Richmond Ferry Terminal Design Project
P R E S E N TAT I O NPrepared for the Water Emergency Transportation Authority by Marcy Wong Donn Logan Architects in association with GLS Landscape Architects,
GHD, Inc. , Architecture & Light, and associated consultants
Presentation on May 5, 2016 to The City Of Richmond
Richmond Ferry Terminal Design Project
D E S I G N R E V I E W S U B M I T T A L Prepared for the Water Emergency Transportation Authority by Marcy Wong Donn Logan Architects in association with GHD, Inc. and associated consultants
Review on July 13, 2015 by the San Francisco Bay Conservation and Development Commission’s Design Review Board (DRB)
KEY MAP
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
LOCAL VICINITY MAP BAY TRAIL
RICHMOND TERMINAL PROJECT
AREA
KAYAK LAUNCH FACILITY
FORD CHANNEL
MARINA BAY YACHT HARBOR
H A L L A V E N U E
MA
RIN
A W
AY
SO
UT
H
HA
RB
OR
WA
Y S
OU
TH
TERMINAL PROJECT
AREA
TERMINAL PROJECT
AREA
KAYAK LAUNCH FACILITY
FORD CHANNEL
MARINA BAY YACHT HARBOR
MA
RIN
A W
AY
SO
UT
H
HA
RB
OR
WA
Y S
OU
TH
RICHMOND RICHMOND RICHMOND
HA
RB
OR
WA
Y S
OU
TH
BAY TRAIL
H A L L A V E N U E
KAYAK LAUNCH FACILITY
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
EXISTING CONDITIONS
3.
HA
RB
OR
WA
Y S
OU
TH
ROSIE THE RIVETER VISITOR CENTER
2.
1.
4.
FORD CHANNEL
FORD ASSEMBLY BUILDING
HA
RB
OR
WA
Y S
OU
TH
HA
RB
OR
WA
Y S
OU
TH
ROSIE THE RIVETER VISITOR CENTER
FORD ASSEMBLY BUILDING
ROSIE THE RIVETER
3.
2.
1.
4.
1. 1. 3. 3.1. PORT OF RICHMOND 2. CITY PARKING LOT 3. REMOVE KAYAK LAUNCH 4. REMOVE GANGWAY & FLOAT BAY TRAIL
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
EXISTING CONDITIONS - AREIAL PHOTO BT STEVE PROEHL, SEPTEMBER 2009
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
BAY TRAILBAY TRAIL
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
PAGERichmond Ferry Terminal, Richmond, CA Presentation on March 23, 2016 to The City Of Richmond
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on March 23, 2016 to The City Of Richmond
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
EXISTING BAY TRAIL
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on May 5, 2016 to The City Of Richmond
COLORED METAL + GLASS SHELTER - SECTION THROUGH GANGWAY & FLOAT - LOW TIDE YEAR 2018
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on March 23, 2016 to The City Of Richmond
MARINA BAY YACHT HARBOR BAY TRAIL
KAYAK LAUNCH FACILITY
BAY TRAILBAY TRAIL
KAYAK LAUNCH FACILITY
MA
RIN
A W
AY
SO
UT
H
H A L L A V E N U E
1 .
2 .
MARINA BAY YACHT HARBOR
KAYAK KAYAK LAUNCH KAYAK
H A L L A V E N U E
1. KAYAK STORAGE ENCLOSURE2. (E) PUBLIC RESTROOMS
PAGEPAGERichmond Ferry Terminal, Richmond, CA Presentation on March 23, 2016 to The City Of Richmond
KAYAK LAUNCH IN MARINA BAY YACHT HARBOR
ELEVATION OF PROPOSED KAYAK LAUNCH
PLAN OF PROPOSED KAYAK LAUNCH
PROPOSED KAYAK LAUNCH
EXISTING DOCKSSLOPE SLOPE
PROPOSED GANGWAY
PROPOSED CONCRETE PILE
PROPOSED STRIPING & SIGNAGEBAY
TRAIL 40’-0”
16’-0
”±1
3’-4
”
SLOPE SLOPE
PROPOSED CONCRETE PILE
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
BAY TRAIL
top related