Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
1 of 40
Tank Farm Plant Operating Procedure Effluent Treatment Facility
USQ Not Required – ETF is a < than Hazard Category 3 Radiological Facility
CHANGE HISTORY ( LAST 5 REV-MODS )
Rev-Mod Release Date Justification: Summary of Changes
A-7 12/26/2018
Standardization and
formatting changes
Removed Special instructions from Data Sheets and
added comments block and Signature Sheet to the end of
Data Sheets. Added valve lineup steps to 5.1.
A-6 08/21/2018 E-DARF Incorporation Deleted a portion of Step 5.6.10.8 to make it more clear.
A-5 08/13/2018 E-DARF Incorporation Deleted “until valve is full open” from Step 5.4.14.
A-4 07/19/2018 E-DARF Incorporation Added new section 5.9 and a Special Instruction.
A-3 05/14/2018 Add operational flexibility. Add clarification that Process Memo may direct cleaning.
Table of Contents Page
1.0 PURPOSE AND SCOPE ................................................................................................................ 3
1.1 Purpose ................................................................................................................................ 3
1.2 Scope ................................................................................................................................... 3
2.0 INFORMATION............................................................................................................................. 3
2.1 Terms and Definitions......................................................................................................... 3
2.2 General Information ............................................................................................................ 3
3.0 PRECAUTIONS AND LIMITATIONS......................................................................................... 4
3.1 Personnel Safety.................................................................................................................. 4
3.2 Radiation and Contamination Control ................................................................................ 4
3.3 Environmental Compliance ................................................................................................ 4
4.0 PREREQUISITES .......................................................................................................................... 5
4.1 Special Tools, Equipment, and Supplies............................................................................. 5
4.2 Performance Documents ..................................................................................................... 5
5.0 Procedure ........................................................................................................................................ 6
5.1 Valve Lineup Determination............................................................................................... 6
5.2 Pre-Start Lineup .................................................................................................................. 7
5.3 Backwash (Rough) [Fine] Filter ......................................................................................... 8
5.4 Charge Filter and Transfer Lines ........................................................................................ 9
5.5 Add and Recirculate Chemicals ........................................................................................ 11
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
2 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines ..................................... 19
5.7 Flush Transfer Lines ......................................................................................................... 25
5.8 Drain Transfer Piping ....................................................................................................... 27
5.9 Lay Up Filter with Sodium EDTA.................................................................................... 32
5.10 Drain CIP Filter per Filter Change.................................................................................... 35
5.11 Records ............................................................................................................................. 36
Table 1 – Quantity Requirement for Filter Cleaning Chemicals .............................................................. 37
Data Sheet 1 – Chemical Cleaning Startup Valve Lineup ........................................................................ 38
Data Sheet 2 – Chemical Cleaning ........................................................................................................... 40
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
3 of 40
1.0 PURPOSE AND SCOPE
1.1 Purpose
This procedure provides instructions for chemical cleaning and for laying up the rough
and fine filters.
1.2 Scope
This procedure provides instructions to use chemical cleaners made up in the CIP tank for
cleaning the fine and rough filters. These systems are also used for chemical solution
layup of the two filters.
Fine and rough filter backwash and use of the CIP tank for RO cleaning are not in the
scope of this procedure.
2.0 INFORMATION
2.1 Terms and Definitions
CIP - Clean-in-Place
EDTA - Ethylenediaminetetraacetic Acid
H2O2 - Hydrogen Peroxide
RO - Reverse Osmosis
SWRT - Secondary Waste Receiving Tank.
2.2 General Information
2.2.1 This procedure is written for cleaning either the rough or fine filter. Valving
associated with performing the rough filter cleaning are in “( )” and valving
associated with the fine filter cleaning are in “[ ]”, or are identified in valving
tables as either rough filter or fine filter valving.
2.2.2 Observe MSDS/SDS PPE requirements for the cleaning chemicals.
2.2.3 Chemical spills are to be reported immediately to the CRO.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
4 of 40
3.0 PRECAUTIONS AND LIMITATIONS
3.1 Personnel Safety
WARNING - Chemicals used for filter cleaning can burn the eyes and skin, and may
cause respiratory tract irritation.
