country / Loan No.
from Signinga
Philippines20. 3389 PHI OCR Water District Development
Sector ProjectSERD SEUW 60.000 22-Apr-16 19-May-16 27 226 7.4 Loan effectiveness extended to Feb 2017.
Regional21. 3445 REG ADF Higher Education in the Pacific
Investment Program - Tranche 2PARD PAUS 14.751 21-Oct-16 3-Nov-16 13 58 1.9 Effectivity expected by 31 Mar 2017.
Sri Lanka22. 3409 SRI OCR Supporting Electricity Supply
Reliabiity ImprovementSARD SAEN 115.000 26-Jul-16 19-Dec-16 146 12 0.4 Effectivity expected by Q1 2017.
23. 3431 SRI ADF Local Government Enhancement Sector Project - Additional Financing
SARD SAUW 58.216 27-Sep-16 2-Nov-16 36 59 1.9 Change of loan currency to be processed and corrected legal opinion to be obtained. To be delegated to SLRM.
24. 3483 SRI OCR Green Power Development and Energy Efficiency Improvement Investment Program-Tranche 2
SARD SAEN 95.000 5-Dec-16 27-Dec-16 22 4 0.1 Effectivity expected by Q1 2017.
25. 3484 SRI ADF Green Power Development and Energy Efficiency Improvement Investment Program-Tranche 2
SARD SAEN 53.828 5-Dec-16 27-Dec-16 22 4 0.1 Effectivity expected by Q1 2017.
Tajikistan26. 3434 TAJ ADF Water Resources Management
in Pyanj River BasinCWRD CWER 18.495 28-Sep-16 15-Nov-16 48 46 1.5 Effectivity expected by May 2017.
27. 3451 TAJ ADF Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
CWRD CWTC 47.440 31-Oct-16 15-Nov-16 15 46 1.5 Effectivity expected by Q1 2017.
Timor-Leste28. 3456 TIM ADF Dili to Baucau Highway Project PARD PATE 47.679 11-Nov-16 22-Dec-16 41 9 0.3 Loan effectivity being arranged with the
government.
Viet Nam29. 3374 VIE OCR Power Transmission Investment
Program - Tranche 3SERD VRM 231.310 18-Dec-15 6-Oct-16 293 86 2.8 Loan became effective on 29 Dec 2016.
Total Project 2,963.720 97 50 1.7
POLICY-BASED LOANSCambodia
30. 3460 CAM ADF Inclusive Financial Sector Development Program, Subprogram 1
SERD SEPF 38.352 17-Nov-16 14-Dec-16 27 17 0.6 Awaiting legal opinion. Effectivity expected by Feb 2017.
Cook Islands31. 3479 COO OCR Disaster Resilience Program PARD PAUS 9.660 2-Dec-16 9-Dec-16 7 22 0.7 Effectivity expected by 8 Mar 2017.
Sri Lanka32. 3446 SRI OCR Capital Market Development
ProgramSARD SAPF 250.000 26-Oct-16 24-Nov-16 29 37 1.2 Waiting for compliance of all tranche
conditions. Effectivity expected by Feb 2017.
Total Policy-Based 298.012 21 25 0.8
PROJECT + POLICY-BASEDAsian Development Fund 599.725 80 44 1.4Ordinary Capital Resources 2,662.007 100 52 1.7Total 3,261.732 90 48 1.6
Sources: Loan Financial Information System (LFIS); Regional Departmentsa No. of days from loan signing to cut-off date (31 December 2016).
Average
Average
Average
31
No. Fund Project Name Dept. Div. (Days) (Months) Remarks
A. ProjectAfghanistan
1. 0508 AFG ADF Road Asset Management Project CWRD CWTC 25.500 31-Oct-16 12-Dec-16 42 19 0.6 Grant made effective on 5 Jan 2017.2. 0521 AFG ADF Energy Supply Improvement
Investment Program, Tranche 2 (formerly MFF II: Energy Development 2014-2023)
CWRD CWEN 188.230 5-Dec-16 20-Dec-16 15 11 0.4 Effectivity expected by Mar 2017.
3. 0522 AFG AITF Energy Supply Improvement Investment Program, Tranche 2 (formerly MFF II: Energy Development 2014-2023)
CWRD CWEN 225.770 5-Dec-16 20-Dec-16 15 11 0.4 Effectivity expected by Mar 2017.
4. 0523 AFG RCPF Energy Supply Improvement Investment Program, Tranche 2 (formerly MFF II: Energy Development 2014-2023)
CWRD CWEN 1.000 5-Dec-16 20-Dec-16 15 11 0.4 Effectivity expected by Mar 2017.
Kiribati5. 0527 KIR ADF Road Rehabilitation Project -
Additional FinancingPARD SPSO 9.000 12-Dec-16 12-Dec-16 0 19 0.6 Grant made effective on 25 Jan 2017.
Kyrgyz Republic6. 0494 KGZ ADF Toktogul Rehabilitation Phase 3
ProjectCWRD CWEN 50.000 8-Sep-16 13-Dec-16 96 18 0.6 Effectivity expected by Jun 2017.
7. 0496 KGZ ADF Central Asia Regional Economic Cooperation Corridors 1 and 3 Connector Road Project
CWRD CWTC 36.720 27-Sep-16 2-Dec-16 66 29 1.0 Effectivity expected by Q1 2017.
Lao People’s Democratic Republic8. 0488 LAO STCF Greater Mekong Subregion
Biodiversity Conservation CorridorsSERD LRM 12.840 9-Aug-16 18-Oct-16 70 74 2.4 Grant made effective on 6 Jan 2017.
9. 0500 LAO ADF Second Strengthening Higher Education Project
SERD SEHS 23.470 29-Sep-16 8-Nov-16 40 53 1.7 Grant made effective on 6 Jan 2017.
10. 0503 LAO ADF Second Strengthening Technical and Vocational Education and Training Project
SERD SEHS 25.000 18-Oct-16 8-Nov-16 21 53 1.7 Grant made effective on 3 Jan 2017.
Maldives11. 0489 MLD ADF Kulhudhuffushi Harbor Expansion
ProjectSARD SATC 9.690 16-Aug-16 5-Oct-16 50 87 2.9 Awaiting legal opinion.
Mongolia12. 9187 MON JFPR Strengthening Community Resilience
to Dzud and Forest and Steppe Fires (formerly Strengthening Capacity for Disaster Risk Management and Coordination)
EARD EAER 3.000 14-Sep-16 28-Oct-16 44 64 2.1 Grant made effective on 31 Jan 2017.
Myanmar13. 0455 MYA UCCRT Mandalay Urban Services
Improvement ProjectSERD SEUW 4.000 12-Nov-15 9-Sep-16 302 113 3.7 Awaiting legal opinion. Effectivity
expected by Feb 2017.
Papua New Guinea14. 0485 PNG HRIIP Highlands Region Road Improvement
Investment Program-Tranche 3PARD PATE 19.990 19-Jul-16 6-Oct-16 79 86 2.8 Draft legal opinion received and revisions
sent to the executing agency on Dec 2016.
Philippines15. 0477 PHI UEIF Water District Development Sector
ProjectSERD SEUW 2.000 22-Apr-16 19-May-16 27 226 7.4 Awaiting legal opinion.
Regional16. 0505 REG CEF Higher Education in the Pacific
Investment Program - Tranche 2PARD PAUS 1.500 21-Oct-16 3-Nov-16 13 58 1.9 Effectivity expected by 31 Mar 2017.
Tajikistan17. 0498 TAJ ADF Water Resources Management in
Pyanj River BasinCWRD CWER 5.850 28-Sep-16 15-Nov-16 48 46 1.5 Effectivity expected by May 2017.
18. 0509 TAJ ADF Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
CWRD CWTC 15.800 31-Oct-16 15-Nov-16 15 46 1.5 Effectivity expected by Q1 2017.
GRANTS AWAITING EFFECTIVENESS(as of 31 December 2016)
Country/ Grant No.
Grant Amount
($ million)Approval
DateDate
Signed
Time Elapsed
Approval to Signing (Days)
Time Elapsed from Signinga
3232
No. Fund Project Name Dept. Div. (Days) (Months) Remarks
GRANTS AWAITING EFFECTIVENESS(as of 31 December 2016)
Country/ Grant No.
Grant Amount
($ million)Approval
DateDate
Signed
Time Elapsed
Approval to Signing (Days)
Time Elapsed from Signinga
19. 0510 TAJ CEF Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project
CWRD CWTC 2.000 31-Oct-16 15-Nov-16 15 46 1.5 Effectivity expected by Q1 2017.
20 9188 TAJ JFPR Water Resources Management in Pyanj River Basin
CWRD CWER 3.000 28-Sep-16 15-Nov-16 48 46 1.5 Effectivity expected by Feb 2017.
664.360 51 56 1.8
B. Policy-Based-NIL
Total Policy-Based / Average 0.000 0 0 0.0
PROJECT + POLICY-BasedTotal / Average
664.360 51 56 1.8
ADF/Average 389.260 39 38 1.3Special Funds/Average - - - -Others/Average 275.100 63 74 2.4Total/Average 664.360 51 56 1.8
ADF = Asian Development Fund; AITF = Afghanistan Infrastructure Trust Fund; CEF = Clean Energy Fund; HRIIP = PNG Highlands Road Improvement Inv. Prog.; JFPR = Japan Fund For Poverty Reduction; RCPF = Regional Coop. & Poverty Reduction Fund; STCF = Strategic Climate Fund; UCCRT = Urban Climate Change Resilience T.F.; UEIF = Urban Environmental Infrastructure Fund.
Sources: Grant Financial Information System (GFIS); and Regional Departments
a No. of days from signing to cut-off date (31 December 2016).
33
Principal Loan Amount
No. Fund Project Name Dept Div ($ million) (Days) (Mos.)
A. PROJECT
Afghanistan1. 2165 AFG ADF Power Transmission and Distribution
ProjectCWRD AFRM 25.745 25.169 0.576 31-Dec-15 25-May-16 146 4.8
Bangladesh2. 2265 BAN ADF Secondary Towns Water Supply and
SanitationSARD BRM 42.452 34.738 7.714 30-Jun-13 13-Jul-16 1,109 36.5
3. 2462 BAN ADF Second Urban Governance and Infrastructure Improvement (Sector) Project
SARD BRM 83.690 82.391 1.299 30-Jun-15 9-Oct-16 467 15.4
4. 2845 BAN OCR Railway Sector Investment Program - Tranche 2
SARD BRM 150.000 149.930 0.070 30-Jun-16 28-Dec-16 181 6.0
Bhutan5. 2258 BHU ADF Urban Infrastructure Development SARD SAUW 25.305 23.557 1.748 31-Dec-12 31-Aug-16 1,339 44.0
Cambodia6. 2288 CAM ADF CAM: GMS Rehabilitation of the Railway in
CambodiaSERD SETC 42.803 42.774 0.029 30-Jun-10 1-Nov-16 2,316 76.1
7. 2373 CAM ADF CAM: Greater Mekong Subregion Southern Transport Corridor Project (Cambodia and Vietnam)
SERD SETC 6.812 6.407 0.405 31-Dec-12 12-Apr-16 1,198 39.4
8. 2376 CAM ADF Tonle Sap Lowlands Rural Development Project
SERD CARM 9.836 9.731 0.105 30-Jun-15 19-Jul-16 385 12.7
9. 2602 CAM ADF Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia Project
SERD SETC 38.529 35.569 2.960 30-Sep-13 1-Nov-16 1,128 37.1
10. 2852 CAM ADF Flood Damage Emergency Reconstruction Project
SERD CARM 52.955 51.645 1.310 30-Sep-15 10-Mar-16 162 5.3
China, People's Republic of 11. 2244 PRC OCR Hunan Flood Management Sector Project EARD EAER 200.000 191.172 8.828 31-Mar-13 25-Feb-16 1,061 34.912. 2260 PRC OCR Inner Mongolia Autonomous Region
Environmental ImprovementEARD EAEN 120.000 117.847 2.153 31-Dec-11 21-Jul-16 1,664 54.7
13. 2395 PRC OCR Henan Sustainable Agriculture and Productivity Improvement Project (formerly Henan High Efficiency Agriculture Development [Sanmenxia Area])
EARD PRCM 66.700 58.460 8.240 30-Jun-13 26-Jan-16 940 30.9
14. 2436 PRC OCR Ningxia Integrated Ecosystem and Agricultural Development Project
EARD PRCM 100.000 99.571 0.429 30-Apr-15 28-Oct-16 547 18.0
15. 2550 PRC OCR Liaoning Small Cities and Towns Development Demonstration Sector Project
EARD PRCM 100.000 91.957 8.043 31-Mar-16 27-Sep-16 180 5.9
16. 2600 PRC OCR Anhui Integrated Transport Sector Improvement Project
EARD PRCM 200.000 200.000 - 31-Dec-15 21-Jun-16 173 5.7
17. 2607 PRC OCR Shanxi Integrated Agricultural Development Project
EARD EAER 100.000 100.000 - 30-Jun-16 6-Sep-16 68 2.2
18. 2631 PRC OCR Second Heilongjiang Road Network Development Project
EARD PRCM 200.000 199.686 0.314 30-Jun-15 13-Jan-16 197 6.5
19. 2700 PRC OCR Risk Mitigation and Strengthening of Endangered Reservoirs in Shandong Province Project
EARD EAER 29.800 25.168 4.632 30-Jun-15 11-Jan-16 195 6.4
20. 2709 PRC OCR Yunnan Integrated Road Network Development Project
EARD EATC 250.000 247.422 2.578 30-Jun-16 14-Oct-16 106 3.5
India21. 2226 IND OCR Kerala Sustainable Urban Development
(formerly Urban Infrastructure Development and Environment II)
SARD INRM 221.200 113.881 107.319 30-Jun-12 25-Nov-16 1,609 52.9
22. 2510 IND OCR MFF - National Power Grid Development Investment Program - Tranche 2
SARD INRM 200.000 124.000 76.000 30-Jun-14 10-Feb-16 590 19.4
23. 2669 IND OCR MFF - Agribusiness Infrastructure Development Investment Program - Tranche 1
SARD SAER 67.600 0.000 67.600 30-Jun-18 12-Aug-16 (687) (22.6)
24. 2736 IND OCR Madhya Pradesh State Roads Project III SARD INRM 300.000 222.115 77.885 30-Jun-14 21-Dec-16 905 29.825. 2837 IND OCR Agribusiness Infrastructure Development
Investment Program - Tranche 2SARD SAER 24.300 0.525 23.775 31-Dec-15 31-Mar-16 91 3.0
Indonesia26. 2264 INO ADF Infrastructure Project Development Facility SERD IRM 26.915 22.169 4.746 30-Sep-12 1-Feb-16 1,219 40.127. 2619 INO OCR Java-Bali Electricity Distribution
Performance Improvement ProjectSERD IRM 50.000 39.127 10.873 30-Nov-12 25-Apr-16 1,242 40.8
28. 2768 INO OCR Urban Sanitation and Rural Infrastructure Support to PNPM Mandiri Project
SERD IRM 100.000 95.554 4.446 30-Jun-15 23-Nov-16 512 16.8
Delays in Loan Closing Date
LOANS CLOSED(1 January - 31 December 2016)
Country / Loan No.
Cumulative Loan
Disbursements ($ million)
Cumulative Loan
Cancellation ($ million)
Original Closing
Date
Actual Closing
Date
3434
Principal Loan Amount
No. Fund Project Name Dept Div ($ million) (Days) (Mos.)
Delays in Loan Closing Date
LOANS CLOSED(1 January - 31 December 2016)
Country / Loan No.
Cumulative Loan
Disbursements ($ million)
Cumulative Loan
Cancellation ($ million)
Original Closing
Date
Actual Closing
Date
Kazakhstan29. 2728 KAZ OCR Central Asia Regional Economic
Cooperation Corridor 2 (Mangystau Oblast Sections) Investment Program - Project 1
CWRD CWTC 283.000 151.111 131.889 31-Jan-16 29-Feb-16 29 1.0
30. 2824 KAZ OCR Central Asia Regional Economic Cooperation Corridor 1 (Taraz Bypass) Project
CWRD CWTC 95.000 82.328 12.672 30-Jun-15 28-Apr-16 303 10.0
31. 2916 KAZ OCR CAREC Corridor 3 (Shymkent-Tashkent Section) [Link to the Western Europe-Western People's Republic of China International Transit Corridor] Road Improvement Project
CWRD CWTC 125.000 80.681 44.319 30-Jun-16 31-Oct-16 123 4.0
32. 3093 KAZ OCR Small and Medium Enterprises Investment Program - Tranche 2
CWRD CWPF 122.000 122.000 - 28-Dec-15 9-Nov-16 317 10.4
Kyrgyz Republic33. 2668 KGZ ADF Emergency Assistance for Recovery and
ReconstructionCWRD CWUW 47.517 46.750 0.767 31-Mar-14 23-Nov-16 968 31.8
Pakistan34. 2396 PAK OCR MFF-Power Transmission Enhancement
Investment Program PFR2CWRD CWEN 220.000 156.838 63.162 31-Dec-13 22-Aug-16 965 31.7
35. 2499 PAK ADF MFF - Sindh Cities Improvement Investment Program - Project 1
CWRD PRM 39.059 36.971 2.088 31-Dec-12 31-Mar-16 1,186 39.0
36. 2742 PAK OCR Flood Emergency Reconstruction Project CWRD CWTC/C 600.000 458.511 141.489 30-Sep-14 8-Aug-16 678 22.3
Papua New Guinea37. 2398 PNG OCR Lae Port Development Project PARD PNRM 60.000 60.000 - 30-Jun-12 30-Jun-16 1,461 48.038. 2399 PNG ADF Lae Port Development Project PARD PNRM 38.423 38.423 - 30-Jun-12 30-Jun-16 1,461 48.039. 2588 PNG OCR Civil Aviation Development Investment
Program - Project 1PARD PNRM 25.000 24.615 0.385 30-Jun-13 15-Jul-16 1,111 36.5
40. 2589 PNG ADF Civil Aviation Development Investment Program - Project 1
PARD PNRM 46.707 46.402 0.305 30-Jun-13 15-Jul-16 1,111 36.5
41. 2590 PNG ADF Civil Aviation Development Investment Program - Project 1
PARD PNRM 18.680 18.680 - 30-Jun-13 15-Jul-16 1,111 36.5
42. 2803 PNG OCR Lae Port Development Project (additional financing)
PARD PNRM 85.000 84.984 0.016 31-Dec-14 30-Jun-16 547 18.0
43. 2804 PNG ADF Lae Port Development Project (additional financing)
PARD PNRM 4.063 4.063 - 31-Dec-14 30-Jun-16 547 18.0
Sri Lanka44. 2546 SRI ADF Eastern and North Central Provincial Road
Project (formerly Road Network Project [Provincial Roads])
SARD SLRM 69.845 65.267 4.578 30-Jun-14 5-Aug-16 767 25.2
45. 2757 SRI OCR Secondary Towns and Rural Community-Based Water Supply and Sanitation Project (Additional Financing)
SARD SLRM 4.300 3.821 0.479 30-Jun-14 11-Feb-16 591 19.4
46. 2758 SRI ADF Secondary Towns and Rural Community-Based Water Supply and Sanitation Project (Additional Financing)
SARD SLRM 12.600 10.059 2.541 30-Jun-14 11-Feb-16 591 19.4
Uzbekistan47. 3043 UZB OCR Improving Rural Small Business Access to
FinanceCWRD CWPF 50.000 50.000 - 31-Dec-17 20-Jan-16 (711) (23.4)
Viet Nam48. 2302 VIE ADF VIE: GMS Kunming-Haiphong Transport
Corridor: Yen Vien-Lao Cai Railway Upgrading Project
SERD SETC 57.494 55.717 1.777 31-Dec-12 21-Dec-16 1,451 47.7
49. 2429 VIE OCR Song Bung 4 Hydropower Project SERD SEEN 196.000 181.141 14.859 30-Jun-14 21-Jul-16 752 24.750. 2468 VIE ADF Health Care in the South Central Coast
Region ProjectSERD SEHS 71.035 68.851 2.184 30-Jun-14 28-Sep-16 821 27.0
51. 2583 VIE ADF Secondary Education Sector Development Program (Project Loan)
SERD VRM 37.764 36.672 1.092 31-Dec-15 20-Apr-16 111 3.6
52. 2747 VIE ADF Phuoc Hoa Water Resources Management (Supplementary)
SERD VRM 58.377 48.537 9.840 30-Sep-14 16-Mar-16 533 17.5
Average Project 690 22.7
35
Principal Loan Amount
No. Fund Project Name Dept Div ($ million) (Days) (Mos.)
Delays in Loan Closing Date
LOANS CLOSED(1 January - 31 December 2016)
Country / Loan No.
Cumulative Loan
Disbursements ($ million)
Cumulative Loan
Cancellation ($ million)
Original Closing
Date
Actual Closing
Date
B. POLICY-BASED
China, People's Republic of 53. 3356 PRC OCR Beijing-Tianjin-Hebei Air Quality
Improvement-Hebei Policy Reforms Program
EARD EAPF 300.000 300.000 - 30-Jun-17 3-Jun-16 (392) (12.9)
Georgia54. 3417 GEO OCR Improving Domestic Resource Mobilization
for Inclusive Growth Program, Subprogram 3
CWRD CWPF 50.000 50.000 - 31-Dec-16 30-Dec-16 (1) (0.0)
55. 3418 GEO ADF Improving Domestic Resource Mobilization for Inclusive Growth Program, Subprogram 3
CWRD CWPF 48.704 48.704 - 31-Dec-16 30-Dec-16 (1) (0.0)
Indonesia56. 2871 INO OCR Precautionary Financing Facility SERD IRM 500.000 500.000 - 31-Dec-13 18-Mar-16 808 26.657. 3274 INO OCR Financial Market Development and
Inclusion Program Subprogram 1SERD SEPF 400.000 400.000 - 30-Jun-16 3-Feb-16 (148) (4.9)
58. 3402 INO OCR Stepping Up Investments for Growth Acceleration Program (Subprogram 2)
SERD SEPF 500.000 500.000 - 31-Dec-16 22-Nov-16 (39) (1.3)
Kazakhstan59. 3272 KAZ OCR Countercyclical Support CWRD CWPF 1,000.000 1,000.000 - 31-Dec-16 5-Jan-16 (361) (11.9)
Kyrgyz Republic60. 3410 KGZ ADF Second Investment Climate Improvement
Program (Subprogram 2)CWRD CWPF 12.018 12.018 - 31-Dec-16 30-Dec-16 (1) (0.0)
Lao People’s Democratic Republic61. 3279 LAO ADF Health Sector Governance Program SERD SEHS 17.004 17.004 - 31-Mar-16 31-Mar-16 0 0.0
Mongolia62. 3297 MON OCR Social Welfare Support Program EARD EASS 150.000 150.000 - 31-Dec-16 15-Jun-16 (199) (6.5)
Pakistan63. 3321 PAK OCR Sustainable Energy Sector Reform Program
- Subprogram 2CWRD CWEN 100.000 100.000 - 30-Jun-16 30-Jun-16 0 0.0
64. 3322 PAK ADF Sustainable Energy Sector Reform Program - Subprogram 2
CWRD CWEN 293.989 293.989 - 30-Jun-16 30-Jun-16 0 0.0
Philippines65. 3333 PHI OCR Expanding Private Participation in
Infrastructure Program (Subprogram 1)SERD SEPF 300.000 300.000 - 31-Dec-16 31-Aug-16 (122) (4.0)
66. 3334 PHI OCR Encouraging Investment through Capital Market Reforms Program (Subprogram 1)
SERD SEPF 300.000 300.000 - 31-Dec-16 31-Aug-16 (122) (4.0)
Tajikistan67. 3343 TAJ ADF Investment Climate Reforms Program -
Subprogram 1CWRD CWPF 6.552 6.552 - 30-Jun-16 8-Jan-16 (174) (5.7)
Tonga68. 3393 TON ADF Building Macroeconomic Resilience
Subprogram 1PARD PAUS 2.998 2.998 - 30-Jun-16 30-Jun-16 0 0.0
Viet Nam69. 3335 VIE ADF Financial Sector Deepening Program
(Subprogram 2)SERD SEPF 100.417 100.417 - 31-Mar-16 31-Mar-16 0 0.0
Average Policy-Based (44) (1.5)
Asian Development Fund 1,338.288 1,292.224 46.064 688 22.6Ordinary Capital Resources 7,944.900 7,132.445 812.455 379 12.5Total 9,283.188 8,424.669 858.519 509 16.7
.
C. TERMINATIONS (Not Signed)
1. 3307 IND OCR Accelerating Infrastructure Investment Facility - Tranche 2
SARD SAPF 300.000 31-Mar-19 24-Nov-16
D. CANCELLATION (Not Effective)
Solomon1. 2897 SOL ADF Broadband for Development Project PARD PAUS 10.500 30-Apr-18 29-Feb-16
Source: Loan Financial Information System (LFIS)
Average
3636
No. Fund Project Name Dept Div i (Days) (Mos.)
Afghanistan1. 2215 AFG ADF Fiscal Management and Public
Administration Reform ProgramCWRD CWPF 50.398 49.642 0.756 31-Dec-15 11-Dec-15 (20) (0.7)
Armenia2. 2922 ARM ADF Women's Entrepreneurship
Support Sector Development Program
CWRD CWPF 19.086 19.086 - 31-Dec-17 17-Dec-15 (745) (24.5)
Bangladesh3. 2200 BAN ADF Southwest Area Integrated Water
Resources Planning and Management
SARD BRM 21.238 20.382 0.856 31-Dec-13 31-Dec-15 730 24.0
4. 2266 BAN ADF Secondary Education Sector Development Program
SARD BRM 88.719 75.612 13.107 30-Jun-13 31-Dec-15 914 30.0
Cambodia5. 2539 CAM ADF GMS: Cambodia Northwest
Provincial Road ImprovementSERD SETC 15.602 12.633 2.969 30-Jun-14 8-Sep-15 435 14.3
6. 2888 CAM ADF Third Education Sector Development Program
SERD SEHS 11.515 11.515 - 31-Dec-13 31-Dec-15 730 24.0
China, People's Republic of7. 2295 PRC OCR Southern Gansu Roads
DevelopmentEARD EATC 300.000 299.999 0.001 30-Jun-12 28-Dec-15 1,276 42.0
Indonesia8. 3303 INO OCR Sustainable and Inclusive Energy
Program (Subprogram 1)SERD SEEN 400.000 400.000 - 31-Dec-15 31-Dec-15 - -
Philippines9. 3233 PHI OCR Increasing Competitiveness for
Inclusive Growth Program - Subprogram 2
SERD SEPF 350.000 350.000 - 31-Dec-15 10-Nov-15 (51) (1.7)
Sri Lanka10. 2080 SRI ADF TA Loan for Road Project
Preparatory FacilitySARD SATC 15.634 15.489 0.145 31-Dec-08 31-Dec-15 2,556 84.0
Viet Nam11. 3213 VIE ADF Microfinance Development
Program Subprogram 2SERD SEPF 47.380 47.380 - 30-Jun-15 30-Sep-15 92 3.0
Source: Loan Financial Information System (LFIS)
LOANS CLOSED IN THE PREVIOUS YEAR BUT REPORTED ONLY IN THE CURRENT YEAR
Country / Loan No.
Principal Loan
Amount ($ million)
Cumulative Loan
Disbursements ($ million)
Cumulative Loan
Cancellation ($ million)
Original Closing
Date
Actual Closing
Date
Delays in Loan Closing Date
37
No. Fund Project Name Dept Div (Days) (Mos.)
