reliance power services

Post on 11-Nov-2021

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Reliance Power Services

& Construction Company

Reliance Power Services & Construction is a Jordanian Company, established in 2013.

Partners : Nancy Dabain –Managing DirectorEnrique Valiente –General Manager

Reliance Mission : Provide unique services to the Power & Industrial Sectors that constitute of flexibility, time constraint, trust and best industry practices.

In Reliance We believe that our Clients are our Partners and we aim to build a long lasting relationship with them. We integrate honesty, integrity and business ethics into all aspects of our business functioning. We manage in a way to increase efficiency , reducing time & cost to reach to a win-win results.

1. Scope of Works

▪ Reliance provides Mechanical & Electrical Construction Services for:➢ Conventional Power Plant Projects (Simple Cycle, Combined Cycle, Thermal )➢ Renewable Power Plant Projects (PV, CSP, Wind)➢ Industrial Plants➢ Water & Waste Water Projects

▪ Reliance Provides utilities and operators with the skilled technical resources needed to address both planned and forced outages 24 hours a day.

▪ Reliance Provides Equipment Manufacture with assistance during their installation, and/or maintenance activities like Ansaldo Energia, Siemens,..etc.

▪ Reliance Provides Owners & OM Teams with required services during the operation & maintenance of the plants such as rehabilitation, dismantling, modification of plant equipment, repairs, ..ets

2. Reliance Staff & Resources :

Reliance employs highly qualified Mangers, Engineers, Supervisors and technical staff who believe in the core values and the mission of the company.The Partners continuously communicate and train the key staff to achieve the goals of the Company.

* Reliance have an extensive data base of all trades and skills with the ability to employ the required number of staffing as per project demand in order to execute the various activities in the scheduled time and to meet the Client requirement.

Manager Director Eng. Nancy Dabain

General ManagerEng. Enrique Valiente

Admin-HR Ammal Al Najjar

Site ManagerHazem Al Sammour

Site HSE ManagerAhmad Almiamar

Reliance Power Services Organization Chart

Mechanical Supervisor

Ayman Bobely

Qa/Qc ManagerTamara Refai

Warehouse KeeperBelal Abu Hilal

Electrical SupervisorOmar Qasim

HSE EngineerGhaith Gandah

Procurement Eng.Oday Samarneh

AccountantReema Zoqash

HSE ManagerAbdul Hamid

3. Equipment Owned by The Company:

The company owned a warehouse of 2000m2 of build up closed building of 360m2 which includes the following main equipment:1. Telehandler Model JCB 540- 1702. Pile Drilling Machines (2No.) 3. Ramming Machines (2No.)4. Truck - Isuzu5. Heat Treatment Machines (2No.)6. Welding Machines (8No.)7. Diesel Generator 30KVA (2No.)8. Container 40ft &20ft (7No.)9. Portable Office Caravan (10No.)10. Scaffolding11. Pallet Lifter (2No.)12. Solar System Measuring & Testing Equipment – Ioc, Voc, IV curve, IR,

Thermographic Imagers,..etc)13. Miscellaneous Testing Equipment (Earthing, Megger,..etc)

4. Projects Completed by Reliance:

1. Amman East Power Plant (Outage May 2019):Clients : Ansaldo EnergiaMajor inspection Ansaldo V94.2 Gas Turbine Scope of Work : ➢ Providing manpower for Ansaldo Team assistance in the

Outage work➢ Providing sand blasting services for the internal parts of

the turbine.➢ Providing insulation technician for turbine works.➢ Providing Scaffolding and other equipment's➢ Providing logistic support (Caravans, Tools Container, ..etc)

4. Projects Completed by Reliance Cont.:

2. Taibeh Solar PV Plant 5.7MWEPC Contractor : Belectric Gulf Limited

Scope of works: Electromechanical Erection works for the execution of the PV Plant including Testing and Commissioning activities.Project Start : December 2018Project Completion Date : May 2019

4. Projects Completed by Reliance Cont. :

3. Empire PV Plant 50MWOwner : FRV Solar HoldingEPC Contractor : OHL Industrial –JordanScope of works : Electromechanical Erection works for the execution , Testing & Commissioning of the PV Plant in Partnership with TEK EnergyCapital .

