1
Harbourfront CommissionTask Force on Kai Tak Harbourfront Development
13 January 2017
Revitalisation of Tsui Ping RiverStage 1 Public Engagement
(Paper No. TFKT 01/2017)
2
Content
• To introduce preliminary design concepts of “Revitalisationof Tsui Ping River”
• To introduce the schedule of Stage 1 Public Engagement
• To seek Members’ views on the Project
3
Background
King Yip Street Nullah
• Constructed more than 50 years ago
• Located along Tsui Ping Road, King Yip Lane and King YipStreet, between Kai Lim Road and the harbour
Wai Y
ip S
treet
Hung T
o R
oad
Hin
g Y
ip S
treet
Shin
g Y
ip S
treet
King Yip Street
Wai Fat Road
4
Energizing Kowloon East
• Transformation of Kowloon East into an attractivealternative Core Business District 2
• Five main focuses under the Conceptual Master Planversion 5.0 promulgated by EKEO in November 2016
Walkability & Mobility
Green CBD
Smart City
Socio-economic Vibrancy
The Spirit of Creation
• The proposed revitalisation of Tsui Ping River will be a keyfeature of the Green CBD.
Background
5
Revitalisation of Tsui Ping River
• Situated in the centre of Kwun Tong District, coupled withits inherent riverine characteristics, the watercourse is aprecious space lending itself very well to beingtransformed into a riverside environment for publicenjoyment.
• We aspire to create a Tsui Ping River that is revitalisedenvironmentally and ecologically, and well connectedwith the neighbourhood, to serve the dual purposes ofnot only an upgraded drainage infrastructure, but also awater-friendly public amenity.
Background
6
Key Objectives
1. Reducing Flood Risk
To enhance the flood conveyance function of the existingriver channel
2. Revitalising the River
To provide waterscape, landscape, ecological and waterquality enhancement
To provide green riverine corridor
3. Improving Walkability and Connectivity
To provide walkways alongside the river
To provide cross-river walkways and landscaped decks
4. Fostering a Vibrant Riverine Public Space
To make Tsui Ping River a landmark where one canexperience the riverine scenery and leisure activities
7
• Revitalisation of the existing River, through the provisionof waterscape design and water features
• Provision of landscaped walkways and footbridges alongthe River to enhance walkability and connectivity
• Provision of landscaped decks over the River
• Modification and face-lifting of the Kwun Tong RoadFootbridge
• Related enhancement work in the vicinity of the River
Works Items
8
Preliminary Design Concepts
Zone D Zone C Zone B Zone A
3
9
View 1
View 3View 2
Zone A (Between Kai Lim Road and Kwun Tong Road)
10
Possible re-provisioning
of footbridge ramp
(feasibility to be further
established)
Zone A (Between Kai Lim Road and Kwun Tong Road)
Lift and staircase
under construction
(by CEDD)
Existing ramp to
be demolished
Kwun Tong
Recreation
Ground
Kwun Tong
Swimming
Pool
Engineered wetland
11
A2
A1Zone A (Between Kai Lim Road and Kwun Tong Road)
Photomontage A1 (near Kwun Tong Recreation Ground)
12
Zone A (Between Kai Lim Road and Kwun Tong Road)
Photomontage A2 (near Kwun Tong Swimming Pool)
A2
A1
13
View 1
View 3View 2
3
Zone B (Between Kwun Tong Road and Shing Yip Street)
14
Footbridge
Existing
footbridge
Shin
g Yip
Street
Landscaped
Deck
Zone B (Between Kwun Tong Road and Shing Yip Street)
15
B1
Zone B (Between Kwun Tong Road and Shing Yip Street)
Photomontage B1 (near Shing Yip Road)
16
View 1
View 4
View 2
View 3
2 4
Zone C (Between Shing Yip Street and Wai Yip Street)
17
Hin
g Yip
Street
King Yip Street
Hu
ng To
Ro
ad
Water
Gate Floating
Pontoon
Terraced
Landscaped
Deck
Landscaped
DeckTsui Ping River
Garden (by
LCSD)
Zone C (Between Shing Yip Street and Wai Yip Street)
Landscaped
Deck
18
C1
C2
C5
C3
C4
Zone C (Between Shing Yip Street and Wai Yip Street)
Photomontage C1 (near Tsui Ping River Garden)
19
Zone C (Between Shing Yip Street and Wai Yip Street)
Photomontage C2 (near Tsui Ping River Garden)
C1
C2
C5
C3
C4
20
Zone C (Between Shing Yip Street and Wai Yip Street)
Photomontage C3 (near Hung To Road / Proposed Water Gate)
C1
C2
C5
C3
C4
21
Zone C (Between Shing Yip Street and Wai Yip Street)
Photomontage C4 (near Hung To Road)
C1
C2
C5
C3
C4
22
Zone C (Between Shing Yip Street and Wai Yip Street)
Photomontage C5 (near Wai Yip Street)
C1
C2
C5
C3
C4
Kwun Tong Preliminary
Treatment Works
23
View 1
1
Wai Y
ip
Street
2
3
View 2 View 3
Victoria Harbour
Kwun Tong Sewage Pumping
Station
Zone D (Between Wai Yip Street and Victoria Harbour)
Wa
i Yip
Stre
et
Kwun Tong Preliminary
Treatment Works
24Floating IslandsWalkway towards
harbourfront
Zone D (Between Wai Yip Street and Victoria Harbour)
25
Stage 1 Public Engagement
• Consultation with District Facilities Management Committee underKwun Tong District Council (12 Jan 2017)
• Consultation with Task Force on Kai Tak Harbourfront Developmentunder Harbourfront Commission (13 Jan 2017)
• Roving Exhibition (16 Jan to 5 Mar 2017)
EKEO Exhibition Hall
Kwun Tong MTR Station
Kwun Tong Swimming Pool
Laguna Park
Shing Yip Street Rest Garden
Kwun Tong Promenade
Tsui Ping Commercial Complex
Phase 1 Laguna City Clubhouse
E-Plaza
• Community Workshop (11 Feb 2017)
• Project Website:www.tsuipingriver.hk
26
Study Progress
• The Project is now in the investigation phase
• The Stage 1 Public Engagement activities have just begun
• Detailed design is anticipated to commence within 2017
27
Members’ views on the Project
are welcome.
Thank you!