A. PROJECT
Afghanistan1. 0281 AFG ESDIP Energy Sector Development Investment
Program-Tranche 3CWRD AFRM 20.000 13.109 6.891 22-Dec-11 21-Jan-12 20-Mar-12 31-Mar-15 3-Aug-16 491 16.1
2. 0282 AFG ESDIP Energy Sector Development Investment Program-Tranche 3
CWRD AFRM 12.400 8.035 4.365 22-Dec-11 21-Jan-12 20-Mar-12 31-Mar-15 3-Aug-16 491 16.1
Bangladesh3. 0036 BAN DG Southwest Area Integrated Water Resources
Planning and ManagementSARD BRM 12.500 12.250 0.250 23-Nov-05 11-May-06 23-Aug-06 31-Dec-13 5-Jan-16 735 24.2
4. 9153 BAN JFPR Institutional Support for Migrant Workers' Remittances
SARD BRM 2.000 1.788 0.212 18-Jan-11 18-Jan-12 18-Jan-12 18-Jan-15 12-Sep-16 603 19.8
Bhutan5. 0174 BHU ADF Road Network Project II SARD SATC 38.760 38.760 - 10-Nov-09 14-Dec-09 19-Jan-10 30-Jun-15 30-Jun-16 366 12.0
Cambodia6. 0090 CAM ADF Enhancing Education Quality Project SERD SEHS 27.100 27.100 0.0004 23-Nov-07 18-Feb-08 15-Sep-08 31-Oct-14 29-Feb-16 486 16.07. 0092 CAM ADF Tonle Sap Lowlands Rural Development
ProjectSERD CARM 9.900 9.884 0.016 5-Dec-07 18-Feb-08 5-Nov-08 30-Jun-15 25-Aug-16 422 13.9
8. 0096 CAM AUSG Greater Mekong Subregion Southern Coastal Corridor Project (Cambodia/Vietnam)
SERD SETC 8.000 7.578 0.422 28-Nov-07 11-Dec-07 11-Dec-07 31-Dec-12 12-Apr-16 1,198 39.4
9. 0116 CAM ADF Emergency Food Assistance Project SERD CARM 17.500 17.494 0.006 2-Oct-08 9-Oct-08 14-Oct-08 30-Sep-11 28-Jun-16 1,733 57.010. 0178 CAM ADF Strengthening Technical and Vocational
Education and Training ProjectSERD SEHS 24.500 24.204 0.296 13-Nov-09 27-Dec-09 26-Feb-10 31-Jul-15 8-Mar-16 221 7.3
11. 0187 CAM AUSG Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia Project
SERD SETC 22.460 21.201 1.259 15-Dec-09 5-Oct-10 5-Jan-11 30-Sep-13 20-Apr-16 933 30.7
12. 0302 CAM GAFSP Additional Financing for Emergency Food Assistance Project
SERD CARM 24.500 24.197 0.303 11-Sep-12 28-Sep-12 12-Oct-12 30-Jun-15 16-Nov-16 505 16.6
China, People's Republic of13. 0113 PRC GEF Ningxia Integrated Ecosystem and
Agricultural Development ProjectEARD PRCM 4.545 4.341 0.204 29-Aug-08 6-Mar-09 3-Jun-09 31-Jul-14 17-Oct-16 809 26.6
Indonesia14. 0198 INO CEF Java-Bali Electricity Distribution Performance
Improvement ProjectSERD IRM 1.000 0.966 0.034 22-Mar-10 29-Jun-10 25-Apr-11 30-Nov-12 25-Nov-16 1,456 47.9
Kyrgyz Republic15. 0217 KGZ ADF Emergency Assistance for Recovery and
ReconstructionCWRD CWUW 51.500 51.500 - 23-Sep-10 27-Sep-10 14-Feb-11 31-Mar-14 26-Sep-16 910 29.9
Lao People’s Democratic Republic16. 0082 LAO ADF Northern Greater Mekong Subregion
Transport Network Improvement ProjectSERD SETC 54.000 53.995 0.005 27-Sep-07 26-Nov-07 15-Jan-08 30-Jun-14 20-Apr-16 660 21.7
0082 LAO AUSG Northern Greater Mekong Subregion Transport Network Improvement Project
SERD SETC 14.500 14.336 0.164 27-Sep-07 26-Nov-07 15-Jan-08 30-Jun-14 20-Apr-16 660 21.7
17. 0117 LAO ADF Greater Mekong Subregion Sustainable Tourism Development Project
SERD LRM 10.000 9.891 0.109 15-Oct-08 14-Nov-08 30-Mar-09 30-Jun-14 18-Feb-16 598 19.7
18. 0144 LAO ADF Sustainable Natural Resource Management and Productivity Enhancement Project
SERD SEER 20.000 19.996 0.004 23-Feb-09 23-Mar-09 8-Sep-09 31-Dec-15 10-May-16 131 4.3
19. 0363 1 LAO ACAF Water Supply and Sanitation Sector Project SERD SEUW 6.000 - 6.000 9-Oct-13 11-Oct-13 7-Nov-13 31-Mar-22 12-Dec-16
Marshall Islands20. 0344 RMI APDRF Drought Disaster Response Project PARD PAUS 0.100 0.100 - 17-May-13 24-May-13 29-May-13 24-Nov-13 4-Feb-16 802 26.421. 0351 RMI APDRF Second Drought Disaster Response Project PARD PAUS 0.200 0.185 0.015 10-Jul-13 18-Jul-13 23-Jul-13 18-Jan-14 26-Apr-16 829 27.3
Mongolia22. 0107 MON ADF Western Regional Road Corridor
Development Project - Phase IEARD EATC 37.600 37.361 0.239 26-Feb-08 18-Apr-08 22-May-08 31-Oct-12 18-May-16 1,295 42.6
23. 0115 MON ADF Agriculture and Rural Development Project EARD EAER 14.720 14.717 0.003 29-Sep-08 24-Oct-08 7-Jan-09 31-Dec-12 13-Apr-16 1,199 39.424. 9152 MON JFPR Promoting Inclusive Financial Services for the
PoorEARD MNRM 2.500 2.475 0.025 17-Dec-10 17-Jan-12 17-Jan-12 17-Jan-15 24-Aug-16 585 19.2
25. 9164 MON JFPR Establishment of Climate Resilient Rural Livelihoods
EARD EAER 2.500 2.494 0.006 8-Jun-12 13-Jun-12 13-Jun-12 13-Dec-16 30-Aug-16 (105) (3.5)
Nepal26. 0182 NEP CLCF Energy Access and Efficiency Improvement
ProjectSARD NRM 0.300 0.024 0.276 27-Nov-09 11-Mar-10 4-Jun-10 30-Mar-13 9-Nov-16 1,320 43.4
27. 0183 NEP CEF Energy Access and Efficiency Improvement Project
SARD NRM 4.200 3.710 0.490 27-Nov-09 11-Mar-10 4-Jun-10 30-Mar-13 9-Nov-16 1,320 43.4
28. 0208 NEP ADF Second Rural Finance Sector Development Project
SARD SAPF 12.100 11.248 0.852 18-Jun-10 23-Dec-10 26-Dec-10 31-Dec-12 14-Jan-16 1,109 36.5
29. 0430 NEP APDRF Nepal Earthquake Disaster Response Humanitarian Assistance
SARD NRM 3.000 3.000 - 27-Apr-15 29-Apr-15 30-Apr-15 29-Oct-15 23-May-16 207 6.8
30. 9141 NEP JFPR Capacity Building for the Promotion of Legal Identity Among the Poor in Nepal
OGC OGC 2.000 0.312 1.688 12-Oct-09 28-Apr-10 28-Apr-10 28-Apr-14 30-Aug-16 855 28.1
31. 9159 NEP JFPR Support for Targeted and Sustainable Development Programs for Highly Marginalized Groups
SARD NRM 2.700 2.126 0.574 30-Mar-11 8-Jun-11 8-Jun-11 31-Oct-15 23-Nov-16 389 12.8
Palau 32. 0381 PAL APDRF Super Typhoon Haiyan Response Project PARD PAUS 0.200 0.200 0.00004 18-Dec-13 20-Dec-13 20-Dec-13 20-Jun-14 29-Jan-16 588 19.3
Actual Closing
Date
Delays in Grant Closing Date
GRANTS CLOSED(1 January - 31 December 2016)
Country/ Grant No.
Grant Amount
($ million)
Cumulative Grant
Disbursements ($ million)
Cumulative Grant
Cancellation ($ million)
Approval Date
Signing Date
Effectivity Date
Original Closing
Date
38
No. Fund Project Name Dept Div (Days) (Mos.)
Actual Closing
Date
Delays in Grant Closing Date
GRANTS CLOSED(1 January - 31 December 2016)
Country/ Grant No.
Grant Amount
($ million)
Cumulative Grant
Disbursements ($ million)
Cumulative Grant
Cancellation ($ million)
Approval Date
Signing Date
Effectivity Date
Original Closing
Date
Papua New Guinea33. 0042 PNG ADF HIV/AIDS Prevention and Control in Rural
Development Enclaves (ADF Grant)PARD PAUS 15.000 14.076 0.924 25-Apr-06 5-Jun-06 31-Aug-06 31-Jul-10 17-Feb-16 2,027 66.6
0042 PNG AUSG HIV/AIDS Prevention and Control in Rural Development Enclaves (ADF Grant)
PARD PAUS 3.500 3.500 - 25-Apr-06 5-Jun-06 31-Aug-06 31-Jul-10 17-Feb-16 2,027 66.6
0042 PNG NZG2 HIV/AIDS Prevention and Control in Rural Development Enclaves (ADF Grant)
PARD PAUS 3.500 3.500 - 25-Apr-06 5-Jun-06 31-Aug-06 31-Jul-10 17-Feb-16 2,027 66.6
Philippines34. 0369 PHI APDRF Typhoon Haiyan (Yolanda) Project SERD PHCO 3.000 3.000 - 13-Nov-13 14-Nov-13 14-Nov-13 14-May-14 28-Oct-16 898 29.535. 9161 PHI JFPR Enhancing Access to Quality Early Childhood
Education Services for Children in Poor Communities
SERD SEHS 1.500 1.435 0.065 20-Feb-12 23-Mar-12 23-Mar-12 23-Mar-15 20-May-16 424 13.9
Samoa36. 0097 SAM ADF Schoolnet and Community Access Project PARD PAUS 5.900 5.555 0.345 14-Dec-07 8-Jan-08 17-Mar-08 30-Jun-13 26-Sep-16 1,184 38.9
Solomon Islands37. 0292 SOL AUSG Domestic Maritime Support (Sector) Project PARD PLCO 4.300 3.768 0.532 23-May-12 2-Nov-12 28-Feb-13 31-Dec-14 20-Jul-16 567 18.638. 0293 SOL NZG2 Domestic Maritime Support (Sector) Project PARD PLCO 5.285 5.034 0.252 23-May-12 2-Nov-12 28-Feb-13 31-Dec-14 20-Jul-16 567 18.6
Tajikistan39. 0245 TAJ ADF CAREC Corridor 3 (Dushanbe-Uzbekistan
Border) Improvement ProjectCWRD CWTC 120.000 119.939 0.061 18-Jan-11 20-Jan-11 19-Feb-11 31-Jul-15 8-Aug-16 374 12.3
Timor-Leste40. 0100 TIM ADF Dili Urban Water Supply Sector Project PARD PAUS 6.000 5.920 0.080 18-Dec-07 5-Mar-08 25-Apr-08 31-May-11 25-Aug-16 1,913 62.941. 9142 TIM JFPR Our Roads Our Future-Supporting Local
Governance and Community-Based Infrastructure Works
PARD TLRM 3.000 2.999 0.001 20-Nov-09 12-Mar-10 12-Mar-10 31-Jan-14 6-Oct-16 979 32.2
Vanuatu42. 0428 VAN APDRF Vanuatu Cyclone Pam Disaster Response
ProjectPARD PLCO 1.000 0.980 0.020 20-Mar-15 25-Mar-15 25-Mar-15 25-Sep-15 31-May-16 249 8.2
Average Project 842 27.7B. POLICY-BASED
Kyrgyz Republic43. 0487 KGZ ADF Second Investment Climate Improvement
Program (Subprogram 2)CWRD CWPF 12.500 12.500 29-Jul-16 12-Aug-16 13-Dec-16 31-Dec-16 30-Dec-16 (1) (0.0)
Nauru44. 0473 NAU ADF Fiscal Sustainability Reform Program PARD PLCO 2.000 2.000 21-Mar-16 1-May-16 8-Jun-16 30-Jun-16 1-Dec-16 154 5.145. 0474 NAU LBDMF Fiscal Sustainability Reform Program PARD PLCO 1.886 1.830 0.056 28-Apr-16 1-May-16 8-Jun-16 30-Jun-16 1-Dec-16 154 5.1
Tajikistan46. 0463 TAJ ADF Investment Climate Reforms Program
(Subprogram 1)CWRD CWPF 53.400 53.400 4-Dec-15 8-Dec-15 21-Dec-15 30-Jun-16 8-Jan-16 (174) (5.7)
Tonga47. 0479 TON ADF Building Macroeconomic Resilience
Subprogram 1PARD PAUS 3.000 3.000 30-May-16 7-Jun-16 14-Jun-16 30-Jun-16 30-Jun-16 - -
Average Policy-Based 27 0.9
ADF/Average 535.480 532.540 2.940 730 24.0Special Funds/Average 7.800 7.490 0.310 699 23.0Other Sources/Average 164.776 140.986 23.790 684 22.5Total/Average 708.056 681.016 27.040 759 24.9
C. TERMINATIONS (Not Signed)
1. 0336 2 CAM AUSG Rural Energy Project SERD SEEN 0.364 - 0.364 15-Jan-16
D. CANCELLATIONS (Not Effective)
1. 0304 SOL ADF Broadband for Development Project PARD PAUS 7.500 - 7.500 29-Feb-16
- = nil, 0.000 is less than $0.0005 millionACAF = ADB Co-financed Assistance Fund; ADF = Asian Development Fund; APDRF = Asia Pacific Disaster Response Fund; AUSG = Australian Grant; CEF = Clean Energy Fund; CLCF = Climate Change Fund; DG = Dutch Grant; 'ESDIP = Energy
Sector Dev. Investment Program; GAFSP = Global Agri and Food Security Program; GEF = Global Environment Facility Grant; JFPR = Japan Fund For Poverty Reduction; NZG2 = New Zealand Grant; LBDMF = Loan Buy Down Mechanism Fund.
1 Fully cancelled.2 Termination of additional financing prior to signing.
39
Revised TA Undisbursed UncontractedAmount Original Revised Balance a Balance b
No. TA No DMC Dept Div TA Title Type ($ million) Approval Completion Completion ($ million) ($ million)
1 8401 AFG CWRD CWEN Gas Development Master Plan PA 1.700 11-Jul-13 31-Oct-14 15-Jul-16 0.501 0.0352 8148 REG CWRD CWRC Enhancing Coordination of the Central Asia Regional
Economic Cooperation ProgramPA 5.500 30-Aug-12 31-Aug-15 31-Aug-16 0.400 0.286
3 8832 PAK CWRD PRM Prioritizing Interventions for Financial Sector Development in Pakistan
PA 0.225 15-Dec-14 30-Nov-15 30-Sep-16 0.096 0.074
CWRD Subtotal 7.425 0.996 0.395
4 8471 PRC EARD EAER Market-based Eco-compensation Mechanisms in Beijing PA 0.400 1-Oct-13 31-Mar-15 30-Sep-16 0.062 0.0115 8728 PRC EARD EAPF Improving Efficiency in Public Service Procurement, Delivery,
and FinancingPA 0.800 26-Sep-14 30-Sep-16 30-Sep-16 0.246 0.143
6 8491 PRC EARD PRCM Strengthening Urban Flood Management in Huainan Municipality
PA 0.500 25-Oct-13 7-Aug-15 13-Jun-16 0.369 0.000
EARD Subtotal 1.700 0.677 0.155
7 7810 REG ERCD ERCI Supporting and Enhancing Regional Surveillance for ASEAN+3 and the Chiang Mai Initiative Multilateralization
CD 1.140 20-May-11 31-May-13 30-Sep-16 0.154 0.130
8 8533 REG ERCD ERCI Asia Regional Integration Center, Phase V RD 1.500 6-Dec-13 31-May-15 31-Aug-16 0.170 0.1009 8943 REG ERCD ERCI ADB and UNESCAP’s Asia-Pacific Trade Facilitation Forum
2015CD 0.210 11-Aug-15 31-Jul-16 31-Jul-16 0.103 0.114
ERCD Subtotal 2.850 0.427 0.345
10 7767 REG IED IED1 Evaluation Capacity Development through On-the-Job Training at the Independent Evaluation Department
CD 0.225 17-Dec-10 28-Feb-15 30-Nov-15 0.044 0.026
11 8023 REG IED IED1 Supporting Evaluation Capacity Development and Networking in Selected Developing Member Countries
CD 0.400 23-Dec-11 31-Jul-14 31-Dec-15 0.025 0.036
12 8604 REG IED IED1 Evaluation Capacity Development through PCR/TCR Preparation (Self-Evaluation) Training
CD 0.225 13-Dec-13 31-Dec-15 31-Jul-16 0.021 0.033
IED Subtotal 0.850 0.091 0.094
13 8497 REG OGC OGC Support to Combat Transnational Organized Environmental Crime and Promote Environmental Law Reform and Enforcement
CD 1.500 25-Oct-13 31-Dec-15 31-Aug-16 1.128 1.068
OGC Subtotal 1.500 1.128 1.068
14 7437 REG OSFMD OSP1 Asia Pacific Procurement Partnership Initiative CD 1.600 11-Dec-09 30-Jun-13 30-Jun-16 0.317 0.097OSFMD Subtotal 1.600 0.317 0.097
15 7469 REG PSOD PSFI Housing Finance Capacity Development in South and Southeast Asia
CD 1.300 22-Dec-09 31-Dec-12 30-Jun-16 0.808 0.043
16 8252 UZB PSOD PSFI JSC Bank Ipak Yuli Small Scale Technical Assistance CD 0.225 5-Dec-12 31-Dec-14 31-Dec-14 0.068 0.06817 8245 PRC PSOD PSIF2 Dynagreen Waste to Energy Project CD 0.500 10-Dec-12 31-Oct-15 8-Sep-16 0.277 0.075
PSOD Subtotal 2.025 1.153 0.186
18 8455 IND SARD SAEN Concentrated Solar Power Project PP 1.000 24-Sep-13 31-Oct-14 31-Mar-16 0.312 0.227SARD Subtotal 1.000 0.312 0.227
19 8485 REG SDCC SDSC Strengthening Regional Response to Malaria and other Communicable Diseases in Asia and the Pacific
CD 4.580 21-Oct-13 31-Dec-15 30-Sep-16 0.253 0.055
SDCC Subtotal 4.580 0.253 0.055
20 8224 INO SERD IRM Improving Access to Finance in Aceh and North Sumatra CD 0.800 8-Nov-12 31-Oct-14 8-Jun-16 0.027 0.01521 8244 MYA SERD MYRM Capacity Development and Institutional Support CD 2.307 3-Dec-12 30-Nov-13 30-Jun-16 0.056 0.05722 7459 REG SERD SEER Greater Mekong Subregion Biodiversity Conservation
CorridorsPP 2.250 17-Dec-09 30-Nov-10 31-Dec-14 0.161 0.126
23 7733 PHI SERD SEHS Support for Social Protection Reform (formerly MDG Acceleration and Poverty Reduction)
PA 1.400 13-Dec-10 31-Jan-13 31-Jan-16 0.395 0.189
24 8502 CAM SERD SEPF Fourth Financial Sector Program PP 0.800 6-Nov-13 31-Dec-14 30-Sep-16 0.090 0.02825 7964 LAO SERD SETC Vientiane Sustainable Urban Transport PP 0.700 12-Dec-11 31-Aug-12 30-Sep-14 0.090 0.00226 8075 REG SERD SETC Improving Road Safety in the Association of Southeast Asian
NationsCD 1.500 25-Apr-12 30-Jun-14 30-Nov-15 0.627 0.335
27 8138 INO SERD SETC Regional Roads Development II PP 1.500 8-Aug-12 31-Oct-13 30-Jun-16 0.198 0.06328 8304 MYA SERD SETC Maximizing Transport Benefits through Community
EngagementCD 0.190 21-Dec-12 31-Jul-14 31-Dec-15 0.047 0.015
29 8327 MYA SERD SETC Developing the Asset Management Program for Myanmar Roads
CD 1.365 20-Feb-13 30-Nov-14 30-Nov-15 0.004 0.004
30 8458 REG SERD SEUW Mitigation of Hazardous Waste Contamination in Urban Areas: Supporting Inclusive Growth
CD 1.500 17-Sep-13 31-Dec-15 31-Aug-16 0.558 0.052
31 8389 REG SERD TRM Support for a Regional Platform on Innovations in Education and Human Resources Development for Competitiveness towards an Integrated ASEAN Community
CD 1.400 21-Jun-13 30-Jun-15 30-Jun-16 0.822 0.575
SERD Subtotal 15.712 3.074 1.460
TOTAL 39.242 8.428 4.083a Undisbursed balance is the amount available for disbursement at the end of the quarter for active TAs.b Uncontracted balance is the amount available for contract awards at the end of the quarter for active TAs.
Source: Technical Assistance Information System (TAIS)
TAs Active 90 Days After Completion Date(as of 31 December 2016)
Milestone Dates
4040
OC
RAD
FTo
tal
OC
RAD
FTo
tal
OC
RAD
FTo
tal
I.A.
Cen
tral
and
Wes
t Asi
a (C
WR
D)
Afgh
anis
tan
-
6.
303
6.
303
-
0.00
3
0.00
3
-
0.
0
0.
0
Ar
men
ia46
.280
30.1
65
76
.445
91.6
59
17
.405
109.
064
19
8.1
57
.7
142.
7
Azer
baija
n25
5.83
2
0.37
4
256.
206
27
3.20
8
-
27
3.20
8
106.
8
-
10
6.6
G
eorg
ia44
.607
23.2
62
67
.868
65.8
02
13
.991
79. 7
93
14
7.5
60
.1
117.
6
Kaza
khst
an17
3.40
6
-
17
3.40
6
200.
669
-
200.
669
11
5.7
-
115.
7
Kyrg
yz R
epub
lic-
60.8
12
60
.812
-
5.
996
5.
996
-
9.9
9.9
Paki
stan
316.
579
18
6.01
5
502.
594
61
3.33
8
256.
146
86
9.48
5
193.
7
137.
7
173.
0
Tajik
ista
n-
-
-
-
0.
324
0.
324
-
-
-
Turk
men
ista
n-
-
-
-
-
-
-
-
-
Uzb
ekis
tan
227.
761
11
3.39
4
341.
156
46
1.31
7
130.
963
59
2.28
0
202.
5
115.
5
173.
6
Subt
otal
1,06
4.46
4
42
0.32
5
1,48
4.78
9
1,
705.
992
424.
829
2,
130.
821
160.
3
101.
1
143.
5
B.
Sout
h As
ia (S
ARD
)Ba
ngla
desh
368.
621
35
1.28
8
719.
909
54
6.20
8
449.
608
99
5.81
6
148.
2
128.
0
138.
3
Bhut
an42
.300
28.2
58
70
.558
43.5
57
35
.577
79.1
34
10
3.0
12
5.9
11
2.2
In
dia
1,80
8.78
9
-
1,80
8.78
9
1,
597.
750
-
1,
597.
750
88.3
-
88.3
M
aldi
ves
-
1.
669
1.
669
-
-
-
-
-
-
N
epal
-
22
1.19
0
221.
190
-
283.
767
28
3.76
7
-
12
8.3
12
8.3
Sr
i Lan
ka20
6.57
8
94.2
52
30
0.83
0
219.
224
13
4.41
8
353.
642
10
6.1
14
2.6
11
7.6
Su
btot
al2,
426.
289
696.
658
3,
122.
946
2,40
6.73
8
90
3.37
0
3,31
0.10
8
99
.2
129.
7
106.
0
Subt
otal
- O
pera
tions
13,
490.
753
1,11
6.98
3
4,
607.
736
4,11
2.73
0
1,
328.
199
5,44
0.92
9
11
7.8
11
8.9
11
8.1
II.
OPE
RAT
ION
S 2
C.
East
Asi
a (E
ARD
)C
hina
, Peo
ple'
s R
epub
lic o
f1,
507.
876
-
1,
507.
876
1,28
8.29
5
-
1,28
8.29
5
85
.4
-
85
.4
Mon
golia
3.14
8
60.2
11
63
.359
8.57
9
44.2
32
52
.812
272.
5
73.5
83
.4
Subt
otal
1,51
1.02
4
60
.211
1,57
1.23
4
1,
296.
874
44.2
32
1,
341.
107
85.8
73
.5
85.4
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s-
-
-
-
-
-
-
-
-
Fiji
19.0
52
-
19.0
52
3.
479
-
3.47
9
18.3
-
18.3
Ki
ribat
i-
3.63
6
3.63
6
-
3.
354
3.
354
-
92.3
92
.3
Mic
rone
sia,
Fed
erat
ed S
tate
s of
3.12
7
3.40
1
6.52
8
3.34
9
3.66
6
7.01
5
107.
1
107.
8
107.
5
Pala
u31
.120
6.43
0
37.5
50
23
.737
6.76
6
30.5
03
76
.3
105.
2
81.2
Pa
pua
New
Gui
nea
93.2
20
58
.743
151.
962
43
.319
16.1
78
59
.497
46.5
27
.5
39.2
R
egio
nal
-
0.
161
0.
161
-
-
-
-
-
-
Sa
moa
-
1.
110
1.
110
-
-
-
-
-
-
So
lom
on Is
land
s-
12.1
85
12
.185
-
9.
056
9.
056
-
74.3
74
.3
Tim
or-L
este
40.9
68
18
.491
59.4
59
35
.224
9.04
9
44.2
73
86
.0
48.9
74
.5
Tong
a-
-
-
-
-
-
-
-
-
Vanu
atu
-
2.
487
2.
487
-
2.78
3
2.78
3
-
11
1.9
11
1.9
Su
btot
al18
7.48
7
106.
642
29
4.12
8
109.
108
50
.851
159.
959
58
.2
47.7
54
.4
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a-
87.0
63
87
.063
-
94
.812
94.8
12
-
108.
9
108.
9
Indo
nesi
a21
7.97
2
4.91
6
222.
888
27
7.22
0
0.21
6
277.
436
12
7.2
4.
4
12
4.5
La
o Pe
ople
's D
emoc
ratic
Rep
ublic
-
39
.739
39.7
39
-
42.3
44
42
.344
-
10
6.6
10
6.6
M
yanm
ar-
47.3
99
47
.399
-
42
.737
42.7
37
-
90.2
90
.2
Phili
ppin
es18
6.86
5
-
18
6.86
5
232.
126
-
232.
126
12
4.2
-
124.
2
Thai
land
-
-
-
-
-
-
-
-
-
Vi
et N
am12
3.69
4
274.
152
39
7.84
5
223.
553
29
8.24
2
521.
795
18
0.7
10
8.8
13
1.2
Su
btot
al52
8.53
1
453.
269
98
1.79
9
732.
898
47
8.35
1
1,21
1.25
0
13
8.7
10
5.5
12
3.4
Su
btot
al -
Ope
ratio
ns 2
2,22
7.04
1
62
0.12
1
2,84
7.16
2
2,
138.
881
573.
435
2,
712.
315
96.0
92
.5
95.3
TO
TAL
5,71
7.79
4
1,
737.
104
7,45
4.89
8
6,
251.
611
1,90
1.63
3
8,
153.
244
109.
3
109.
5
109.
4
- =
nil,
ADF
= As
ian
Dev
elop
men
t Fun
d, O
CR
= O
rdin
ary
Cap
ital R
esou
rces
a Exc
lude
s no
nsov
erei
gn a
nd c
ofin
ance
d lo
ans;
and
incl
udes
loan
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
Sour
ces:
eO
pera
tions
, Loa
n Fi
nanc
ial I
nfor
mat
ion
Syst
em
OPE
RAT
ION
S 1
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illio
n)PR
OJE
CT
LOAN
CO
NTR
ACT
AWAR
DS/
CO
MM
ITM
ENTS
a
Proj
ecte
dAc
hiev
emen
ts (%
)Ac
tual
41
AD
FO
SFO
ther
sTo
tal
AD
FO
SFO
ther
sTo
tal
AD
FO
SFO
ther
sTo
tal
I.A
.C
entr
al a
nd W
est A
sia
(CW
RD
)A
fgha
nist
an24
4.08
2
-
132.
797
37
6.87
8
403.
499
-
14
6.44
7
549.
946
16
5.3
-
110.
3
14
5.9
Kyr
gyz
Rep
ublic
40.0
12
-
0.10
6
40
.119
16
.280
-
0.
106
16.3
86
40.7
-
10
0.0
40.8
P
akis
tan
-
-
-
-
-
-
89.7
96
89.7
96
-
-
-
-
Tajik
ista
n14
3.66
0
-
8.03
0
15
1.69
1
97.9
07
-
11.9
44
109.
850
68
.2
-
148.
7
72
.4
Subt
otal
427.
754
-
14
0.93
4
568.
688
51
7.68
5
-
248.
294
76
5.97
9
121.
0
-
17
6.2
134.
7
B
.So
uth
Asi
a (S
AR
D)
Ban
glad
esh
-
-
13.5
72
13.5
72
-
-
13.9
31
13.9
31
-
-
102.
6
10
2.6
Bhu
tan
30.0
79
-
-
30.0
79
25.3
69
-
-
25.3
69
84.3
-
-
84
.3
Indi
a-
-
4.
228
4.22
8
-
-
3.
548
3.54
8
-
-
83
.9
83.9
M
aldi
ves
14.7
62
-
2.88
0
17
.642
10
.619
-
0.
183
10.8
02
71.9
-
6.
3
61.2
N
epal
42.8
92
-
9.29
8
52
.189
49
.673
-
25
.372
75
.045
11
5.8
-
272.
9
14
3.8
Reg
iona
l-
-
0.
180
0.18
0
-
-
0.
456
0.45
6
-
-
25
3.9
253.
9
S
ri La
nka
5.50
4
-
0.
318
5.82
2
2.
230
0.48
0
0.
214
2.92
5
40
.5
-
67.5
50
.2
Subt
otal
93.2
37
-
30.4
75
123.
712
87
.892
0.
480
43.7
04
132.
076
94
.3
-
143.
4
10
6.8
Subt
otal
- O
pera
tions
152
0.99
1
-
171.
409
69
2.40
0
605.
577
0.
480
291.
998
89
8.05
6
116.
2
-
17
0.4
129.
7
II.
OPE
RA
TIO
NS
2C
.Ea
st A
sia
(EA
RD
)C
hina
, Peo
ple'
s R
epub
lic o
f-
0.
300
16.1
23
16.4
23
-
0.51
5
4.
024
4.53
9
-
17
1.7
25.0
27
.6
Mon
golia
2.83
3
-
5.
591
8.42
4
2.
375
-
4.88
2
7.
257
83.8
-
87
.3
86.1
Su
btot
al2.
833
0.30
0
21
.714
24
.847
2.
375
0.51
5
8.
906
11.7
96
83.8
17
1.7
41.0
47
.5
D.
Paci
fic (P
AR
D)
Coo
k Is
land
s-
-
-
-
-
-
6.
432
6.43
2
-
-
-
-
Fi
ji-
-
-
-
-
2.
000
-
2.00
0
-
-
-
-
K
iriba
ti2.
400
-
2.73
0
5.
130
2.40
0
-
2.
562
4.96
2
10
0.0
-
93.8
96
.7
Mar
shal
l Isl
ands
4.73
6
0.
0000
01
3.
805
8.54
1
2.
864
-
2.26
0
5.
124
60.5
-
59
.4
60.0
N
auru
4.85
7
-
6.
396
11.2
52
4.96
7
-
4.
889
9.85
6
10
2.3
-
76.4
87
.6
Pal
au-
-
-
-
-
-
-
-
-
-
-
-
P
apua
New
Gui
nea
0.02
7
-
14
.400
14
.427
-
-
13
.134
13
.134
-
-
91
.2
91.0
R
egio
nal
-
-
0.10
1
0.
101
-
-
-
-
-
-
-
-
Sam
oa30
.716
-
6.
953
37.6
68
20.9
00
-
6.74
1
27
.641
68
.0
-
97.0
73
.4
Sol
omon
Isla
nds
6.10
1
-
0.
070
6.17
2
5.
380
-
-
5.38
0
88
.2
-
-
87.2
Ti
mor
-Les
te2.
834
-
0.60
5
3.
439
1.54
2
-
0.
046
1.58
8
54
.4
-
7.6
46
.2
Tong
a4.
600
-
7.47
6
12
.076
3.
040
-
15.8
25
18.8
66
66.1
-
21
1.7
156.
2
Tu
valu
2.00
0
-
-
2.
000
1.68
6
-
-
1.
686
84.3
-
-
84
.3
Van
uatu
3.06
9
-
14
.222
17
.291
3.
069
-
15.1
77
18.2
46
100.
0
-
10
6.7
105.
5
Su
btot
al61
.339
0.
0000
01
56
.757
11
8.09
7
45.8
48
2.00
0
67
.067
11
4.91
5
74.7
20
0,00
0,00
0.0
11
8.2
97.3
E.