Project Start : December 2017Project Completion Date : June 2018

4. Mafraq PV Plant 25MWOwner : FRV Solar HoldingEPC Contractor : OHL Industrial –JordanScope of works: Electromechanical Erection works for the execution of the PV Plant including Testing & Commissioning activities .Project Start : August 2017Completion date : March 2018

4. Projects Completed by Reliance cont.:

5. Zaatari Refugee Camp 13MW PV Plant

Owner : MEMR (Ministry of Energy & Mineral Resources-Jordan)Funded by : KFWEPC Contractor : Belectric Gulf Ltd.Scope of works : Electromechanical Erection works including Testing & Commissioning activities for the Plant.Project Start : June 2017Project Completed : October 2017

6. Arab Potash Company➢ Provision of skilled Manpower (welders, fabricators, mechanical fitters) for

outage works. (January 2017 & March 2017)

7. AES Levant Holding –IPP4➢ Provision of Skilled Manpower (Mechanical Technicians) for Outages works.

(March 2017 , April 2017)➢ Performing various works as per Client request ( scaffolding, Insulation, and

Cladding).

8. AES PSC Jordan–IPP1➢ Provision of Skilled Manpower (Mechanical Technicians, Welders, Scaffolders)

for Outage works – Gas Turbine, Steam Turbine ,HRSG and BOP. (March 2017)

7. Existing Fuel oil & Ammonia Pipe Lines Survey/Rehabilitation & Extension of the Industrial Terminal in South Port, Aqaba (March 2016)Client: Jordan Industrial Port-AqabaEPC : UTE Tecnicas Reunidas -PHB

a) Inspection of Existing fuel oil piping including supports, insulation and painting according to API570 and provide Final report assessing the remaining lifetime of the pipeline. The works includes removing insulation and reinstate the same.b) Inspection of Existing Ammonia Piping system (Import line and Pre-Cooling line), utilizing LRUT Method in addition to visual and normal UT and provide Final Report assessing the life time and recommendations according to API570. The works includes removing the insulation and supply and installation of new polyurethane foam and cladding sheets in the removed areas.

9. SAMRA III Add on Combined Cycle Power Plant:Client: SAMRA Electric Power Company (SEPCO)EPC : METKA S.APeriod of Execution : March 2014 –December 2015

a) Supply & Apply of Painting works for Stacks, HRSG’s, Piping and ACC Ducts and various structures.b) Provision of Qualified Manpower for varies activities of erection works (Piping works, BOP equipment erection).c) Provision of Skilled manpower for testing & commissioning activities.d) HVAC Erection works for the combined cycle plant.e) Electrical Erection Works (Cabling, Termination, Installations of various items)f) HRSG Piping Modification works, welding P91, P11 and C Steel pipe g) Water Treatment Plant works (Complete Erection of equipment & piping)h) HRSG’s Elevators Cladding worksi) GRS Cold Flare System & Vent Piping at Samra IV Fast Track

10. 3 Mw PV Solar Power Plant Azraq Jordan: End Client: Ministry of Energy Mineral Recourse EPC : ENNERA Energy & Mobility , S.L.Sub-Contractor: Reliance Power Services & Construction Period of Execution : November 2014 – March 2015

Description of Works:

- Installation of Electrical Equipment ( 11KV transformer , Inverters, MV

Switchgear)

- PV Panels Installations

- SCB (String Combiner Boxes) Installation & termination

- MV Cable installation & Termination

- LV , Control, DC Solar cable and fiber optic, cabling installations and

terminations.

- Cable trenches & foundations

- Earthing system

- CCTV System installation ( fiber optic cabling, cameras, panels installations)

- Testing, Commissioning

11. Mechanical & Electrical Erection works of production lines at Royal Can Factory –Sulaimanya -Iraq Client : ROYAL CAN FactoryEPC : ASIBEX –JordanPeriod of Execution : June 2014 – November 2014

Description of Works:

- Installation of Electrical Equipment ( Switchgear, Transformers, Motor

Control Panels, Motors, Frequency Converters, UPS, Battery Charger)

- Installation of cable trays, ladders, conduit systems, with related supporting

system on steel structure.

- PLC & Data Management system

- Cabling of MV, LV, Control, Instrumentation,

- Termination works for Process equipment ( Uncoiler, Cupper, Body

Makers, Mist Collection system, Washer, Decorator, Conveyers, Palletizer,

chiller & air compressor)

- Testing & Commissioning

12. Nuqul Group Plants :

• Addition of Refiner including supply & installation of piping system associated with the works at Al Snobar Hygienic Paper Mill Plant.

• Supply & Installation of Insulation and Cladding for Fuel Oil Tanks for Al Snobar Hygienic Paper Mill Plant.

• Supply & Installation of Insulation and Cladding for Fuel Oil Tanks for Al Keena Hygienic Paper Mill Plant.

• Remove the existing boiler Stack, Supply & Installation of new Boiler Chimney at Al Snobar Hygienic Paper Mill.

• Remove the existing damaged insulation & cladding works and replace with new ones for all ducting, piping and related equipment at Al Snobar & Al Keena hygienic Paper Mills.

Al Snobar factory Jordan piping and pump erection.