3.1.1 Upon completion of any portion of this procedure which requires PPE,
personnel must inspect their PPE for caustic residue or other contaminates. If
caustic residue or other contaminates are found or suspected, dispose of the
PPE compliant with ETF waste management processes in accordance with
ETF-65D-003, Package Waste.
3.2 Radiation and Contamination Control
3.2.1 Work in radiological areas will be performed using a radiological work
permit following review by Radiological Control per ALARA Work Planning
procedure, TFC-ESHQ-RP_RWP-C-03.
3.3 Environmental Compliance
3.3.1 In the event of a spill/leak/release, notify the SOM/FWS and respond per
ETF-ERP-85B-003, Emergency Spill or Release at ETF.
3.3.2 When disconnecting, breaching or opening systems or system components
that currently contain or previously contained radioactive material, the
following actions apply:
HPT coverage is required
Pre-job and post-job HPT surveys are required
Contamination controls shall be implemented in accordance with
ETF-02-001, until radiological verifications have been performed.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
5 of 40
4.0 PREREQUISITES
4.1 Special Tools, Equipment, and Supplies
The following supplies may be needed to perform this procedure:
Face shield
Rubber gloves
Tight-fitting chemical goggles
Chemical protective apron
Tetra sodium EDTA (MSDS/SDS #060663)
MC-4 (MSDS/SDS #040427B)
Keen ENV911 (GHX/SDS #075500)
Tide (MSDS/SDS #013324)
Terg-a-Zyme (MSDS/SDS #056080)
Triton X-100 (MSDS/SDS #056213)
MC-1 (MSDS/SDS #040428)
MemChem MCT201 (GHS/SDS # 075499).
4.2 Performance Documents
The following documents may be needed to perform this procedure:
ETF-20B-001, Sump Tank/Pump System Operation
ETF-60-002, Integrated MTT Operations.
ETF-65D-003, Package Waste.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
6 of 40
5.0 PROCEDURE
Special Instruction
Draining of the CIP filters may be performed at any time per Section 5.10.
NOTE - Each cleaning evolution consists of:
Charging filter and transfer lines (Section 5.4)
Adding and recirculating cleaning chemical(s) or layup chemical (Section 5.5),
and one or both of the following:
Draining cleaning chemical(s) from (rough) [fine] filter and transfer lines
and CIP equipment (Sections 5.6, 5.7, and 5.8)
Draining layup chemical from transfer lines and CIP equipment, but not
from (rough) [fine] filter (Section 5.9).
- Some cleaning events require more than one cleaning evolution. A different chemical
may be needed or the cleaning evolution may be repeated with the same chemical, as
prescribed by Process Memo.
- Sodium EDTA may be used as either a cleaning chemical or a layup chemical.
- To avoid excessive foaming in Sump Tank 2, the RO/filter cleaning switch is toggled
to maintain sump tank level between 40 and 50%.
- Due to the infrequent use of rough filter, its operation includes a separate step for
activating a “Rough Filter Normal Operation” permissive switch on graphic Rough,
before valve positions can be changed.
- SOM determines component lineup requirements.
5.1 Valve Lineup Determination
5.1.1 (SOM) DETERMINE which valve lineup Checklists/Data sheets need to be
performed.
5.1.2 (SOM) IF valves are known to be in the required position and do not require
verification, INITIAL/DATE AND DOCUMENT reason in the comments
section of the Checklist/Data Sheet.
5.1.3 (SOM) IF valves are not in the required position because of an existing
process (i.e., LOTO, Caution Tag, Work Package, Administrative Lock,
Facility Tag or Status Seals), MARK N/A on the Checklist/Data Sheet AND
INITIAL/DATE AND DOCUMENT reason in the comments section of the
Checklist/Data Sheet
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
7 of 40
5.2 Pre-Start Lineup
5.2.1 PERFORM pre-start valve lineup per Data Sheet 1.
5.2.2 TURN ON the following CIP tank heaters:
JB-60F300
60F-E-1A
60F-E-1B.