Sout
heas
t Asi
a (S
ERD
)C
ambo
dia
10.5
78
-
16.6
61
27.2
39
9.99
1
-
17
.729
27
.720
94
.5
-
106.
4
10
1.8
Indo
nesi
a-
-
5.
515
5.51
5
-
-
5.
075
5.07
5
-
-
92
.0
92.0
La
o P
eopl
e's
Dem
ocra
tic R
epub
lic16
.477
-
2.
307
18.7
85
21.2
78
-
1.31
0
22
.588
12
9.1
-
56.8
12
0.2
Mya
nmar
-
3.00
0
11
.954
14
.954
-
3.
000
12.3
18
15.3
18
-
100.
0
10
3.0
102.
4
P
hilip
pine
s-
0.
100
7.45
6
7.
556
-
-
3.32
5
3.
325
-
-
44.6
44
.0
Reg
iona
l-
-
0.
233
0.23
3
-
-
0.
171
0.17
1
-
-
73
.3
73.3
Th
aila
nd-
-
0.
832
0.83
2
-
-
0.
042
0.04
2
-
-
5.
0
5.0
V
iet N
am-
-
6.
744
6.74
4
-
-
3.
800
3.80
0
-
-
56
.3
56.3
Su
btot
al27
.056
3.
100
51.7
03
81.8
59
31.2
69
3.00
0
43
.769
78
.039
11
5.6
96.8
84
.7
95.3
Su
btot
al -
Ope
ratio
ns 2
91.2
28
3.40
0
13
0.17
4
224.
803
79
.491
5.
515
119.
742
20
4.74
9
87.1
16
2.2
92.0
91
.1
TOTA
L61
2.22
0
3.40
0
30
1.58
3
917.
203
68
5.06
9
5.99
5
41
1.74
1
1,10
2.80
5
11
1.9
176.
3
13
6.5
120.
2
-
= ni
l, AD
F =
Asia
n D
evel
opm
ent F
und,
OSF
= O
ther
Spe
cial
Fun
da
Ex
clud
e po
licy-
base
d gr
ants
. In
clud
es g
rant
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
Sour
ces:
Gra
nt F
inan
cial
Info
rmat
ion
Syst
em; e
Ope
ratio
ns
OPE
RA
TIO
NS
1
PRO
JEC
T G
RA
NT
CO
NTR
AC
T A
WA
RD
S a
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illio
n)
Proj
ecte
dA
chie
vem
ents
(%)
Act
ual
4242
OC
RAD
FTo
tal
OC
RAD
FTo
tal
OC
RAD
FTo
tal
I.A.
Cen
tral
and
Wes
t Asi
a (C
WR
D)
Afgh
anis
tan
-
12
.616
12.6
16
-
9.18
7
9.18
7
-
72
.8
72.8
Ar
men
ia92
.997
17.2
98
11
0.29
4
111.
336
22
.025
133.
361
11
9.7
12
7.3
12
0.9
Az
erba
ijan
686.
197
1.
229
68
7.42
6
775.
541
1.
139
77
6.68
1
113.
0
92.7
11
3.0
G
eorg
ia81
.523
98.2
82
17
9.80
5
78.3
29
12
1.13
8
199.
467
96
.1
123.
3
110.
9
Kaza
khst
an10
5.16
3
-
10
5.16
3
124.
616
-
124.
616
11
8.5
-
118.
5
Kyrg
yz R
epub
lic-
28.9
01
28
.901
-
31
.011
31.0
11
-
107.
3
107.
3
Paki
stan
541.
668
28
3.24
8
824.
916
70
5.45
4
431.
203
1,
136.
658
130.
2
152.
2
137.
8
Tajik
ista
n-
-
-
-
0.
275
0.
275
-
-
-
Turk
men
ista
n21
.661
-
21
.661
21.3
13
-
21.3
13
98
.4
-
98
.4
Uzb
ekis
tan
133.
621
45
.819
179.
440
16
1.05
7
64.3
78
22
5.43
5
120.
5
140.
5
125.
6
Subt
otal
1,66
2.82
9
48
7.39
2
2,15
0.22
1
1,
977.
647
680.
357
2,
658.
003
118.
9
139.
6
123.
6
B.
Sout
h As
ia (S
ARD
)Ba
ngla
desh
328.
243
27
7.70
1
605.
944
44
8.66
6
373.
923
82
2.59
0
136.
7
134.
6
135.
8
Bhut
an4.
2300
00
3.28
5
7.51
5
9.41
1
0.12
3
9.53
4
222.
5
3.8
126.
9
Indi
a1,
404.
414
-
1,
404.
414
1,38
0.93
6
-
1,38
0.93
6
98
.3
-
98
.3
Mal
dive
s-
-
-
-
0.
013
0.
013
-
-
-
Nep
al-
126.
528
12
6.52
8
-
15
4.05
5
154.
055
-
121.
8
121.
8
Sri L
anka
203.
182
97
.852
301.
034
19
9.45
4
139.
036
33
8.49
0
98.2
14
2.1
11
2.4
Su
btot
al1,
940.
069
505.
365
2,
445.
434
2,03
8.46
8
66
7.15
1
2,70
5.61
8
10
5.1
13
2.0
11
0.6
Su
btot
al -
Ope
ratio
ns 1
3,60
2.89
8
99
2.75
7
4,59
5.65
5
4,
016.
114
1,34
7.50
7
5,
363.
621
111.
5
135.
7
116.
7
II.O
PER
ATIO
NS
2C
.Ea
st A
sia
(EAR
D)
Chi
na, P
eopl
e's
Rep
ublic
of
1,62
8.28
0
-
1,62
8.28
0
1,
606.
653
-
1,
606.
653
98.7
-
98.7
M
ongo
lia61
.624
29.9
00
91
.524
79.7
99
25
.105
104.
904
12
9.5
84
.0
114.
6
Subt
otal
1,68
9.90
4
29
.900
1,71
9.80
4
1,
686.
452
25.1
05
1,
711.
557
99.8
84
.0
99.5
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s0.
105
-
0.10
5
0.41
2
-
0.
412
39
4.3
-
394.
3
Fiji
6.26
0
-
6.
260
0.
936
-
0.93
6
15.0
-
15.0
Ki
ribat
i-
3.24
3
3.24
3
-
2.
820
2.
820
-
87.0
87
.0
Mic
rone
sia,
Fed
erat
ed S
tate
s of
4.08
0
4.25
0
8.33
0
2.36
2
2.99
6
5.35
8
57.9
70
.5
64.3
Pa
lau
5.68
0
1.91
3
7.59
3
6.89
3
3.27
7
10.1
70
12
1.4
17
1.3
13
3.9
Pa
pua
New
Gui
nea
75.7
78
36
.527
112.
305
75
.429
39.9
11
11
5.34
0
99.5
10
9.3
10
2.7
R
egio
nal
-
0.
499
0.
499
-
0.21
0
0.21
0
-
42
.1
42.1
Sa
moa
-
0.
200
0.
200
-
0.04
4
0.04
4
-
21
.9
21.9
So
lom
on Is
land
s-
7.40
8
7.40
8
-
8.
202
8.
202
-
110.
7
110.
7
Tim
or-L
este
23.4
59
5.
204
28
.664
15.2
63
4.
212
19
.475
65.1
80
.9
67.9
To
nga
-
2.
998
2.
998
-
2.99
8
2.99
8
-
10
0.0
10
0.0
Va
nuat
u-
4.50
1
4.50
1
-
4.
302
4.
302
-
95.6
95
.6
Subt
otal
115.
362
66
.744
182.
105
10
1.29
5
68.9
72
17
0.26
7
87.8
10
3.3
93
.5
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a-
129.
873
12
9.87
3
-
14
1.48
3
141.
483
-
108.
9
108.
9
Indo
nesi
a1,
235.
393
7.80
2
1,24
3.19
5
1,
308.
885
2.83
3
1,31
1.71
8
10
5.9
36
.3
105.
5
Lao
Peop
le's
Dem
ocra
tic R
epub
lic-
11.6
06
11
.606
-
17
.148
17.1
48
-
147.
8
147.
8
Mya
nmar
-
31
.600
31.6
00
-
37.2
39
37
.239
-
11
7.8
11
7.8
Ph
ilippi
nes
651.
228
-
651.
228
70
9.95
5
-
70
9.95
5
109.
0
-
10
9.0
Th
aila
nd-
-
-
2.88
1
-
2.
881
-
-
-
Viet
Nam
276.
305
38
6.32
8
662.
633
42
0.81
0
386.
762
80
7.57
1
152.
3
100.
1
121.
9
Subt
otal
2,16
2.92
6
56
7.20
9
2,73
0.13
5
2,
442.
530
585.
466
3,
027.
995
112.
9
103.
2
110.
9
Subt
otal
- O
pera
tions
23,
968.
191
663.
853
4,
632.
045
4,23
0.27
7
67
9.54
2
4,90
9.81
9
10
6.6
10
2.4
10
6.0
TO
TAL
7,57
1.08
9
1,
656.
611
9,22
7.70
0
8,
246.
391
2,02
7.04
9
10
,273
.441
108.
9
122.
4
111.
3
- =
nil,
ADF
= As
ian
Dev
elop
men
t Fun
d, O
CR
= O
rdin
ary
Cap
ital R
esou
rces
a Exc
lude
s no
nsov
erei
gn a
nd c
ofin
ance
d lo
ans;
and
incl
udes
loan
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
Sour
ces:
eO
pera
tions
, Loa
n Fi
nanc
ial I
nfor
mat
ion
Syst
em, R
egio
nal D
epar
tmen
ts
PRO
JEC
T AN
D P
OLI
CY-
BAS
ED L
OAN
DIS
BU
RSE
MEN
TS a
OPE
RAT
ION
S 1
Proj
ecte
dAc
hiev
emen
ts (%
)
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illion
)
Actu
al
43
OC
RAD
FTo
tal
OC
RAD
FTo
tal
OC
RAD
FTo
tal
I.A.
Cen
tral
and
Wes
t Asi
a (C
WR
D)
Afg
hani
stan
-
12
.616
12.6
16
-
9.18
7
9.
187
-
72
.8
72.8
A
rmen
ia32
.997
17.2
98
50
.294
51.3
36
22
.025
73.3
61
15
5.6
127.
3
14
5.9
Aze
rbai
jan
186.
197
1.
229
187.
426
27
5.54
1
1.13
9
27
6.68
1
148.
0
92
.7
147.
6
G
eorg
ia31
.523
49.5
78
81
.101
28.3
29
72
.433
100.
763
89
.9
146.
1
12
4.2
Kaz
akhs
tan
105.
163
-
105.
163
12
4.61
6
-
12
4.61
6
118.
5
-
118.
5
K
yrgy
z R
epub
lic-
16.8
83
16
.883
-
18
.993
18.9
93
-
112.
5
11
2.5
Pak
ista
n34
1.66
8
184.
618
52
6.28
6
505.
454
33
2.57
3
838.
027
14
7.9
180.
1
15
9.2
Tajik
ista
n-
-
-
-
0.
275
0.27
5
-
-
-
Turk
men
ista
n21
.661
-
21
.661
21.3
13
-
21.3
13
98
.4
-
98
.4
Uzb
ekis
tan
133.
621
45
.819
179.
440
16
1.05
7
64.3
78
22
5.43
5
120.
5
14
0.5
125.
6
Su
btot
al85
2.82
9
328.
040
1,
180.
869
1,16
7.64
7
52
1.00
4
1,68
8.65
1
13
6.9
158.
8
14
3.0
B.
Sout
h As
ia (S
ARD
)B
angl
ades
h32
8.24
3
277.
701
60
5.94
4
448.
666
37
3.92
3
822.
590
13
6.7
134.
6
13
5.8
Bhu
tan
4.23
0000
3.28
5
7.
515
9.41
1
0.
123
9.53
4
22
2.5
3.8
126.
9
In
dia
1,40
4.41
4
-
1,40
4.41
4
1,
380.
936
-
1,
380.
936
98.3
-
98.3
M
aldi
ves
-
-
-
-
0.01
3
0.
013
-
-
-
N
epal
-
12
6.52
8
126.
528
-
154.
055
15
4.05
5
-
12
1.8
121.
8
S
ri La
nka
203.
182
97
.852
301.
034
19
9.45
4
139.
036
33
8.49
0
98.2
14
2.1
112.
4
Su
btot
al1,
940.
069
505.
365
2,
445.
434
2,03
8.46
8
66
7.15
1
2,70
5.61
8
10
5.1
132.
0
11
0.6
Subt
otal
- O
pera
tions
12,
792.
898
833.
405
3,
626.
303
3,20
6.11
4
1,
188.
155
4,39
4.26
9
11
4.8
142.
6
12
1.2
II.O
PER
ATIO
NS
2C
.Ea
st A
sia
(EAR
D)
Chi
na, P
eopl
e's
Rep
ublic
of
1,32
8.28
0
-
1,32
8.28
0
1,
306.
653
-
1,
306.
653
98.4
-
98.4
M
ongo
lia11
.624
29.9
00
41
.524
29.7
99
25
.105
54.9
04
25
6.4
84.0
13
2.2
Subt
otal
1,33
9.90
4
29
.900
1,36
9.80
4
1,
336.
452
25.1
05
1,
361.
557
99.7
84
.0
99.4
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s0.
105
-
0.
105
0.41
2
-
0.41
2
39
4.3
-
39
4.3
Fiji
6.26
0
-
6.26
0
0.
936
-
0.
936
15.0
-
15.0
K
iriba
ti-
3.24
3
3.
243
-
2.
820
2.82
0
-
87.0
87
.0
Mic
rone
sia,
Fed
erat
ed S
tate
s of
4.08
0
4.
250
8.33
0
2.
362
2.99
6
5.
358
57.9
70
.5
64.3
P
alau
5.68
0
1.
913
7.59
3
6.
893
3.27
7
10
.170
121.
4
17
1.3
133.
9
P
apua
New
Gui
nea
75.7
78
36
.527
112.
305
75
.429
39.9
11
11
5.34
0
99.5
10
9.3
102.
7
R
egio
nal
-
0.
499
0.49
9
-
0.21
0
0.
210
-
42
.1
42.1
S
amoa
-
0.
200
0.20
0
-
0.04
4
0.
044
-
21
.9
21.9
S
olom
on Is
land
s-
7.40
8
7.
408
-
8.
202
8.20
2
-
110.
7
11
0.7
Tim
or-L
este
23.4
59
5.
204
28.6
64
15
.263
4.21
2
19
.475
65.1
80
.9
67.9
To
nga
-
-
-
-
-
-
-
-
-
V
anua
tu-
4.50
1
4.
501
-
4.
302
4.30
2
-
95.6
95
.6
Subt
otal
115.
362
63
.746
179.
107
10
1.29
5
65.9
74
16
7.26
9
87.8
10
3.5
93.4
E.
Sout
heas
t Asi
a (S
ERD
)C
ambo
dia
-
75
.080
75.0
80
-
86.6
91
86
.691
-
11
5.5
115.
5
In
done
sia
235.
393
7.
802
243.
195
30
8.88
5
2.83
3
31
1.71
8
131.
2
36
.3
128.
2
La
o P
eopl
e's
Dem
ocra
tic R
epub
lic-
11.6
06
11
.606
-
17
.148
17.1
48
-
147.
8
14
7.8
Mya
nmar
-
31
.600
31.6
00
-
37.2
39
37
.239
-
11
7.8
117.
8
P
hilip
pine
s51
.228
-
51
.228
109.
955
-
109.
955
21
4.6
-
21
4.6
Thai
land
-
-
-
2.
881
-
2.
881
-
-
-
V
iet N
am27
6.30
5
285.
911
56
2.21
6
420.
810
28
6.34
5
707.
155
15
2.3
100.
2
12
5.8
Subt
otal
562.
926
41
1.99
9
974.
925
84
2.53
0
430.
256
1,
272.
786
149.
7
10
4.4
130.
6
Su
btot
al -
Ope
ratio
ns 2
2,01
8.19
1
50
5.64
5
2,52
3.83
7
2,
280.
277
521.
335
2,
801.
612
113.
0
10
3.1
111.
0
TO
TAL
4,81
1.08
9
1,
339.
051
6,15
0.14
0
5,
486.
391
1,70
9.49
0
7,
195.
881
114.
0
12
7.7
117.
0
-
= ni
l, A
DF
= A
sian
Dev
elop
men
t Fun
d, O
CR
= O
rdin
ary
Cap
ital R
esou
rces
a Exc
lude
s no
nsov
erei
gn a
nd c
ofin
ance
d lo
ans;
and
incl
udes
loan
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
Sou
rces
: eO
pera
tions
, Loa
n Fi
nanc
ial I
nfor
mat
ion
Sys
tem
OPE
RAT
ION
S 1
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illio
n)PR
OJE
CT
LOAN
DIS
BU
RSE
MEN
TS a
Proj
ecte
dAc
hiev
emen
ts (%
)Ac
tual
4444
OC
RAD
FTo
tal
OC
RAD
FTo
tal
OC
RAD
FTo
tal
I.A.
Cen
tral
and
Wes
t Asi
a (C
WR
D)
Afgh
anis
tan
-
-
-
-
-
-
-
-
-
Ar
men
ia60
.000
-
60
.000
60.0
00
-
60.0
00
10
0.0
-
100.
0
Azer
baija
n50
0.00
0
-
50
0.00
0
500.
000
-
500.
000
10
0.0
-
100.
0
Geo
rgia
50.0
00
48
.704
98.7
04
50
.000
48.7
04
98
.704
100.
0
100.
0
100.
0
Kaza
khst
an-
-
-
-
-
-
-
-
-
Kyrg
yz R
epub
lic-
12.0
18
12
.018
-
12
.018
12.0
18
-
100.
0
100.
0
Paki
stan
200.
000
98
.630
298.
630
20
0.00
0
98.6
30
29
8.63
0
100.
0
100.
0
100.
0
Tajik
ista
n-
-
-
-
-
-
-
-
-
Turk
men
ista
n-
-
-
-
-
-
-
-
-
Uzb
ekis
tan
-
-
-
-
-
-
-
-
-
Su
btot
al81
0.00
0
159.
352
96
9.35
2
810.
000
15
9.35
3
969.
353
10
0.0
10
0.0
10
0.0
B
.So
uth
Asia
(SAR
D)
Bang
lade
sh-
-
-
-
-
-
-
-
-
Bhut
an-
-
-
-
-
-
-
-
-
Indi
a-
-
-
-
-
-
-
-
-
Mal
dive
s-
-
-
-
-
-
-
-
-
Nep
al-
-
-
-
-
-
-
-
-
Sri L
anka
-
-
-
-
-
-
-
-
-
Su
btot
al-
-
-
-
-
-
-
-
-
Subt
otal
- O
pera
tions
181
0.00
0
159.
352
96
9.35
2
810.
000
15
9.35
3
969.
353
10
0.0
10
0.0
10
0.0
II.
OPE
RAT
ION
S 2
C.
East
Asi
a (E
ARD
)C
hina
, Peo
ple'
s R
epub
lic o
f30
0.00
0
-
30
0.00
0
300.
000
-
300.
000
10
0.0
-
100.
0
Mon
golia
50.0
00
-
50.0
00
50
.000
-
50
.000
100.
0
-
10
0.0
Su
btot
al35
0.00
0
-
35
0.00
0
350.
000
-
350.
000
10
0.0
-
100.
0
D.
Paci
fic (P
ARD
)C
ook
Isla
nds
-
-
-
-
-
-
-
-
-
Fi
ji-
-
-
-
-
-
-
-
-
Kirib
ati
-
-
-
-
-
-
-
-
-
M
icro
nesi
a, F
eder
ated
Sta
tes
of-
-
-
-
-
-
-
-
-
Pala
u-
-
-
-
-
-
-
-
-
Papu
a N
ew G
uine
a-
-
-
-
-
-
-
-
-
Reg
iona
l-
-
-
-
-
-
-
-
-
Sam
oa-
-
-
-
-
-
-
-
-
Solo
mon
Isla
nds
-
-
-
-
-
-
-
-
-
Ti
mor
-Les
te-
-
-
-
-
-
-
-
-
Tong
a-
2.99
8
2.99
8
-
2.
998
2.
998
-
100.
0
100.
0
Vanu
atu
-
-
-
-
-
-
-
-
-
Su
btot
al-
2.99
8
2.99
8
-
2.
998
2.
998
-
100.
0
100.
0
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a-
54.7
93
54
.793
-
54
.793
54.7
93
-
100.
0
100.
0
Indo
nesi
a1,
000.
000
-
1,
000.
000
1,00
0.00
0
-
1,00
0.00
0
10
0.0
-
100.
0
Lao
Peop
le's
Dem
ocra
tic R
epub
lic-
-
-
-
-
-
-
-
-
Mya
nmar
-
-
-
-
-
-
-
-
-
Ph
ilipp
ines
600.
000
-
600.
000
60
0.00
0
-
60
0.00
0
100.
0
-
10
0.0
Th
aila
nd-
-
-
-
-
-
-
-
-
Viet
Nam
-
10
0.41
7
100.
417
-
100.
417
10
0.41
7
-
10
0.0
10
0.0
Su
btot
al1,
600.
000
155.
210
1,
755.
210
1,60
0.00
0
15
5.20
9
1,75
5.20
9
10
0.0
10
0.0
10
0.0
Su
btot
al -
Ope
ratio
ns 2
1,95
0.00
0
15
8.20
8
2,10
8.20
8
1,
950.
000
158.
207
2,
108.
207
100.
0
100.
0
100.
0
TOTA
L2,
760.
000
317.
560
3,
077.
560
2,76
0.00
0
31
7.56
0
3,07
7.56
0
10
0.0
10
0.0
10
0.0
-
= ni
l, AD
F =
Asia
n D
evel
opm
ent F
und,
OC
R =
Ord
inar
y C
apita
l Res
ourc
esa E
xclu
des
nons
over
eign
and
cof
inan
ced
loan
s; a
nd in
clud
es lo
ans
that
wer
e cl
osed
dur
ing
the
perio
d.So
urce
s: e
Ope
ratio
ns, L
oan
Fina
ncia
l Inf
orm
atio
n Sy
stem
, Reg
iona
l Dep
artm
ents
OPE
RAT
ION
S 1
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illio
n)PO
LIC
Y-B
ASED
LO
AN D
ISB
UR
SEM
ENTS
a
Proj
ecte
dAc
hiev
emen
ts (%
)Ac
tual
45
ADF
OSF
Oth
ers
Tota
lAD
FO
SFO
ther
sTo
tal
ADF
OSF
Oth
ers
Tota
lI.
A.C
entr
al a
nd W
est A
sia
(CW
RD
)A
fgha
nist
an16
8.81
7
-
41.4
34
210.
251
17
5.37
8
-
50. 3
95
225.
774
10
3.9
-
121.
6
10
7.4
Kyr
gyz
Rep
ublic
31.2
09
-
0.36
5
31
.574
29
.718
-
0.
365
30.0
83
95.2
-
10
0.0
95.3
P
akis
tan
-
-
73.3
05
73.3
05
-
-
69.3
28
69.3
28
-
-
94.6
94
.6
Tajik
ista
n10
1.83
3
-
4.11
6
10
5.94
9
110.
963
-
5.
824
116.
787
10
9.0
-
141.
5
11
0.2
Subt
otal
301.
858
-
11
9.22
1
421.
080
31
6.06
0
-
125.
913
44
1.97
2
104.
7
-
10
5.6
105.
0
B
.So
uth
Asia
(SAR
D)
Ban
glad
esh
-
-
13.1
03
13.1
03
-
-
11.1
85
11.1
85
-
-
85.4
85
.4
Bhu
tan
6.34
1
-
-
6.
341
7.94
2
-
-
7.
942
125.
2
-
-
12
5.2
Indi
a-
-
1.
673
1.67
3
-
-
1.
168
1.16
8
-
-
69
.8
69.8
M
aldi
ves
1.26
0
-
0.
457
1.71
7
7.
012
-
3.11
1
10
.123
55
6.5
-
680.
7
58
9.6
Nep
al43
.360
-
15
.346
58
.706
47
.437
-
19
.065
66
.502
10
9.4
-
124.
2
11
3.3
Reg
iona
l-
-
0.
079
0.07
9
-
-
0.
199
0.19
9
-
-
25
2.2
252.
2
S
ri La
nka
4.00
0
-
0.
082
4.08
2
2.
990
2.00
0
0.
450
5.44
0
74
.7
-
551.
9
13
3.3
Subt
otal
54.9
61
-
30.7
40
85.7
01
65.3
81
2.00
0
35
.178
10
2.55
9
119.
0
-
11
4.4
119.
7
Su
btot
al -
Ope
ratio
ns 1
356.
820
-
14
9.96
1
506.
781
38
1.44
1
2.00
0
16
1.09
1
544.
532
10
6.9
-
107.
4
10
7.4
II.O
PER
ATIO
NS
2C
.Ea
st A
sia
(EAR
D)
Chi
na, P
eopl
e's
Rep
ublic
of
-
0.25
3
13
.613
13
.866
-
0.
282
1.98
7
2.
268
-
111.
4
14
.6
16.4
M
ongo
lia1.
411
-
2.55
4
3.
966
1.70
0
2.
000
1.55
0
5.
251
120.
5
-
60
.7
132.
4
Su
btot
al1.
411
0.25
3
16
.168
17
.832
1.
700
2.28
2
3.
537
7.51
9
12
0.5
903.
1
21
.9
42.2
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s-
-
-
-
-
-
1.
096
1.09
6
-
-
-
-
Fi
ji-
-
-
-
-
2.
000
-
2.00
0
-
-
-
-
K
iriba
ti2.
400
-
2.35
5
4.
755
2.40
0
-
2.
100
4.50
0
10
0.0
-
89.2
94
.6
Mar
shal
l Isl
ands
1.12
0
-
0.
880
2.00
0
0.
357
0.18
5
0.
282
0.82
5
31
.9
-
32.1
41
.2
Nau
ru2.
970
-
2.41
3
5.
383
3.51
6
-
3.
134
6.64
9
11
8.4
-
129.
9
12
3.5
Pal
au-
-
-
-
-
(0
.000
04)
-
(0.0
0004
)
-
-
-
-
P
apua
New
Gui
nea
0.07
4
-
10
.119
10
.193
0.
074
-
7.79
3
7.
867
100.
0
-
77
.0
77.2
R
egio
nal
-
-
0.23
4
0.
234
-
-
(0.0
08)
(0.0
08)
-
-
(3.4
)
(3.4
)
Sam
oa7.
758
-
2.38
0
10
.138
8.
980
-
1.55
4
10
.534
11
5.7
-
65.3
10
3.9
Sol
omon
Isla
nds
7.35
5
-
0.
740
8.09
5
8.
178
-
0.74
0
8.
918
111.
2
-
10
0.0
110.
2
Ti
mor
-Les
te5.
370
-
1.17
9
6.
549
6.90
4
-
0.
262
7.16
7
12
8.6
-
22.3
10
9.4
Tong
a6.
104
-
6.16
5
12
.269
7.
124
-
10.4
59
17.5
82
116.
7
-
16
9.7
143.
3
Tu
valu
1.29
0
-
-
1.
290
0.58
1
-
-
0.
581
45.0
-
-
45
.0
Van
uatu
0.37
1
-
6.
804
7.17
5
0.
371
(0.0
20)
6.63
5
6.
986
100.
0
-
97
.5
97.4
Su
btot
al34
.812
-
33
.269
68
.081
38
.485
2.
166
34.0
46
74.6
96
110.
5
-
10
2.3
109.
7
E.
Sout
heas
t Asi
a (S
ERD
)C
ambo
dia
6.54
2
-
8.
330
14.8
72
7.12
5
-
8.
595
15.7
20
108.
9
-
10
3.2
105.
7
In
done
sia
-
-
5.76
1
5.
761
-
-
3.92
5
3.
925
-
-
68.1
68
.1
Lao
Peo
ple'
s D
emoc
ratic
Rep
ublic
32.2
68
-
1.37
3
33
.641
34
.617
-
2.
240
36.8
57
107.
3
-
16
3.2
109.
6
M
yanm
ar-
-
2.
303
2.30
3
-
-
4.
857
4.85
7
-
-
21
0.9
210.
9
P
hilip
pine
s-
-
11
.568
11
.568
-
-
12
.647
12
.647
-
-
10
9.3
109.
3
R
egio
nal
-
-
0.20
5
0.
205
-
-
0.35
7
0.
357
-
-
173.
8
17
3.8
Thai
land
-
-
0.43
5
0.
435
-
-
0.05
7
0.
057
-
-
13.0
13
.0
Vie
t Nam
-
-
6.89
7
6.
897
-
3.00
0
17
.734
20
.734
-
-
25
7.1
300.
6
Su
btot
al38
.810
-
36
.873
75
.682
41
.742
3.
000
50.4
12
95.1
54
107.
6
-
13
6.7
125.
7
Su
btot
al -
Ope
ratio
ns 2
75.0
34
0.25
3
86
.309
16
1.59
5
81.9
27
7.44
7
87
.995
17
7.36
9
109.
2
2,
947.
9
102.
0
10
9.8
TOTA
L43
1.85
3
0.25
3
23
6.27
0
668.
376
46
3.36
8
9.44
7
24
9.08
6
721.
901
10
7.3
3,73
9.5
10
5.4
108.
0
-
= ni
l, A
DF
= A
sian
Dev
elop
men
t Fun
d, O
SF
= O
ther
Spe
cial
Fun
da
In
clud
es g
rant
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
b
Exc
lude
s di
sbur
sem
ent p
roje
ctio
ns fo
r par
tially
adm
inis
tere
d gr
ants
(31,
32,
145
, 192
, 273
, 358
, 427
).S
ourc
es:
Gra
nt F
inan
cial
Info
rmat
ion
Sys
tem
; eO
pera
tions
; Reg
iona
l Dep
artm
ents
OPE
RAT
ION
S 1
PRO
JEC
T AN
D P
OLI
CY-
BAS
ED G
RAN
T D
ISB
UR
SEM
ENTS
a
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illion
)
Proj
ecte
d b
Achi
evem
ents
(%)
Actu
al
4646
ADF
OSF
Oth
ers
Tota
lAD
FO
SFO
ther
sTo
tal
ADF
OSF
Oth
ers
Tota
lI.
A.C
entr
al a
nd W
est A
sia
(CW
RD
)A
fgha
nist
an16
8.81
7
-
41.4
34
210.
251
17
5.37
8
-
50. 3
95
225.
774
10
3.9
-
121.
