Republic of the Philippines
Office of the President
Philippine Sports Commission
PHILIPPINE BIDDING DOCUMENTS (As Harmonized with Development Partners)
Rehabilitation of Ninoy Aquino Stadium
(Additional Works) Re-bid
Sixth Edition
July 2020
-
1
-
2
TABLE OF CONTENTS
Glossary of Terms, Abbreviations, and Acronyms ..........................................4
Section I. Invitation to Bid .................................................................................7
Section II. Instructions to Bidders .................................................................. 10
1. Scope of Bid ............................................................................................................11
2. Funding Information ...............................................................................................11
3. Bidding Requirements .............................................................................................11
4. Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices ....................11
5. Eligible Bidders .......................................................................................................11
6. Origin of Associated Goods ....................................................................................12
7. Subcontracts ............................................................................................................12
8. Pre-Bid Conference .................................................................................................12
9. Clarification and Amendment of Bidding Documents............................................13
10. Documents Comprising the Bid: Eligibility and Technical Components ...............13
11. Documents Comprising the Bid: Financial Component .........................................13
12. Alternative Bids ......................................................................................................14
13. Bid Prices ................................................................................................................14
14. Bid and Payment Currencies ...................................................................................14
15. Bid Security .............................................................................................................14
16. Sealing and Marking of Bids...................................................................................14
17. Deadline for Submission of Bids ............................................................................15
18. Opening and Preliminary Examination of Bids ......................................................15
19. Detailed Evaluation and Comparison of Bids .........................................................15
20. Post Qualification ....................................................................................................15
21. Signing of the Contract ...........................................................................................16
Section III. Bid Data Sheet .............................................................................. 17
Section IV. General Conditions of Contract ................................................. 20
1. Scope of Contract ....................................................................................................21
2. Sectional Completion of Works ..............................................................................21
3. Possession of Site ....................................................................................................21
4. The Contractor’s Obligations ..................................................................................21
5. Performance Security ..............................................................................................21
6. Site Investigation Reports .......................................................................................22
-
3
7. Warranty ..................................................................................................................22
8. Liability of the Contractor .......................................................................................22
9. Termination for Other Causes .................................................................................22
10. Dayworks ................................................................................................................22
11. Program of Work.....................................................................................................23
12. Instructions, Inspections and Audits .......................................................................23
13. Advance Payment....................................................................................................23
14. Progress Payments ..................................................................................................23
15. Operating and Maintenance Manuals......................................................................23
Section V. Special Conditions of Contract..................................................... 25
Section VI. Specifications ................................................................................ 27
Section VII. Drawings ...................................................................................... 28
Section VIII. Bill of Quantities ....................................................................... 29
Section IX. Checklist of Technical and Financial Documents ..................... 30
-
4
Glossary of
Terms, Abbreviations, and Acronyms
ABC – Approved Budget for the Contract.
ARCC – Allowable Range of Contract Cost.
BAC – Bids and Awards Committee.
Bid – A signed offer or proposal to undertake a contract submitted by a bidder in response to
and in consonance with the requirements of the bidding documents. Also referred to as
Proposal and Tender. (2016 revised IRR, Section 5[c])
Bidder – Refers to a contractor, manufacturer, supplier, distributor and/or consultant who
submits a bid in response to the requirements of the Bidding Documents. (2016 revised IRR,
Section 5[d])
Bidding Documents – The documents issued by the Procuring Entity as the bases for bids,
furnishing all information necessary for a prospective bidder to prepare a bid for the Goods,
Infrastructure Projects, and/or Consulting Services required by the Procuring Entity. (2016
revised IRR, Section 5[e])
BIR – Bureau of Internal Revenue.
BSP – Bangko Sentral ng Pilipinas.
CDA – Cooperative Development Authority.
Consulting Services – Refer to services for Infrastructure Projects and other types of projects
or activities of the GOP requiring adequate external technical and professional expertise that
are beyond the capability and/or capacity of the GOP to undertake such as, but not limited to:
(i) advisory and review services; (ii) pre-investment or feasibility studies; (iii) design; (iv)
construction supervision; (v) management and related services; and (vi) other technical services
or special studies. (2016 revised IRR, Section 5[i])
Contract – Refers to the agreement entered into between the Procuring Entity and the Supplier
or Manufacturer or Distributor or Service Provider for procurement of Goods and Services;
Contractor for Procurement of Infrastructure Projects; or Consultant or Consulting Firm for
Procurement of Consulting Services; as the case may be, as recorded in the Contract Form
signed by the parties, including all attachments and appendices thereto and all documents
incorporated by reference therein.
Contractor – is a natural or juridical entity whose proposal was accepted by the Procuring
Entity and to whom the Contract to execute the Work was awarded. Contractor as used in these
Bidding Documents may likewise refer to a supplier, distributor, manufacturer, or consultant.
CPI – Consumer Price Index.
DOLE – Department of Labor and Employment.
-
5
DTI – Department of Trade and Industry.
Foreign-funded Procurement or Foreign-Assisted Project – Refers to procurement whose
funding source is from a foreign government, foreign or international financing institution as
specified in the Treaty or International or Executive Agreement. (2016 revised IRR, Section
5[b]).
GFI – Government Financial Institution.
GOCC – Government-owned and/or –controlled corporation.
Goods – Refer to all items, supplies, materials and general support services, except Consulting
Services and Infrastructure Projects, which may be needed in the transaction of public
businesses or in the pursuit of any government undertaking, project or activity, whether in the
nature of equipment, furniture, stationery, materials for construction, or personal property of
any kind, including non-personal or contractual services such as the repair and maintenance of
equipment and furniture, as well as trucking, hauling, janitorial, security, and related or
analogous services, as well as procurement of materials and supplies provided by the Procuring
Entity for such services. The term “related” or “analogous services” shall include, but is not
limited to, lease or purchase of office space, media advertisements, health maintenance
services, and other services essential to the operation of the Procuring Entity. (2016 revised
IRR, Section 5[r])
GOP – Government of the Philippines.
Infrastructure Projects – Include the construction, improvement, rehabilitation, demolition,
repair, restoration or maintenance of roads and bridges, railways, airports, seaports,
communication facilities, civil works components of information technology projects,
irrigation, flood control and drainage, water supply, sanitation, sewerage and solid waste
management systems, shore protection, energy/power and electrification facilities, national
buildings, school buildings, hospital buildings, and other related construction projects of the
government. Also referred to as civil works or works. (2016 revised IRR, Section 5[u])
LGUs – Local Government Units.
NFCC – Net Financial Contracting Capacity.
NGA – National Government Agency.
PCAB – Philippine Contractors Accreditation Board.
PhilGEPS - Philippine Government Electronic Procurement System.
Procurement Project – refers to a specific or identified procurement covering goods,
infrastructure project or consulting services. A Procurement Project shall be described,
detailed, and scheduled in the Project Procurement Management Plan prepared by the agency
which shall be consolidated in the procuring entity's Annual Procurement Plan. (GPPB Circular
No. 06-2019 dated 17 July 2019)
PSA – Philippine Statistics Authority.
SEC – Securities and Exchange Commission.
-
6
SLCC – Single Largest Completed Contract.
UN – United Nations.
-
7
Section I. Invitation to Bid
-
8
Republic of the Philippines
Office of the President
Philippine Sports Commission
Invitation to Bid for Rehabilitation of Ninoy Aquino
Stadium (Additional Works) Re-bid
1. The Philippine Sports Commission, through the National Sports Development Fund
(NSDF) FY 2021, intends to apply the sum of Php98,735,379.50 being the Approved
Budget for the Contract (ABC) to payments under the contract for Rehabilitation of
Ninoy Aquino Stadium (Additional Works) Re-bid [PSCBAC-1-2021]. Bids
received in excess of the ABC shall be automatically rejected at bid opening.
2. The Philippine Sports Commission now invites bids for the above Procurement Project. Completion of the Works is required in One Hundred Twenty (120) calendar
days. Bidders should have completed a contract similar to the Project. The description
of an eligible bidder is contained in the Bidding Documents, particularly, in Section II
(Instructions to Bidders).
3. Bidding will be conducted through open competitive bidding procedures using non-discretionary “pass/fail” criterion as specified in the 2016 revised Implementing Rules
and Regulations (IRR) of Republic Act (RA) No. 9184.
4. Interested bidders may obtain further information from the Philippine Sports Commission and inspect the Bidding Documents at the address given below from
Mondays to Fridays, 8:00 AM to 5:00 PM.