5.2.3 ON graphic Sump Tank, TURN ON RO/filter cleaning switch.
5.2.4 IF rough filter is to be cleaned or laid up, ON graphic Rough, TURN ON
rough filter Normal Operation switch.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
8 of 40
5.3 Backwash (Rough) [Fine] Filter
NOTE - Filter is purged of process water by backwashing and refilling with verification
water before chemical cleaning.
5.3.1 BACKWASH filter as follows:
5.3.1.1 ENSURE the following valves CLOSED:
Rough Filter Fine Filter
60B-156 60B-157
60B-006 60B-036
AOV-60B009 AOV-60B039
5.3.1.2 CONFIRM pressure indicator (PI-60B105) [PI-60B205]
reads 85 to 95 psi.
5.3.1.3 CLOSE valve (SOV-60B021) [SOV-60B051].
5.3.1.4 OPEN valve (AOV-60B010) [AOV-60B040].
5.3.1.5 OPEN valve (AOV-60B005) [AOV-60B035].
5.3.1.6 WAIT two minutes, CLOSE valve (AOV-60B005)
[AOV-60B035].
5.3.1.7 CLOSE valve (AOV-60B010) [AOV-60B040].
5.3.1.8 OPEN valve (SOV-60B021) [SOV-60B051].
5.3.2 FILL filter with verification tank water as follows:
5.3.2.1 ENSURE valve (AOV-60B009) [AOV-60B039] CLOSED.
5.3.2.2 OPEN valve (AOV-60B007) [AOV-60B037].
5.3.2.3 ENSURE valve (60B-027) [60B-029] CLOSED.
5.3.2.4 OPEN the following valves:
Rough Filter Fine Filter
60B-006 60B-036
60H-045 60H-114
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
9 of 40
5.3 Backwash (Rough) [Fine] Filter (Cont.)
5.3.2.5 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B111) [LSH-60B211]
On graphic Display (rough filter) [fine filter], (LSH111)
[LSH211]
OPEN valve (AOV-60B009) [AOV-60B039].
5.3.2.6 CLOSE valve (AOV-60B007) [AOV-60B037].
5.3.2.7 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B112) [LSH-60B212]
On graphic Display (rough filter) [fine filter], (LSH112)
[LSH212]
WAIT approximately ten seconds AND
CLOSE the following valves:
Rough Filter Fine Filter
60H-045 60H-114
60B-006 60B-036
AOV-60B009 AOV-60B039
5.4 Charge Filter and Transfer Lines
5.4.1 ENSURE filter has been filled with verification water.
5.4.2 OPEN the following valves:
60B-171
60B-160.
5.4.3 OPEN valve (60B-006) [60B-036].
5.4.4 OPEN the following valves:
Rough Filter Fine Filter
60B-027 60B-029
60B-156 60B-157
5.4.5 OPEN valve (AOV-60B009) [AOV-60B039].
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
10 of 40
5.4 Charge Filter and Transfer Lines (Cont.)
5.4.6 WHEN one of the following indicates OFF (approximately two minutes):
On group (3) [15], (LSH-60B-112) [LSH-60B-212]
On graphic (rough filter) [fine filter], (LSH112) [LSH212]
OPEN valve (AOV-60B007) [AOV-60B037].
5.4.7 WAIT for water to fill transfer lines (usually takes less than ten minutes).
5.4.8 OPEN valve (60H-045) [60H-114].
5.4.9 OPEN 60B-161 approximately 41 OPEN.
5.4.10 OPEN 60B-167, CIP filter vent.
5.4.11 WHEN water can be heard through CIP filter vent, CLOSE 60B-167.
5.4.12 WHEN one of the following indicates ON:
On group (3) [15], (LSH-60B-111) [LSH-60B-211]
On graphic (rough filter) [fine filter], (LSH111) [LSH211]
CLOSE valve (AOV-60B007) [AOV-60B037].
5.4.13 WHEN one of the following indicates ON:
On group (3) [15], (LSH-60B-112) [LSH-60B-212]
On graphic (rough filter) [fine filter], (LSH112) [LSH212]
CLOSE the following valves:
Rough Filter Fine Filter
60B-006 60B-036
60H-045 60H-114
AOV-60B009 AOV-60B039
60B-027 60B-029
60B-156 60B-157
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
11 of 40
5.5 Add and Recirculate Chemicals
NOTE - All key strokes are performed on TIC-60F300 or TIC-60F301 temp control
panel.