6
10
7.4
Kyr
gyz
Rep
ublic
18.7
09
-
0.36
5
19
.074
17
.218
-
0.
365
17.5
83
92.0
-
10
0.0
92.2
P
akis
tan
-
-
73.3
05
73.3
05
-
-
69.3
28
69.3
28
-
-
94.6
94
.6
Tajik
ista
n10
1.83
3
-
4.11
6
10
5.94
9
110.
963
-
5.
824
116.
787
10
9.0
-
141.
5
11
0.2
Subt
otal
289.
358
-
11
9.22
1
408.
580
30
3.56
0
-
125.
913
42
9.47
2
104.
9
-
10
5.6
105.
1
B
.So
uth
Asia
(SAR
D)
Ban
glad
esh
-
-
13.1
03
13.1
03
-
-
11.1
85
11.1
85
-
-
85.4
85
.4
Bhu
tan
6.34
1
-
-
6.
341
7.94
2
-
-
7.
942
125.
2
-
-
12
5.2
Indi
a-
-
1.
673
1.67
3
-
-
1.
168
1.16
8
-
-
69
.8
69.8
M
aldi
ves
1.26
0
-
0.
457
1.71
7
7.
012
-
3.11
1
10
.123
55
6.5
-
680.
7
58
9.6
Nep
al33
.360
-
15
.346
48
.706
37
.437
-
19
.065
56
.502
11
2.2
-
124.
2
11
6.0
Reg
iona
l-
-
0.
079
0.07
9
-
-
0.
199
0.19
9
-
-
25
2.2
252.
2
S
ri La
nka
4.00
0
-
0.
082
4.08
2
2.
990
2.00
0
0.
450
5.44
0
74
.7
-
551.
9
13
3.3
Subt
otal
44.9
61
-
30.7
40
75.7
01
55.3
81
2.00
0
35
.178
92
.559
12
3.2
-
114.
4
12
2.3
Subt
otal
- O
pera
tions
133
4.32
0
-
149.
961
48
4.28
1
358.
941
2.
000
161.
091
52
2.03
2
107.
4
-
10
7.4
107.
8
II.
OPE
RAT
ION
S 2
C.
East
Asi
a (E
ARD
)C
hina
, Peo
ple'
s R
epub
lic o
f-
0.
253
13.6
13
13.8
66
-
0.28
2
1.
987
2.26
8
-
11
1.4
14.6
16
.4
Mon
golia
1.41
1
-
2.
554
3.96
6
1.
700
2.00
0
1.
550
5.25
1
12
0.5
-
60.7
13
2.4
Subt
otal
1.41
1
0.
253
16.1
68
17.8
32
1.70
0
2.
282
3.53
7
7.
519
120.
5
90
3.1
21.9
42
.2
D.
Paci
fic (P
ARD
)C
ook
Isla
nds
-
-
-
-
-
-
1.09
6
1.
096
-
-
-
-
Fiji
-
-
-
-
-
2.00
0
-
2.
000
-
-
-
-
Kiri
bati
2.40
0
-
2.
355
4.75
5
2.
400
-
2.10
0
4.
500
100.
0
-
89
.2
94.6
M
arsh
all I
slan
ds1.
120
-
0.88
0
2.
000
0.35
7
0.
185
0.28
2
0.
825
31.9
-
32
.1
41.2
N
auru
0.97
0
-
0.
583
1.55
3
1.
516
-
1.30
3
2.
819
156.
3
-
22
3.5
181.
5
P
alau
-
-
-
-
-
(0.0
0004
)
-
(0
.000
04)
-
-
-
-
Pap
ua N
ew G
uine
a0.
074
-
10.1
19
10.1
93
0.07
4
-
7.
793
7.86
7
10
0.0
-
77.0
77
.2
Reg
iona
l-
-
0.
234
0.23
4
-
-
(0
.008
)
(0.0
08)
-
-
(3
.4)
(3
.4)
S
amoa
7.75
8
-
2.
380
10.1
38
8.98
0
-
1.
554
10.5
34
115.
7
-
65
.3
103.
9
S
olom
on Is
land
s2.
355
-
0.74
0
3.
095
3.17
8
-
0.
740
3.91
8
13
5.0
-
100.
0
12
6.6
Tim
or-L
este
5.37
0
-
1.
179
6.54
9
6.
904
-
0.26
2
7.
167
128.
6
-
22
.3
109.
4
To
nga
3.10
4
-
6.
165
9.26
9
4.
124
-
10.4
59
14.5
82
132.
8
-
16
9.7
157.
3
Tu
valu
1.29
0
-
-
1.
290
0.58
1
-
-
0.
581
45.0
-
-
45
.0
Van
uatu
0.37
1
-
6.
804
7.17
5
0.
371
(0.0
20)
6.
635
6.98
6
10
0.0
-
97.5
97
.4
Subt
otal
24.8
12
-
31.4
39
56.2
51
28.4
85
2.16
6
32
.216
62
.866
11
4.8
-
102.
5
11
1.8
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a6.
542
-
8.33
0
14
.872
7.
125
-
8.59
5
15
.720
10
8.9
-
103.
2
10
5.7
Indo
nesi
a-
-
5.
761
5.76
1
-
-
3.
925
3.92
5
-
-
68
.1
68.1
La
o P
eopl
e's
Dem
ocra
tic R
epub
lic32
.268
-
1.
373
33.6
41
34.6
17
-
2.24
0
36
.857
10
7.3
-
163.
2
10
9.6
Mya
nmar
-
-
2.30
3
2.
303
-
-
4.85
7
4.
857
-
-
210.
9
21
0.9
Phi
lippi
nes
-
-
11.5
68
11.5
68
-
-
12.6
47
12.6
47
-
-
109.
3
10
9.3
Reg
iona
l-
-
0.
205
0.20
5
-
-
0.
357
0.35
7
-
-
17
3.8
173.
8
Th
aila
nd-
-
0.
435
0.43
5
-
-
0.
057
0.05
7
-
-
13
.0
13.0
V
iet N
am-
-
6.
897
6.89
7
-
3.
000
17.7
34
20.7
34
-
-
257.
1
30
0.6
Subt
otal
38.8
10
-
36.8
73
75.6
82
41.7
42
3.00
0
50
.412
95
.154
10
7.6
-
136.
7
12
5.7
Subt
otal
- O
pera
tions
265
.034
0.
253
84.4
79
149.
765
71
.927
7.
447
86.1
65
165.
539
11
0.6
2,94
7.9
10
2.0
110.
5
TO
TAL
399.
353
0.
253
234.
440
63
4.04
6
430.
868
9.
447
247.
255
68
7.57
1
107.
9
3,
739.
5
105.
5
10
8.4
- =
nil,
AD
F =
Asi
an D
evel
opm
ent F
und,
OS
F =
Oth
er S
peci
al F
und
a
Incl
udes
gra
nts
that
wer
e cl
osed
dur
ing
the
perio
d.b
E
xclu
des
disb
urse
men
t pro
ject
ions
for p
artia
lly a
dmin
iste
red
gran
ts (3
1, 3
2, 1
45, 1
92, 2
73, 3
58, 4
27).
Sou
rces
: G
rant
Fin
anci
al In
form
atio
n S
yste
m; e
Ope
ratio
ns
OPE
RAT
ION
S 1
PRO
JEC
T G
RAN
T D
ISB
UR
SEM
ENTS
a
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illio
n)
Proj
ecte
d b
Achi
evem
ents
(%)
Actu
al
47
ADF
OSF
Oth
ers
Tota
lAD
FO
SFO
ther
sTo
tal
ADF
OSF
Oth
ers
Tota
lI.
A.C
entr
al a
nd W
est A
sia
(CW
RD
)Af
ghan
ista
n-
-
-
-
-
-
-
-
-
-
-
-
Ky
rgyz
Rep
ublic
12.5
00
-
-
12.5
00
12.5
00
-
-
12.5
00
100.
0
-
-
10
0.0
Paki
stan
-
-
-
-
-
-
-
-
-
-
-
-
Tajik
ista
n-
-
-
-
-
-
-
-
-
-
-
-
Su
btot
al12
.500
-
-
12
.500
12
.500
-
-
12
.500
10
0.0
-
-
100.
0
B
.So
uth
Asia
(SAR
D)
Bang
lade
sh-
-
-
-
-
-
-
-
-
-
-
-
Bh
utan
-
-
-
-
-
-
-
-
-
-
-
-
Indi
a-
-
-
-
-
-
-
-
-
-
-
-
M
aldi
ves
-
-
-
-
-
-
-
-
-
-
-
-
Nep
al10
.000
-
-
10
.000
10
.000
-
-
10
.000
10
0.0
-
-
100.
0
R
egio
nal
-
-
-
-
-
-
-
-
-
-
-
-
Sri L
anka
-
-
-
-
-
-
-
-
-
-
-
-
Subt
otal
10.0
00
-
-
10.0
00
10.0
00
-
-
10.0
00
100.
0
-
-
10
0.0
Subt
otal
- O
pera
tions
122
.500
-
-
22
.500
22
.500
-
-
22
.500
10
0.0
-
-
100.
0
II.
OPE
RAT
ION
S 2
C.
East
Asi
a (E
ARD
)C
hina
, Peo
ple'
s R
epub
lic o
f-
-
-
-
-
-
-
-
-
-
-
-
M
ongo
lia-
-
-
-
-
-
-
-
-
-
-
-
Su
btot
al-
-
-
-
-
-
-
-
-
-
-
-
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s-
-
-
-
-
-
-
-
-
-
-
-
Fi
ji-
-
-
-
-
-
-
-
-
-
-
-
Ki
ribat
i-
-
-
-
-
-
-
-
-
-
-
-
M
arsh
all I
slan
ds-
-
-
-
-
-
-
-
-
-
-
-
N
auru
2.00
0
-
1.
830
3.83
0
2.
000
-
1.83
0
3.
830
100.
0
-
10
0.0
100.
0
Pa
lau
-
-
-
-
-
-
-
-
-
-
-
-
Papu
a N
ew G
uine
a-
-
-
-
-
-
-
-
-
-
-
-
R
egio
nal
-
-
-
-
-
-
-
-
-
-
-
-
Sam
oa-
-
-
-
-
-
-
-
-
-
-
-
So
lom
on Is
land
s5.
000
-
-
5.00
0
5.
000
-
-
5 .00
0
10
0.0
-
-
100.
0
Ti
mor
-Les
te-
-
-
-
-
-
-
-
-
-
-
-
To
nga
3.00
0
-
-
3.
000
3.00
0
-
-
3.
000
100.
0
-
-
10
0.0
Tuva
lu-
-
-
-
-
-
-
-
-
-
-
-
Va
nuat
u-
-
-
-
-
-
-
-
-
-
-
-
Su
btot
al10
.000
-
1.
830
11.8
30
10.0
00
-
1.83
0
11
.830
10
0.0
-
100.
0
10
0.0
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a-
-
-
-
-
-
-
-
-
-
-
-
In
done
sia
-
-
-
-
-
-
-
-
-
-
-
-
Lao
Peop
le's
Dem
ocra
tic R
epub
lic-
-
-
-
-
-
-
-
-
-
-
-
M
yanm
ar-
-
-
-
-
-
-
-
-
-
-
-
Ph
ilippi
nes
-
-
-
-
-
-
-
-
-
-
-
-
Reg
iona
l-
-
-
-
-
-
-
-
-
-
-
-
Th
aila
nd-
-
-
-
-
-
-
-
-
-
-
-
Vi
et N
am-
-
-
-
-
-
-
-
-
-
-
-
Su
btot
al-
-
-
-
-
-
-
-
-
-
-
-
Su
btot
al -
Ope
ratio
ns 2
10.0
00
-
1.83
0
11
.830
10
.000
-
1.
830
11.8
30
100.
0
-
10
0.0
100.
0
TO
TAL
32.5
00
-
1.83
0
34
.330
32
.500
-
1.
830
34.3
30
100.
0
-
10
0.0
100.
0
-
= ni
l, AD
F =
Asia
n D
evel
opm
ent F
und,
OSF
= O
ther
Spe
cial
Fun
da
In
clud
es g
rant
s th
at w
ere
clos
ed d
urin
g th
e pe
riod.
b
Excl
udes
dis
burs
emen
t pro
ject
ions
for p
artia
lly a
dmin
iste
red
gran
ts (3
1, 3
2, 1
45, 1
92, 2
73, 3
58, 4
27).
Sour
ces:
Gra
nt F
inan
cial
Info
rmat
ion
Syst
em; R
egio
nal D
epar
tmen
ts
OPE
RAT
ION
S 1
POLI
CY-
BAS
ED G
RAN
T D
ISB
UR
SEM
ENTS
a
(1 J
anua
ry -
31 D
ecem
ber 2
016,
$ m
illion
)
Proj
ecte
d b
Achi
evem
ents
(%)
Actu
al
4848
Country/Loan No. Fund Project Name
A. Loans with Tranche Releases
Armenia1. 3453 - OCR Infrastructure Sustainability
Support Program (Phase 2)10-Nov-16 27 Dec 16 90.000 CWRD CWPF 1 27 Dec 16 60.000 27 Dec 16 60.000 60.000
2 27 Dec 17 30.000 Azerbajian
2. 3486 - OCR Countercyclical Support Facility Program
07-Dec-16 23 Dec 16 500.000 CWRD CWPF 1 23 Dec 16 500.000 23 Dec 16 500.000 500.000
Cambodia3. 3415 - ADF Decentralized Public Service
and Financial Management Sector Development Program
18 Aug 16 20 Dec 16 14.382 SERD SEPF 1 15-Dec-16 14.382 21-Dec-16 14.382 14.382
4. 3426 - ADF Upper Secondary Education Sector Development Program (Policy-Based Loan)
23-Sep-16 05 Dec 16 14.634 SERD SEHS 1 15 Dec 16 14.634 29-Dec-16 14.634 14.634
5. 3428 - ADF Strengthening Public Financial Management Program (Subprogram 1)
26-Sep-16 08 Dec 16 25.777 SERD CARM 1 Jan-17 25.777 13-Dec-16 25.777 25.777
China, People's Republic of6. 3356 - OCR Beijing-Tianjin-Hebei Air Quality
Improvement-Hebei Policy Reforms Program
10 Dec 15 20 May 16 300.000 EARD EAPF 1 30 Apr 16 300.000 03 Jun 16 300.000 300.000
Georgia7. 3417 - OCR Improving Domestic Resource
Mobilization for Inclusive Growth Program (Subprogram
31 Aug 16 06 Dec 16 50.000 CWRD CWPF 1 Q4 2016 50.000 09-Dec-16 50.000 50.000
8. 3418 - ADF Improving Domestic Resource Mobilization for Inclusive Growth Program (Subprogram 3)
31 Aug 16 06 Dec 16 48.704 CWRD CWPF 1 06-Dec-16 48.704 12-Dec-16 48.704 48.704
Indonesia9. 3402 - OCR Stepping Up Investments for
Growth Acceleration Program (Subprogram 2)
28 Jun 16 19 Aug 16 500.000 SERD SEPF 1 30-Sep-16 500.000 23 Aug 16 500.000 500.000
10. 3454 - OCR Fiscal and Public Expenditure Ma 10 Nov 16 06 Dec 16 500.000 SERD SEPF 1 Dec-16 500.000 12 Dec 16 500.000 500.000
Kyrgyz Republic11. 3410 - ADF Second Investment Climate
Improvement Program (Subprogram 2)
29 Jul 16 13 Dec 16 12.018 CWRD CWPF 1 Q4 2016 12.018 16 Dec 16 12.018 12.018
Mongolia12. 3297 - OCR Social Welfare Support
Program29 Sep 15 13 Nov 15 150.000 EARD EASS 1 30 Oct 15 100.000 20 Nov 15 100.000 150.000
2 30 Jun 16 50.000 03-May-16 50.000 13 Apr 16
Pakistan13. 3398 - OCR Public Sector Enterprises
Reform Program (Subprogram 1)
28-Jun-16 29 Jun 16 200.000 CWRD CWPF 1 Jun-16 200.000 30-Jun-16 200.000 200.000
14. 3399 - ADF Public Sector Enterprises Reform Program (Subprogram 1) (SF)
28-Jun-16 29 Jun 16 98.630 CWRD CWPF 1 Jun-16 98.630 30-Jun-16 98.630 98.630
Philippines15. 3333 - OCR Expanding Private Participation
in Infrastructure Program - Subprogram 1
26 Nov 15 18 Jan 16 300.000 SERD SEPF 1 15-Jan-16 100.000 21 Jan 16 100.000 300.000
2 1-Mar-16 200.000 10-Mar-16 200.000
16. 3334 - OCR Encouraging Investment through Capital Market Reforms Program - Subprogram 1
26 Nov 15 18 Jan 16 300.000 SERD SEPF 1 15-Jan-16 200.000 21 Jan 16 100.00 300.000
2 1-Mar-16 100.000 10-Mar-16 200.00
Tonga17. 3393 - ADF Building Macroeconomic
Resilience (Subprogram 1)30 May 16 14 Jun 16 2.998 PARD PAUS 1 14 Jun 16 2.998 22 Jun 16 2.998 2.998
Viet Nam18. 3335 - ADF 26 Nov 15 21 Mar 16 100.417 SERD SEPF 1 1-Mar-16 100.417 23 Mar 16 100.417 100.417
Subtotal (A) 3,207.560 3,177.560 3,177.560
Financial Sector Deepening Program - Subprogram 2
STATUS OF POLICY-BASED LOAN TRANCHE RELEASES(1 January - 31 December 2016, $ million)
Loan Effective-ness Date
Net Loan Amount
Expected Tranche Releases Actual Tranche Releases Cum. Disburse-
ment Date
Approved Dept. Div.Tranche
No.Release
Date Tranche Amount
Actual Date of Release
Amount Disbursed
49
Country/Loan No. Fund Project Name
STATUS OF POLICY-BASED LOAN TRANCHE RELEASES(1 January - 31 December 2016, $ million)
Loan Effective-ness Date
Net Loan Amount
Expected Tranche Releases Actual Tranche Releases Cum. Disburse-
ment Date
Approved Dept. Div.Tranche
No.Release
Date Tranche Amount
Actual Date of Release
Amount Disbursed
B. Loans without Tranche Release
Bangladesh1. 2362 - ADF Good Governance Program 30 Oct 07 26 Nov 07 144.993 SARD BRM 1 26 Nov 07 52.120 29 Nov 07 52.120 105.506
2 26 Aug 08 53.387 28 Nov 08 53.387 26 Nov 08
3 30 Jun 09 39.487 30 Sep 1025 Nov 1031 Jul 11
31 Dec 11Q2 2012
Dec 201230 Jun 1330 Jun 1431 Dec 1430-Jun-1531-Dec-15
Q2 2016Q2 2018
2. 3318 - OCR 20 Nov 15 11 Dec 15 150.000 SARD SAPF 1 Dec-15 80.000 15-Dec-15 80.000 80.000 2 15-Jun-17 70.000
3. 3319 - ADF 20 Nov 15 11 Dec 15 96.366 SARD SAPF 1 15-Jun-17 96.366
Bhutan4. 3258 - ADF 02 Jun 15 16 Jun 15 19.416 SARD SAPF 1 01-Dec-16 19.416
31-Dec-1631-Mar-17
Cambodia5. 2673 - ADF 23 Sep 10 03 Jun 11 19.250 SERD SEER 1 31 Dec 10 10.372 03 Oct 11 10.372 10.372
28 Feb 11Aug 2011Oct 2011
13 Sep 112 31 Dec 12 8.878
28 Feb 1330 Jun 1330 Jun 1531 Dec 1530-Jun-1631-Jul-16
19-Dec-1630-Jun-17
6. 3006 - ADF 27 Jun 13 13 Nov 13 23.024 SERD CARM 1 Q1 2014 12.299 19 Dec 13 12.299 12.299 31 Dec 13
2 30 Jun 16 10.725 30 Sep 1630-Nov-1630-Jun-17
7. 3166 - ADF 26 Sep 14 09 Jan 15 6.190 SERD CARM 1 09 Jan 15 3.143 13 Apr 15 3.143 3.143 01 Apr 15
2 29 Dec 17 3.047
8. 3460 - ADF Inclusive Financial Sector Development Program (Subprogram 1)
17-Nov-16 - 38.352 SERD SEPF 1 28 Feb 17 38.352
Cooks Islands9. 3479 - OCR Disaster Resilience Program 2-Dec-16 - 9.660 PARD PAUS 1 Q4 2017 9.660
India10. 2452 - OCR 02 Oct 08 02 Feb 10 105.000 SARD INRM 1 31 Jan 09 20.000 17 Feb 10 20.000 20.000
2 30 Sep 09 40.000 30 Sep 15
Q4 2016Q1 2017
3 31 Oct 10 45.000 30 Sep 15
Q4 2017
11. 3182 - OCR 24 Oct 14 25 Nov 15 250.000 SARD SAUW 1 31-Dec-15 125.000 22 Dec 15 125.000 125.000 2 31-Dec-17 125.000
12. 3187 - OCR Punjab Development Finance Program
19 Nov 14 12 Dec 14 200.000 SARD SAPF 1 15 Dec 14 50.000 18 Dec 14 50.000 50.000
2 Jun-16 50.000 Sep-16Jun-17
3 Jan-17 100.000 30-Apr-17
Jun-17
Khadi Reform and Development Program
Rajasthan Urban Sector Development Program
Third Capital Market Development Program
Third Capital Market Development Program
Strengthening Economic Management Program II
Water Resources Management Sector Development Program
Climate-Resilient Rice Commercialization Sector Development Program
Technical and Vocational Education and Training Sector Development Program
5050
Country/Loan No. Fund Project Name
STATUS OF POLICY-BASED LOAN TRANCHE RELEASES(1 January - 31 December 2016, $ million)
Loan Effective-ness Date
Net Loan Amount
Expected Tranche Releases Actual Tranche Releases Cum. Disburse-
ment Date
Approved Dept. Div.Tranche
No.Release
Date Tranche Amount
Actual Date of Release
Amount Disbursed
13. 3424 - OCR Visakhapatnam-Chennai Industrial Corridor Development Program
20 Sep 16 - 125.000 SARD SAUW 1 Q3 2017 62.500
2 Dec-19 62.500
Lao People's Democratic Republic14. 2777 - ADF 20 Sep 11 09 Jan 12 9.114 SERD SEHS 1 31 Dec 13 4.870 30 Jun 14 4.870 4.870
Mar 201430 Jun 14
2 Q4 2016 4.244 Q1 2017
Philippines15. 3505 - OCR Local Government Finance and
Fiscal Decentralization Reform Program, Subprogram 2
13-Dec-16 - 250.000 SERD SEPF 1 30 Apr 17 250.000
Sri Lanka16. 3446 - OCR Capital Market Development Pro 26-Oct-16 - 250.000 SARD SAPF 1 Mar-17 125.000
2 Sep-18 125.000 Tajikistan
17. 3513 - ADF Investment Climate Reforms Pro 22-Dec-16 - 30.157 CWRD CWPF 1 28-Feb-17 30.157
Viet Nam18. 3493 - ADF Second Secondary Education Se 8-Dec-16 - 48.005 SERD SEHS 1 Q4 2017 48.005
19. 3502 - OCR Improving Public Expenditure Qu 13-Dec-16 - 82.700 SERD SEPF 1 30 Jun 17 82.700
20. 3503 - ADF Improving Public Expenditure Qu 13-Dec-16 - 114.917 SERD SEPF 1 30 Jun 17 114.917
Subtotal (B) 1,972.144 411.190 411.190
TOTAL (A + B) 5,179.704 3,588.750 3,588.750
ADF = Asian Development Fund, OCR = Ordinary Capital Resources
Sources: eOperations; Loan Financial Information Systems; and Regional Departments
Secondary Education Sector Development Program
51
Tranche Release Tranche Actual Date AmountFund Project Name Dept Div No. Date Amount of Release Disbursed
A. Grants with Tranche Release
Kyrgyz Republic1. 0487 - ADF Second Investment Climate
Improvement Program (Subprogram 2)
29-Jul-16 13-Dec-16 12.500 CWRD CWPF 1 Q4 2016 12.500 16-Dec-16 12.500 12.500
Nauru2. 0473 - ADF Fiscal Sustainability Reform
Program21-Mar-16 08-Jun-16 2.000 PARD PLCO 1 13-May-16 2.000 31-Aug-16 2.000 2.000
20-Jul-16
3. 0474 - LBDMF Fiscal Sustainability Reform Program
28-Apr-16 08-Jun-16 1.830 PARD PLCO 1 28-Apr-16 1.830 14-Sep-16 1.830 1.830
20-Jul-16
Nepal4. 0305 - ADF 26-Sep-12 26-Aug-13 21.000 SARD NRM 1 31 May 13 11.000 09-Sep-13 11.000 21.000
31 Jul 132 31-Jul-15 10.000 09-Dec-16 10.000
15-Dec-16
Solomon5. 0478 - ADF Economic Growth and Fiscal
Reform Program27-May-16 20-Jul-16 5.000 PARD PLCO 1 05-Aug-16 5.000 29-Jul-16 5.000 5.000
Tonga6. 0479 - ADF Building Macroeconomic Resilience
(Subprogram 1)30-May-16 14-Jun-16 3.000 PARD PAUS 1 14-Jun-16 3.000 22-Jun-16 3.000 3.000
Subtotal (A) 45.330 45.330 45.330
B. Grants without Tranche Release
Kyrgyz Republic1. 0407 - ADF 29-Sep-14 28-Jul-15 10.000 CWRD CWSS 1 Q3 2015 3.000 31-Jul-15 3.000 3.000
2 Q3 2017 7.00030-Dec-17
Nepal2. 0306 - UKNIG 26-Sep-12 26-Aug-13 4.000 SARD NRM 1 31 May 13 0.900 9-Sep-13 0.900 0.900
31 Jul 132 31-Jul-15 3.100
15-Dec-16Q1 2017
Samoa3. 0525 - ADF Fiscal Resilience Improvement
Program (Subprogram 1)7-Dec-16 - 5.000 PARD SPSO 1 16-Feb-17 5.000
Tajikistan4. 0530 - ADF Investment Climate Reforms
Program - Subprogram 222-Dec-16 - 19.240 CWRD CWPF 1 28-Feb-17 19.240
Subtotal (B) 38.240 3.900 3.900
Total (A + B) 83.570 49.230 49.230
ADF= Asian Development Fund, LBDMF = Loan Buy Down Mechanism Fund, UKNIG = UK and Northern Ireland Grant
Sources: eOperations; Grant Financial Information Systems; and Regional Departments
Strengthening Public Management Program
Strengthening Education System Sector Development Program
STATUS OF POLICY-BASED GRANT TRANCHE RELEASES(1 January - 31 December 2016, $ million)
Grant Effectivity
Date
Net Grant
Amount
Expected Tranche Releases Actual Tranche ReleasesCum.
Disburse-ment
Country / Grant No.
Date Approved
Strengthening Public Management Program
5252
DateIdentified/ Cost
Principal Net Approval OverrunProject Cost Amount Amount Date of Cost Amount
Country/Loan No. Project Name ($ million) ($ million) ($ million) Overrun ($ million) Reason and Proposed Action
Armenia1. L2561 - ARM North-South Road
Corridor Investment Program - Tranche 1
- 57.119 57.119 Apr -12 / 17 Jun-16
6.000 Civil works contract amount is higher than theEngineer's estimate due to rapid increase inprices of road construction materials.Action Taken: Removal of the underfundedscope of approximately 2 km from the scope ofLoan 2561 (Tranche 1) and transferred the samescope to Loan 2729 (Tranche 2). Minor changesin scope and implementation memo wasapproved on 17 June 2016.
Cambodia2. L2839 - CAM Provincial Roads
Improvement52.888 45.559 45.559 Apr-15 5.120 Financing shortfall due to depreciation of special
drawing rights (SDR) by $5.12 million.
Action Taken: Additional financing of $6.00million under Loan 3442 CAM was approved bythe Board of Directors on 26 September 2016.
Indonesia3. L3123 - INO Metropolitan Sanitation
Management Investment Project
TBD 80.000 80.000 Aug-15 66.700 Cost overrun is due to significant increase of waste water treatment cost which is twice the original cost.
Action Taken: The Government of Indonesiathrough the Ministry of Finance has submitted arequest for changes of project scope andimplementation arrangements: Details of theirrequest are as follows: (i) cancellation of Cimahisubproject; (ii) reduction of scope of Makassar,Jambi and Pekan Baru subprojects; (iii) revisedprocurement plan; (iv) revised financing plan; (v)reallocations of loan proceeds; and (vi) revisedimplementation schedule. A major change ofproject scope and implementation memo is beingprocessed.
Kiribati4. L2795/
G0263/ G0387
South Tarawa Sanitation Improvement Sector
26.130 6.426 6.426 3.030. Costs were underestimated during projectappraisal and some packages required aredesign during actual implementation stage.Action Taken: Additional financing of $2.8 underGrant 0502 Kiribati was approved on 17 October2016 plus additional contribution of $0.23 millionfrom the Government of Kiribati to fill-up thefinancing gap.
Lao People's Democratic Republic5. G0234 - LAO Second Northern
Greater Mekong Subregion Transport Network Improvement
12.300 20.000 20.000 11-Oct-16 12.300 Cost overrun in the project's civil worksestimated to cost USD12.3 million were due to (i)inappropriate estimates for the contractsawarded for routes 6A and 6B; (ii) scope change(increased length and costs over the Na MaRiver on route 6B and; (iii) cost escalation due todelayed procurement. Action Taken: OPEC fund for InternationalDevelopment (partially administered by ADB) toprovide additional financing equivalent to USD9.0million and the Government of Lao PDR willfinance the remaining USD3.3 million. Partialadministration of additional cofinancing wasapproved by the Board of Directors on 11October 2016.
Pakistan6. L2286 - PAK Renewable Energy
Development Sector Investment Program - Tranche 1
129.390 117.000 117.000 15-Jun-16 12.000 Insufficient loan proceeds due to decline in Japanese yen to US dollar exchange rate.
LOANS/GRANTS WITH COST OVERRUNS(1 January - 31 December 2016)
53
DateIdentified/ Cost
Principal Net Approval OverrunProject Cost Amount Amount Date of Cost Amount
Country/Loan No. Project Name ($ million) ($ million) ($ million) Overrun ($ million) Reason and Proposed Action
LOANS/GRANTS WITH COST OVERRUNS(1 January - 31 December 2016)
Action Taken: The governments of KhyberPakhtunkhwa and Punjab have agreed tofinance from their own resources the $12.00million difference between cumulative contractaward and available loan proceeds.