5. A complete set of Bidding Documents may be acquired by interested bidders on 29 January 2021 from given address and website/s below and upon payment of the
applicable fee for the Bidding Documents, pursuant to the latest Guidelines issued by
the GPPB, in the amount of Php50,000.00. The Procuring Entity shall allow the bidder
to present its proof of payment for the fees in person.
6. The Philippine Sports Commission will hold a Pre-Bid Conference on 8 February 2021, 10:00 A.M. at Ground Floor, Administration Building, Rizal Memorial Sports
Complex, P. Ocampo Sr. St., Malate, Manila, which shall be open to prospective
bidders. Only one representative per prospective bidder shall be allowed. The
representative must: (a) present a negative COVID-19 RT-PCR (swab test) result taken
at least three (3) days before the scheduled pre-bid conference; and (b) fill out and
submit the Health Declaration Form (HDF) at least two (2) days prior to the pre-bid
conference. The HDF may be accessed this link: https://bit.ly/3m9sxB6
7. Bids must be duly received by the BAC Secretariat through manual submission at the office address as indicated below, on or before 22 February 2021 at 10:00 A.M. Late
bids shall not be accepted.
-
9
8. All bids must be accompanied by a bid security in any of the acceptable forms and in the amount stated in ITB Clause 16.
9. Bid opening shall be on 7 February 2021, 10:00 A.M. at the given address below. Bids will be opened in the presence of the bidders’ representatives who choose to attend the
activity. The representative must: (a) present a negative COVID-19 RT-PCR (swab)
test result taken at least three (3) days before the scheduled pre-bid conference; and (b)
fill out and submit the Health Declaration Form (HDF) at least two (2) days prior to the
pre-bid conference. The HDF may be accessed this link: https://bit.ly/3m9sxB6.
10. The Philippine Sports Commission reserves the right to reject any and all bids, declare a failure of bidding, or not award the contract at any time prior to contract award in
accordance with Sections 35.6 and 41 of the 2016 revised Implementing Rules and
Regulations (IRR) of RA No. 9184, without thereby incurring any liability to the
affected bidder or bidders.
11. For further information, please refer to:
Atty. Michelle C. Labajanan
Bids and Awards Committee Secretariat
Philippine Sports Commission
2nd Floor, Administration Building
Rizal Memorial Sports Complex
P. Ocampo Sr. St.,
Malate, Manila
bac@psc.gov.ph
8523-9831 local 186
www.psc.gov.ph
12. You may visit the following websites:
For downloading of Bidding Documents: https://psc.gov.ph/en/pbd,-bid-data-sheet-
and-terms-of-reference.html
28 January 2021
Sgd.
ATTY. GUILLERMO B. IROY, JR.
Chairman, Bids and Awards Committee
https://bit.ly/3m9sxB6mailto:bac@psc.gov.phhttp://www.psc.gov.ph/
-
10
Section II. Instructions to Bidders
-
11
1. Scope of Bid
The Procuring Entity, Philippine Sports Commission, invites Bids for the
Rehabilitation of Ninoy Aquino Stadium (Additional Works) Re-bid with Project
Identification Number PSCBAC-1-2021.
The Procurement Project (referred to herein as “Project”) is for the construction of
Works, as described in Section VI (Specifications).
2. Funding Information
2.1. The GOP through the source of funding as indicated below for FY 2021 in the amount of Php98,735,379.50.
2.2. The source of funding is:
a. National Sports Development Fund (NSDF)
3. Bidding Requirements
The Bidding for the Project shall be governed by all the provisions of RA No. 9184 and
its 2016 revised IRR, including its Generic Procurement Manual and associated
policies, rules and regulations as the primary source thereof, while the herein clauses
shall serve as the secondary source thereof.
Any amendments made to the IRR and other GPPB issuances shall be applicable only
to the ongoing posting, advertisement, or invitation to bid by the BAC through the
issuance of a supplemental or bid bulletin.
The Bidder, by the act of submitting its Bid, shall be deemed to have inspected the site,
determined the general characteristics of the contracted Works and the conditions for
this Project, such as the location and the nature of the work; (b) climatic conditions;
(c) transportation facilities; (c) nature and condition of the terrain, geological conditions
at the site communication facilities, requirements, location and availability of
construction aggregates and other materials, labor, water, electric power and access
roads; and (d) other factors that may affect the cost, duration and execution or
implementation of the contract, project, or work and examine all instructions, forms,
terms, and project requirements in the Bidding Documents.
4. Corrupt, Fraudulent, Collusive, Coercive, and Obstructive Practices
The Procuring Entity, as well as the Bidders and Contractors, shall observe the highest
standard of ethics during the procurement and execution of the contract. They or
through an agent shall not engage in corrupt, fraudulent, collusive, coercive, and
obstructive practices defined under Annex “I” of the 2016 revised IRR of RA No. 9184
or other integrity violations in competing for the Project.
5. Eligible Bidders
-
12
5.1. Only Bids of Bidders found to be legally, technically, and financially capable will be evaluated.
5.2. The Bidder must have an experience of having completed a Single Largest Completed Contract (SLCC) that is similar to this Project, equivalent to at least
fifty percent (50%) of the ABC adjusted, if necessary, by the Bidder to current
prices using the PSA’s CPI, except under conditions provided for in Section
23.4.2.4 of the 2016 revised IRR of RA No. 9184.
A contract is considered to be “similar” to the contract to be bid if it has the
major categories of work stated in the BDS.
5.3. For Foreign-funded Procurement, the Procuring Entity and the foreign government/foreign or international financing institution may agree on another
track record requirement, as specified in the Bidding Document prepared for
this purpose.
5.4. The Bidders shall comply with the eligibility criteria under Section 23.4.2 of the 2016 IRR of RA No. 9184.
6. Origin of Associated Goods
There is no restriction on the origin of Goods other than those prohibited by a decision
of the UN Security Council taken under Chapter VII of the Charter of the UN.
7. Subcontracts
7.1. The Bidder may subcontract portions of the Project to the extent allowed by the Procuring Entity as stated herein, but in no case more than fifty percent (50%)
of the Project.
The Procuring Entity has prescribed that:
a. Subcontracting is not allowed.
7.2 Subcontracting of any portion of the Project does not relieve the Contractor of any liability or obligation under the Contract. The Supplier will be responsible for the
acts, defaults, and negligence of any subcontractor, its agents, servants, or workmen
as fully as if these were the Contractor’s own acts, defaults, or negligence, or those
of its agents, servants, or workmen.
8. Pre-Bid Conference
The Procuring Entity will hold a pre-bid conference for this Project on the specified
date and time and either at its physical address at Ground Floor, Administration
Building, Rizal Memorial Sports Complex, P. Ocampo Sr. St., Malate, Manila and/or
through videoconferencing/webcasting} as indicated in paragraph 6 of the IB.
-
13
9. Clarification and Amendment of Bidding Documents
Prospective bidders may request for clarification on and/or interpretation of any part of
the Bidding Documents. Such requests must be in writing and received by the
Procuring Entity, either at its given address or through electronic mail indicated in the
IB, at least ten (10) calendar days before the deadline set for the submission and receipt
of Bids.
10. Documents Comprising the Bid: Eligibility and Technical Components
10.1. The first envelope shall contain the eligibility and technical documents of the Bid as specified in Section IX. Checklist of Technical and Financial
Documents.
10.2. If the eligibility requirements or statements, the bids, and all other documents for submission to the BAC are in foreign language other than English, it must
be accompanied by a translation in English, which shall be authenticated by the
appropriate Philippine foreign service establishment, post, or the equivalent
office having jurisdiction over the foreign bidder’s affairs in the Philippines.
For Contracting Parties to the Apostille Convention, only the translated
documents shall be authenticated through an apostille pursuant to GPPB
Resolution No. 13-2019 dated 23 May 2019. The English translation shall
govern, for purposes of interpretation of the bid.
10.3. A valid PCAB License is required, and in case of joint ventures, a valid special PCAB License, and registration for the type and cost of the contract for this
Project. Any additional type of Contractor license or permit shall be indicated
in the BDS.
10.4. A List of Contractor’s key personnel (e.g., Project Manager, Project Engineers, Materials Engineers, and Foremen) assigned to the contract to be bid, with their
complete qualification and experience data shall be provided. These key
personnel must meet the required minimum years of experience set in the BDS.