5.5.1 ON JB-60F300, ENSURE TIC-60F300 is set at 95°F as follows (unless
otherwise specified by SOM):
5.5.1.1 HOLD DOWN “RESET” for longer than three seconds until
“LocH” appears in window.
5.5.1.2 PRESS “RESET” once to get “SP” appearing in window.
5.5.1.3 PRESS “” or “” push button to change temperature setpoint.
5.5.1.4 PRESS AND HOLD “RESET” for more than three seconds to
return to OPERATING mode.
5.5.1.5 IF SOM direction was provided, RECORD in ETF Control
Room Logbook.
5.5.2 ON JB-60F300, ENSURE TIC-60F301 is set at 100°F as follows (unless
otherwise specified by SOM):
5.5.2.1 HOLD DOWN “RESET” for longer than three seconds until
“LocH” appears in window.
5.5.2.2 PRESS “RESET” once to get “SP” appearing in window.
5.5.2.3 PRESS “” or “” push button to change temperature setpoint.
5.5.2.4 PRESS AND HOLD “RESET” for more than three seconds to
return to OPERATING mode.
5.5.2.5 IF SOM direction was provided, RECORD in ETF Control
Room Logbook.
5.5.3 FULLY OPEN the following valves:
60B-161
60B-162.
5.5.4 SLOWLY OPEN valve 60F-052.
5.5.5 IF directed by SOM, USE hose AND
ADD water.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
12 of 40
5.5 Add and Recirculate Chemicals (Cont.)
5.5.6 OBSERVE CIP tank level on one of the following:
On graphic 2nd RO LI-60F303.
Locally on LCU-2A group 25 LT-60F303.
5.5.7 WHEN one of the following indicates 50%:
On graphic 2nd RO LI-60F303
Locally on LCU-2A group 25 LT-60F303
CLOSE 60F-052.
5.5.8 OPEN valve 60F-318 to approximately 41 OPEN.
NOTE - Chemical quantities to make one batch are listed in Table 1 – Quantity
Requirement for Filter Cleaning Chemicals.
- When making up a solution using chemicals in solid form, the solution is
pre-filtered by re-circulating CIP tank content through cleaning filter
(60B-FL-3) before introducing to rough or fine filter.
Pre-Filter CIP Tank Contents through Cleaning Filter
5.5.9 CLOSE valve 60B-171.
5.5.10 ENSURE the following valves CLOSED:
Rough Filter Fine Filter
60B-027 60B-029
60B-156 60B-157
5.5.11 ENSURE the following valves OPEN:
60B-160
60B-161
60B-162.
5.5.12 OPEN valve 60F-315.
5.5.13 START VD-235466, CIP pump on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25.
5.5.14 WHILE maintaining PIT-60F-304 between 30 and 50 psig, SLOWLY
OPEN valve 60F-318.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
13 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Pre-Filter CIP Tank Contents through Cleaning Filter (Cont.)
5.5.15 IF H2O2 is to be added from H2O2 feed tank, PERFORM the following:
5.5.15.1 OPEN the following valves:
60D-382
60D-384
60D-381.
5.5.15.2 ENSURE the following valves CLOSED:
60D-386
60D-383
60D-380.
5.5.15.3 TURN ON pump 60D-P-3.
5.5.15.4 SET pump 60D-P-3 stroke length at 100%.
5.5.15.5 SET pump 60D-P-3 stroke frequency at 100%.
5.5.15.6 DETERMINE CIP tank H2O2 concentration at approximately
five-minute intervals, by performing the following steps:
NOTE - H2O2 may need to be diluted in Sample Preparation
Room before performing H2O2 analysis. A dilution
factor of approximately 100 may be needed to get
concentration down to an easily readable range of 10 to
30 ppm (i.e., 1 part sample solution to 99 parts
demineralized water).
- To obtain final reading in %: (reading in ppm x
dilution factor) x 10E-4.