13. Central Electricity Generating Co. (CEGCO)

• Installation of Moisture separators for GT12 at Rehab Power Plant• Fuel Oil Piping installation & connection for fuel oil tanks system at Aqaba

Thermal Power Station. • Repair of Fuel Oil Tanks painting system at Rehab Power Plant. • Supply, Fabricate, Paint & Install Steel Platform for 50Ton Over Head

Crane & Condensers (Unit 1,2,3,4,5) at Aqaba Thermal Power Station-CEGCO.

• Steam Turbine Insulation work –Calcium silicate Insulation works• Maintenance Activities during the outages of the plant, repair of steam

lines, repair of gas ducts, insulation repair & provision of skilled manpower at Aqaba Thermal Power Station.

• Remove the existing damaged Supporting of CRH+HRH Steam Line and Replace with new ones at Aqaba Thermal Power Station.

• Dismantle the existing & Replacement of new Steam Coil of Heat Exchangers of Unit No. 7 at Hussein Thermal Power Station-CEGCO.

14. AES Jordan PSC- Amman East Power Plant (Outage March2014):

• Supply & Install Additional Hanger Supports for Main Steam Line at HRSG #1 &2.• Modification Works of Guillotine Damper of HRSG#1• Provision of Technicians for the Minor Inspection of Gas Turbine #1 &2 , and

outage work for BOP.• Repair of Steam Line Leak including PWHT and insulation repair.• Provision of Scaffolding system with certified scaffolders.• Various on call repair works during forced outages.

15. Aqaba Container Terminal (ACT):

• RTG Bogies Repair of Welding Cracks at Aqaba Container Terminal – The works includes identifying the welding problem by NDT and repair the same to the Client Satisfaction (April & June 2014).

CCPP AES Amman East Jordan

16. Al Qatrana Power Plant :

• Outage Works during HGPI (April 2015)✓ Provide skilled manpower during the outage

• Outage Works during HGPI (August 2014)✓ Gas Turbine Air Intake Filter Replacement (GT#1 & 2)✓ Repair of HP Steam Lines Supporting system✓ Supply, fabricate & install steel structure for maintenance access✓ Repair works inside HP side for HRSG Tubing✓ Replacement of leaking steam valves including PWHT✓ Repair of painting system of Drain Pot

• Dismantle the existing & Install new & modified system including supply & installation of valves and piping system for Fuel Oil Filtration Skid (September 2013).

• Repair Works for HRSG tube Puncture & replacement of the defected tubes including welding, NDT & heat treatment. (August 2013)

16. Al Qatrana Power plant April 2015✓ Outage work in gas turbine Siemens V94.2

17. Amman East Power Plant (Outage May 2015 & May 2016):Clients : Ansaldo Energia.

• Major inspection Ansaldo V94.2 Gas Turbine (May to June 2015)✓ Providing manpower as I&C and Mechanical technicians and helpers ✓ Providing sand blasting services for the internal parts of the turbine.✓ Providing insulation technician for turbine works.✓ Providing Scaffolding and other equipment's✓ Providing logistic support.

Client: AES PSC Jordan:

• HRSG maintenance works ✓ Providing Thermographic camera✓ Providing Manpower as technician, fabricator, welder and helpers

ANSALDO ENERGIA: Major Overhaul V94.2 May 2015

Ansaldo Major Inspection works

HEALTH SAFETY & ENVIRONMENT (HSE)

Reliance recognizes that high standards of Health, Safety and welfare are an integral element of efficient business management and profitability of an organization. Therefore, the company’s management considers HSE to be of equal importance to production and quality.Reliance strives to keep its employees safe by assigning highly experienced safety teams, conducting regular safety training, conducting periodic safety audits and updating its HSE policy with the latest local and international standards. Reliance is also committed to the environment by conforming to all relevant legislation regarding waste disposal, toxic emissions, conservation and pollution. Reliance has been certified in May 26th of 2014 for ISO14001 & ISO18001.

QUALITY

Reliance exercises strict quality control procedures by assigning strong quality control teams on all of its projects and by continuously monitoring their performance through periodic internal audits. This also applies to main vendors at the company database where periodic evaluation reviews are carried out by Reliance quality department to assess their performance history.Furthermore, the company strives to keep all of its clients satisfied with its performance by making sure that its quality procedures comply with project, local and international standards. Reliance continuously upgrades its performance level by acquiring feedbacks from its Clients and adopts necessary enhancement in its system.Reliance has been certified on 26th of May 2014 for ISO9001.

Reliance Power Services & Construction Company Ltd.

Ministry of Trade & Industry Registration No. 32533

7th Circle –Silawi Building-2rd FloorP.O.Box : 1068 , Amman 11821

JordanLand Phone: +962 581 8299

Email: reliance@reliancepowerservices.comwww.reliancepowerservices.com

top related