10.5. A List of Contractor’s major equipment units, which are owned, leased, and/or under purchase agreements, supported by proof of ownership, certification of
availability of equipment from the equipment lessor/vendor for the duration of
the project, as the case may be, must meet the minimum requirements for the
contract set in the BDS.
11. Documents Comprising the Bid: Financial Component
11.1. The second bid envelope shall contain the financial documents for the Bid as specified in Section IX. Checklist of Technical and Financial Documents.
11.2. Any bid exceeding the ABC indicated in paragraph 1 of the IB shall not be accepted.
-
14
11.3. For Foreign-funded procurement, a ceiling may be applied to bid prices provided the conditions are met under Section 31.2 of the 2016 revised IRR of
RA No. 9184.
12. Alternative Bids
Bidders shall submit offers that comply with the requirements of the Bidding
Documents, including the basic technical design as indicated in the drawings and
specifications. Unless there is a value engineering clause in the BDS, alternative Bids
shall not be accepted.
13. Bid Prices
All bid prices for the given scope of work in the Project as awarded shall be considered
as fixed prices, and therefore not subject to price escalation during contract
implementation, except under extraordinary circumstances as determined by the NEDA
and approved by the GPPB pursuant to the revised Guidelines for Contract Price
Escalation guidelines.
14. Bid and Payment Currencies
14.1. Bid prices may be quoted in the local currency or tradeable currency accepted by the BSP at the discretion of the Bidder. However, for purposes of bid
evaluation, Bids denominated in foreign currencies shall be converted to
Philippine currency based on the exchange rate as published in the BSP
reference rate bulletin on the day of the bid opening.
14.2. Payment of the contract price shall be made in:
a. Philippine Pesos.
15. Bid Security
15.1. The Bidder shall submit a Bid Securing Declaration or any form of Bid Security in the amount indicated in the BDS, which shall be not less than the percentage
of the ABC in accordance with the schedule in the BDS.
15.2. The Bid and bid security shall be valid until one hundred twenty (120) calendar days from the date of the opening of bids. Any bid not accompanied
by an acceptable bid security shall be rejected by the Procuring Entity as non-
responsive.
16. Sealing and Marking of Bids
Each Bidder shall submit one copy of the first and second components of its Bid.
-
15
The Procuring Entity may request additional hard copies and/or electronic copies of the
Bid. However, failure of the Bidders to comply with the said request shall not be a
ground for disqualification.
If the Procuring Entity allows the submission of bids through online submission to the
given website or any other electronic means, the Bidder shall submit an electronic copy
of its Bid, which must be digitally signed. An electronic copy that cannot be opened or
is corrupted shall be considered non-responsive and, thus, automatically disqualified.
17. Deadline for Submission of Bids
The Bidders shall submit on the specified date and time and either at its physical address
or through online submission as indicated in paragraph 7 of the IB.
18. Opening and Preliminary Examination of Bids
18.1. The BAC shall open the Bids in public at the time, on the date, and at the place specified in paragraph 9 of the IB. The Bidders’ representatives who are present
shall sign a register evidencing their attendance. In case videoconferencing,
webcasting or other similar technologies will be used, attendance of participants
shall likewise be recorded by the BAC Secretariat.
In case the Bids cannot be opened as scheduled due to justifiable reasons, the
rescheduling requirements under Section 29 of the 2016 revised IRR of RA No.
9184 shall prevail.
18.2. The preliminary examination of Bids shall be governed by Section 30 of the 2016 revised IRR of RA No. 9184.
19. Detailed Evaluation and Comparison of Bids
19.1. The Procuring Entity’s BAC shall immediately conduct a detailed evaluation of all Bids rated “passed” using non-discretionary pass/fail criteria. The BAC
shall consider the conditions in the evaluation of Bids under Section 32.2 of
2016 revised IRR of RA No. 9184.
19.2. If the Project allows partial bids, all Bids and combinations of Bids as indicated in the BDS shall be received by the same deadline and opened and evaluated
simultaneously so as to determine the Bid or combination of Bids offering the
lowest calculated cost to the Procuring Entity. Bid Security as required by ITB
Clause 16 shall be submitted for each contract (lot) separately.
19.3. In all cases, the NFCC computation pursuant to Section 23.4.2.6 of the 2016 revised IRR of RA No. 9184 must be sufficient for the total of the ABCs for all
the lots participated in by the prospective Bidder.
20. Post Qualification
Within a non-extendible period of five (5) calendar days from receipt by the Bidder of
the notice from the BAC that it submitted the Lowest Calculated Bid, the Bidder shall
-
16
submit its latest income and business tax returns filed and paid through the BIR
Electronic Filing and Payment System (eFPS), and other appropriate licenses and
permits required by law and stated in the BDS.
21. Signing of the Contract
The documents required in Section 37.2 of the 2016 revised IRR of RA No. 9184 shall
form part of the Contract. Additional Contract documents are indicated in the BDS.
-
17
Section III. Bid Data Sheet
-
18
Bid Data Sheet ITB Clause
5.2 For this purpose, contracts similar to the Project refer to contracts which have
the same major categories of work, which shall be:
Construction of sports arena or sports stadium.
7.1
Subcontracting is not allowed.
10.3 Bidder must have a valid PCAB license with principal classification
Category AAA General Building.
Bidder must have PCAB ARCC rating of Medium A for Building.
Bidder must be ISO 9001 Certified.
10.4
The key personnel must meet the required minimum years of experience set
below:
Key Personnel General
Experience
Relevant Experience
(Experience in similar
project and similar
position)
Lead Architect (Conservation
Design, Planning and
Management)
10 years 5 years
Project Manager (Architect or
Engineer)
10 years 5 years
Project Engineer/Architect 5 years 2 years
Materials Engineer 2 5 years 2 years
Electrical Engineer 5 years 2 years
Mechanical Engineer 5 years 2 years
Sanitary Engineer/Master
Plumber
5 years 2 years
Foreman 5 years 2 years
Safety Officer with certificate
of training in occupational
safety and health
3 years 2 years
10.5 The minimum major equipment requirements are the following:
Equipment Capacity Number of Units
Boom truck 10T 1
Backhoe ½ bucket 1
Dump truck 10 wheeler
20 cubic meters
3
Jackhammer with
compressor
175 CF, screw type 2
Welding machine 500 amperes 5
12 No further instructions.
-
19
15.1 The bid security shall be in the form of a Bid Securing Declaration or any of the
following forms and amounts:
a. The amount of not less than Php1,974,707.59 [two percent (2%) of ABC], if bid security is in cash, cashier’s/manager’s check, bank
draft/guarantee or irrevocable letter of credit;
b. The amount of not less than Php4,936,768.98 [five percent (5%) of ABC] if bid security is in Surety Bond.
19.2 Partial bids not allowed.
20 Bidder must have a valid PCAB license with principal classification
Category AAA General Building.
Bidder must have PCAB ARCC rating of Medium A for Building.
Bidder must be ISO 9001 Certified.
Bidder must be in sound financial standing with annual turnover/gross
billings of at least 50% of the ABC.
Bidder must have complete construction of a structure with at least
contract value of 50% of the ABC.
Bidder must have a licensed civil engineer, mechanical engineer, electrical
engineer, sanitary engineer and safety officer.
Bidder must have ten (10) years of experience in the field of civil works
specifically in sports stadium or sports arena.
21
Additional contract documents relevant to the Project that may be required by
existing laws and/or the Procuring Entity, such as construction schedule and S-
curve, manpower schedule, construction methods, equipment utilization
schedule, construction safety and health program approved by the DOLE, and
other acceptable tools of project scheduling shall be submitted during post-
qualification.
-
20
Section IV. General Conditions of Contract
-
21
1. Scope of Contract
This Contract shall include all such items, although not specifically mentioned, that can
be reasonably inferred as being required for its completion as if such items were
expressly mentioned herein. All the provisions of RA No. 9184 and its 2016 revised
IRR, including the Generic Procurement Manual, and associated issuances, constitute
the primary source for the terms and conditions of the Contract, and thus, applicable in
contract implementation. Herein clauses shall serve as the secondary source for the
terms and conditions of the Contract.
This is without prejudice to Sections 74.1 and 74.2 of the 2016 revised IRR of RA No.
9184 allowing the GPPB to amend the IRR, which shall be applied to all procurement
activities, the advertisement, posting, or invitation of which were issued after the
effectivity of the said amendment.
2. Sectional Completion of Works
If sectional completion is specified in the Special Conditions of Contract (SCC),
references in the Conditions of Contract to the Works, the Completion Date, and the
Intended Completion Date shall apply to any Section of the Works (other than
references to the Completion Date and Intended Completion Date for the whole of the
Works).