- Quantitative paper indicating strips or Chemetrics test
kits is used for H2O2 concentration determination.
a. OBTAIN 10-mL sample jar.
b. COLLECT sample from valve 60B-164.
c. DETERMINE H2O2 concentration with quantitative
paper or Chemetrics test kits.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
14 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Pre-Filter CIP Tank Contents through Cleaning Filter (Cont.)
5.5.15.7 WHEN 0.3% H2O2 concentration is obtained, PERFORM the
following:
a. TURN OFF pump 60D-P-3.
b. CLOSE the following valves:
60D-381
60D-382
60D-384.
5.5.16 IF chemical is in container(s), PERFORM the following:
5.5.16.1 DETERMINE amount of chemical to add using Table 1
WARNING
Chemicals used for filter cleaning can burn the eyes and skin,
and may cause respiratory tract irritation.
5.5.16.2 WHEN adding chemicals to CIP tank, DON the following PPE:
Rubber gloves
Tight-fitting chemical goggles
Chemical protective apron.
Special Instructions
Sodium EDTA must be added very slowly to ensure complete mixing with
tank contents.
5.5.16.3 ADD chemical specified by SOM to CIP tank as follows:
a. SLOWLY POUR chemical into funnel at top of tank,
OR
REMOVE hatch from top of tank.
b. SLOWLY POUR chemical into CIP tank.
c. RE-INSTALL CIP tank hatch.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
15 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Pre-Filter CIP Tank Contents through Cleaning Filter (Cont.)
5.5.17 IF wearing PPE, REMOVE PPE.
5.5.18 ALLOW solution in CIP to recirculate for at least ten minutes or as
instructed by SOM.
5.5.18.1 IF SOM direction provided, RECORD in ETF Control Room
Logbook.
Recirculate Chemicals Through (Rough) [Fine] Filters
5.5.19 OPEN (AOV-60B-009) [AOV-60B-039].
5.5.20 OPEN valve (60B-156) [60B-157].
5.5.21 SLOWLY OPEN valve 60B-171.
5.5.22 CLOSE valve 60B-160.
5.5.23 OPEN valve (60B-027) [60B-029].
Special Instructions
Valve manipulation in step 5.5.25 must be performed immediately after step 5.5.24 to
prevent routing excessive amount of chemical solution to SWRT.
5.5.24 WHEN one of the following indicates ON:
On group display (3) [15], (LSH-60B-112) [LSH-60B-212]
On graphic (rough filter) [fine filter], (LSH112) [LSH212]
OPEN valve (60B-006) [60B-036].
5.5.25 IMMEDIATELY CLOSE valve (AOV-60B009) [AOV-60B039].
5.5.26 RECORD recirculation flow (FIT-60F-301) on Data Sheet 2.
NOTE - Cleaning filter dP limit is 20 psid unless otherwise instructed.
5.5.27 MONITOR AND PERIODICALLY RECORD cleaning filter dP
(PDI-60B-301) on Data Sheet 2.
5.5.28 IF cleaning filter cartridges do not need to be changed out, GO TO
step 5.5.30.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
16 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Recirculate Chemicals Through (Rough) [Fine] Filters (Cont.)
NOTE - Step 5.5.29 is to be performed in preparation for cleaning filter cartridge
change-out.
5.5.29 IF cleaning filter cartridges need to be changed out, or PDI-60B-301 reads
greater than 20 psid, DRAIN cleaning filter as follows:
5.5.29.1 ON graphic 2nd RO, SHUT DOWN CIP pump.
5.5.29.2 CLOSE the following valves:
60B-161
60B-162.
5.5.29.3 OPEN valve 60B-167.
5.5.29.4 OPEN the following valves:
60B-165
60B-166.
5.5.29.5 CONFIRM PDI-60B-301 reads zero.
5.5.29.6 REQUEST Maintenance replace filter cartridges.
5.5.29.7 WHEN cleaning filter is reassembled, CLOSE the following
valves:
60B-165
60B-166.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
17 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Recirculate Chemicals Through (Rough) [Fine] Filters (Cont.)