Sri Lanka7. L2710/
L2711 - SRI Jaffna Kilinochchi
Water Supply and Sanitation Project
164.000 20.000 60.871
20.000 60.871
24-Jun-14 120.000 Cost overrun is due to change in water source and replacement of water treatment plant with sea water desalination plant. The cabinet of ministers has approved to restructure the project and request additional financing to meet the cost overrun.
Action Taken: Additional loan financing is beingprocessed and is expected be approved by theBoard of Directors on Q3 2017.
Viet Nam8. L2937/ G0317 - VIE Greater Mekong
Subregion Flood and Drought Risk Management and Mitigation Project
- 40.519 / 5.887
40.519/ 0.9089
2015 - Financing gap due to the withdrawal/terminationof grant financing by the Government ofAustralia's Department of Foreign Affairs andTrade (DFAT) from the project
Action Taken: Additional financing of $1.8 million from the Integrated Disaster Risk Fund (IDRMF) under Grant 0483 Viet Nam was approved by the Board of Directors on 15 January 2016.
Source: Regional Departments
5454
Fund Project Name
Division Principal Amount
($ million)
Amount Cancelled($ million)
Cancellation Date Reasons for Cancellations
I. LOANSA. Ordinary Capital Resources (OCR)Azerbaijan1. 2354 - AZE OCR Road Network Development Program -
Tranche 1AZRM 190.000 11.000 7-Oct-16 Partial cancellation of surplus funds to improve overall
portfolio performance and to avoid commitment charges.Bangladesh2. 2845 - BAN OCR Railway Sector Investment Program - Tranche
2BRM 150.000 0.070 28-Dec-16 Undisbursed balance at closing.
China, People's Republic of3. 2244 - PRC OCR Hunan Flood Management Sector EAER 200.000 8.828 25-Feb-16 Unutilized amount from civil works category and from
contingencies at closing4. 2260 - PRC OCR Inner Mongolia Autonomous Region
Environment ImprovementEAEN 120.000 2.153 21-Jul-16 Undisbursed amount from equipment and consulting
services at loan closing. 5. 2395 - PRC OCR Henan Sustainable Agriculture and
Productivity Improvement ProjectPRCM 66.700 0.240 26-Jan-16 Undisbursed balance at closing.
6. 2436 - PRC OCR Ningxia Integrated Ecosystem and Agricultural Development
PRCM 100.000 0.429 28-Oct-16 Undisbursed balance at closing.
7. 2550 - PRC OCR Liaoning Small Cities and Towns Development Demonstration Sector
PRCM 100.000 8.043 27-Sep-16 Final cancellation, savings from different categories tofacilitate loan closing.
8. 2574 - PRC OCR Hebei Small Cities and Towns Development Demonstration Sector
PRCM 100.000 2.741 19-Dec-16 Undisbursed balance at closing.
9. 2631 - PRC OCR Second Heilongjiang Road Network Development
PRCM 200.000 0.314 13-Jan-16 Undisbursed balance at closing.
10. 2700 - PRC OCR Risk Mitigation and Strengthening of Endangered Reservoirs in Shandong Province
EAER 29.800 4.632 11-Jan-16 Undisbursed amount at closing due to funding from other sources and actual contract prices were lower than the original estimates
11. 2709 - PRC OCR Yunnan Integrated Road Network Development
EATC 250.000 2.578 14-Oct-16 Undisbursed balance at closing.
India12. 2226 - IND OCR Kerala Sustainable Development INRM 221.200 45.000 18-May-16 Cancellation from loan funds under civil works assessed to
be unutilized during tripartite portfolio review mission in January 2016.
2226 - IND OCR Kerala Sustainable Development 9.519 25-Nov-16 Cancellation of undisbursed amount upon loan closing.13. 2452 - IND OCR Khadi Reform and Development Program INRM 150.000 45.000 20-Dec-16 Partial cancellation, program was restructured which
resulted to reduction and cancellation of loan size by $45million (memo on major changes was approved on 14December 2016).
14. 2506 - IND OCR Rajasthan Urban Sector Development Investment Program - Tranche 2
INRM 150.000 2.210 27-Jun-16 Cancellation from uncommitted/unutilized loan funds from civil works category assessed during tripartite portfolio review mission in January 2016.
15. 2669 - IND OCR Agribusiness Infrastructure Development Investment Program - Tranche 1
SAER 67.600 35.100 12-Aug-16 Project encountered delays in consultant recruitments,procurement of equipment, concessionaire selections, andpending approvals from the Department of EconomicsAffairs. It was agreed during review mission in July 2016 tocancel and close the loan account to avoid unnecessarycommitment charges. All outstanding payment related tothe project will be shouldered by the executing agency.
16. 2679 - IND OCR Sustainable Coastal Protection and Management Investment Program - Tranche 1
INRM 51.555 4.190 29-Mar-16 Unused and unallocated amount from Karnataka and Maharastra works.
17. 2684 - IND OCR Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program - Tranche 1
SAER 56.900 1.400 25-Feb-16 Unused funds allocated for the emergency riverbankprotection works which were no longer needed as therewere no serious damages on November 2015 monsoonseason.
18. 2725 - IND OCR Rajasthan Urban Sector Development Investment Program - Tranche 3
INRM 63.000 5.000 27-Jun-16 Partial cancellation from uncommitted loan funds from civilworks, equipment, preparation and implementationassistance categories assessed to be unutilized duringtripartite portfolio review mission in January 2016.
19. 2736 - IND OCR Madhya Pradesh State Roads III INRM 300.000 9.885 21-Dec-16 Undisbursed balance at closing.20. 2778 - IND OCR Gujarat Solar Power Transmission INRM 100.000 5.000 9-Feb-16 Savings from contingency due to changes in contract prices
and reallocation across loan categories.2778 - IND OCR Gujarat Solar Power Transmission 7.000 17-Nov-16 Partial cancellation of savings after reassessment, contract
variation and reallocation of fund utilization across allcategories due to changes in quantities during projectexecution.
21. 2797 - IND OCR Uttarakhand Urban Sector Development Investment Program - Tranche 2
INRM 100.000 20.000 24-Oct-16 Partial cancellation under project 2, savings fromequipment, consultants, project implementation and fromunallocated categories after contract variation and priceescalation.
22. 2806 - IND OCR Assam Urban Infrastructure Investment - Tranche 1
INRM 81.000 10.000 2-Sep-16 Partial cancellation, unutilized amount from civil works,equipment, preparation and implementation assistancecategories. Cancelled amount will be returned to MFF poolfor tranche 2 utilization.
(1 January - 31 December 2016)CANCELLATION OF LOAN/GRANT PROCEEDS a
Country/ Loan/ Grant No.
55
Fund Project Name
Division Principal Amount
($ million)
Amount Cancelled($ million)
Cancellation Date Reasons for Cancellations
(1 January - 31 December 2016)CANCELLATION OF LOAN/GRANT PROCEEDS a
Country/ Loan/ Grant No.
23. 2833 - IND OCR Infrastructure Development Investment Program for Tourism - Tranche 2
INRM 43.840 7.000 6-Sep-16 Partial cancellation, undisbursed loan funds under civilworks, equipment, consulting services and incrementaladministrative cost categories of Project 2 (Tamil Nadu).
24. 2837 - IND OCR Agribusiness Infrastructure Development Investment Program - Tranche 2
SAER 24.300 10.675 31-Mar-16 The executing agency and ADB decided to close and cancelthe undisbursed amount as there was no activity under theloan. The government did not request further extension asthe bidding of the PPP concessionaires which was the mainactivity under the loan had failed twice.
25. 2925 - IND OCR Jammu and Kashmir Urban Sector Development Investment Program - Tranche 2
SAUW 110.000 15.000 1-Feb-16 Uncommitted loan funds from incremental administrationsupport and from unallocated categories.
26. 3065 - IND OCR Rural Connectivity Investment Program - Tranche 2
INRM 275.000 25.000 23-Aug-16 Partial cancellation of savings from the uncommitted loanfunds, civil works, goods and contingency categories due tothe depreciation of Indian rupee against US dollar whichreduced the value of the contracts in dollar terms.
27. 3108 - IND OCR Railway Sector Investment Program - Tranche 2
SATC 130.000 10.000 29-Apr-16 Cancellation of unallocated loan amount as agreed duringtripartite portfolio review mission in July 2015.
Indonesia28. 2619 - INO OCR Java-Bali Electricity Distribution Performance
ImprovementIRM 50.000 10.873 3-Mar-16 Undisbursed amount at loan closing. The large undisbursed
amount was attributed to delayed civil work packages in DKIJakarta and East Java due to permit and contractorperformance issue.
29. 2768 - INO OCR Urban Sanitation and Rural Infrastructure Support to the PNPM Mandiri
IRM 100.000 1.920 23-Nov-16 Undisbursed balance at closing.
Kazakhstan30. 2728 - KAZ OCR Central Asia Regional Economic Cooperation
Corridor 2 (Mangystau Oblast Sections) Investment Program - Tranche 1
CWTC 283.000 27.889 29-Feb-16 Undisbursed loan amount from works and consultingservices categories cancelled at closing.
31. 2824 - KAZ OCR Central Asia Regional Economic Cooperation Corridor 1 (Taraz Bypass)
CWTC 95.000 2.672 28-Apr-16 Undisbursed balance at closing.
32. 2916 - KAZ OCR CAREC Corridor 3 (Shymkent-Tashkent Section) [Link to the Western Europe-Western
CWTC 125.000 4.300 19-Jul-16 Undisbursed balance at closing.
2916 - KAZ OCR CAREC Corridor 3 (Shymkent-Tashkent Section) [Link to the Western Europe-Western
CWTC 0.019 31-Oct-16 Undisbursed balance at closing.
Pakistan33. 2396 - PAK OCR Power Transmission Enhancement
Investment Program - Tranche 2CWEN 220.000 8.162 22-Aug-16 Undisbursed loan funds across all categories upon closing
of loan account.34. 2742 - PAK OCR Flood Emergency Reconstruction CWTC/CWER 600.000 38.755 8-Aug-16 Undisbursed loan funds across all categories upon closing
of loan account.35. 2846 - PAK OCR Power Transmission Enhancement
Investment Program - Tranche 3PRM 243.240 23.000 24-Oct-16 Partial cancellation of savings to reduce commitment
charges; surplus from works-grid station, equipment andfrom unallocated categories which were no longer requiredas all contracts have been awarded.
36. 3134 - PAK OCR National Highway Network Development in Balochistan
PRM 195.000 72.400 9-Nov-15 b Partial loan cancellation due to substitution of loan amountwith DFID grant amount under Grant 0451-PAK approved on9 November 2015 but effected on 21 January 2016.
37. 3203 - PAK OCR Power Transmission Enhancement Investment Program – Tranche 4
PRM 248.000 25.000 8-Feb-16 Partial cancellation, package ADB-74 Quetta Industrial hadno bidders and all activities were on-hold due to projectlocation, security issues, MFF availability period forrebidding and contract implementation.
3203 - PAK OCR Power Transmission Enhancement Investment Program – Tranche 4
33.000 31-May-16 Partial cancellation, the remaining MFF utilization period wasinsufficient for contract award and implementation forpackage ADB-80 Guddu Muzaffargargh 500 kVtransmission line. This package will be financed under thenew MFF Second Power Transmission EnhancementInvestment Program Tranche 1.
3203 - PAK OCR Power Transmission Enhancement Investment Program – Tranche 4
5.300 15-Jun-16 Partial cancellation, insufficient time for the executing agency to obtain endorsement from the government for the procurement of additional vehicles which were not part of the original periodic financing request under package ADB 75 GSO. This package will be financed under the new MFF Second Power Transmission Enhancement Investment Program Tranche 1.
3203 - PAK OCR Power Transmission Enhancement Investment Program – Tranche 4
61.000 21-Sep-16 Partial cancellation of surplus funds assessed during reviewmission in August 2016 and to reduce the government'scommitment charges.
Papua New Guinea38. 2588 - PNG OCR Civil Aviation Development Investment
Program - Tranche 1PNRM 25.000 0.385 15-Jul-16 Undisbursed balance at closing.
39. 2713 - PNG OCR Town Electrification Investment Program - Tranche 1
PNRM 40.900 3.000 26-Sep-16 Partial cancellation due to transfer of Ramazon Hydro PowerProject from tranche 1 to tranche 2. The cancelled amountwill be used to finance the projects under tranche 2.
40. 2803 - PNG OCR Lae Port Development (Additional Financing) PNRM 85.000 0.016 30-Jun-16 Undisbursed balance at closing.
5656
Fund Project Name
Division Principal Amount
($ million)
Amount Cancelled($ million)
Cancellation Date Reasons for Cancellations
(1 January - 31 December 2016)CANCELLATION OF LOAN/GRANT PROCEEDS a
Country/ Loan/ Grant No.
Sri Lanka41. 2626 - SRI OCR Conflict-Affected Region Emergency SLRM 150.000 11.828 5-Aug-16 The appreciation of US dollar resulted to large savings
across all categories.42. 2757 - SRI OCR Secondary Towns and Rural Community-
Based Water Supply and Sanitation (Supplementary)
SLRM 4.300 0.479 11-Feb-16 Undisbursed balance at closing.
Thailand43. 2608 - THA OCR Greater Mekong Subregion: Highway
ExpansionSETC 77.100 7.580 23-Mar-16 Savings from the civil works, consulting services and from
the unallocated category.Turkmenistan44. 2737 - TKM OCR North-South Railway CWTC 125.000 0.362 25-Jan-16 Undisbursed balance at closing.Uzbekistan45. 2492 - UZB OCR Water Resources Management Sector URM 85.000 7.000 28-Jun-16 Partial cancellation of uncommitted funds based on the
results of bidding for civil works and equipment andvehicles.
Viet Nam46. 2429 - VIE OCR Song Bung 4 Hydropower SEEN 196.000 14.859 21-Jul-16 Final cancellation of unutilized loan proceeds which consists
of savings from all cost categories.47. 2451 - VIE OCR Ho Chi Minh City-Long Thanh-Dau Giay
Expressway ConstructionSETC 410.200 91.556 28-Oct-16 Loan savings across all categories upon closing and partial
cancellation of IDC for $53.3 million due to partial cancellation of $120.0 million in 2013 and 2014.
` 48. 2961 - VIE OCR Water Sector Investment Program - Tranche 2
VRM 212.000 21.294 31-Dec-16 Amount was cancelled due to unavailability of the follow-up investment to complete the expansion of water supply system in Quang Tri
49. 3207 - VIE OCR Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing
SETC 117.000 64.444 28-Oct-16 Savings from works, unallocated, interest and commitmentcharges.
50. 3251 - VIE OCR Water Sector Investment Program - Tranche 3
VRM 142.500 30.479 31-Dec-16 Amount was cancelled due to change in local government'sinvestment priority.
Subtotal (OCR) 875.580
B. Asian Development FundAfghanistan1. 2165 - AFG ADF Power Transmission and Distribution AFRM 25.75 0.576 25-May-16 Undisbursed balance at closing.Bangladesh2. 2462 - BAN ADF Second Urban Governance and Infrastructure
Improvement (Sector)BRM 83.690 1.299 9-Oct-16 Undisbursed balance at closing.
3. 2555 - BAN ADF Urban Public and Environmental Health Sector Development Program (Project)
SAUW 53.44 18.100 19-Jul-16 Uncommitted loan funds from various categories aftercancellation of package 4 and 5 of the project.
Bhutan4. 2258 - BHU ADF Urban Infrastructure Development SAUW 25.31 1.748 31-Aug-16 Undisbursed balance at closing.Cambodia5. 2288 - CAM ADF Greater Mekong Subregion: Rehabilitation of
the Railway in CambodiaSETC 42.803 0.029 1-Nov-16 Undisbursed balance at closing.
6. 2373 - CAM ADF Greater Mekong Subregion Southern Coastal Corridor (Regional)
SETC 6.812 0.405 12-Apr-16 Undisbursed balance at closing.
7. 2376 - CAM ADF Tonle Sap Lowlands Rural Development Project
CARM 9.836 0.105 19-Jul-16 Undisbursed balance at closing.
8. 2602 - CAM ADF Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia (Supplementary)
SETC 38.529 2.960 1-Nov-16 Undisbursed balance at closing.
9. 2670 - CAM ADF Rural Roads Improvement SETC 34.291 0.737 13-Dec-16 Undisbursed balance at closing.10. 2852 - CAM ADF Flood Damage Emergency Reconstruction
ProjectCARM 52.955 1.310 10-Mar-16 Undisbursed balance at closing.
Indonesia11. 2264 - INO ADF Infrastructure Reform Sector Development
Program (Project Loan)IRM 26.915 4.746 1-Feb-16 Undisbursed balance at closing.
Kyrgyz Republic12. 2668 - KGZ ADF Emergency Assistance for Recovery and
ReconstructionCWUW 47.517 0.767 23-Nov-16 Undisbursed balance at closing.
Nepal13. 2097 - NEP ADF Subregional Transport Facilitation NRM - 0.013 18-Jul-16 Undisbursed balance at closing.Pakistan14. 2499 - PAK ADF Sindh Cities Improvement Investment
Program - Tranche 1PRM 39.059 2.088 31-Mar-16 Undisbursed balance at closing.
Papua New Guinea15. 2589 - PNG ADF Civil Aviation Development Investment
Program - Tranche 1PNRM 46.707 0.305 15-Jul-16 Undisbursed balance at closing.
Sri Lanka16. 2546 - SRI ADF Eastern and North Central Provincial Road SLRM 69.845 4.578 5-Aug-16 Savings were due to the appreciation of foreign currencies
against the Sri Lankan Rupee (SLR). All the contracts,except for the consultancy contract, were in SLR.
17. 2758 - SRI ADF Secondary Towns and Rural Community-Based Water Supply and Sanitation (Additional Financing)
SLRM 12.600 2.542 11-Feb-16 All the contracts, except for the consultancy contract, werein Sri Lankan Rupee.
57
Fund Project Name
Division Principal Amount
($ million)
Amount Cancelled($ million)
Cancellation Date Reasons for Cancellations
(1 January - 31 December 2016)CANCELLATION OF LOAN/GRANT PROCEEDS a
Country/ Loan/ Grant No.
Viet Nam18. 2302 - VIE ADF Greater Mekong Subregion Kunming-Hai
Phong Transport Corridor: Yen Vien-Lao Cai Railway Upgrading
SETC 57.494 1.777 21-Dec-16 Undisbursed balance at closing.
19. 2468 - VIE ADF Health Care in the South Central Coast Region
SEHS 71.035 2.185 28-Sep-16 Undisbursed balance at closing.
20. 2583 - VIE ADF Secondary Education Sector Development Program (Project Loan)
VRM 37.764 1.092 20-Apr-16 Undisbursed balance at closing.
21. 2614 - VIE ADF SOE Reform and Corporate Governance Facilitation Program - Tranche 1
SEPF 8.902 3.555 15-Jul-16 Partial cancellation of procurement packages 6, 8 and 9 forstate-owned enterprise Song Da Corporation.
22. 2653 - VIE ADF Skills Enhancement SEHS 19.124 9.445 13-Oct-16 Partial cancellation of uncommitted balance from subloans001 to 003 under Loan B (Bac Nan VC, An Nhat Vinh C,Dong An VC). Project is rated actual problem and thepartial cancellation will improve the project rating.
23. 2747 - VIE ADF Phuoc Hoa Water Resources (Supplementary)
VRM 58.377 0.096 16-Mar-16 Undisbursed balance at closing.
24. 3208 - VIE ADF Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing (Regular Term)
SETC 14.887 8.643 28-Oct-16 Savings from works, interest charges and from unallocatedcategories.
25. 3209 - VIE ADF Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing (Hard Term)
SETC 12.868 7.467 31-Dec-16 Savings from works, interest charges and from unallocatedcategories.
Subtotal (ADF) 76.567 Total (Loan) 952.147
II. GRANTSA. Asian Development FundAfghanistan1. 0261 - AFG ADF Transport Network Development Investment
Program-Tranche 1AFRM 189.000 1.000 08-Dec-15 b Cancellation due to partial substitution to Grant 262 - AFG
approved on 8 December 2015 but was only effected 2February 2016.
Cambodia2. 0090 - CAM ADF Enhancing Education Quality Project SEHS 27.100 0.000 29-Feb-16 Undisbursed balance at closing.3. 0092 - CAM ADF Tonle Sap Lowlands Rural Development CARM 9.900 0.016 25-Aug-16 Undisbursed balance at closing.4. 0116 - CAM ADF Emergency Food Assistance Project CARM 17.500 0.006 28-Jun-16 Undisbursed balance at closing.5. 0178 - CAM ADF Strengthening Technical and Vocational
Education and TrainingSEHS 24.500 0.296 8-Mar-16 Undisbursed balance at closing.
Lao People's Democratic Republic6. 0082 - LAO ADF Northern Greater Mekong Subregion
Transport Network ImprovementSETC 54.000 0.005 20-Apr-16 Undisbursed balance at closing.
7. 0117 - LAO ADF Greater Mekong Subregion Sustainable Tourism Development
LRM 10.000 0.109 18-Feb-16 Undisbursed balance at closing.
8. 0144 - LAO ADF Sustainable Natural Resource Management and Productivity Enhancement
SEER 20.000 0.004 10-May-16 Undisbursed balance at closing.
Mongolia9. 0107 - MON ADF Western Regional Road Corridor
Development-Phase IEATC 37.600 0.239 18-May-16 Undisbursed balance at closing.
10. 0115 - MON ADF Agriculture and Rural Development EAER 14.720 0.003 13-Apr-16 Undisbursed balance at closing.Nepal11. 0208 - NEP ADF Rural Finance Sector Development Cluster
Program (Subprogram 2)SAPF 12.100 0.852 14-Jan-16 Undisbursed balance at closing.
Papua New Guinea12. 0042 - PNG ADF HIV/AIDS Prevention and Control in Rural
Development EnclavesPAUS 15.000 0.924 17-Feb-16 Undisbursed balance at closing.
Samoa13. 0097 - SAM ADF SchoolNet and Community Access PAUS 5.900 0.345 26-Sep-16 Undisbursed balance at closing.Tajikistan14. 0245 - TAJ ADF CAREC Corridor 3 (Dushanbe-Uzbekistan
Border) ImprovementCWTC 120.000 0.061 8-Aug-16 Undisbursed balance at closing.
Timor-Leste15. 0100 - TIM ADF Dili Urban Water Supply Sector PAUS 6.000 0.080 25-Aug-16 Undisbursed balance at closing.
Subtotal (ADF) 3.940
B. Other FundsAfghanistan1. 0281 - AFG ESDIP Energy Sector Development Investment
Program-Tranche 3AFRM 20.000 6.891 03-Aug-16 Undisbursed balance at closing.
2. 0282 - AFG ESDIP Energy Sector Development Investment Program-Tranche 3
AFRM 12.400 4.365 03-Aug-16 Undisbursed balance at closing.
Bangladesh3. 0036 - BAN DG Southwest Area Integrated Water Resources
Planning and ManagementBRM 12.500 0.250 5-Jan-16 Undisbursed balance at closing.
4. 9153 - BAN JFPR Institutional Support for Migrant Workers' Remittances
BRM 2.000 0.212 12-Sep-16 Undisbursed balance at closing.
Cambodia5. 0096 - CAM AUSG Greater Mekong Subregion Southern Coastal C SETC 8.000 0.422 12-Apr-16 Undisbursed balance at closing.
5858
Fund Project Name
Division Principal Amount
($ million)
Amount Cancelled($ million)
Cancellation Date Reasons for Cancellations
(1 January - 31 December 2016)CANCELLATION OF LOAN/GRANT PROCEEDS a
Country/ Loan/ Grant No.
6. 0187 - CAM AUSG Greater Mekong Subregion: Rehabilitation of th SETC 22.460 1.259 20-Apr-16 Undisbursed balance at closing.7. 0302 - CAM GAFSP Emergency Food Assistance - Additional
FinancingCARM 24.500 0.303 16-Nov-16 Undisbursed balance at closing.
China, People's Republic of8. 0113 - PRC GEF Ningxia Integrated Ecosystem and Agricultural
DevelopmentPRCM 4.545 0.204 17-Oct-16 Undisbursed balance at closing.
Indonesia9. 0198 - INO CEF Java-Bali Electricity Distribution Performance
ImprovementIRM 1.000 0.034 25-Nov-16 Undisbursed balance at closing.
Lao People's Democratic Republic10. 0082 - LAO AUSG Northern Greater Mekong Subregion
Transport Network ImprovementSETC 68.500 0.164 20-Apr-16 Undisbursed balance at closing.
11. 0363 - LAO ACAF Water Supply and Sanitation Sector SEUW 6.000 6.000 12-Dec-16 Full cancellation of Phu Bia Mining (PBM) grant due tochanges in company's ownership and due to the currentworldwide commodities crisis which influenced them toterminate their contribution to the project.
Marshall Islands12. 0351 - RMI APDRF Second Drought Disaster Response PAUS 0.200 0.015 26-Apr-16 Undisbursed balance at closing.Mongolia13. 9152 - MON JFPR Promoting Inclusive Financial Services for the
PoorMNRM 2.500 0.025 24-Aug-16 Undisbursed balance at closing.
14. 9164 - MON JFPR Establishment of Climate-Resilient Rural Livelihoods
EAER 2.500 0.006 30-Aug-16 Undisbursed balance at closing.
Nauru15. 0474 NAU LBDMF Fiscal Sustainability Reform Program PLCO 1.886 0.056 01-Dec-16 Undisbursed balance at closing.Nepal16. 0182 - NEP CEF Energy Access and Efficiency Improvement NRM 0.300 0.276 9-Nov-16 Undisbursed balance at closing.
17. 0183 - NEP CLCF Energy Access and Efficiency Improvement NRM 4.200 0.490 9-Nov-16 Undisbursed balance at closing.
18. 9141 - NEP JFPR Capacity Building for the Promotion of Legal Identity among the Poor in Nepal
OGC 2.000 1.688 30-Aug-16 Undisbursed balance at closing.
19. 9159 - NEP JFPR Support for Targeted and Sustainable Development Programs for Highly Marginalized Groups
NRM 2.700 0.574 23-Nov-16 Undisbursed balance at closing.
20. 0397 - NEP NGLR South Asia Subregional Economic Cooperation Power System Expansion
NRM 60.000 38.000 19-Sep-16 Partial cancellation of Norway grant due to the ongoingrefugee crisis in Europe. The Government of Norway hasdecided to divert part of the budget for internationaldevelopment and the shortfall will be funded by ADF loan.
Palau21. 0381 - PAL APDRF Super Typhoon Haiyan Response PAUS 0.200 0.00004 29-Jan-16 Undisbursed balance at closing.Philippines22. 9161 - PHI JFPR Enhancing Access to Quality Early Childhood
Education Services for Children in Poor Communities
SEHS 1.500 0.065 20-May-16 Undisbursed balance at closing.
Solomon Islands23. 0292 - SOL AUSG Domestic Maritime Support (Sector)
(Supplementary)PLCO 4.300 0.178 20-Jul-16 Undisbursed balance at closing.
24. 0293 - SOL NZG2 Domestic Maritime Support (Sector) (Supplementary)
PLCO 5.285 0.252 20-Jul-16 Undisbursed balance at closing.
Timor-Leste25. 9142 - TIM JFPR Our Roads Our Future-Supporting Local
Governance and Community-Based Infrastructure Works
TLRM 3.000 0.001 6-Oct-16 Undisbursed balance at closing.
Vanuatu26. 0428 - VAN APDRF Vanuatu Cyclone Pam Disaster Response PLCO 1.000 0.020 31-May-16 Undisbursed balance at closing.Viet Nam27. 0317 - VIE AUSG Greater Mekong Subregion Flood and Drought
Risk Management and MitigationVRM 5.887 4.935 15-Jan-16 Partial cancellation of Australian grant due to change in
strategic direction of Australian aid program effective 2016.
0317 - VIE AUSG Greater Mekong Subregion Flood and Drought Risk Management and Mitigation
VRM 0.044 12-Jul-16 Cancellation of undisbursed commitment under category 6A(consultant) and category 3 (vehicle) to align with actualdisbursements.
Subtotal (Other Funds) 66.725 Total (Grant) 70.664
Grand Total (Loan + Grant) 8,999.321 1,022.811
a Includes cancellation of amount less than $100.00 at the time of loan closing.b Cancelled on 2015 but processed only in current year.
Sources: Controller's; Grant Financial Information Systems; Loan Financial Information Systems; and Regional Departments
ADF = Asian Development Fund, ACAF = ADB Co-financed Assistance Fund, APDRF = Asia Pacific Disaster Response Fund, AUSG = Australian Grant, CEF = Clean Energy Fund, CLCF = Climate Change Fund, DG = Dutch Grant, ESDIP = Energy Sector Development Investment Program, GAFSP = Global Agri and Food Security Program, GEF = Global Environment Facility Grant, JFPR = Japan Fund for Poverty Reduction, LBDMF = Loan Buy Down Mechanism Fund, NGLR = Norwegian Grant (Other Projects), NZG2 = New Zealand Grant, OCR = Ordinary Capital Resources
59
No.
of
Proj
ects
No.
%Am
t%
No.
%Am
t%
No.
%Am
t%
I.A.
Cen
tral
and
Wes
t Asi
a (C
WR
D)
Afg
hani
stan
24
3,
057.
421
20
83
.3
2,
241.
421
73.3
2
8.3
51
6.00
0
16.9
2
8.3
300.
000
9.8
Arm
enia
9
678.
024
8
88
.9
64
5.57
1
95.2
1
11.1
32.4
53
4.
8
-
-
-
-
A
zerb
aija
n9
1,
708.
828
9
100.
0
1,
708.
828
100.
0
-
-
-
-
-
-
-
-
G
eorg
ia12
918.
960
11
91.7
810.
960
88
.2
1
8.
3
108.
000
11
.8
-
-
-
-
Kaz
akhs
tan
3
679.
981
3
10
0.0
679.
981
10
0.0
-
-
-
-
-
-
-
-
Kyr
gyz
Rep
ublic
11
53
2.71
5
9
81.8
436.
942
82
.0
2
18
.2
95
.773
18.0
-
-
-
-
P
akis
tan
33
6,
182.
525
27
81
.8
5,
042.
167
81.6
5
15.2
1,04
9.38
5
17
.0
1
3.
0
90
.973
1.
5
R
egio
nal
1
17.1
05
1
10
0.0
17.1
05
10
0.0
-
-
-
-
-
-
-
-
Tajik
ista
n11
643.
466
10
90.9
633.
466
98
.4
1
9.
1
10.0
00
1.
6
-
-
-
-
Tu
rkm
enis
tan
1
116.
520
1
10
0.0
116.
520
10
0.0
-
-
-
-
-
-
-
-
Uzb
ekis
tan
24
3,
689.
114
18
75
.0
2,
589.
114
70.2
6
25.0
1,10
0.00
0
29
.8
-
-
-
-
Subt
otal
138
18
,224
.659
117
84
.8
14
,922
.075
81
.9
18
13.0
2,91
1.61
1
16
.0
3
2.
2
39
0.97
3
2.
1
B
.So
uth
Asia
(SAR
D)
Ban
glad
esh
47
6,
086.
933
39
83
.0
5,
183.
162
85.2
8
17.0
903.
771
14
.8
-
-
-
-
Bhu
tan
8
237.
579
6
75
.0
17
3.92
6
73.2
2
25.0
63.6
53
26
.8
-
-
-
-
Indi
a79
10,5
13.2
55
68
86
.1
9,
660.
785
91.9
9
11.4
801.
970
7.
6
2
2.5
50.5
00
0.5
Mal
dive
s3
71
.807
2
66.7
64.6
90
90
.1
1
33
.3
7.
117
9.9
-
-
-
-
Nep
al34
2,01
0.90
6
31
91.2
1,87
0.15
8
93
.0
3
8.
8
140.
748
7.
0
-
-
-
-
R
egio
nal
3
106.
150
3
10
0.0
106.
150
10
0.0
-
-
-
-
-
-
-
-
Sri
Lank
a26
2,99
7.48
8
24
92.3
2,81
0.74
8
93
.8
1
3.
8
155.
940
5.
2
1
3.8
30.8
00
1.0
Subt
otal
200
22
,024
.118
173
86
.5
19
,869
.619
90
.2
24
12.0
2,07
3.19
9
9.
4
3
1.5
81.3
00
0.4
Subt
otal
- O
pera
tions
133
8
40,2
48.7
77
29
0
85.8
34,7
91.6
94
86.4
42
12
.4
4,
984.
810
12.4
6
1.8
472.
273
1.2
II.O
PER
ATIO
NS
2C
.Ea
st A
sia
(EAR
D)
Chi
na, P
eopl
e's
Rep
ublic
of
75
9,
547.
362
52
69
.3
6,
970.
571
73.0
16
21
.3
1,
829.
975
19.2
7
9.3
746.
816
7.8
Mon
golia
22
69
9.31
9
15
68
.2
50
8.85
5
72.8
4
18.2
149.
763
21
.4
3
13
.6
40.7
01
5.8
Subt
otal
97
10
,246
.681
67
69.1
7,47
9.42
6
73
.0
20
20.6
1,97
9.73
8
19
.3
10
10.3
78
7.51
7
7.
7
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s1
20
.501
1
100.
0
20
.501
100.
0
-
-
-
-
-
-
-
-
Fi
ji4
20
4.65
0
2
50.0
52.0
00
25
.4
1
25
.0
2.
650
1.3
1
25
.0
150.
000
73.3
K
iriba
ti2
34
.642
2
100.
0
34
.642
100.
0
-
-
-
-
-
-
-
-
M
arsh
all I
slan
ds2
9.
200
1
50.0
0.20
0
2.
2
-
-
-
-
1
50.0
9.
000
97
.8
Mic
rone
sia,
Fed
erat
ed S
tate
s of
2
28.1
42
-
-
-
-
2
10
0.0
28.1
42
10
0.0
-
-
-
-
Nau
ru2
12
.436
2
100.
0
12
.436
100.
0
-
-
-
-
-
-
-
-
P
alau
2
53.3
16
1
50
.0
24
.688
46.3
1
50.0
28.6
28
53
.7
-
-
-
-
Pap
ua N
ew G
uine
a13
715.
945
7
53
.8
50
0.49
3
69.9
4
30.8
114.
233
16
.0
2
15
.4
101.
219
14.1
R
egio
nal
2
6.31
1
2
10
0.0
6.31
1
10
0.0
-
-
-
-
-
-
-
-
Sam
oa5
15
7.38
4
3
60.0
127.
384
80
.9
2
40
.0
30
.000
19.1
-
-
-
-
S
olom
on Is
land
s5
80
.869
3
60.0
49.2
48
60
.9
2
40
.0
31
.621
39.1
-
-
-
-
Ti
mor
-Les
te5
24
8.99
1
4
80.0
120.
056
48
.2
-
-
-
-
1
20
.0
128.
935
51.8
To
nga
5
62.4
96
5
10
0.0
62.4
96
10
0.0
-
-
-
-
-
-
-
-
Tuva
lu1
2.
000
-
-
-
-
1
100.
0
2.
000
100.
0
-
-
-
-
V
anua
tu4
99
.778
3
75.0
94.7
78
95
.0
-
-
-
-
1
25
.0
5.00
0
5.0
Subt
otal
55
1,
736.
661
36
65
.5
1,
105.
233
63.6
13
23
.6
23
7.27
4
13.7
6
10.9
39
4.15
4
22
.7
E.So
uthe
ast A
sia
(SER
D)
Cam
bodi
a26
1,00
5.83
5
20
76.9
673.
217
66
.9
5
19
.2
25
7.63
7
25.6
1
3.8
74.9
81
7.5
Indo
nesi
a15
1,87
9.77
5
12
80.0
1,67
1.52
0
88
.9
2
13
.3
17
3.25
5
9.2
1
6.
7
35
.000
1.
9
La
o P
eopl
e's
Dem
ocra
tic R
epub
lic19
570.
360
16
84.2
489.
962
85
.9
2
10
.5
64
.350
11.3
1
5.3
16.0
48
2.8
Mya
nmar
10
35
8.34
6
8
80.0
211.
125
58
.9
2
20
.0
14
7.22
1
41.1
-
-
-
-
P
hilip
pine
s11
2,35
6.49
5
9
81
.8
1,
829.
663
77.6
1
9.1
12
1.83
2
5.2
1
9.
1
40
5.00
0
17
.2
Reg
iona
l10
555.
423
10
100.
0
55
5.42
3
100.
0
-
-
-
-
-
-
-
-
Th
aila
nd2
71
.520
1
50.0
69.5
20
97
.2
-
-
-
-
1
50
.0
2.00
0
2.8
Vie
t Nam
53
7,
726.
349
42
79
.2
6,
468.
609
83.7
8
15.1
1,15
0.05
6
14
.9
3
5.
7
10
7.68
4
1.
4
Su
btot
al14
6
14,5
24.1
03
11
8
80.8
11,9
69.0
39
82.4
20
13
. 7
1,
914.
352
13.2
8
5.5
640.
713
4.4
Subt
otal
- O
pera
tions
229
8
26,5
07.4
46
22
1
74.2
20,5
53.6
97
77.5
53
17
.8
4,
131.
364
15.6
24
8.
1
1,
822.
384
6.
9
TO
TAL
636
66
,756
.223
511
80
.3
55
,345
.392
82
.9
95
14.9
9,11
6.17
4
13
.7
30
4.7
2,29
4.65
7
3.4
Sour
ce: e
Ope
ratio
nsa
C
over
s ef
fect
ive
proj
ects
act
ive
as o
f 31
Dec
embe
r 201
6.E
xclu
des
disb
urse
men
t crit
eria
(act
uals
& p
roje
ctio
ns) f
or p
artia
lly a
dmin
iste
red
loan
s an
d gr
ants
(014
5-LA
O, 0
192-
CA
M, 0
273-
VA
N, 0
358-
NE
P, 0
427-
VA
N).
Pro
ject
s w
ith a
dditi
onal
fina
ncin
g no
t ret
rofit
ted
to it
s or
igin
al p
roje
ct re
cord
are
repo
rted
sepa
rate
ly.
Exc
lude
s pr
ojec
ts c
ombi
ned
with
pol
icy-
base
d lo
ans/
gran
ts u
nder
pro
gram
mod
ality
.E
xclu
des
loan
-rela
ted
gran
ts.
Sou
rce
for N
et A
mou
nt is
OD
S.
OPE
RAT
ION
S 1
POR
TFO
LIO
RAT
ING
S a
(as
of 3
1 D
ecem
ber 2
016)
Loa
n &
Gra
nt
Net
Am
ount
($
mill
ion)
On
Trac
kPo
tent
ial P
robl
emAc
tual
Pro
blem
6060
No.
of
Proj
ects
Yes
Part
ial
No
On
Trac
kPo
tent
ial
Prob
lem
Actu
al
Prob
lem
On
Trac
kPo
tent
ial
Prob
lem
Actu
al
Prob
lem
Yes
No
SPS
UI.
A.C
entr
al a
nd W
est A
sia
(CW
RD
)A
fgha
nist
an24
3,05
7.42
1
23
-
1
19
1
4
21
1
2
24
-
24
-
-
A
rmen
ia9
678.
024
9
-
-
7
1
1
9
-
-
9
-
9
-
-
Aze
rbai
jan
9
1,
708.
828
9
-
-
8
1
-
9
-
-
9
-
9
-
-
G
eorg
ia12
918.
960
12
-
-
11
1
-
10
2
-
12
-
12
-
-
K
azak
hsta
n3
679.
981
3
-
-
3
-
-
3
-
-
3
-
3
-
-
Kyr
gyz
Rep
ublic
11
53
2.71
5
10
-
1
9
1
1
10
1
-
11
-
11
-
-
P
akis
tan
33
6,
182.
525
30
2
1
29
2
2
28
3
2
31
2
33
-
-
Reg
iona
l1
17.1
05
1
-
-
1
-
-
1
-
-
1
-
1
-
-
Tajik
ista
n11
643.
466
11
-
-
10
1
-
11
-
-
10
1
11
-
-
Tu
rkm
enis
tan
1
11
6.52
0
1
-
-
1
-
-
1
-
-
1
-
1
-
-
U
zbek
ista
n24
3,68
9.11
4
24
-
-
22
1
1
21
1
2
21
3
24
-
-
Su
btot
al13
8
18,2
24.6
59
13
3
2
3
120
9
9
12
4
8
6
132
6
13
8
-
-
B.
Sout
h As
ia (S
ARD
)B
angl
ades
h47
6,08
6.93
3
47
-
-
38
4
5
40
5
2
47
-
47
-
-
B
huta
n8
237.
579
8
-
-
7
-
1
7
-
1
8
-
8
-
-
Indi
a79
10,5
13.2
55
78
-
1
70
4
5
60
14
5
78
1
78
1
-
M
aldi
ves
3
71
.807
3
-
-
1
1
1
3
-
-
3
-
3
-
-
N
epal
34
2,
010.
906
34
-
-
31
2
1
29
3
2
34
-
34
-
-
Reg
iona
l3
106.
150
3
-
-
3
-
-
2
1
-
3
-
3
-
-
Sri
Lank
a26
2,99
7.48
8
25
-
1
23
3
-
22
2
2
26
-
26
-
-
Su
btot
al20
0
22,0
24.1
18
19
8
-
2
173
14
13
16
3
25
12
199
1
19
9
1
-
Subt
otal
- O
pera
tions
133
8
40,2
48.7
77
33
1
2
5
293
23
22
28
7
33
18
331
7
33
7
1
-
II.O
PER
ATIO
NS
2C
.Ea
st A
sia
(EAR
D)
Chi
na, P
eopl
e's
Rep
ublic
of
75
9,
547.
362
73
-
2
50
8
17
53
11
11
75
-
75
-
-
M
ongo
lia22
699.
319
21
-
1
15
-
7
16
4
2
22
-
22
-
-
Su
btot
al97
10,2
46.6
81
94
-
3
65
8
24
69
15
13
97
-
97
-
-
D
.Pa
cific
(PAR
D)
Coo
k Is
land
s1
20.5
01
1
-
-
1
-
-
1
-
-
1
-
1
-
-
Fiji
4
20
4.65
0
4
-
-
3
-
1
2
-
2
4
-
4
-
-
K
iriba
ti2
34.6
42
2
-
-
2
-
-
2
-
-
2
-
2
-
-
Mar
shal
l Isl
ands
2
9.
200
2
-
-
1
-
1
1
-
1
2
-
2
-
-
M
icro
nesi
a, F
eder
ated
Sta
tes
of2
28.1
42
1
-
1
2
-
-
1
-
1
2
-
2
-
-
Nau
ru2
12.4
36
2
-
-
1
1
-
2
-
-
2
-
2
-
-
Pal
au2
53.3
16
2
-
-
1
-
1
1
1
-
2
-
2
-
-
Pap
ua N
ew G
uine
a13
715.
945
12
-
1
9
-
4
10
1
2
12
1
12
1
-
Reg
iona
l2
6.31
1
2
-
-
2
-
-
2
-
-
2
-
2
-
-
Sam
oa5
157.
384
5
-
-
3
1
1
4
1
-
5
-
5
-
-
Sol
omon
Isla
nds
5
80
.869
5
-
-
2
2
1
4
-
1
5
-
5
-
-
Ti
mor
-Les
te5
248.
991
3
2
-
4
1
-
4
-
1
5
-
5
-
-
Tong
a5
62.4
96
5
-
-
4
1
-
4
1
-
5
-
5
-
-
Tuva
lu1
2.00
0
1
-
-
-
1
-
-
-
1
1
-
1
-
-
Van
uatu
4
99
.778
4
-
-
3
-
1
3
-
1
4
-
4
-
-
Su
btot
al55
1,73
6.66
1
51
2
2
38
7
10
41
4
10
54
1
54
1
-
E.
Sout
heas
t Asi
a (S
ERD
)C
ambo
dia
26
1,
005.
835
26
-
-
21
2
3
20
2
4
26
-
26
-
-
Indo
nesi
a15
1,87
9.77
5
15
-
-
11
2
2
12
2
1
15
-
15
-
-
La
o P
eopl
e's
Dem
ocra
tic R
epub
lic19
570.
360
18
-
1
17
1
1
17
-
2
19
-
19
-
-
M
yanm
ar10
358.
346
10
-
-
9
-
1
9
-
1
10
-
10
-
-
P
hilip
pine
s11
2,35
6.49
5
10
-
1
10
-
1
10
-
1
11
-
11
-
-
R
egio
nal
10
55
5.42
3
10
-
-
8
2
-
9
1
-
10
-
10
-
-
Thai
land
2
71
.520
2
-
-
1
-
1
1
-
1
2
-
2
-
-
V
iet N
am53
7,72
6.34
9
49
2
2
46
3
4
46
1
6
52
1
53
-
-
Su
btot
al14
6
14,5
24.1
03
14
0
2
4
123
10
13
12
4
6
16
14
5
1
146
-
-
Su
btot
al -
Ope
ratio
ns 2
298
26
,507
.446
285
4
9
22
6
25
47
234
25
39
29
6
2
297
1
-
TO
TAL
636
66
,756
.223
616
6
14
519
48
69
52
1
58
57
627
9
63
4
2
-
Safe
guar
dsLo
an &
Gra
nt
Net
Am
ount
($
mill
ion)
Port
folio
Rat
ings
by
Indi
cato
r(a
s of
31
Dec
embe
r 201
6)
OPE
RAT
ION
S 1
Tech
nica
lC
ontr
act A
war
dsD
isbu
rsem
ents
Fina
ncia
l
61
Country/Loan No. Fund Project Name
Net Loan Amount ($mn)
Loan Approval
Date Dept.Administering
Division Approving AuthorityDate
Approved
A. Major ChangesIndia
1. 2452 - IND OCR Khadi Reform and Development Program 105.000 2-Oct-08 SARD INRM Board 14-Dec-16
B. Minor ChangesAfghanistan
2. 2227 - AFG ADF Western Basins Water Resources Management 50.879 20-Dec-05 CWRD AFRM Director, CWER 3-May-162227 - AFG ADF Western Basins Water Resources Management 50.879 20-Dec-05 CWRD AFRM Director, CWER 7-Oct-16
Armenia3. 2561 - ARM ADF North-South Road Corridor Investment Program -
Tranche 157.119 6-Oct-09 CWRD CWTC Director, CWTC 17-Jun-16
4. 2729 - ARM OCR North-South Road Corridor Investment Program - Tranche 2
170.000 21-Dec-10 CWRD CWTC Director, CWTC 17-Jun-16
5. 2752 - ARM ADF Sustainable Urban Development Investment Program - Tranche 1
43.86 9-May-11 CWRD ARRM OIC, CWUW 3-Mar-16
6. 3293 - ARM OCR Sustainable Urban Development Investment Program - Tranche 2
112.97 29-Sep-15 CWRD CWUW Director, CWUW 3-May-16
Azerbaijan7. 2354 - AZE OCR Road Network Development Program - Tranche 1 179.00 4-Oct-07 CWRD AZRM Director General, CWRD 21-Jun-168. 2355 - AZE ADF Road Network Development Program - Tranche 1 9.83 4-Oct-07 CWRD AZRM Director General, CWRD 21-Jun-169. 2831 - AZE OCR Road Network Development Program - Tranche 3 200.00 14-Dec-11 CWRD AZRM Director General, CWRD 21-Jun-1610. 3116 - AZE OCR Road Network Development Program - Tranche 4 45.00 27-Mar-14 CWRD CWTC Director, CWTC 9-Mar-16
Bangladesh11. 2317 - BAN ADF Railway Sector Investment Program - Subproject 1 29.32 13-Feb-07 SARD BRM Director, SATC 9-Mar-16
2317 - BAN ADF Railway Sector Investment Program - Subproject 1 29.32 13-Feb-07 SARD BRM Director, SATC 21-Apr-1612. 2382 - BAN ADF Dhaka Water Supply Sector Development Program 139.51 10-Dec-07 SARD SAUW OIC, SAUW 20-Oct-1613. 2555 - BAN ADF Urban Public and Environmental Health Sector
Development Program 35.34 28-Sep-09 SARD SAUW Director, SAUW 23-Jun-16
2555 - BAN ADF Urban Public and Environmental Health Sector Development Program
35.34 28-Sep-09 SARD SAUW Director, SAUW 15-Aug-16
14. 2688 - BAN ADF Subregional Transport Project Preparatory Facility 22.09 3-Nov-10 SARD SATC OIC, SATC 26-Jul-1615. 2878 - BAN ADF Urban Primary Health Care Services Delivery 46.21 18-Jul-12 SARD SAHS Director, SAHS 27-May-1616. 3047 - BAN ADF Secondary Education Sector Investment Program -
Tranche 186.83 21-Oct-13 SARD BRM OIC, BRM 11-May-16
17. 3131 - BAN ADF Skills for Employment Investment Program - Tranche 1 87.74 3-Jun-14 SARD BRM Director, SAHS 28-Jan-16
18. 3142 - BAN ADF Third Urban Governance and Infrastructure Improvement
110.28 17-Jul-14 SARD SAUW Director, SAUW 18-Apr-16
Bhutan19. 3149 - BHU ADF South Asia Subregional Economic Cooperation Road
Connectivity27.30 31-Jul-14 SARD SATC Director, SATC 17-Jun-16
Cambodia20. 2288 - CAM ADF Greater Mekong Subregion: Rehabilitation of the
Railway in Cambodia42.77 13-Dec-06 SERD SETC Director General, SERD 22-Jan-16
21. 2602 - CAM ADF Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia
35.57 15-Dec-09 SERD SETC Director, SERD 22-Jan-16
22. 2670 - CAM ADF Rural Roads Improvement 33.55 23-Sep-10 SERD SETC Director, SETC 9-Mar-16
23. 2672 - CAM ADF Water Resources Management Sector Development Program
9.42 23-Sep-10 SERD CARM OIC, CARM 11-Aug-16
24. 2673 - CAM ADF Water Resources Management Sector Development Program
19.25 23-Sep-10 SERD SEER OIC, SERD 4-Feb-16
2673 - CAM ADF Water Resources Management Sector Development Program
19.25 23-Sep-10 SERD SEER OIC, SERD 30-Jun-16
25. 2839a - CAM ADF Provincial Roads Improvement 45.56 16-Dec-11 SERD CARM Board 18-Oct-16China, People's Republic of
26. 2395 - PRC OCR Henan Sustainable Agriculture and Productivity Improvement Project
58.46 13-Dec-07 EARD PRCM Deputy Country Director, PRCM
26-Jan-16
27. 2600 - PRC OCR Anhui Integrated Transport Sector Improvement 200.00 10-Dec-09 EARD PRCM OIC, PRCM 3-Jun-16
28. 2606 - PRC OCR Shanxi Small Cities and Towns Development Demonstration Sector
100.00 18-Dec-09 EARD PRCM OIC, PRCM 1-Feb-16
2606 - PRC OCR Shanxi Small Cities and Towns Development Demonstration Sector
100.00 18-Dec-09 EARD PRCM OIC, PRCM 7-Jun-16
29. 2647 - PRC OCR Wuhan Urban Environmental Improvement 100.00 30-Jun-10 EARD PRCM OIC, PRCM 5-Sep-16
30. 2648 - PRC OCR Chongqing Urban-Rural Infrastructure Development Demonstration
100.00 30-Jun-10 EARD PRCM Country Director, PRCM 18-Mar-16
31. 2658 - PRC OCR Inner Mongolia Autonomous Region Environment Improvement Project (Phase II)
150.00 6-Aug-10 EARD PRCM Director General, EARD 21-Dec-16
32. 2738 - PRC OCR Qinghai Rural Water Resources Management 60.00 17-Mar-11 EARD PRCM OIC, PRCM 19-Oct-1633. 2760 - PRC OCR Gansu Tianshui Urban Infrastructure Development 100.00 29-Jun-11 EARD PRCM Deputy Country Director,
PRCM22-Apr-16
2760 - PRC OCR Gansu Tianshui Urban Infrastructure Development 100.00 29-Jun-11 EARD PRCM OIC, PRCM 6-Jun-16
LOAN PROJECTS WITH CHANGES(1 January - 31 December 2016)
6262
Country/Loan No. Fund Project Name
Net Loan Amount ($mn)
Loan Approval
Date Dept.Administering
Division Approving AuthorityDate
Approved
LOAN PROJECTS WITH CHANGES(1 January - 31 December 2016)
34. 2829 - PRC OCR Hai River Estuary Area Pollution Control and Ecosystem Rehabilitation
100.00 13-Dec-11 EARD PRCM Country Director, PRCM 5-May-16
35. 2903 - PRC OCR Gansu Urban Infrastructure Development and Wetland Protection
100.00 26-Sep-12 EARD PRCM OIC, PRCM 10-Aug-16
36. 2915 - PRC OCR Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project
100.00 12-Oct-12 EARD EATC OIC, PRCM 18-Jul-16
2915 - PRC OCR Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project
100.00 12-Oct-12 EARD EATC Director, EATC 23-Nov-16
37. 3022 - PRC OCR Chongqing Urban-Rural Infrastructure Development Demonstration II
150.00 20-Sep-13 EARD EASS Director, EASS 28-Apr-16
38. 3217 - PRC OCR Yunnan Pu'er Regional Integrated Road Network Development
200.00 8-Dec-14 EARD PRCM OIC, PRCM 22-Dec-16
39. 3218 - PRC OCR Low-Carbon District Heating in Hohhot in Inner Mongolia Autonomous Region
150.00 9-Dec-14 EARD EAEN Country Director, PRCM 7-Apr-16
40. 3294 - PRC OCR Shaanxi Mountain Road Safety Demonstration 200.00 28-Sep-15 EARD EATC OIC, PRCM 10-Aug-1641. 3308 - PRC OCR Chemical Industry Energy Efficiency and Emission Reduc 100.00 30-Oct-15 EARD EAEN Country Director, PRCM 10-Nov-16
Cook Islands42. 3193b - COO OCR Renewable Energy Sector 8.98 21-Nov-14 PARD PATE Board 29-Aug-16
3193 - COO OCR Renewable Energy Sector 8.98 21-Nov-14 PARD PATE Director, PATE 14-Sep-16Fiji
43. 3210 - FIJ OCR Transport Infrastructure Investment Sector 100.00 5-Dec-14 PARD PATE Director General, PARD 2-Aug-16Georgia
44. 2560 - GEO ADF Road Corridor Investment Program - Tranche 1 116.09 6-Oct-09 CWRD CWTC Director, CWTC 17-Feb-1645. 2749 - GEO ADF Urban Services Improvement Investment Program -
Tranche 173.18 12-Apr-11 CWRD GRM Director General, CWRD 25-Aug-16
46. 2807 - GEO ADF Urban Services Improvement Investment Program - Tranche 2
36.29 23-Nov-11 CWRD GRM Director General , CWRD 2-Sep-16
47. 2843 - GEO OCR Road Corridor Investment Program - Tranche 3 140.00 22-Dec-11 CWRD CWTC Director, CWTC 17-Feb-1648. 3238 - GEO OCR Urban Services Improvement Investment Program -
Tranche 4108.00 11-Dec-14 CWRD CWUW Director General, CWRD 2-Sep-16
India49. 2226 - IND OCR Kerala Sustainable Development 113.88 20-Dec-05 SARD INRM OIC, INRM 11-Aug-16
2226 - IND OCR Kerala Sustainable Development 113.88 20-Dec-05 SARD INRM Country Director, INRM 24-Aug-16
50. 2309 - IND OCR Uttaranchal Power Sector Investment Program - Tranche 1
25.75 2-Jan-07 SARD SAEN OIC, SAEN 5-Dec-16
51. 2452 - IND OCR Khadi Reform and Development Program 105.00 2-Oct-08 SARD INRM OIC, SARD 1-Feb-162452 - IND OCR Khadi Reform and Development Program 105.00 2-Oct-08 SARD INRM Director General, SARD 19-Jul-16
52. 2498 - IND OCR Uttaranchal Power Sector Investment Program - Tranche 2
10.77 23-Dec-08 SARD SAEN OIC, SAEN 5-Dec-16
53. 2502 - IND OCR Uttaranchal Power Sector Investment Program - Tranche 3
28.00 8-Jan-09 SARD SAEN OIC, SAEN 5-Dec-16
54. 2506 - IND OCR Rajasthan Urban Sector Development Investment Program - Tranche 2
122.00 19-Jan-09 SARD INRM Country Director, INRM 4-Jul-16
55. 2594 - IND OCR Jharkhand State Roads 174.00 2-Dec-09 SARD INRM Director General, SARD 2-Dec-1656. 2638 - IND OCR North Karnataka Urban Sector Investment Program -
Tranche 2123.00 14-Jun-10 SARD INRM Country Director, INRM 6-Apr-16
2638 - IND OCR North Karnataka Urban Sector Investment Program - Tranche 2
123.00 14-Jun-10 SARD INRM Country Director, INRM 9-Sep-16
57. 2663 - IND OCR Bihar State Highways II 274.64 16-Sep-10 SARD INRM Country Director, INRM 27-Oct-1658. 2681 - IND OCR Bihar Power System Improvement 132.20 19-Oct-10 SARD INRM Country Director, INRM 21-Jan-16
2681 - IND OCR Bihar Power System Improvement 132.20 19-Oct-10 SARD INRM Country Director, INRM 1-Jun-1659. 2684 - IND OCR Assam Integrated Flood and Riverbank Erosion Risk
Management Investment Program - Tranche 148.50 25-Oct-10 SARD SAER OIC, SAER 1-Mar-16
2684 - IND OCR Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program - Tranche 1
48.50 25-Oct-10 SARD SAER OIC, SARD 5-Aug-16
60. 2705 - IND OCR Karnataka State Highways Improvement 305.00 29-Nov-10 SARD INRM Director General, SARD 7-Dec-1661. 2725 - IND OCR Rajasthan Urban Sector Development Investment
Program - Tranche 355.00 13-Dec-10 SARD INRM Country Director, INRM 19-Jan-16
2725 - IND OCR Rajasthan Urban Sector Development Investment Program - Tranche 3
55.00 13-Dec-10 SARD INRM Country Director, INRM 4-Jul-16
62. 2736 - IND OCR Madhya Pradesh State Roads III 222.12 10-Mar-11 SARD INRM Country Director, INRM 5-May-162736 - IND OCR Madhya Pradesh State Roads III 222.12 10-Mar-11 SARD INRM Country Director, INRM 13-Dec-16
63. 2778 - IND OCR Gujarat Solar Power Transmission 68.00 12-Sep-11 SARD INRM OIC, INRM 1-Mar-162778 - IND OCR Gujarat Solar Power Transmission 68.00 12-Sep-11 SARD INRM Country Director, INRM 12-Dec-16
64. 2794 - IND OCR Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 1
113.00 18-Oct-11 SARD INRM OIC, SAEN 8-Apr-16
65. 2882 - IND OCR North Karnataka Urban Sector Investment Program-Tranche 3
60.00 22-Aug-12 SARD INRM Country Director, INRM 6-Apr-16
2882 - IND OCR North Karnataka Urban Sector Investment Program-Tranche 3
60.00 22-Aug-12 SARD INRM Country Director, INRM 9-Sep-16
66. 2894 - IND OCR Bihar State Highways II - Additional Financing 300.00 20-Sep-12 SARD INRM Country Director, INRM 31-May-1667. 2924 - IND OCR Uttarakhand Power Sector Investment Program -
Tranche 47.62 26-Oct-12 SARD SAEN OIC, SAEN 5-Dec-16
63
Country/Loan No. Fund Project Name
Net Loan Amount ($mn)
Loan Approval
Date Dept.Administering
Division Approving AuthorityDate
Approved
LOAN PROJECTS WITH CHANGES(1 January - 31 December 2016)
68. 2925 - IND OCR Jammu and Kashmir Urban Sector Development Investment Program - Tranche 2
95.00 26-Oct-12 SARD SAUW Director, SAUW 20-Dec-16
69. 3001 - IND OCR Himachal Pradesh Clean Energy Transmission Investment Program - Tranche 2
110.00 7-May-13 SARD INRM OIC, SAEN 8-Apr-16
70. 3052 - IND OCR Rajasthan Renewable Energy Transmission Investment Program - Tranche 1
62.00 22-Oct-13 SARD INRM Country Director, INRM 16-Dec-16
71. 3055 - IND OCR Uttarakhand Emergency Assistance 200.00 28-Oct-13 SARD INRM Country Director, INRM 19-Oct-1672. 3132 - IND OCR Jammu and Kashmir Urban Sector Development
Investment Program - Tranche 360.00 18-Jun-14 SARD SAUW Director, SAUW 20-Dec-16
73. 3172 - IND OCR Karnataka Integrated and Sustainable Water Resources Management Investment Program - Project 1
31.00 17-Oct-14 SARD SAER OIC, SAER 5-Apr-16
3172 - IND OCR Karnataka Integrated and Sustainable Water Resources Management Investment Program - Project 1
31.00 17-Oct-14 SARD SAER Director, SAER 27-Jul-16
Indonesia74. 2927 - INO OCR State Accountability Revitalization Project 57.75 31-Oct-12 SERD IRM OIC, IRM 26-Oct-1675. 2928 - INO OCR Polytechnic Education Development Project 75.00 31-Oct-12 SERD IRM OIC, IRM 7-Jun-1676. 3015 - INO OCR West Kalimantan Power Grid Strengthening 49.50 27-Aug-13 SERD IRM Country Director, IRM 29-Jul-16
Kiribati77. 2718c - KIR ADF Road Rehabilitation 11.26 10-Dec-10 PARD SPSO Board 12-Dec-1678. 2795d - KIR ADF South Tarawa Sanitation Improvement Sector 6.43 17-Oct-11 PARD SPSO Board 17-Oct-16
Kyrgyz Republic79. 2556 - KGZ ADF Issyk-Kul Sustainable Development 14.91 30-Sep-09 CWRD KYRM Director General, CWRD 8-Jun-16
2556 - KGZ ADF Issyk-Kul Sustainable Development 14.91 30-Sep-09 CWRD KYRM Country Director KYRM 7-Dec-1680. 2668 - KGZ ADF Emergency Assistance for Recovery and
Reconstruction46.75 23-Sep-10 CWRD CWUW Director General, CWRD 22-Mar-16
81. 2671 - KGZ ADF Power Sector Improvement 15.67 27-Sep-10 CWRD KYRM Director, CWEN 31-May-162671 - KGZ ADF Power Sector Improvement 15.67 27-Sep-10 CWRD KYRM OIC, CWEN 28-Oct-16
82. 2869 - KGZ ADF Power Sector Rehabilitation 13.11 11-Jun-12 CWRD CWEN Director, CWEN 12-May-162869 - KGZ ADF Power Sector Rehabilitation 13.11 11-Jun-12 CWRD CWEN OIC, CWEN 18-Aug-162869 - KGZ ADF Power Sector Rehabilitation 13.11 11-Jun-12 CWRD CWEN OIC, CWEN 28-Oct-162869 - KGZ ADF Power Sector Rehabilitation 13.11 11-Jun-12 CWRD CWEN Director, CWEN 25-Nov-16
83. 3212 - KGZ ADF Toktogul Rehabilitation Phase 2 58.72 2-Dec-14 CWRD CWEN Director General, CWRD 17-May-163212 - KGZ ADF Toktogul Rehabilitation Phase 2 58.72 2-Dec-14 CWRD CWEN Director, CWEN 2-Jun-163212 - KGZ ADF Toktogul Rehabilitation Phase 2 58.72 2-Dec-14 CWRD CWEN OIC, CWEN 28-Oct-16
84. 3422 - KGZ ADF Toktogul Rehabilitation Phase 3 58.11 8-Sep-16 CWRD CWEN Director, CWEN 23-Sep-16Lao People's Democratic Republic
85. 3041 - LAO ADF Water Supply and Sanitation Sector 31.09 9-Oct-13 SERD SEUW Director General, SERD 12-Dec-16Mongolia
86. 2766 - MON ADF Higher Education Reform 17.42 28-Jul-11 EARD MNRM Country Director, MNRM 26-Jul-162766 - MON ADF Higher Education Reform 17.42 28-Jul-11 EARD MNRM Country Director, MNRM 8-Aug-16
87. 2963 - MON ADF Fifth Health Sector Development Project (SF) 26.52 10-Dec-12 EARD MNRM Country Director, MNRM 25-Aug-1688. 3244 - MON OCR Darkhan Wastewater Management 9.45 16-Dec-14 EARD MNRM Director, EASS 28-Apr-1689. 3245 - MON ADF Darkhan Wastewater Management 8.28 16-Dec-14 EARD MNRM Director, EASS 28-Apr-16
Myanmar90. 3084 - MYA ADF Power Distribution Improvement Project (SF) 53.31 6-Dec-13 SERD SEEN Director, SEEN 7-Jun-16
Nepal91. 2990 - NEP ADF Tanahu Hydropower Project (SF) 105.06 21-Feb-13 SARD SAEN Director General, SARD 31-Aug-1692. 3057 - NEP ADF Bagmati River Basin Improvement 22.73 31-Oct-13 SARD SAER OIC, SAER 17-Oct-1693. 3139 NEP ADF South Asia Subregional Economic Cooperation Power
System Expansion157.00 4-Jul-14 SARD NRM OIC, SAEN 17-Mar-16
3139 NEP ADF South Asia Subregional Economic Cooperation Power System Expansion
157.00 4-Jul-14 SARD NRM Director, SAEN 15-Jul-16
Pakistan94. 2286 PAK OCR Renewable Energy Development Sector Investment
Program - Tranche 1117.00 13-Dec-06 CWRD PRM Director General, CWRD 27-Jun-16
95. 2287 PAK ADF Renewable Energy Development Sector Investment Program
5.14 13-Dec-06 CWRD PRM Director General, CWRD 27-Jun-16
96. 2439 - PAK ADF Power Distribution Enhancement Investment Program - Tranche 1
8.73 12-Sep-08 CWRD PRM Country Director, PRM 4-Apr-15
2439 - PAK ADF Power Distribution Enhancement Investment Program - Tranche 1
8.73 12-Sep-08 CWRD PRM Country Director, PRM 14-Oct-16
97. 2727 - PAK OCR Power Distribution Enhancement Investment Program - Tranche 2
172.30 14-Dec-10 CWRD PRM OIC, CWRD 27-Jun-16
98. 2846 - PAK OCR Power Transmission Enhancement Investment Program - Tranche 3
220.24 22-Dec-11 CWRD PRM Country Director, PRM 16-Jun-16
2846 - PAK OCR Power Transmission Enhancement Investment Program - Tranche 3
220.24 22-Dec-11 CWRD PRM Country Director, PRM 26-Oct-16
99. 2972 - PAK OCR Power Distribution Enhancement Investment Program - Tranche 3
245.00 14-Dec-12 CWRD PRM Country Director, PRM 1-Nov-16
100. 3090 - PAK OCR Jamshoro Power Generation Project 840.00 9-Dec-13 CWRD CWEN OIC, CWEN 6-Jan-16101. 3091 - PAK OCR Jamshoro Power Generation Project 30.00 9-Dec-13 CWRD CWEN OIC, CWEN 6-Jan-16102. 3092 - PAK ADF Jamshoro Power Generation Project 26.22 9-Dec-13 CWRD CWEN OIC, CWEN 6-Jan-16
6464
Country/Loan No. Fund Project Name
Net Loan Amount ($mn)
Loan Approval
Date Dept.Administering
Division Approving AuthorityDate
Approved
LOAN PROJECTS WITH CHANGES(1 January - 31 December 2016)
103. 3121 - PAK OCR National Trade Corridor Highway Investment Program - Tranche 2
117.60 1-Apr-14 CWRD PRM Director General, CWRD 28-Apr-16
3121 - PAK OCR National Trade Corridor Highway Investment Program - Tranche 2
117.60 1-Apr-14 CWRD PRM Country Director, PRM 21-Nov-16
104. 3134 - PAK OCR National Highway Network Development in Balochistan 122.60 27-Jun-14 CWRD PRM Director, CWTC 22-Jan-16
3134 - PAK OCR National Highway Network Development in Balochistan 122.60 27-Jun-14 CWRD PRM Director, CWTC 9-Jun-16
105. 3159 - PAK OCR Trimmu and Panjnad Barrages Improvement 50.00 22-Sep-14 CWRD CWER Director, CWER 8-Jan-16106. 3160 - PAK ADF Trimmu and Panjnad Barrages Improvement 87.62 22-Sep-14 CWRD CWER Director, CWER 8-Jan-16107. 3197 - PAK OCR National Trade Corridor Highway Investment Program -
Tranche 387.80 25-Nov-14 CWRD PRM Director General, CWRD 28-Apr-16
108. 3203 - PAK OCR Power Transmission Enhancement Investment Program – Tranche 4
123.70 3-Dec-14 CWRD PRM Director, CWEN 28-Jul-16
109. 3239 - PAK ADF Federally Administered Tribal Areas Water Resources Development
39.39 15-Dec-14 CWRD PRM Country Director, PRM 5-May-16
3239 - PAK ADF Federally Administered Tribal Areas Water Resources Development
39.39 15-Dec-14 CWRD PRM Country Director, PRM 28-Jul-16
110. 3300e - PAK OCR National Motorway M-4 Gojra–Shorkot Section 178.00 30-Sep-15 CWRD PRM Board 10-Jun-16111. 3344 - PAK OCR Central Asia Regional Economic Cooperation Regional
Improving Border Services150.00 4-Dec-15 CWRD CWTC OIC, CWTC 20-May-16
3344 - PAK OCR Central Asia Regional Economic Cooperation Regional Improving Border Services
150.00 4-Dec-15 CWRD CWTC Director, CWTC 8-Nov-16
112. 3345 - PAK ADF Central Asia Regional Economic Cooperation Regional Improving Border Services
96.26 4-Dec-15 CWRD CWTC OIC, CWTC 20-May-16
3345 - PAK ADF Central Asia Regional Economic Cooperation Regional Improving Border Services
96.26 4-Dec-15 CWRD CWTC Director, CWTC 8-Nov-16
Palau113. 3346 - PAL OCR North Pacific Regional Connectivity Investment 16.47 7-Dec-15 PARD PAUS Director-General, PARD 2-Dec-16114. 3347 - PAL ADF North Pacific Regional Connectivity Investment 8.22 7-Dec-15 PARD PAUS Director-General, PARD 2-Dec-16
Papua New Guinea115. 2713 - PNG OCR Town Electrification Investment Program - Tranche 1 37.90 6-Dec-10 PARD PNRM Country Director, PNRM 6-Oct-16
116. 2714 - PNG ADF Town Electrification Investment Program - Tranche 1 14.50 6-Dec-10 PARD PNRM Country Director, PNRM 6-Oct-16
Philippines117. 2465 - PHI OCR Agrarian Reform Communities Project II 67.00 27-Oct-08 SERD SEER Director, SEER 12-Jul-16118. 2662f - PHI OCR Social Protection Support 400.00 2-Sep-10 SERD SEHS Board 9-Feb-16119. 2836 - PHI OCR Road Improvement and Institutional Development 62.00 15-Dec-11 SERD SETC Director, SETC 14-Jul-16120. 3100 - PHI OCR KALAHI-CIDSS National Community-Driven
Development Project372.10 16-Dec-13 SERD SEHS OIC, SEHS 25-Oct-16
3100g - PHI OCR KALAHI-CIDSS National Community-Driven Development Project
372.10 16-Dec-13 SERD SEHS Board 4-Mar-16
Sri Lanka121. 2624 - SRI OCR Fiscal Management Efficiency 30.80 15-Apr-10 SARD SLRM OIC, SARD 26-Apr-16
2624 - SRI OCR Fiscal Management Efficiency 30.80 15-Apr-10 SARD SLRM OIC, SARD 15-Nov-16122. 2790h - SRI ADF Local Government Enhancement Sector 52.06 29-Sep-11 SARD SLRM Board 27-Sep-16123. 3027 - SRI OCR Southern Road Connectivity 70.00 23-Sep-13 SARD SATC Director, SATC 2-Sep-16
3027 - SRI OCR Southern Road Connectivity 70.00 23-Sep-13 SARD SATC Director, SATC 16-Dec-16124. 3028 - SRI ADF Southern Road Connectivity 4.60 23-Sep-13 SARD SATC Director, SATC 2-Sep-16
3028 - SRI ADF Southern Road Connectivity 4.60 23-Sep-13 SARD SATC Director, SATC 16-Dec-16Uzbekistan
125. 2629 - UZB OCR Talimarjan Power Project 340.00 20-Apr-10 CWRD CWEN Director, CWEN 6-May-16126. 2633 - UZB ADF Water Supply and Sanitation Services Investment
Program - Tranche 2133.38 21-Apr-10 CWRD URM Country Director, URM 27-Jan-16
127. 2746 - UZB OCR Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program - Tranche 2
240.00 31-Mar-11 CWRD URM Director, CWTC 3-May-16
128. 2772 - UZB OCR Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program - Tranche 1
129.50 2-Sep-11 CWRD URM Director General, CWRD 19-May-16
129. 2781 - UZB OCR Central Asia Regional Economic Cooperation Corridor 6 (Marakand-Karshi) Railway Electrification
100.00 28-Sep-11 CWRD CWTC Director, CWTC 23-Mar-16
130. 2965 - UZB OCR Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program - Tranche 2
220.00 10-Dec-12 CWRD CWTC Director General, CWRD 3-May-16
131. 3039 - UZB OCR Housing for Integrated Rural Development Investment Program - Tranche 2
200.00 1-Oct-13 CWRD URM OIC, URM 18-Mar-16
132. 3355 - UZB OCR Second Central Asia Regional Economic Cooperation Corridor 2 Road Investment Program – Tranche 3
150.00 9-Dec-15 CWRD CWTC Director General, CWRD 24-Nov-16
133. 3405 - UZB OCR Small Business Finance 100.00 30-Jun-16 CWRD CWPF OIC, CWPF 30-Sep-16Vanuatu
134. 2832i - VAN ADF Port Vila Urban Development 4.29 13-Dec-11 PARD PAUS Board 8-Dec-16
65
Country/Loan No. Fund Project Name
Net Loan Amount ($mn)
Loan Approval
Date Dept.Administering
Division Approving AuthorityDate
Approved
LOAN PROJECTS WITH CHANGES(1 January - 31 December 2016)
Viet Nam135. 2372 - VIE ADF Greater Mekong Subregion Southern Coastal Corridor
(Regional)71.96 28-Nov-07 SERD SETC Director, SETC 2-Feb-16
2372 - VIE ADF Greater Mekong Subregion Southern Coastal Corridor (Regional)
71.96 28-Nov-07 SERD SETC Director, SETC 5-Oct-16
2372 - VIE ADF Greater Mekong Subregion Southern Coastal Corridor (Regional)
71.96 28-Nov-07 SERD SETC Director, SETC 22-Dec-16
136. 2391 - VIE OCR Greater Mekong Subregion: Kunming-Hai Phong Transport Corridor-Noi Bai-Lao Cai Highway Project
896.00 14-Dec-07 SERD SETC Director General, SERD 22-Jan-16
2391 - VIE OCR Greater Mekong Subregion: Kunming-Hai Phong Transport Corridor-Noi Bai-Lao Cai Highway Project
896.00 14-Dec-07 SERD SETC Director General, SERD 29-Aug-16
137. 2392 - VIE ADF Greater Mekong Subregion: Kunming-Hai Phong Transport Corridor-Noi Bai-Lao Cai Highway Project
193.05 14-Dec-07 SERD SETC Director General, SERD 22-Jan-16
2392 - VIE ADF Greater Mekong Subregion: Kunming-Hai Phong Transport Corridor-Noi Bai-Lao Cai Highway Project
193.05 14-Dec-07 SERD SETC Director General, SERD 29-Aug-16
138. 2513 - VIE ADF Quality and Safety Enhancement of Agricultural Products and Biogas Development
93.61 18-Mar-09 SERD SEER Director, SEER 7-Nov-16
139. 2610 - VIE OCR Mong Duong 1 Thermal Power Project - Tranche 2 902.85 21-Dec-09 SERD SEEN Country Director, VRM 26-Apr-16140. 2699 - VIE ADF Second Greater Mekong Subregion Regional
Communicable Diseases Control25.95 22-Nov-10 SERD SEHS Director, SEHS 9-Sep-16
141. 2750 - VIE OCR University of Science and Technology of Hanoi Development (New Model University)
170.00 25-Apr-11 SERD SEHS Director, SEHS 15-Nov-16
142. 2751 - VIE ADF University of Science and Technology of Hanoi Development (New Model University)
17.23 25-Apr-11 SERD SEHS Director, SEHS 15-Nov-16
143. 2937j - VIE ADF Greater Mekong Subregion Flood and Drought Risk Management and Mitigation Project (LAO/VIE) (SF)
40.52 6-Nov-12 SERD VRM Board 15-Jan-16
144. 3113 - VIE ADF Sustainable Urban Transport for Ho Chi Minh City Mass Rapid Transit Line 2
8.78 20-Feb-14 SERD VRM Country Director, VRM 24-Aug-16
3113 - VIE ADF Sustainable Urban Transport for Ho Chi Minh City Mass Rapid Transit Line 2
8.78 20-Feb-14 SERD VRM Country Director, VRM 26-Oct-16
145. 3207 - VIE OCR Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing
52.56 3-Dec-14 SERD SETC Director General, SERD 29-Aug-16
146. 3208 - VIE ADF Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing (Regular Term)
6.24 3-Dec-14 SERD SETC Director General, SERD 29-Aug-16
147. 3209 - VIE ADF Greater Mekong Subregion Kunming–Hai Phong Transport Corridor—Noi Bai–Lao Cai Highway - Additional Financing (Hard Term)
5.40 3-Dec-14 SERD SETC Director General, SERD 29-Aug-16
148. 3251 - VIE OCR Water Sector Investment Program - Tranche 3 112.02 27-Mar-15 SERD VRM Director General, SERD 12-Oct-16149. 3340 - VIE OCR Urban Environment and Climate Change Adaptation 100.00 27-Nov-15 SERD SEUW Director, SEUW 4-Nov-16
3340 - VIE OCR Urban Environment and Climate Change Adaptation 100.00 27-Nov-15 SERD SEUW Vice President (Operations 2) 29-Nov-16
ADF = Asian Development Fund, OCR = Ordinary Capital ResourcesNote: Only copies of approved memos received by OSFMD (including loan extensions) are included in this report.
L2492/2493 (SF)-UZB - Water Resources Management Sector Project, approved on 29 Dec15, was received by OSFMD in 2016; thus was not included in 2015 report.a Refers to additional financing approval 3442-Cambodiab Refers to additional financing approval 0493-Cook Islandsc Refers to additional financing approval 0527-Kiribatid Refers to additional financing approval 0502-Kiribatie Refers to additional financing approval 3395, 0482-Pakistanf Refers to additional financing approval 3369-Philippinesg Refers to additional financing approval 0472-Philippinesh Refers to additional financing approval 3431-Sri Lankai Refers to additional financing approval 0526-Vanuatuj Refers to additional financing approval 0483-Viet Nam
Sources: Board documents; and Regional Departments
6666
Fund Project Name
Net Grant Amount ($mn)
Grant Approval Date Dept.
Administering Division Approving Authority
Date Approved
A. Major Changes- None -
B. Minor ChangesAfghanistan
1. 0012 - AFG ADF Qaisar-Bala Murghab Road 55.000 12-Jul-05 CWRD AFRM Vice President (Operations 1) 6-Apr-160012 - AFG ADF Qaisar-Bala Murghab Road 55.000 12-Jul-05 CWRD AFRM President 12-Dec-16
2. 0033 - AFG ADF Western Basins Water Resources Management 14.500 20-Dec-05 CWRD AFRM Director, CWER 3-May-160033 - AFG ADF Western Basins Water Resources Management 14.500 20-Dec-05 CWRD AFRM Director, CWER 7-Oct-16
3. 0052 - AFG CG Western Basins Water Resources Management 8.350 25-Aug-06 CWRD AFRM Director, CWER 3-May-164. 0081 - AFG ADF Road Network Development 1 176.000 28-Sep-07 CWRD AFRM Vice President (Operations 1) 6-Apr-16
0081 - AFG ADF Road Network Development 1 176.000 28-Sep-07 CWRD AFRM Vice President (Operations 1) 12-Dec-165. 0167 - AFG ADF Water Resources Development Investment Program -
Tranche 186.600 06-Oct-09 CWRD AFRM Director, CWER 7-Oct-16
6. 0184 - AFG ADF Energy Sector Development Investment Program-Tranche 2 81.500 03-Dec-09 CWRD AFRM Director, CWEN 16-May-16
7. 0244 - AFG ADF Road Network Development Investment Program - Tranche 2
310.000 21-Dec-10 CWRD AFRM Vice President (Operations 1) 6-Apr-16
0244 - AFG ADF Road Network Development Investment Program - Tranche 2
310.000 21-Dec-10 CWRD AFRM President 12-Dec-16
8. 0327 - AFG ADF Transport Network Development Investment Program - Tranche 2
149.000 10-Dec-12 CWRD AFRM Country Director, AFRM 19-Dec-16
9. 0355 - AFG ADF Transport Network Development Investment Program - Tranche 3
220.000 11-Sep-13 CWRD CWTC Director, CWTC 9-Mar-16
10. 0362 - AFG ADF Water Resources Development Investment Program - Tranche 2
100.000 08-Oct-13 CWRD AFRM Director, CWER 13-Jul-16
11. 0411 - AFG ADF Northern Flood-Damaged Infrastructure Emergency Rehabilitation
40.000 16-Oct-14 CWRD AFRM Country Director, AFRM 21-Mar-16
0411 - AFG ADF Northern Flood-Damaged Infrastructure Emergency Rehabilitation
40.000 16-Oct-14 CWRD AFRM OIC, CWER 21-Dec-16
12. 0412 - AFG AITF Northern Flood-Damaged Infrastructure Emergency Rehabilitation
16.660 16-Oct-14 CWRD AFRM Country Director, AFRM 21-Mar-16
0412 - AFG AITF Northern Flood-Damaged Infrastructure Emergency Rehabilitation
16.660 16-Oct-14 CWRD AFRM OIC, CWER 21-Dec-16
Bangladesh CWRD13. 0298 - BAN SWEG Urban Primary Health Care Services Delivery 20.000 18-Jul-12 SARD SAHS Director, SAHS 27-May-1614. 0310 - BAN STCF Coastal Climate-Resilient Infrastructure 10.000 28-Sep-12 SARD BRM Country Director, BRM 12-Oct-1615. 0391 - BAN SWG Skills for Employment Investment Program - Tranche 1 10.000 3-Jun-14 SARD BRM Director, SAHS 28-Jan-16
Bhutan16. 0295a - BHU ADF Air Transport Connectivity Enhancement 6.920 21-Jun-12 SARD SATC Board 29-Jun-16
17. 0098 - BHU ADF South Asia Subregional Economic Cooperation Information 4.700 17-Dec-07 SARD SATC Director, SATC 25-Oct-1618. 0400 - BHU ADF South Asia Subregional Economic Cooperation Road 18.960 31-Jul-14 SARD SATC Director, SATC 17-Jun-16
Cambodia19. 0156b - CAM ADF Second Rural Water Supply and Sanitation Sector 21.000 15-Sep-09 SERD SEUW Board 22-Sep-1620. 0186 - CAM ADF Tonle Sap Poverty Reduction and Smallholder Development 27.300 08-Dec-09 SERD CARM OIC, CARM 12-Oct-1621. 0285 - CAM AUSG Flood Damage Emergency Reconstruction 11.933 27-Mar-12 SERD CARM Country Director, CARM 20-Sep-16
China, People's Republic of 22. 0196 - PRC CLCF Tianjin Integrated Gasification Combined Cycle Power Plant 5.000 08-Feb-10 EARD EAEN Director, EAEN 26-Apr-16
23. 0388 - PRC GEF Jiangxi Fuzhou Urban Integrated Infrastructure Improvement Project
2.546 14-May-14 EARD EATC OIC, PRCM 18-Jul-16
Cook Islands24. 0415c - COO REDCI Renewable Energy Sector 7.260 21-Nov-14 PARD PATE Board 29-Aug-16
0415 - COO REDCI Renewable Energy Sector 7.260 21-Nov-14 PARD PATE Director, PATE 14-Sep-16India
25. 9134 - IND JFPR Capacity Building and Livelihood Enhancement of Poor
2.000 19-Jun-09 SARD INRM OIC, INRM 13-Jun-1626. 9147 - IND JFPR Improving Small Farmers' Access to Market in Bihar and
Maharashtra3.000 30-Jul-10 SARD SAER Director General, SARD 12-May-16
27. 9168 - IND JFPR Livelihood Improvement for River Erosion Victims in Assam 2.500 5-Oct-12 SARD SAER Director General, SARD 31-Mar-16
Indonesia28. 0354 - INO CEF West Kalimantan Power Grid Strengthening 2.000 27-Aug-13 SERD IRM Country Director, IRM 29-Jul-16
Kiribati29. 0263d - KIR South Tarawa Sanitation Improvement Sector 13.950 17-Oct-11 PARD SPSO Board 17-Oct-16
Kyrgyz Republic30. 0163 - KGZ ADF Issyk-Kul Sustainable Development 13.500 30-Sep-09 CWRD KYRM Director General, CWRD 8-Jun-16
0163 - KGZ ADF Issyk-Kul Sustainable Development 13.500 30-Sep-09 CWRD KYRM Country Director, KYRM 7-Dec-1631. 0217 - KGZ ADF Emergency Assistance for Recovery and Reconstruction 51.500 23-Sep-10 CWRD CWUW Director General, CWRD 22-Mar-16
32. 0218 - KGZ ADF Power Sector Improvement 28.100 27-Sep-10 CWRD KYRM Director, CWEN 31-May-160218 - KGZ ADF Power Sector Improvement 28.100 27-Sep-10 CWRD KYRM OIC, CWEN 28-Oct-16
33. 0294 - KGZ ADF Power Sector Rehabilitation 40.000 11-Jun-12 CWRD CWEN Director, CWEN 12-May-160294 - KGZ ADF Power Sector Rehabilitation 40.000 11-Jun-12 CWRD CWEN OIC, CWEN 18-Aug-160294 - KGZ ADF Power Sector Rehabilitation 40.000 11-Jun-12 CWRD CWEN OIC, CWEN 28-Oct-160294 - KGZ ADF Power Sector Rehabilitation 40.000 11-Jun-12 CWRD CWEN Director, CWEN 25-Nov-16
Country/ Grant No.
GRANT PROJECTS WITH CHANGES(1 January - 31 December 2016)
67
Fund Project Name
Net Grant Amount ($mn)
Grant Approval Date Dept.
Administering Division Approving Authority
Date Approved
Country/ Grant No.
GRANT PROJECTS WITH CHANGES(1 January - 31 December 2016)
34. 0366 - KGZ ADF Central Asia Regional Economic Cooperation Corridor 3 (Bishkek-Osh Road) Improvement, Phase 4
35.000 5-Nov-13 CWRD CWTC OIC, CWTC 13-Jul-16
35. 0419 - KGZ ADF Toktogul Rehabilitation Phase 2 44.500 2-Dec-14 CWRD CWEN Director General, CWRD 17-May-160419 - KGZ ADF Toktogul Rehabilitation Phase 2 44.500 2-Dec-14 CWRD CWEN Director, CWEN 2-Jun-160419 - KGZ ADF Toktogul Rehabilitation Phase 2 44.500 2-Dec-14 CWRD CWEN OIC, CWEN 28-Oct-16
36. 0494 - KGZ ADF Toktogul Rehabilitation Phase 3 50.000 8-Sep-16 CWRD CWEN Director, CWEN 23-Sep-1637. 9170 - KGZ JFPR Women's Entrepreneurship Development 1.500 14-Jan-13 CWRD KYRM Country Director, KYRM 5-Dec-16
Lao People's Democratic Republic38. 0143 - LAO ADF Small Towns Water Supply and Sanitation Sector 23.500 2-Feb-09 SERD SEUW Technical Advisor (Gender
Equity), SDGG11-May-16
0143 - LAO ADF Small Towns Water Supply and Sanitation Sector 23.500 2-Feb-09 SERD SEUW OIC, SERD 25-Oct-16
39. 0195 - LAO ADF Greater Mekong Subregion Northern Power Transmission 20.000 26-Jan-10 SERD LRM OIC, LRM 25-Oct-1640. 0234e - LAO ADF Second Northern Greater Mekong Subregion Transport
Network Improvement20.000 25-Nov-10 SERD LRM Board 11-Oct-16
41. 0242f - LAO ADF Greater Mekong Subregion Biodiversity Conservation Corrido 20.000 10-Dec-10 SERD LRM Board 9-Aug-160242 - LAO ADF Greater Mekong Subregion Biodiversity Conservation Corrido 20.000 10-Dec-10 SERD LRM OIC, SEER 28-Nov-16
42. 0309 - LAO ADF Governance and Capacity Development in Public Sector Management Program - Subprogram 1 (Project)
6.000 27-Sep-12 SERD SEPF Director, SEPF 11-Jul-16
43. 0363 - LAO ACAF Water Supply and Sanitation Sector 0.000 9-Oct-13 SERD SEUW Director General, SERD 12-Dec-1644. 0488 - LAO STCF Greater Mekong Subregion Biodiversity Conservation
Corridors - Additional Financing12.840 9-Aug-16 SERD LRM OIC, SEER 28-Nov-16
Maldives45. 0409 - MLD ADF Preparing Outer Islands for Sustainable Energy Development 38.000 29-Sep-14 SARD SAEN OIC, SAEN 19-Aug-16
Mongolia46. 0204g - MON ADF Southeast Gobi Urban and Border Town Development 15.000 19-Apr-10 EARD MNRM Board 22-Apr-16
0204 - MON ADF Southeast Gobi Urban and Border Town Development 15.000 19-Apr-10 EARD MNRM Country Director, MNRM 3-Jun-16Nepal
47. 0099 - NEP ADF South Asia Subregional Economic Cooperation Information Highway
5.000 17-Dec-07 SARD NRM OIC, SARD 19-Jan-16
0099 - NEP ADF South Asia Subregional Economic Cooperation Information Highway
5.000 17-Dec-07 SARD NRM Country Director, NRM 18-Apr-16
0099 - NEP ADF South Asia Subregional Economic Cooperation Information Highway
5.000 17-Dec-07 SARD NRM Director General, SARD 7-Oct-16
48. 0106 - NEP ADF Information and Communication Technology Development 25.000 28-Jan-08 SARD NRM Director General, SARD 21-Mar-16
49. 0215 - NEP ADF Detailed Engineering Study for the Upper Seti Hydropower 2.500 2-Sep-10 SARD SAEN Director General, SARD 5-Apr-16
50. 0219 - NEP ADF Community Irrigation 24.400 27-Sep-10 SARD NRM Country Director, NRM 4-Nov-1651. 0367 - NEP ADF Bagmati River Basin Improvement 4.500 31-Oct-13 SARD SAER OIC, SAER 17-Oct-1652. 0397 - NEP NGLR South Asia Subregional Economic Cooperation Power
System Expansion22.000 4-Jul-14 SARD NRM Director, SAEN 15-Jul-16
53. 0398h - NEP STCF South Asia Subregional Economic Cooperation Power System Expansion
11.200 4-Jul-14 SARD NRM Board 29-Nov-16
Pakistan54. 0434 - PAK DPECP National Trade Corridor Highway Investment Program -
Tranche 2 (Partial Substitution of ADB OCR Loan)82.400 31-Jul-15 CWRD PRM Director General, CWRD 28-Apr-16
0434 - PAK DPECP National Trade Corridor Highway Investment Program - Tranche 2 (Partial Substitution of ADB OCR Loan)
82.400 31-Jul-15 CWRD PRM Country Director, PRM 21-Nov-16
55. 0435 - PAK DPECP National Trade Corridor Highway Investment Program - Tranche 3 (Partial Substitution of ADB OCR Loan)
39.200 31-Jul-15 CWRD PRM Director General, CWRD 28-Apr-16
56. 0440i - PAK DPECP National Motorway M-4 Gojra–Shorkot Section 92.000 30-Sep-15 CWRD PRM Board 10-Jun-1657. 0451 - PAK DPECP National Highway Network Development in Balochistan
(Partial Substitution of ADB OCR Loan)72.400 3-Nov-15 CWRD PRM Director, CWTC 22-Jan-16
0451 - PAK DPECP National Highway Network Development in Balochistan (Partial Substitution of ADB OCR Loan)
72.400 3-Nov-15 CWRD PRM Director, CWTC 9-Jun-16
Philippines58. 0472 - PHI TYMTF KALAHI–CIDSS National Community-Driven Development -
Additional Financing5.000 4-Mar-16 SERD SEHS Director, SEHS 15-Jul-16
59. 9169 - PHI JFPR Agribusiness Development Assistance for Smallholders in Mindanao
2.000 11-Dec-12 SERD SEER Director, SEER 16-May-16
60. 9175 - PHI JFPR Emergency Assistance and Early Recovery for Poor Municipalities Affected by Typhoon Yolanda
20.000 13-Dec-13 SERD PHCO Country Director, PhCO 10-Mar-16
Regional61. 9158 - REG JFPR Improving Gender-Inclusive Access to Clean and Renewable
Energy in Bhutan, Nepal and Sri Lanka3.000 18-Mar-11 SARD SAEN OIC, SARD 5-May-16
62. 9160 - REG JFPR Developing Sustainable Alternative Livelihoods in Coastal Fishing Communities in the Coral Triangle
2.000 2-Nov-11 SERD SEER Director, SEER 23-Nov-16
9160 - REG JFPR Developing Sustainable Alternative Livelihoods in Coastal Fishing Communities in the Coral Triangle
2.000 2-Nov-11 SERD SEER Director, SEER 5-Dec-16
Tajikistan63. 0301 - TAJ ADF Central Asia Regional Economic Cooperation Corridor 6
(Ayni-Uzbekistan Border Road) Improvement100.000 11-Sep-12 CWRD TJRM Country Director, TJRM 3-Oct-16
6868
Fund Project Name
Net Grant Amount ($mn)
Grant Approval Date Dept.
Administering Division Approving Authority
Date Approved
Country/ Grant No.
GRANT PROJECTS WITH CHANGES(1 January - 31 December 2016)
64. 0352 - TAJ STCF Building Climate Resilience in the Pyanj River Basin 21.550 25-Jul-13 CWRD CWER Director, CWER 22-Jan-16Thailand
65. 9179 - THA JFPR Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin
2.000 22-Oct-14 SERD TRM Country Director, TRM 8-Jul-16
9179 - THA JFPR Community-Based Flood Risk Management and Disaster Response in the Chao Phraya Basin
2.000 22-Oct-14 SERD TRM Director, OSP2 15-Sep-16
Tonga66. 0347j - TON ADF Outer Island Renewable Energy 2.000 27-Jun-13 PARD PATE Board 14-Dec-1667. 0348j - TON AUSG Outer Island Renewable Energy 4.500 27-Jun-13 PARD PATE Board 14-Dec-16
Vanuatu68. 0275k - VAN AUSG Port Vila Urban Development 26.500 13-Dec-11 PARD PAUS Board 8-Dec-1669. 0276k - VAN ATAG Port Vila Urban Development 4.500 13-Dec-11 PARD PAUS Board 8-Dec-16
Viet Nam70. 0095 - VIE AUSG Greater Mekong Subregion Southern Coastal Corridor 25.500 28-Nov-07 SERD SETC Director, SETC 2-Feb-16
0095 - VIE AUSG Greater Mekong Subregion Southern Coastal Corridor 25.500 28-Nov-07 SERD SETC Director, SETC 31-Aug-160095 - VIE AUSG Greater Mekong Subregion Southern Coastal Corridor 25.500 28-Nov-07 SERD SETC Director, SETC 5-Oct-160095 - VIE AUSG Greater Mekong Subregion Southern Coastal Corridor 25.500 28-Nov-07 SERD SETC Director, SETC 22-Dec-16
71. 0317l - VIE AUSG Greater Mekong Subregion Flood and Drought Risk Management and Mitigation
0.909 6-Nov-12 SERD VRM Board 15-Jan-16
0317 - VIE AUSG Greater Mekong Subregion Flood and Drought Risk Management and Mitigation
0.909 6-Nov-12 SERD VRM Director, SEER 12-Jul-16
72. 0462 - VIE UCCRT Urban Environment and Climate Change Adaptation 4.000 27-Nov-15 SERD SEUW Director, SEUW 4-Nov-160462 - VIE UCCRT Urban Environment and Climate Change Adaptation 4.000 27-Nov-15 SERD SEUW Vice President (Operations 2) 29-Nov-16
Note: Only copies of approved memos received by OSFMD (including loan extensions) are included in this report.
a Refers to additional financing approval 0484 Bhutanb Refers to additional financing approvals 3433 and 0497 Cambodiac Refers to additional financing approval 0493 Cooks Islandsd Refers to dditional financing approval 0527 Kiribatie Refers to additional cofinancing approvals 8255 and 8310 Lao f Refers to additional financing approval 0488 Laog Refers to additional financing approval 3388 Mongoliah Refers to additional financing approval 0520 Nepali Refers to additional financing approvals 3395 and 0482 Pakistanj Refers to additional financing approvals 3509 and 0528 Tongak Refers to additional financing approval 0526 Vanuatu
Sources: Board documents; and Regional Departments
ACAF = ADB Co-financed Assistance Fund, ADF = Asian Development Fund, AITF = Afghanistan Infrastructure Trust Fund, ATAG = A.T.F. -Australian TA Grant, AUSG = Australian Grant, CEF = Clean Energy Fund, CG = Canadian Grant, CLCF = Climate Change Fund, GEF = Global Environment Facility Grant, IDRMF = Integrated Disaster Risk Management Fund, JFPR = Japan Fund for Poverty Reduction, NGLR = Norwegian Grant, REDCI = Renewable Energy Dev Sec in Cook Islands, STCF = Strategic Climate Fund, SWEG = Swedish Grant, SWG = Swiss Grant, TYMTF = Typhoon Yolanda Multi-Donor Fund, UCCRTF = Urban Climate Change Resilience T.F.
Grant 0261-AFG (SF)/ Grant 0262 - AFG: MFF Transport Network Development Investment Program-Tranche 1, approved on 08 Dec15; Grant 0411-0412 - Northern Flood-Damaged Infrastructure Emergency Rehabilitation Project, aproved on 15Oct15; Grant 0295-BHU: Air Transport Connectivity Enhancement Project, approved on 25 Sep15 and JFPR9158 REG: Improving Gender-Inclusive Access to Clean and Renewable Energy in Bhutan, Nepal, and Sri Lanka , approved on 4 Sep15, were received by OSFMD in 2016; thus were not included in 2015 report.
69
Fund Project Name
TA Amount ($mn) TA Approval Date Dept.
Administering Division Approving Authority
Date Approved
A. Change in Scope
Pakistan1. 8683 - PAK TASF Punjab Intermediate Cities Improvement Investment Program 1.300 10-Jul-14 CWRD CWUW Vice President (Operations 1) 18-Feb-16
Regional2. 8301 - REG TASF,
RCIF,RCPF
Central Asia Regional Economic Cooperation: Supporting Capacity Development Needs of CAREC 2020
3.400 17-Dec-12 CWRD CWRC President 08-Dec-16
3. 8595 - REG TASF Civil Society Participation for Development Effectiveness 2.100 16-Dec-13 SDCC NGOC Vice-President, KMSD 25-Aug-16
4. 8606 - REG TASF,CLCF,NDF
Enhancing Readiness of ADB Developing Member Countries for Scaled Up Climate Finance
1.488 20-Dec-13 SDCC SDCD Vice-President, KMSD 12-Sep-16
5. 8812 - REG IDRMF Enhanced Use of Disaster Risk Information for Decision Making in Southeast Asia
3.075 11-Dec-14 SDCC SDCD President 30-Sep-16
6. 8954 - REG AUTF,STCF
Promoting Sustainable Energy for All in Asia and the Pacific - Project Development and Investment Facilitation (Subproject D)
1.038 10-Sep-15 SDCC SDSC Vice-President, KMSD 02-Feb-16
7. 9007 - REG TASF Strengthening the Enabling Environment for Disaster Risk Financing (Phase 1)
1.300 2-Dec-15 SDCC SDSC Vice-President, KMSD 26-Jul-16
8. 9086 - REG TASF Building Project Implementation Capacities in the Pacific 2.900 18-Mar-16 PARD PATE President 11-Oct-16
Uzbekistan9. 8706 - UZB TASF Central Asia Regional Economic Cooperation Corridor 2 (Pap-
Namangan-Andijan) Railway Electrification0.400 25-Aug-14 CWRD CWTC Vice President (Operations 1) 12-Aug-16
Viet Nam10. 8957 - VIE TASF,
PRITF Basic Infrastructure for Inclusive Growth in the Northeast Provinces Sector
2.450 14-Sep-15 SERD VRM Vice-President (Operations 2) 29-Apr-16
B. Change in Implementation Arrangements
Pakistan1. 8683 - PAK TASF Punjab Intermediate Cities Improvement Investment Program 1.300 10-Jul-14 CWRD CWUW Vice President (Operations 1) 18-Feb-16
Regional2. 8301 - REG TASF,
RCIF,RCPF
Central Asia Regional Economic Cooperation: Supporting Capacity Development Needs of CAREC 2020
3.400 17-Dec-12 CWRD CWRC President 08-Dec-16
3. 8595 - REG TASF Civil Society Participation for Development Effectiveness 2.100 16-Dec-13 SDCC NGOC Vice-President, KMSD 25-Aug-16
4. 8606 - REG TASF,CLCF,NDF
Enhancing Readiness of ADB Developing Member Countries for Scaled Up Climate Finance
1.488 20-Dec-13 SDCC SDCD Vice-President, KMSD 12-Sep-16
5. 8954 - REG AUTF,STCF
Promoting Sustainable Energy for All in Asia and the Pacific - Project Development and Investment Facilitation (Subproject D)
1.038 10-Sep-15 SDCC SDSC Vice-President, KMSD 02-Feb-16
6. 9007 - REG TASF Strengthening the Enabling Environment for Disaster Risk Financing (Phase 1)
1.300 2-Dec-15 SDCC SDSC Vice-President, KMSD 26-Jul-16
Uzbekistan7. 8706 - UZB TASF Central Asia Regional Economic Cooperation Corridor 2 (Pap-
Namangan-Andijan) Railway Electrification0.400 25-Aug-14 CWRD CWTC Vice President (Operations 1) 12-Aug-16
Viet Nam8. 8957 - VIE TASF,
PRITF Basic Infrastructure for Inclusive Growth in the Northeast Provinces Sector
2.450 14-Sep-15 SERD VRM Vice-President (Operations 2) 29-Apr-16
Note: Only copies of approved memos received by OSFMD (including TA extensions) are included in this report.
Source: Regional Departments
TAs WITH MAJOR CHANGE IN SCOPE, IMPLEMENTATION ARRANGEMENT, OR BOTH(1 January - 31 December 2016)
TA No./Country
AUTF = Austria Trust Fund, CLCF = Climate Change Fund, IDRMF = Integrated Disaster Risk Management Fund, NDF = Nordic Development Fund, PRITF = Project Readiness Improvement Trust Fund, RCIF = Regional Cooperation & Integration Fund, RCPF = Regional Coop. & Poverty Reduction Fund, STCF = Strategic Climate Fund, TASF = Technical Assistance Special Fund
7070
MULTITRANCHE FINANCING FACILITY PROJECTS WITH CHANGES(1 January - 31 December 2016)
Project NameTotal Approved Amount ($mn)
MFF Approval Date Dept.
Administering Division
Approving Authority
Date Approved
A. Major Changes
Pakistan1. 0007 - PAK Power Transmission Enhancement Investment Program 800.00 12-Dec-06 CWRD CWEN Board 05-Dec-16
Sri Lanka2. 0084 - SRI Green Power Development and Energy Efficiency
Improvement Investment Program300.00 15-Jul-14 SARD SAEN Board 04-Oct-16
B. Minor Changes
Afghanistan3. 0025 - AFG Road Network Development Investment Program 400.00 28-Nov-08 CWRD CWOD President 12-Dec-16
Armenia4. 0035 - ARM North-South Road Corridor Investment Program 500.00 29-Sep-09 CWRD CWTC President 04-Aug-16
India5. 0079 - IND South Asia Subregional Economic Cooperation Road
Connectivity Investment Program500.00 28-Mar-14 SARD SATC President 01-Mar-16
Regional6. 0068 - REG Higher Education in the Pacific Investment Program 19.00 11-Jun-12 PARD PAUS President 15-Jul-16
Sri Lanka7. 0084 - SRI Green Power Development and Energy Efficiency
Improvement Investment Program300.00 15-Jul-14 SARD SAEN President 05-Dec-16
Uzbekistan8. 0059 - UZB Second Central Asia Regional Economic Cooperation
Corridor 2 Road Investment Program500.00 23-Aug-11 CWRD CWTC President 26-Apr-16
Viet Nam9. 0053 - VIE Greater Mekong Subregion Ben Luc-Long Thanh
Expressway Project636.00 14-Dec-10 SERD SETC President 13-May-16
Note: Only copies of approved memos received by OSFMD (including extensions) are included in this report.
Source: Regional Departments
Country/ MFF No.
71
2016 PROJECT COMPLETION REPORT (PCR/XARR) PROGRAM
Program Breakdown Achievement
ORGANIZATION GROUP Qtr1 Qtr2 Qtr3 Qtr4 Total Qtr1 Qtr2 Qtr3 Qtr4 Total
OPERATIONS GROUP 1 2 9 12 0 23 1 1 25 0 27
CWRD 1 3 6 0 10 0 0 9 0 9CWEN 0 0 2 0 2 - - 2 - 2CWER 0 1 0 0 1 - - 1 - 1CWPF 0 0 1 0 1 - - 1 - 1CWTC 1 0 2 0 3 - - 3 - 3CWUW 0 1 0 0 1 - - 1 - 1PRM 0 1 1 0 2 - - 1 - 1
SARD 1 6 6 0 13 1 1 16 0 18SAEN 0 0 1 0 1 - - 1 - 1SAHS 1 0 1 0 2 1 - 2 - 3SAPF 0 0 1 0 1 - - 2 - 2SATC 0 0 1 0 1 - - 1 - 1SAUW 0 0 1 0 1 - - 1 - 1BRM 0 1 0 0 1 - - 2 - 2INRM 0 4 1 0 5 - 1 4 - 5NRM 0 1 0 0 1 - - 1 - 1SLRM 0 0 0 0 0 - - 2 - 2
OPERATIONS GROUP 2 3 14 7 0 24 4 13 16 0 33
EARD 0 0 5 0 5 0 1 6 0 7EAER 0 0 1 0 1 - - 1 - 1MNRM 0 0 2 0 2 - - 4 - 4PRCM 0 0 2 0 2 - 1 1 - 2
PARD 0 5 2 0 7 0 1 7 0 8PAOD 0 0 0 0 0 - - 1 - 1PATE 0 0 0 0 0 - - 1 - 1PAUS 0 1 1 0 2 - - 1 - 1PLCO 0 1 0 0 1 - 1 - - 1SPSO 0 3 1 0 4 - - 4 - 4
SERD 3 9 0 0 12 4 11 3 0 18SEEN 0 0 0 0 0 - 1 - - 1SEHS 0 1 0 0 1 1 2 1 - 4SEPF 0 4 0 0 4 - 4 1 - 5SETC 2 0 0 0 2 1 - 1 - 2CARM 1 0 0 0 1 1 1 - - 2IRM 0 2 0 0 2 1 - - - 1LRM 0 2 0 0 2 - 3 - - 3
PRIVATE SECTOR AND 0 0 8 0 8 0 0 10 0 10COFINANCING OPERATIONS
PSOD 0 0 8 0 8 0 0 10 0 10PSPM 0 0 8 0 8 - - 10 - 10
ADB TOTAL 5 23 27 0 55 5 14 51 0 70
7272
2016 TECHNICAL ASSISTANCE COMPLETION REPORT (TCR) PROGRAM
Original Program Breakdown Achievement
ORGANIZATION GROUP Qtr1 Qtr2 Qtr3 Qtr4 Total Qtr1 Qtr2 Qtr3 Qtr4 Total
BOARD OF DIRECTORS 0 0 5 0 5 1 0 0 0 1
IED 0 0 5 0 5 1 - - - 1
PRESIDENT'S GROUP 3 2 0 0 5 2 1 1 1 5
OAI 0 1 0 0 1 - - 1 1 2SPD 3 1 0 0 4 2 1 - - 3
KNOWLEDGE MANAGEMENT AND 22 19 18 0 59 14 16 22 0 52SUSTAINABLE DEVELOPMENT
ERCD 14 4 8 0 26 6 4 8 0 18ERCI 2 0 5 0 7 3 2 - - 5ERDI 4 0 0 0 4 1 - 3 - 4EREA 3 0 3 0 6 1 - 2 - 3ERMR 2 3 0 0 5 - 2 3 - 5EROD 3 1 0 0 4 1 - - - 1
SDCC 8 15 10 0 33 8 12 14 0 34
NGOC 0 0 0 0 0 - - 1 - 1SDSC 3 7 5 0 15 2 4 9 - 15SDCD 1 4 1 0 6 3 2 1 - 6SDCC-KS 0 1 0 0 1 - 1 - - 1SDES 0 1 0 0 1 - - 1 - 1SDTC 3 1 3 0 7 3 3 1 - 7SDOD-FCI 1 1 1 0 3 - 2 1 - 3
FINANCE AND RISK MANAGEMENT 1 0 0 0 1 1 1 2 0 4
CTL 1 0 0 0 1 - 1 1 - 2TD 0 0 0 0 0 1 - 1 - 2
OPERATIONS GROUP 1 8 10 10 0 28 4 10 24 0 38
CWRD 4 6 6 0 16 2 4 13 0 19CWEN 0 0 1 0 1 - - 1 - 1CWER 0 2 0 0 2 - - 2 - 2CWOD-PPP 0 0 0 0 0 - - 1 - 1CWOD-PSG 0 0 0 0 0 - - 1 - 1CWPF 2 2 2 0 6 - 2 4 - 6CWRC 1 1 0 0 2 2 - - - 2CWTC 0 0 1 0 1 - 1 - - 1CWUW 1 0 0 0 1 - 1 - - 1GRM 0 1 0 0 1 - - 1 - 1KYRM 0 0 0 0 0 - - 1 - 1PRM 0 0 2 0 2 - - 2 - 2
SARD 4 4 4 0 12 2 6 11 0 19SAEN 0 0 0 0 0 - - 1 - 1SAER 0 1 0 0 1 - 1 - - 1SAHS 0 0 1 0 1 - - 1 - 1SAOD 1 0 0 0 1 1 - - - 1SAPF 1 0 2 0 3 - 3 2 - 5SARC 1 0 0 0 1 - 1 - - 1SATC 0 1 0 0 1 1 - - - 1SAUW 0 1 0 0 1 - - 1 - 1BRM 1 1 0 0 2 - 1 2 - 3INRM 0 0 1 0 1 - - 2 - 2NRM 0 0 0 0 0 - - 1 - 1SLRM 0 0 0 0 0 - - 1 - 1
73
2016 TECHNICAL ASSISTANCE COMPLETION REPORT (TCR) PROGRAM
Original Program Breakdown Achievement
ORGANIZATION GROUP Qtr1 Qtr2 Qtr3 Qtr4 Total Qtr1 Qtr2 Qtr3 Qtr4 Total
OPERATIONS GROUP 2 20 41 11 0 72 21 49 31 0 101
EARD 7 5 9 0 21 13 14 9 0 36EAEN 6 1 0 0 7 2 5 1 - 8EAER 0 4 1 0 5 5 5 - - 10EAOD 0 0 0 0 0 1 1 - - 2EAPF 0 0 5 0 5 2 2 1 - 5EASS 0 0 1 0 1 1 - 1 - 2EATC 0 0 2 0 2 2 - 3 - 5PRCM 1 0 0 0 1 - 1 3 - 4
PARD 8 5 2 0 15 4 4 11 0 19PAOD 2 0 0 0 2 - - 3 - 3PATE 0 0 2 0 2 - - 2 - 2PAUS 4 3 0 0 7 3 3 2 - 8PLCO 0 1 0 0 1 - 1 1 - 2PNRM 0 1 0 0 1 - - 1 - 1SPSO 2 0 0 0 2 1 - 2 - 3
SERD 5 31 0 0 36 4 31 11 0 46SEEN 0 3 0 0 3 - 4 1 - 5SEER 1 1 0 0 2 - 4 2 - 6SEHS 0 0 0 0 0 - 2 - - 2SEPF 0 9 0 0 9 1 4 3 - 8SERC 0 2 0 0 2 - 2 - - 2SETC 2 0 0 0 2 - 2 - - 2SEUW 0 2 0 0 2 - 1 1 - 2CARM 2 1 0 0 3 1 3 1 - 5IRM 0 5 0 0 5 1 2 1 - 4LRM 0 1 0 0 1 1 - - - 1MYRM 0 1 0 0 1 - 1 1 - 2PHCO 0 2 0 0 2 - - - - 0TRM 0 1 0 0 1 - 3 - - 3VRM 0 3 0 0 3 - 3 1 - 4
ADMINISTRATION AND 0 0 3 0 3 0 0 0 0 0CORPORATE MANAGEMENT
OSFMD 0 0 3 0 3 - - - - 0
PRIVATE SECTOR AND 0 1 6 0 7 0 1 1 1 3COFINANCING OPERATIONS
OCO 0 1 0 0 1 0 1 0 0 1
PSOD 0 0 6 0 6 0 0 1 1 2PSFI 0 0 1 0 1 - - - 1 1PSIF1 0 0 2 0 2 - - 1 - 1PSIF2 0 0 2 0 2 - - - - 0PSIS 0 0 1 0 1 - - - - 0
ADB TOTAL 54 73 53 0 180 43 78 81 2 204
The following TCRs were circulated in 2015: a) TA8203-IND: Supporting West Bengal Development Finance Program appended to the PCR of Loan 2926-IND: West Bengal Development Finance Program. Circulated on 14 Aug 2015 (IN.261-15); b) TA8228-BAN: Enhancing Efficiency of the Capital Market appended to the PCR of Loan 2951-BAN: Second Capital Market Development Program, Loan 2952-BAN: Second Capital Market Development Program, Loan 2953-BAN: Second Capital Market Development Program (ADF Hard Term). Circulated on 8 Sep 2015 (IN.312-15); and c) TA4934-IND: Institutional Strengthening of Madhya Pradesh Public Works Department appended to the PCR of Loan 2330-IND: Madhya Pradesh State Roads Sector Project II. Circulated on 11 Sep 2015 (IN.321-15).
7474
No. of Total Staff-Days/Recipient CPRM b LD c SFA PI SPA MTR PR PCR Others Total Projects d Staff-Days Project
Afghanistan 2 - - - - - 32 - - 34 16 325 20.3Armenia 3 - - 2 - - 18 - - 23 10 203 20.3Azerbaijan 3 - - 1 - 3 14 - 1 22 10 187 18.7Bangladesh 2 - - 2 3 2 29 - 4 42 28 530 18.9Bhutan 1 - - - - - 2 1 - 4 2 65 32.5Cambodia 1 - - 1 4 1 26 3 - 36 21 d 489 23.3China, People's Republic of 3 - - 9 7 10 62 2 - 93 73 1151 15.8Cook Islands - - - - - - - - - - - - -Fiji - - - 1 - - 1 - - 2 2 12 6.0Georgia 3 - - 3 - 2 21 - - 29 11 544 49.5India 4 - - 6 54 2 74 2 1 143 70 d 965 13.8Indonesia 1 - - 1 2 1 9 - - 14 9 161 17.9Kazakhstan 2 - - - - 1 3 - - 6 2 98 49.0Kiribati - - - - - - 3 - - 3 2 20 10.0Kyrgyz Republic 2 - - 2 2 2 17 1 - 26 12 d 297 24.8Lao People's Democratic Republic 1 - - 1 1 1 29 - - 33 19 d 265 13.9Maldives 2 - - - - - 2 - - 4 1 19 19.0Marshall Islands - - - - - - 3 - - 3 1 17 17.0Micronesia, Federated States of - - - - - - - - - - - - -Mongolia 4 - - 5 - 1 22 - 3 35 21 381 18.1Myanmar - 1 - 1 - - 11 - 1 14 6 129 21.5Nauru - - - - - 1 1 - - 2 2 11 5.5Nepal 3 - - 1 2 2 23 1 2 34 25 d 493 19.7Pakistan 2 - - 5 7 3 42 1 6 66 25 672 26.9Palau - - - - 1 - 2 - - 3 1 7 7.0Papua New Guinea 1 1 - - - 1 6 - - 9 6 97 16.2Philippines 1 - - - 1 1 13 - - 16 7 139 19.9Samoa - - - - - - 3 - - 3 3 29 9.7Solomon Islands - - - - - 1 4 - - 5 3 25 8.3Sri Lanka 1 1 - 1 2 - 23 1 - 29 18 327 18.2Tajikistan 3 - - 1 - 3 13 - - 20 12 d 344 28.7Thailand - - - - - - 1 - - 1 1 6 6.0Timor-Leste - - - - - - - - - - - - -Tonga - - - - - 1 5 - - 6 5 37 7.4Turkmenistan - - - - - - 2 - - 2 1 13 13.0Tuvalu - - - - - - - - - - - - -Uzbekistan 1 - - 3 8 - 25 1 - 38 19 574 30.2Vanuatu - - - 1 1 2 2 - - 6 3 32 10.7Viet Nam 1 1 - - 6 5 67 4 - 84 47 d 1081 23.0
Regional - - - - - - 2 - - 2 2 5 2.5
Grand Total 47 4 0 47 101 46 612 17 18 892 496 9,750 19.7
(ii) Supplementary and additional financing are not counted separately.(iii) Missions classified as other grants project administration (OGPA) are verified with regional departments if purely administration or not.a Covers missions for both loan and grant projects.b Includes other portfolio review missions conducted during the year, e.g., tripartite, interim, quarterly.c Includes multiple loan disbursement reviews in a country.d Excludes projects reviewed by CPR or CPIA, which were concurrently reviewed by the missions. MFF subprojects/tranches are counted individually. Project number 39399-013 (IND/NEP), 40190-023 (LAO/VIE), 40253-023(CAM/LAO/VIE), 42179-013 (LAO/VIE), 43120-013 (CAM/LAO), 46124-001 (KGZ/TAJ) fall under multiple countries and are counted in each country.
Sources: e-Ops (extract of 10 January 2017) and Operations/Non-Operations Departments (for CPRM and LD)
Project Administration Missions a
(1 January - 31 December 2016)
Number of Missions
NOTES: (i) Project administration missions consist of country portfolio review (CPR), loan disbursement (LD), supplementary financing appraisal (SFA), project inception (PI), special project administration (SPA), midterm review (MTR), project review (PR), project completion review (PCR), and other project-specific consultations by professional staff, national officers, administrative staff, and consultants from headquarters and resident missions.
75
Number Total Staff-Recipient TAI TAR STA RETA Others Total of Staff- Days/
TAs Days TA
AFG 1 3 - - - 4 3 21 7.0ARM 1 4 - - - 5 4 9 2.3AZE - 1 - - - 1 1 4 4.0BAN 1 4 - - - 5 4 43 10.8BHU 1 9 - - - 10 7 78 11.1CAM 1 2 - - 1 4 3 45 15.0PRC 13 49 - - 2 64 38 517 13.6COO - - - - - - - - -FIJ - 1 - - - 1 1 4 4.0GEO 1 2 - - - 3 2 11 5.5IND 3 11 - 1 - 15 10 91 9.1INO 2 5 - - - 7 3 73 24.3KAZ - 1 - - - 1 1 2 2.0KIR - - - - - - - - -KGZ - 2 - - - 2 1 12 12.0LAO 1 1 - - - 2 2 5 2.5MAL - 3 - - - 3 1 7 7.0MLD - 2 - - - 2 1 10 10.0RMI - - - - - - - - -FSM - - - - - - - - -MON 6 21 - - 4 31 18 231 12.8MYA - 6 - - - 6 3 11 3.7NAU - - - - - - - - -NEP - 4 - - - 4 4 36 9.0PAK 2 7 - - 4 13 7 239 34.1PAL - - - - - - - - -PNG - - - - - - - - -PHI - 4 - - - 4 4 16 4.0SAM - - - - - - - - -SOL 1 - - - - 1 1 2 2.0SRI 2 7 - - - 9 8 63 7.9TAJ - 4 - - - 4 2 19 9.5THA - - - - - - - - -TIM - - - - - - - - -TON - - - - - - - - -TKM - - - - - - - - -TUV - - - - - - - - -UZB 1 - 1 - 5 7 4 35 8.8VAN - - - - - - - - -VIE - 3 2 - - 5 3 18 6.0
REG 13 53 3 32 2 103 44 817 18.6
Grand Tota 50 209 6 33 18 316 180 2,419 13.4Note: TA administration missions consist of inception (TAI), review (TAR), special TA reviews (STA), regional training program activitiesactivities (RETA), and other project-specific consultations by international staff; national and administrative staff; and consultants
Sources: e-Operations (extract of 10 January 2017) and Operations/Non-Operations Departments
Technical Assistance Administration Missions(1 January - 31 December 2016)
TA Missions
and resident missions.
7676