3. Possession of Site
4.1. The Procuring Entity shall give possession of all or parts of the Site to the Contractor based on the schedule of delivery indicated in the SCC, which
corresponds to the execution of the Works. If the Contractor suffers delay or
incurs cost from failure on the part of the Procuring Entity to give possession in
accordance with the terms of this clause, the Procuring Entity’s Representative
shall give the Contractor a Contract Time Extension and certify such sum as fair
to cover the cost incurred, which sum shall be paid by Procuring Entity.
4.2. If possession of a portion is not given by the above date, the Procuring Entity will be deemed to have delayed the start of the relevant activities. The resulting
adjustments in contract time to address such delay may be addressed through
contract extension provided under Annex “E” of the 2016 revised IRR of RA
No. 9184.
4. The Contractor’s Obligations
The Contractor shall employ the key personnel named in the Schedule of Key Personnel
indicating their designation, in accordance with ITB Clause 10.3 and specified in the
BDS, to carry out the supervision of the Works.
The Procuring Entity will approve any proposed replacement of key personnel only if
their relevant qualifications and abilities are equal to or better than those of the
personnel listed in the Schedule.
5. Performance Security
-
22
5.1. Within ten (10) calendar days from receipt of the Notice of Award from the Procuring Entity but in no case later than the signing of the contract by both
parties, the successful Bidder shall furnish the performance security in any of
the forms prescribed in Section 39 of the 2016 revised IRR.
5.2. The Contractor, by entering into the Contract with the Procuring Entity, acknowledges the right of the Procuring Entity to institute action pursuant to
RA No. 3688 against any subcontractor be they an individual, firm, partnership,
corporation, or association supplying the Contractor with labor, materials and/or
equipment for the performance of this Contract.
6. Site Investigation Reports
The Contractor, in preparing the Bid, shall rely on any Site Investigation Reports
referred to in the SCC supplemented by any information obtained by the Contractor.
7. Warranty
7.1. In case the Contractor fails to undertake the repair works under Section 62.2.2 of the 2016 revised IRR, the Procuring Entity shall forfeit its performance
security, subject its property(ies) to attachment or garnishment proceedings, and
perpetually disqualify it from participating in any public bidding. All payables
of the GOP in his favor shall be offset to recover the costs.
7.2. The warranty against Structural Defects/Failures, except that occasioned-on force majeure, shall cover the period from the date of issuance of the Certificate
of Final Acceptance by the Procuring Entity. Specific duration of the warranty
is found in the SCC.
8. Liability of the Contractor
Subject to additional provisions, if any, set forth in the SCC, the Contractor’s liability
under this Contract shall be as provided by the laws of the Republic of the Philippines.
If the Contractor is a joint venture, all partners to the joint venture shall be jointly and
severally liable to the Procuring Entity.
9. Termination for Other Causes
Contract termination shall be initiated in case it is determined prima facie by the
Procuring Entity that the Contractor has engaged, before, or during the implementation
of the contract, in unlawful deeds and behaviors relative to contract acquisition and
implementation, such as, but not limited to corrupt, fraudulent, collusive, coercive, and
obstructive practices as stated in ITB Clause 4.
10. Dayworks
-
23
Subject to the guidelines on Variation Order in Annex “E” of the 2016 revised IRR of
RA No. 9184, and if applicable as indicated in the SCC, the Dayworks rates in the
Contractor’s Bid shall be used for small additional amounts of work only when the
Procuring Entity’s Representative has given written instructions in advance for
additional work to be paid for in that way.
11. Program of Work
11.1. The Contractor shall submit to the Procuring Entity’s Representative for approval the said Program of Work showing the general methods, arrangements,
order, and timing for all the activities in the Works. The submissions of the
Program of Work are indicated in the SCC.
11.2. The Contractor shall submit to the Procuring Entity’s Representative for approval an updated Program of Work at intervals no longer than the period
stated in the SCC. If the Contractor does not submit an updated Program of
Work within this period, the Procuring Entity’s Representative may withhold
the amount stated in the SCC from the next payment certificate and continue to
withhold this amount until the next payment after the date on which the overdue
Program of Work has been submitted.
12. Instructions, Inspections and Audits
The Contractor shall permit the GOP or the Procuring Entity to inspect the Contractor’s
accounts and records relating to the performance of the Contractor and to have them
audited by auditors of the GOP or the Procuring Entity, as may be required.
13. Advance Payment
The Procuring Entity shall, upon a written request of the Contractor which shall be
submitted as a Contract document, make an advance payment to the Contractor in an
amount not exceeding fifteen percent (15%) of the total contract price, to be made in
lump sum, or at the most two installments according to a schedule specified in the SCC,
subject to the requirements in Annex “E” of the 2016 revised IRR of RA No. 9184.
14. Progress Payments
The Contractor may submit a request for payment for Work accomplished. Such
requests for payment shall be verified and certified by the Procuring Entity’s
Representative/Project Engineer. Except as otherwise stipulated in the SCC, materials
and equipment delivered on the site but not completely put in place shall not be included
for payment.
15. Operating and Maintenance Manuals
15.1. If required, the Contractor will provide “as built” Drawings and/or operating and maintenance manuals as specified in the SCC.
-
24
15.2. If the Contractor does not provide the Drawings and/or manuals by the dates stated above, or they do not receive the Procuring Entity’s Representative’s
approval, the Procuring Entity’s Representative may withhold the amount stated
in the SCC from payments due to the Contractor.
-
25
Section V. Special Conditions of Contract
-
26
Special Conditions of Contract
GCC Clause
2 No further instructions.
4.1 The start date is the date indicated in the Notice to Proceed.
6 The site investigation reports are: None.
7.2 Fifteen (15) years.
10 No dayworks are applicable to the contract.
11.1 The Contractor shall submit the Program of Work to the Procuring
Entity’s Representative within 15 calendar days of delivery of the Notice
to Proceed.
11.2 The period between Program of Work updates is thirty (30) calendar days.
Payment will not be processed if an updated program of work is not
submitted.
13 The amount of the advance payment is 15% of the total contract price.
14 No further instructions.
15.1 The date by which operating and maintenance manuals are required is
within seven (7) calendar days after completion date.
The date by which “as built” drawings are required is within fifteen (15)
calendar days after completion date.
15.2 The final payment will be withheld for failing to produce “as built”
drawings and/or operating and maintenance manuals by the date required.
-
27
Section VI. Specifications
See attached Annex “A”, Technical Specifications.
-
28
Section VII. Drawings
1. Architectural Plan 2. Structural Plan 3. Construction of Control Room Plan
Copies of the enumerated plans may be secured from the PSC Engineering Unit.
-
29
Section VIII. Bill of Quantities
See attached Annex “B”, Bill of Quantities
-
30
Section IX. Checklist of Technical and Financial
Documents
-
31
Checklist of Technical and Financial Documents
I. TECHNICAL COMPONENT ENVELOPE
Class “A” Documents
Legal Documents
⬜ (a) Valid PhilGEPS Registration Certificate (Platinum Membership) (all pages);
⬜ (b) Registration certificate from Securities and Exchange Commission (SEC), Department of Trade and Industry (DTI) for sole proprietorship, or
Cooperative Development Authority (CDA) for cooperatives or its equivalent
document;
and
⬜ (c) Mayor’s or Business permit issued by the city or municipality where the principal place of business of the prospective bidder is located, or the
equivalent document for Exclusive Economic Zones or Areas;
and
⬜ (e) Tax clearance per E.O. No. 398, s. 2005, as finally reviewed and approved by the Bureau of Internal Revenue (BIR).
Technical Documents
⬜ (f) Statement of the prospective bidder of all its ongoing government and private contracts, including contracts awarded but not yet started, if any, whether
similar or not similar in nature and complexity to the contract to be bid; and
⬜ (g) Statement of the bidder’s Single Largest Completed Contract (SLCC) similar to the contract to be bid, except under conditions provided under the rules;
and
⬜ (h) Philippine Contractors Accreditation Board (PCAB) License; or
Special PCAB License in case of Joint Ventures;
and registration for the type and cost of the contract to be bid; and
⬜ (i) Original copy of Bid Security. If in the form of a Surety Bond, submit also a certification issued by the Insurance Commission;
or
Original copy of Notarized Bid Securing Declaration (subject to the
provisions of GPPB Resolution No. 9-2020; and
(j) Project Requirements, which shall include the following:
⬜ a. Organizational chart for the contract to be bid;
⬜ b. List of contractor’s key personnel (e.g., Project Manager, Project Engineers, Materials Engineers, and Foremen), to be assigned to the
contract to be bid, with their complete qualification and experience
data;
⬜ c. List of contractor’s major equipment units, which are owned, leased, and/or under purchase agreements, supported by proof of ownership or
certification of availability of equipment from the equipment
lessor/vendor for the duration of the project, as the case may be; and
⬜ (k) Original duly signed Omnibus Sworn Statement (OSS);
-
32
and if applicable, Original Notarized Secretary’s Certificate in case of a
corporation, partnership, or cooperative; or Original Special Power of
Attorney of all members of the joint venture giving full power and authority
to its officer to sign the OSS and do acts to represent the Bidder.