5.5.29.8 IF recirculation of cleaning chemical is to be resumed,
PERFORM the following:
a. ENSURE valve 60B-167 is OPEN.
b. ENSURE valve 60B-162 is CLOSED.
c. OPEN the following valves to 41 OPEN:
60B-161
60F-318.
d. ON graphic 2nd RO, START CIP pump.
e. WHILE maintaining PIT-60F-304 between 30 and
50 psig, SLOWLY OPEN valve 60F-318 until valve is
full OPEN.
NOTE - It will normally take less than 30 seconds for flow through vent
valve 60B-167.
f. WHEN steady flow can be heard through valve 60B-167,
OPEN valve 60B-162.
g. FULLY OPEN valve 60B-161.
h. CLOSE valve 60B-167.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
18 of 40
5.5 Add and Recirculate Chemicals (Cont.)
Recirculate Chemicals Through (Rough) [Fine] Filters (Cont.)
5.5.30 WHEN chemical recirculation is complete, PERFORM the following:
5.5.30.1 RECORD CIP filter dP (PDI-60B-301) on Data Sheet 2.
5.5.30.2 SHUT DOWN VD-235467, CIP pump on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25.
5.5.30.3 CLOSE the following valves:
(60B-027) [60B-029]
(60B-156) [60B-157]
(60B-006) [60B-036]
60F-315.
5.5.30.4 IF sodium EDTA is chemical being circulated, and (rough) [fine]
filter is to remain full of sodium EDTA solution as directed by
process memo or SOM, GO TO Section 5.9.
a. IF SOM direction provided, RECORD in ETF Control
Room Logbook.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
19 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines
Drain Chemical from (Rough) [Fine] Filters
5.6.1 PURGE filter as follows:
5.6.1.1 ENSURE the following valves CLOSED:
Rough Filter Fine Filter
60B-156 60B-157
60B-006 60B-036
AOV-60B009 AOV-60B039
5.6.1.2 CONFIRM pressure indicator (PI-60B105) [PI-60B205] reads
85 to 95 psi.
5.6.1.3 CLOSE valve (SOV-60B021) [SOV-60B051].
5.6.1.4 OPEN valve (AOV-60B-010) [AOV-60B040].
5.6.1.5 OPEN valve (AOV-60B005) [AOV-60B035].
5.6.1.6 WAIT two minutes, CLOSE valve (AOV-60B005)
[AOV-60B035].
5.6.1.7 CLOSE valve (AOV-60B010) [AOV-60B040].
5.6.1.8 OPEN valve (SOV-60B021) [SOV-60B051].
5.6.2 FILL filter with verification tank water as follows:
5.6.2.1 OPEN valve (AOV-60B007) [AOV-60B037].
5.6.2.2 ENSURE closed valve (60B-027) [60B-029].
5.6.2.3 ENSURE the following valves are OPEN:
Rough Filter Fine Filter
60B-006 60B-036
60H-045 60H-114
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
20 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
Drain Chemical from (Rough) [Fine] Filters (Cont.)
5.6.2.4 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B111) [LSH-60B211]
On graphic (rough filter) [fine filter], (LSH111) [LSH211]
OPEN valve (AOV-60B009) [AOV-60B-039].
5.6.2.5 CLOSE valve (AOV-60B007) [AOV-60B037].
5.6.2.6 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B112) [LSH-60B212]
On graphic (rough filter) [fine filter], (LSH112) [LSH212]
WAIT approximately ten seconds AND
CLOSE the following valves:
Rough Filter Fine Filter
60H-045 60H-114
60B-006 60B-036
AOV-60B009 AOV-60B039
5.6.3 REPEAT steps 5.6.1 and 5.6.2 two more times.
5.6.4 REPEAT step 5.6.1 one more time.
Drain Transfer Piping
5.6.5 OPEN the following valves:
Rough Filter Fine Filter
AOV-60B007 AOV-60B037
AOV-60B009 AOV-60B039
60B-156 60B-157
60B-006 60B-036
60B-027 60B-029
5.6.6 ENSURE the following valves are OPEN:
60B-161
60B-171.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
21 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
5.6.7 OPEN the following valves:
60B-160
60B-165
60B-166
60B-167.
NOTE - The piping should be drained for at least five minutes.
5.6.8 WHEN liquid stops draining, CLOSE the following valves:
60B-160 60B-161
60B-162 60B-165
60B-166 60B-167.
Drain CIP Tank
NOTE - When draining solution containing Terg-A-Zyme, MC-4, Kleen ENV911, or
Tide, inspection of Sump Tank 2 and RO system drip trays is performed during
CIP tank draining to avoid foam overflow.
5.6.9 IF using one of the following cleaning chemicals:
Terg-A-Zyme
MC-4
Tide
Kleen ENV911.
GO TO step 5.6.13.
Special Instructions
CIP pump suction valve 60F-315 must be closed before draining CIP tank, or CIP pump
will need to be re-primed before restarting.
5.6.10 ENSURE valve 60F-315 is CLOSED.
5.6.10.1 IF valve is OPEN, INFORM SOM.
5.6.11 OPEN valve 60F-314.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
22 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
Drain CIP Tank (Cont.)
5.6.12 WHEN CIP tank is fully drained, PERFORM the following:
5.6.12.1 THROTTLE valve 60F-052 half to full OPEN to flush all
chemical residue from CIP tank.
5.6.12.2 WHEN at least five minutes has elapsed, CLOSE 60F-052.
5.6.12.3 CLOSE valve 60F-314.
5.6.12.4 PROCEED TO step 5.6.20.
Drain Terg-A-Zyme, MC-4, Kleen ENV911, or Tide from CIP Tank to Sump
5.6.13 IF the last batch of chemical drained to Sump Tank 2 contained any of these
listed:
Terg-A-Zyme
MC-4
Tide
Kleen ENV911.
PERFORM the following:
5.6.13.1 INSPECT Sump Tank 2 for residual foam.
5.6.13.2 IF residual foam is present, FLUSH Sump Tank 2 per
ETF-20B-001 to clear foam.
5.6.14 CLOSE valve 60F-315.
5.6.15 OPEN valve 60F-314 to approximately 41 OPEN.
5.6.16 OBSERVE liquid level in CIP tank decreasing.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
23 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
Drain Terg-A-Zyme, MC-4, Kleen ENV911, or Tide from CIP Tank to Sump
(Cont.)
NOTE - Foaming in Sump Tank 2 is deemed excessive when a level of foam is within
three feet of the sump hatch.
5.6.17 INSPECT for excessive foaming as follows:
5.6.17.1 OPEN Sump Tank 2 hatch inspection lid to observe foam level.
5.6.17.2 IF foam appears to be excessive, PERFORM the following:
a. CLOSE 60F-314.
a. PERFORM Sump Tank 2 washdown for five to ten
minutes per ETF-20B-001.
b. OPEN 60F-314 to approximately 41 OPEN.
c. GO TO step 5.6.17.1 to re-inspect Sump Tank 2.
d. INSPECT the drip trays for foam backup under the
following:
CIP tank 1st RO banks
2nd RO banks 2nd RO feed tank.
5.6.17.3 IF foam backup is observed, THROTTLE CLOSE 60F-314
until foam is backed down.
5.6.18 WHEN CIP tank is fully drained, PERFORM the following:
5.6.18.1 THROTTLE 60F-052 half to full OPEN to flush all chemical
residues from CIP tank.
5.6.18.2 PERFORM inspection for excessive foaming per step 5.6.17.
5.6.18.3 WHEN at least five minutes has elapsed, CLOSE 60F-052.
5.6.18.4 CLOSE valve 60F-314.
5.6.19 REQUEST RadCon survey the following to ensure no contamination has
occurred from foam overflow or backup:
Sump 2 area
RO system drip trays
CIP tank drip tray.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
24 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
5.6.20 CLOSE the following valves:
60F-318
60B-171.
5.6.21 CLOSE the following valves:
Rough Filter Fine Filter
60B-156 60B-157
60B-027 60B-029
5.6.22 CLOSE the following valves:
Rough Filter Fine Filter
AOV-60B007 AOV-60B037
AOV-60B009 AOV-60B039
5.6.23 FILL filter with verification water as follows:
5.6.23.1 ENSURE valve (60B-006) [60B-036] is OPEN.
5.6.23.2 OPEN the following valves:
Rough Filter Fine Filter
AOV-60B007 AOV-60B037
60H-045 60H-114
5.6.23.3 WHEN level switch (LSH-60B111) [LSH-60B211] on group
display (3) [15] indicates ON, OPEN valve (AOV-60B009)
[AOV-60B039].
5.6.23.4 CLOSE valve (AOV-60B007) [AOV-60B037].
5.6.23.5 WHEN level switch (LSH-60B112) [LSH-60B212] on group
display (3) [15] indicates ON, WAIT approximately ten seconds.
5.6.23.6 CLOSE the following valves:
Rough Filter Fine Filter
60H-045 60H-114
60B-006 60B-036
AOV-60B009 AOV-60B039
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
25 of 40
5.6 Drain Chemical from (Rough) [Fine] Filters and Transfer Lines (Cont.)
5.6.24 IF more cleaning is needed, or filter is to be laid up with sodium EDTA,
GO TO Section 5.4.
5.6.25 ON JB-60F300, TURN OFF the following CIP tank heaters:
60F-E-1A
60F-E-1B.
5.7 Flush Transfer Lines
NOTE - Transfer lines are flushed when no additional cleaning needs to be performed before
placing filter in service.
5.7.1 ENSURE filter is filled with verification water.
5.7.2 OPEN the following valves:
60B-160
60B-161
60B-162.
5.7.3 ENSURE valve (60B-027) [60B-029] CLOSED.
5.7.4 OPEN valve 60B-171.
5.7.5 OPEN the following valves:
Rough Filter Fine Filter
60B-156 60B-157
60H-045 60H-114
60B-006 60B-036
5.7.6 MONITOR level increase in CIP on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25 LT-60F-303.
5.7.7 AFTER approximately two minutes, OPEN valve (60B-027) [60B-029].
5.7.8 MONITOR level increase in CIP on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25 LT-60F-303.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
26 of 40
5.7 Flush Transfer Lines (Cont.)
5.7.9 AFTER two minutes, CLOSE the following valves:
Rough Filter Fine Filter
60H-045 60H-114
60B-027 60B-029
5.7.10 FLUSH CIP tank and pump transfer line as follows:
5.7.10.1 CLOSE valve 60B-171.
5.7.10.2 ENSURE valve 60B-160 is OPEN.
5.7.10.3 ENSURE CIP tank level on one of the following is above 25%:
On graphic 2nd RO LI-60F303
Locally on LCU-2A group 25 LT-60F-303.
5.7.10.4 POSITION valve 60F-311 to sump.
5.7.10.5 OPEN valve 60F-318 to approximately 41 OPEN.
5.7.10.6 OPEN valve 60F-315.
5.7.10.7 START VD-235466, CIP pump on one of the following:
On graphic 2nd RO or
Locally on LCU-2A group 25.
5.7.10.8 WHILE maintaining PIT-60F-304 between 30 and 50 psig,
SLOWLY OPEN valve 60F-318.
5.7.10.9 WHEN CIP tank level reaches approximately 10%, SHUT
DOWN VD-235467, CIP pump on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25.
5.7.10.10 POSITION valve 60F-311 to CIP tank.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
27 of 40
5.8 Drain Transfer Piping
5.8.1 OPEN the following valves:
Rough Filter Fine Filter
AOV-60B007 AOV-60B037
AOV-60B009 AOV-60B039
60B-027 60B-029
5.8.2 ENSURE the following valves OPEN:
Rough Filter Fine Filter
60B-156 60B-157
60B-006 60B-036
5.8.3 ENSURE the following valves are OPEN:
60B-160
60B-161.
5.8.4 OPEN the following valves:
60B-165
60B-166
60B-167
60B-171.
5.8.5 IF the CIP tank level increase approaches the overflow, OPEN the CIP tank
drain per step 5.8.12.
5.8.6 WHEN liquid stops draining, CLOSE the following valves:
60B-160 60B-161
60B-162 60B-165
60B-166 60B-167.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
28 of 40
5.8 Drain Transfer Piping (Cont.)
NOTE - When draining solution containing Terg-A-Zyme, MC-4, