rbs installation

Post on 13-Jul-2016

129 Views

Category:

Documents

33 Downloads

Preview:

Click to see full reader

DESCRIPTION

RBS Installation

TRANSCRIPT

RBS 6102

Done by: Ali Noureddine

alinoureddine@live.ca

+96176618788

Comissioning 4+4+4 900/1800

Using OMT R48S

Digital Unit for GSM (DUG)

Prepared for the future

• Supports multistandard

• Main Unit

Capacity

• Up to 12 TRX

• Half the size of predecessor

• Multiple digital units (TG-sync)

Opening OMT

Press on Configuration and create IDB

Dialogue box will for create IDB.

Chose the type of RBS 6102RUG.

Antenna sector setup press new

Chose the frequency and type of

combining

Press OK

Press another new for the 1800 band

Click OK

Two sectors will be generated

Repeat it three times

Then press OK.

Finalizing the RBS

• Last steps is to put the RBS in maintenance mode.

• Connect the laptop to RBS.

• Connect OMT to RBS.

• Install the IDB

• Remove the maintenance mode.

• Call NMC for confirmation.

• Done by: Ali Noureddine

• alinoureddine@live.ca

top related