Financial Documents
⬜ (l) The prospective bidder’s audited financial statements, showing, among others, the prospective bidder’s total and current assets and liabilities, stamped
“received” by the BIR or its duly accredited and authorized institutions, for
the preceding calendar year which should not be earlier than two (2) years
from the date of bid submission; and
⬜ (m) The prospective bidder’s computation of Net Financial Contracting Capacity (NFCC).
Class “B” Documents
⬜ (n) If applicable, duly signed joint venture agreement (JVA) in accordance with RA No. 4566 and its IRR in case the joint venture is already in existence;
or
duly notarized statements from all the potential joint venture partners stating
that they will enter into and abide by the provisions of the JVA in the instance
that the bid is successful.
II. FINANCIAL COMPONENT ENVELOPE
⬜ (o) Original of duly signed and accomplished Financial Bid Form; and
Other documentary requirements under RA No. 9184
⬜ (p) Original of duly signed Bid Prices in the Bill of Quantities; and
⬜ (q) Duly accomplished Detailed Estimates Form, including a summary sheett indicating the unit prices of construction materials, labor rates, and equipment
rentals used in coming up with the Bid; and
⬜ (r) Cash Flow by Quarter.
-
33
Additional Forms
No. Description
1 Statement of Single Largest Completed Contract
2 List of all ongoing government and private contracts including contracts awarded
but not yet started
3 Computation of Net Financial Contracting Capacity (NFCC)
4 Joint Venture Agreement
5 Organizational Chart
6 Qualification of Key Personnel Proposed to be Assigned to the Contract
7 Key Personnel (Format of Bio-data/Resume)
8 List of Equipment Owned or Leased and/or Under Purchase Agreements, Pledged
to the Proposed Project
9 Statement of Availability of Key Personnel and Equipment
10 Affidavit of Site Inspection
11 Detailed Cost Estimates/Unit Price Analysis
12 Quarterly Cash Flow and Payment Schedule
-
34
SF-INFR-16 - STATEMENT SHOWING THE BIDDER’S SINGLE LARGEST COMPLETED CONTRACT WHICH IS SIMILAR IN NATURE
Business Name : ___________________________________________________
Business Address : ___________________________________________________
Name of Contract
a. Owner Name
b. Address c. Telephone Nos.
Nature of Work
Contractor’s Role a. Amount at Award b. Amount at
Completion c. Duration
a. Date Awarded
b. Contract Effectivity c. Date Completed
Description
%
Government
Private
Note: This statement shall be supported with:
1 Owner’s Certificate of Final Acceptance or the Certificate of Completion
2 Whenever applicable, the Constructor Performance Evaluation Summary (CPES) Final Rating which must be satisfactory.
3.
Contract
4 Additional information to prove the role of the entity and the actual scope of work directly undertaken by the entity as mentioned under ITB Clause 12.1(a)(iii) of the Bid Data Sheet.
Submitted by : ___________________________________________________
(Printed Name & Signature)
Designation : ___________________________________________________ Date : ___________________________________________________
-
35
SF-INFR-15 - LIST OF ALL ONGOING GOVERNMENT & PRIVATE CONSTRUCTION CONTRACTS INCLUDING CONTRACTS AWARDED BUT NOT YET STARTED
Business Name : ___________________________________________________
Business Address : ___________________________________________________
Name of Contract/Location Project Cost
a. Owner Name b. Address
c. Telephone Nos.
Nature of Work
Contractor’s Role a. Date Awarded b. Date Started
c. Date of Completion
% of Accomplishment Value of Outstanding
Works Description
% Planned Actual
Government
Private
Note: This statement shall be supported with: Total Cost
1 Notice of Award and/or Contract
2 Notice to Proceed issued by the owner
3 Certificate of Accomplishments signed by the owner or Project Engineer
Submitted by : ___________________________________________________ (Printed Name & Signature)
Designation : ___________________________________________________ Date : ___________________________________________________
-
36
COMPUTATION OF NET FINANCIAL CONTRACTING CAPACITY (NFCC) A. Summary of the Firm’s/Contractor’s assets and liabilities on the basis of the attached copy of
audited financial statement, stamped “RECEIVED” by the Bureau of Internal Revenue or BIR authorized collecting agent, for the immediately preceding year and a certified copy of Schedule of Fixed Assets particularly the list of construction equipment.
Year 20__
1. Total Assets
2. Current Assets
3. Total Liabilities
4. Current Liabilities
5. Total Net Worth (1-3)
6. Current Net Worth or Net Working Capital (2-4)
B. The Net Financial Contracting Capacity (NFCC) based on the above data is computed as follows:
NFCC = K (current asset – current liabilities) minus value of all outstanding contracts including those awarded contracts but not yet started NFCC = Php _______________________________________ K = 10 for a contract duration of one year or less.
Submitted by: ________________________________________ Name of Firm / Contractor _________________________________________ Signature of Authorized Representative Date: _____________________________ NOTE: If Partnership or Joint Venture, each Partner or Member Firm of Joint Venture shall submit the above requirements.
-
37
JOINT VENTURE AGREEMENT
KNOW ALL MEN BY THESE PRESENTS: That this JOINT VENTURE AGREEMENT is entered into by and between: ___________, of legal age, __(civil status)__, owner/proprietor of _________________________ and a resident of ________________________.
- and -
_______________________, of legal age, __(civil status)__, owner/proprietor of ____________________ a resident of ____________________________________.
That both parties agree to join together their capital, manpower, equipment, and other resources and efforts to enable the Joint Venture to participate in the Bidding and Undertaking of the hereunder stated Contract of the Procuring Entity.
1. NAME OF PROJECT CONTRACT AMOUNT
That both parties agree to be jointly and severally liable for their participation in the Bidding and Undertaking of the said contract. That both parties agree that ___________________ and/or __________________ shall be the Official Representative of the Joint Venture, and are granted full power and authority to do, execute and perform any and all acts necessary and/or to represent the Joint Venture in the Bidding and Undertaking of the said contract, as fully and effectively and the Joint Venture may do and if personally present with full power of substitution and revocation.
That this Joint Venture Agreement shall remain in effect only for the above stated Contracts until terminated by both parties.
Done this _____ day of ______, in the year of our Lord _____.
-
38
CONTRACTOR’S ORGANIZATIONAL CHART FOR THE CONTRACT
Submit Copy of the Organizational Chart that the Contractor intends to use to execute the Contract if awarded to him to include in the chart, among others, the names of the required proposed Key Personnel as indicated in the ITB and other Key Engineering Personnel.
Attach the required Proposed Organizational Chart for the Contract as stated above
Note: This organization chart should represent the “Contractor’s Organization” required for the Project, and not the organizational chart of the entire firm.
-
39
SF-INFR-48 - QUALIFICATION OF KEY PERSONNEL PROPOSED TO BE ASSIGNED TO THE CONTRACT
Project Manager (Licensed Civil Engineer or Licensed Architect)
PROJECT ENGINEERS Materials/
Quality Control
Engineer II (DPWH
Accredited) * Attached Proof of
Accreditation
Safety Officer (Certified by
BWC of DOLE or with Certificate of Training in Occupational
Safety and Health)
*Attached Certification or
Training
Conservation Specialist *
Sustaina-bility
Expert **
Licensed Civil/ Structural
Engineer for Building Works
Professional Mechanical
Engineer
Professional Electrical Engineer
Licensed Sanitary Engineer
Licensed Electronics & Communication Engineer
Licensed Architect
1 Name
2 Address
3 Date of Birth
4 Employed Since
5 Experience
Total Experience (Years)
Required
Actual
Experience in Similar Project (Years)
Required
Actual
6 Previous Employment
7 Education
8
PRC License/Accreditation/Certification/ training (as required)
* Attached Supporting Documents for validation purposes )
Experience in Similar Work refers to experience of the key personnel in the construction of any commercial, institutional, industrial buildings of similar nature and complexity as the proposed project occupying same proposed position. *Conservation Specialist shall have experience in conservation of Heritage building projects. ** Sustainability Expert shall be LEED Accredited Professional or BERDE Certified Professional or its equivalent. Submitted by :__________________________________ (Printed Name & Signature) Designation :__________________________________ Date :__________________________________
-
40
KEY PERSONNEL (FORMAT OF BIO-DATA/RESUME)
Give the detailed information of the following personnel who are scheduled to be assigned as full-time field staff for the project. Fill up a form for each person. - Authorized Managing Officer / Representative - Sustained Technical Employee 1. Name : ____________________________________________ 2. Date of Birth : ____________________________________________ 3. Nationality : ____________________________________________ 4. Education and Degrees : ____________________________________________ 5. Specialty : ____________________________________________ 6. Registration : ____________________________________________ 7. Length of Service with the Firm : _____ Year from ____ (months) _____ (year)
To ____ (months) _____ (year)
8. Years of Experience : ____________________________________________ 9. If Item 7 is less than the required number of years, give name and length of service with previous
employers. (attached additional sheet/s), if necessary:
Name and Address of Employer Length of Service
_________________________ _____ year(s) from _______ to ______ _________________________ _____ year(s) from _______ to ______ _________________________ _____ year(s) from _______ to ______
10. Experience:
This should cover the number of years of experience required under ITB Clause 12.1b(ii.2) of the Bidding Documents for each of the required key personnel.(Attached as many pages as necessary to show involvement of personnel in projects using the format below).
1. Name : ____________________________________________ 2. Name and Address of Owner : ____________________________________________ 3. Name and Address of the
Owner’s Engineer : ____________________________________________ (Consultant)
4. Indicate the Features of Project (particulars of the project components and any other particular interest connected with the project) : ___________________________________________
5. Contract Amount Expressed in
Philippine Currency : ____________________________________________ 6. Position : ____________________________________________
-
41
7. Structures for which the employee was responsible : ____________________________________________
8. Assignment Period : from _______ (months) _______ (years)
: to _______ (months) _______ (years) ___________________________ Name and Signature of Employee It is hereby certified that the above personnel can be assigned to this project, if the contract is awarded to our company. ___________________________________ ____________________________________ (Place and Date) (The Authorized Representative)
-
42
SF-INFR - 49 - LIST OF EQUIPMENT, OWNED OR LEASED AND/OR UNDER PURCHASE AGREEMENTS, PLEDGED TO THE PROPOSED CONTRACT
Business Name : ___________________________________________________ Business Address : ___________________________________________________
Minimum Required Equipment
No. of units
Model/ Year
Manufac-tured
Capacity/ Performance
/ Size
Plate No.
Motor No. / Body No.
Specific Location
Condition
Status
Owned with
attached Proof
Leased with
attached Proof from the Lessor
Under Purchase
Agreement with attached Proof from the
Vendor
This Certifies that the above list of equipment are in good working condition and will be available for use during the execution of the Project.
Submitted by
: ___________________________________________________
(Printed Name & Signature) Designation : ___________________________________________________
Date : ___________________________________________________ Note:
(a) if owned: Submit proof of ownership of equipment i.e. receipt, etc. If leased and/or under purchase agreement: submit proof of lease and/or under purchase agreement (with corresponding engine numbers, chassis numbers and/or serial numbers) and Certification of availability of equipment in good working condition for the duration of the Project issued by the Equipment Lessor/Vendor.
-
43
SF-INFR-18 – STATEMENT OF AVAILABILITY OF KEY PERSONNEL AND EQUIPMENT
(Date of Issuance)
Name of the Head of the Procuring Entity Position of the Head of the Procuring Entity (Name of Procuring Entity) (Address of Procuring Entity) Attention : The Chairman Bids and Awards Committee
Dear Sir:
In compliance with the requirements of the ___(Name of the Procuring Entity)___ BAC for the bidding of the __(Name of the Contract)__, we certify that __(Name of the Bidder)__ has in its employ key personnel, such as Project Manager, Project Engineers, Architect, Materials/Quality Control Engineer, Safety Officer, Conservation Specialist and Sustainability Expert who may be engaged for the construction of the said contract.
Further, we likewise certify the availability of equipment that __(Name of the Bidder)__ owns, has under lease, and/or has under purchase agreements, that may be used for the construction contracts.
Very truly yours,
__(Name of the Representative__ ________(Position)___________ ______(Name of Bidder)_______
-
44
AFFIDAVIT OF SITE INSPECTION
I, ___(Representative of the Bidder)___, of legal age, __(civil status)__, Filipino and residing at ___(Address of the Representative)_, under oath, hereby depose and say: 1. That I am the __(Position in the Bidder)__ of the ___(Name of the Bidder)___, with office at
___(Address of the Bidder)___; 2. That I have inspected the site for _____(Name of the Contract)____, located at __(location of the
Contract)__; 3. That I am making this statement as part of the requirement for the Technical Proposal of the
___(Name of the Bidder)___ for __(Name of the Contract)__. IN FAITH WHEREOF, I hereby affix my signature this _____ day of _____, 20___ at _____________, Philippines. _________________
AFFIANT SUBSCRIBED AND SWORN TO before me this _________, day of ______ 2016, affiant exhibiting to me his/her (any Government ID/Passport No.) issued on _________ at _____________________, Philippines and his/her ID picture appearing herein. _______________________
(Notary Public) Until _________ PTR No. _________ Date _________ Place _________ TIN _________
Doc. No. _______ Page No. _______ Book No. _______ Series of 20__
-
45
SAMPLE FORM
PROJECT:Rehabilitation and Conservation of the Manila Metropolitan Theater
NAME OF CONTRACTOR: _________________________________________
FORM 3 - DETAILED COST ESTIMATES /UNIT PRICE ANALYSIS
4. SEQUENCE OF OPERATION/ACTIVITIES
PRICE NO. UNIT QUANTITY UNIT COST AMOUNT
5. DIRECT MATERIALS COST
REF. NO. UNITNO. OF
HOURS
UNIT RATE (hourly)AMOUNT
6. DIRECT LABOR COST
REF. NO. UNITNO. OF
HOURS
UNIT RATE (hourly)AMOUNT
7. DIRECT EQUIPMENT COST
WORK DAYS TO COMPLETE ITEM 3 8. ESTIMATED DIRECT COST (EDC) = (5 + 6 + 7 )
AVERAGE OUTPUT/WORKDAY TOTAL COST (8 + 9 + 10)
UNIT COST
Signature and Official Stamp of Bidder: _______________________________________________________ Date: __________________________
National Commission for Culture and the Arts
10. VAT (__% x [8 + 9])
9. OVERHEAD CONTINGENCIES MISC.(OCM),
PROFIT =__ % of EDC
3. TOTAL QUANTITY AND UNIT1. ITEM NO. 2. ITEM NAME/DESCRIPTION
DESIGNATION/DESCRIPTION OF PERSONNEL
NAME/DESCRIPTION OF EQUIPMENT
E
Q
U
I
P
M
E
N
T
M
A
T
E
R
I
A
L
S
L
A
B
O
R
NAME/DESCRIPTION OF MATERIALS
-
46
Contract Name : ___________________________________________________ Location
: ___________________________________________________
QUARTERLY CASH FLOW AND PAYMENT SCHEDULE
PARTICULAR % WT. 1 2 3 4
ACCOMPLISHMENT
CASH FLOW
CUMULATIVE ACCOMPLISHMENT
CUMULATIVE CASH FLOW
Submitted by: Name of the Representative of the Bidder Date: _______________ Position Name of the Bidder One of the requirements from the bidder to be included in its Financial Envelope is the monthly cash flow and payment schedule.
-
47
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 1 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
Name of the Project : REHABILITATION OF NINOY AQUINO STADIUM
(ADDITIONAL WORKS) RE-BID
Location : RMSC, Pablo Ocampo Sr. St., Malate, Manila
I. OBJECTIVE
The basic objective of the project is to rehabilitate the Ninoy Aquino Stadium located at RMSC,
Pablo Ocampo Sr. St., Malate, Manila.
II. BASIC INFORMATION
Project Name : Rehabilitation of Ninoy Aquino Stadium (Additional Works) Re-bid
Location : RMSC, Pablo Ocampo Sr. St., Malate, Manila
III. QUALIFICATION
- Contractors must have a valid PCAB license with principal classification Category AAA General
Building.
- Contractor must have PCAB ARCC rating of Medium Afor Building.
- Contractor must be ISO 9001 Certified.
- Contractor must be in sound financial standing with annual turnover/gross billings of at least 50%
of the ABC.
- Contractor must have complete construction of a structure with at least contract value of 50% of
the ABC.
- Contractors must have a licensed Civil Engineer, Mechanical Engineer, Electrical Engineer,
Sanitary Engineer and Safety Officer.
- The company must have ten (10) years of experience in the field of civil works specifically in
Stadium.
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 2 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
IV. GENERAL SPECIFICATIONS
The work shall include the supply of labor, materials, tools, equipment and services necessary to
complete the subject project per approved Scope of Work, approved Construction Plans/Drawings and these
Technical Specifications, which are parts of the Contract of Services, Governing Codes: Republic Act No.
9184 and its Implementing Rules and Regulations, National Building Code of the Philippines (P.D. 1096),
Philippine Electrical Code, Philippine Plumbing and Sanitary Code, Philippine Mechanical Code, and all
related applicable local ordinances and regulations.
Necessary building permits, clearances or licenses including occupancy permits shall be provided
by the Contractor.
The Contractor shall submit, prior to the execution of the specified works, his schedule of work
expressed in PERT/CPM Network Diagram, indicating the computation of the contract time, all activities,
their duration and projected percentage accomplishments/cash flow, for monitoring purposes.
For all new constructions, the Contractor shall provide new materials, fabricated products, and
necessary equipment and services for all works.
For all repair or replacement works, use brand new materials, brands/models, measurements, and
finishes. Major materials, products or work items, large volume or quantity items, or other expensive items
that are not particularly mentioned in these specifications, shall require submission of samples, product
tests, mock-up models, and selection, or approval prior to their installation or application in the project.
Sub-contracting shall only be limited to specialty work items, which require provision of special
materials, methods, techniques and equipment and are subject to the approval of the Philippine Sports
Commission.
The contractor shall provide full-time supervision of the works.
All materials and equipment shall be delivered to the site at designated locations within the project
premises.
The Philippine Sports Commission or its authorized representative reserves the right to reject any
materials or workmanship that may be found defective or not inconformity with the approved Construction
Plans/Drawings and these Technical Specifications. In case where conflicts between the Construction
Plans/Drawings and the Technical Specifications arise, these should be immediately being brought to the
attention of the Philippine Sports Commission or its authorized representative for appropriate action.
All billings shall be subject to submission of a Statement of Account by the Contractor, including
his percentage accomplishment report and photographs for inspection/evaluation and acceptance by the
Philippine Sports Commission. The Contractor shall provide access to the construction areas for the
convenience of the inspection team during project inspection.
Change or additional works that are necessary but were not included in the scope of work shall be
subject to variation order preparation upon request and notice by the Contractor.
V. GENERAL REQUIREMENTS
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 3 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
1.0 Regulatory Requirements
1.1 National Building Code of the Philippines
1.2 National Plumbing and Sanitary Code of the Philippines
1.3 Philippine Electrical Code
1.4 Philippine Mechanical Code
2.0 Submittals
2.1 Construction Schedules
2.2 Shop Drawings, Product Data and Samples, Color Swatches
2.3 Construction Photographs
2.4 Permits (when necessary)
VI. OUTLINE TECHNICAL SPECIFICATIONS
1.0 Securing/Renewal of Building Permits:
Necessary building permits, clearances, or licenses including occupancy permit shall be
provided by the Contractor. The Contractor shall pay all fees and other incidental expenses.
2.0 Dismantling of existing unwanted structures:
2.1 Demolition, Removal and Dismantling
1. Before commencing any demolition, removal, and/or dismantling work, all affected
electrical lines and water supply lines shall be disconnected, or shut off except such as
required for use in connection with the work on site.
2. Demolish selectively and remove or dismantle carefully all components of structures
indicated in the drawings necessary to prepare for renovations. All reusable materials shall
be coordinated with the agency architect/engineer for reuse.
3. Store reusable parts of the structures and materials within the area. All other materials
retrieved from the site shall be turned over, supported with an inventory report on quantity
and description of materials, to the Philippine Sports Commission, through the agency
Property Officer. Only reusable materials shall stay in the construction area. On the other
hand, all unused and destroyed materials shall be supported with a Report of Waste
Materials.
4. Protect and maintain structures, materials, fixtures, and utilities that are to remain within
the property.
3.0 Site Works
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 4 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
3.1 Site Preparation
3.1.1 General
The Work under this Section shall include complete demolition work: timbering, clearing,
grubbing, scalping, clean up and disposal of all debris and other objectionable matter and
grading work as directed by the Construction Officer.
3.1.2 Requirements
Demolition in work shall consist of complete removal/demolition of all obstructions.
Timbering shall consist of felling and disposal of all trees specifically indicated to be
removed. No timbering shall be done until each tree to be removed has been physically
marked for removal by the Construction Officer. Trees marked for removal shall be felled
in such a manner as not to injure other trees, fences, wires, buildings and facilities which
are to remain. All damage to remaining trees, plants or facilities resulting from such
timbering shall be repaired by the Contractor at no additional cost to the Agency. All
resulting stumps shall be left clean and free from sharp protuberances and shall not extend
more than 30 cm above ground surface.
Cleaning shall consist of the removal and disposal of all stumps, vines, bush, grass, roots,
vegetation, fences, rocks, masonry and debris within the limits and rights-of-way of the
project.
Disposal of non-combustible waste shall be accomplished by removal from job-site by the
Construction Officer. In no case shall the Construction Officer, prior to commencement of
operation, or permission from the property owner, such permission to include the site
location, method of disposal and any restrictions or conditions that may form part of the
agreement between the Contractor and the Owner. The Contractor shall save the
Government from any claim arising or resulting from such disposal operations.
Burning shall be accomplished at site without damage to nearby trees, buildings or other
facilities by flames, smoke or ash. All applicable regulations shall be complied with such
burning. Permission by the Construction Officer to accomplish burning shall not be
construed as to relieve the Contractor of determining and complying with such regulations.
All fires shall be kept under constant and adequate attendance and fire control measures
and devices shall be sufficient in quantity to control all blazes. In the event that conditions
are unsuitable for burning waste, at the option of the Contractor, combustible material may
be disposed by other means, provided that prior approval of the Construction Officer is
obtained.
The grading work shall be done after clearing the site of stumps, roots, grass, etc. Grading
work shall be general smoothening the ground surface of the site such as covering holes
left by stumps, etc. and leveling sharp and steep grades.
3.2 Excavating and Grading
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 5 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
3.2.1 General
Work under this section shall be subject to the requirements of applicable paragraphs of
the General Conditions of Contract.
3.2.2 Work Included
This work includes labor, materials, and equipment necessary for excavating and grading
as required in the Drawings and as specified herein. This, in general, includes cleaning and
removal of grass, trees, and loose stones, and excavation for foundations, footings, septic
vault, and rough and finish grading.
3.2.3 Materials
Factory fill material shall be of the materials approved by the Construction Officer, and
shall be of the type that has obtained its optimum moisture contents.
Unsatisfactory fill materials are Fill Materials that are too wet or too soft, as determined by
the Construction Officer, and deficient in providing a stable subgrade or foundation of
structures or pavements.
Selected backfill materials shall consist of sand, stone, gravel or screened stoned, uniformly
graded and free from soft or unsound particles or other objectionable materials. Sieve
analysis shall conform with ASTM C136, and shall conform to the following gradation
limits:
Passing 3/8 inch sieve - 100%
Passing No. 4 sieve - 85-100%
Passing No. 100 sieve - 0-10%
Passing No. 200 sieve - 0-3%
3.2.4 Workmanship
3.2.4.1 Staking Out
The Contractor shall stake cut lines and corners. He shall build batter boards and
shall locate first and second floor lines in relation to existing grades. Lines and
levels shall be approved by the Construction Officer or his representative before
excavation is started.
The Contractor shall construct two permanent benchmarks of previously known
elevations near the site of construction for purpose of determining any settlement
that may occur during the construction.
3.2.4.2 Excavation
Excavation shall be executed in a careful manner to proper depths. No excavation
shall be carried below elevations indicated on Drawings unless made necessary by
existing conditions. Claims for extras will not be allowed for excavations not
authorized by the Construction Officer.
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 6 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
Excavated materials shall be transported to and placed in fill areas within work
limits. Unsatisfactory materials encountered within established subgrades as
shown or 0.30m below grade shall be replaced with satisfactory materials as
specified.
Surplus excavated materials not required for fill or embankment shall be disposed
of in designated waste or spoil areas. Unsatisfactory excavated materials shall be
disposed in designated waste or spoil areas. Excavated materials shall be
performed to provide proper drainage at all times. Materials required for fill, in
excess of that produced by excavation within the grading limits, shall be excavated
from approved borrow areas.
Excavation shall be left clean and clear of loose material.
3.2.4.3 Water and Drainage
Contractor shall do everything necessary for keeping water out of excavations and
away from building during construction.
3.2.4.4 Backfill
Backfill shall be installed against foundation walls in not more than 2” or 50mm.
Backfill shall be carefully tamped. Debris shall not be used for backfilling.
3.2.4.5 Grading
Finish grading shall include areas with limits shown on plot plan. Grades shall be
reformed to easy contours in accordance with Drawings.
3.3 Concrete Culvert Pipe
3.3.1 General
Whenever Concrete Culvert Pipes are indicated in the Plans, this work shall consist of
furnishing reinforced and non-reinforced concrete culvert pipes of the sizes and dimensions
indicated on the drawings, conforming to the specifications and the directions of the
Construction Officer.
3.3.2 Materials
The fabrication of the pipes shall conform to the specification of ASHO Designation M
170. The Construction Officer reserves the right to inspect and test the pipes delivered for
use in the work. Defects that are discovered after acceptance of delivery of the pipes but
before installation of the pipe shall be cause for rejection without additional cost to the
Agency. Mortar for pipe joints shall be composed of one (1) part portland cement and two
(2) parts sand, and shall conform to the requirements of item RC 100: Plain and Reinforced
Concrete.
3.3.3 Workmanship
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 7 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
Trenching for concrete culvert pipes shall conform to, and shall be payable under, item EX
100: Excavation. The pipe trench shall be excavated to the depth, grade and width
established by the Construction Officer. In material considered satisfactory by the
Construction Officer, the pipes may be laid directly on the trench bed shaped to the form
of the pipes for at least 10 per centum of their outside diameters. In rock or hardpan and
other material considered unsatisfactory by the Construction Officer, the trench bed shall
be excavated 30 centimeters deeper and the required selected or granular material shall be
laid to bed the pipes. In preparing the pipe bed, recesses for pipe bells shall be provided.
Pockets of unsuitable material shall be removed and replaced with approved selected or
granular material.
Pipes shall be carefully laid, with hubs up-graded, ends fully and closely joint, true to the
lines and grades required. After one length of pipe is laid, the lower portion of the hub shall
be primed with mortar on the inside sufficient enough to bring the inner surfaces of the
next pipe flushed and even those of the previous one. The remainder of the joint on the
inside shall then be filled with mortar and then struck off to a smooth finish. The outside
of the joint shall also be filled with mortar, and excess mortar shall be used to form a bead
all around the outside of the joint. After the initial set of the outside mortar, it shall be
protected from air and sun by thoroughly wetted burlap or earth.
The pipes shall be tested for undue settlement and for water tightness of joints, before
backfilling the trench. Unsatisfactorily work shall be corrected without additional cost to
the Government.
Filling and Backfilling. The mortar joints shall have set sufficiently prior to backfilling.
Backfilling shall be brought up, in uniform 15-centimeter layer on both side and over the
line of pipes, to the finished grade. Compaction shall be accompanied by sprinkling with
water to obtain at least 95% relative compaction.
3.3.4 Methods of Measurement and Basis of Payment
For purposes of progress payments, concrete pipes installed complete in place in
accordance with drawings, these specifications, or as directed by the Engineer shall be paid
for the total length in linear meters according to size and kind, measured along the axis of
the pipes.
The quantities measured as provided above and accepted for payment shall be paid for the
purposes of progress payments only at the unit price per linear meter of the kind and size
of concrete pipes, in which price and payments shall constitute full compensation for
furnishing or manufacturing of the pipes, for hauling and installing, for bedding and
jointing, and for all other headwalls and other structures are excluded from the payment
prescribed herein. Final payment shall not exceed the total amount for this work item
shown in the Proposal Schedule.
When the Proposal Schedule does not provide separate payment for work herein specified,
full compensation therefore shall be considered as included in the lump sum contract price
for Exterior Drainage System within the purview of items PS 100.
3.4 Roadways and Paving
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 8 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
3.4.1 General
Whenever Roadways and Paving are called for in the Plans, the Contractor shall furnish all
labor, materials, equipment and incidentals for the construction of new pavement,
sidewalks, gutters and curbs, and for the restoration of existing pavement, sidewalks,
gutters and curbs, as shown on the Drawings and as specified herein. The Construction
Officer may direct the Contractor to excavate and repave additional areas to those
indicated.
3.4.2 Standard Specification Reference
Except as otherwise specified herein, materials and construction shall be in accordance
with the “Republic of the Philippines, Department of Public Highways, General
Specifications for Roads and Bridges, 1976.”
ASTM D1559 Resistance to Plastic Flow of Bituminous Mixture Using Marshall
Apparatus.
3.4.3 Materials
Granular subbase and base course materials shall be as specified under Items 300, 301, and
302 of the General Specifications. Grading requirements shall be as follows:
Sub-base Standard Sieve Size Percent Passing
75.00 mm 100
37.50 mm 80 100
9.50 mm 45 100
4.75 mm 30 85
2.00 mm 15 65
0.425 mm 5 35
0.075 mm 0 15
Base Standard Sieve Size Percent Passing
25.00 mm 100
19.0 m 75 100
7.75 mm 40 60
2.00 mm 25 45
0.425 mm 12 25
0.075 mm 5 12
Concrete shall meet the requirements for structural concrete.
For asphalt concrete, under Item 401 of General Specifications, aggregate grading shall be
Class B. Test specimens of the job-mix formula shall be prepared and tested in accordance
with the design procedures given for the Marshall Method of Mix design, and shall meet
the requirements given below when tested in accordance with ASTM D1559.
Marshall Stability N 3300 min
Flow, 0.25 mm 8 - 46
Percent voids in total mix 3 - 5
Use 75-blows/end compaction
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 9 of 71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
The job-mix formula shall be submitted for the Construction Officer’s approval that may
change the aggregate grading and bitumen content to improve the quality of the mix.
For Gravel surfacing material, under Item0 407 of General Specifications 1 grading
requirements shall be as follows:
Standard Sieve Size Percent Passing
25.00 mm 100
19.00 mm 85 - 100
9.50 mm 60 - 100
4.75 mm 50 - 85
2.00 mm 40 - 70
0.425 mm 25 - 45
0.075 mm 10 - 25
3.4.4 Workmanship
3.4.4.1 Subgrade
Following clearing, grubbing and preparation stripping of topsoil the subgrade
shall be prepared by sprinkling and rolling with a steel roller until the subgrade is
completed to 90 percent of optimum. Subgrade in cut areas shall be scarified to a
depth of 0.15 m and recompacted at a moisture content slightly above the optimum.
Areas that require common fill to raise to sub-grade elevations shown on the
Drawings shall be filled except that no lift shall be thicker than 150 mm. Where
existing sub-grade materials have been disturbed, or are in the opinion of the
Construction Officer unsuitable for subgrade, the materials shall be removed as
directed and shall be replaced with common fill and shall be compacted.
No subbase material for new restored pavement shall be placed until the
Construction Officer has inspected and approved the subgrade.
3.4.4.2 Subbase and Base Course Materials
Aggregate Base Course shall be placed and compacted as shown on the Drawings,
and as required in - Aggregate Base Course.
The finish base course shall not vary more than 1.5 centimeters above or below the
set grade at any point. Any area that does not conform to the grading requirements
shall be reworked and recompacted.
3.4.4.3 Portland Cement Concrete Pavement
See - Portland Cement Concrete Pavement.
3.4.4.4 Sidewalks
All sidewalks disturbed during the course of the work shall be restored to their
original condition. New sidewalks shall be 21 Map concrete.
-
PHILIPPINE SPORTS COMMISSION Page No.: Page 10 of
71
TECHNICAL SPECIFICATIONS Revision No.: 0
PSC-SOP-VFMS-02 F06 Effectivity: 03-01-19
New concrete pavement shall be in accordance with - Concrete of the General
Sp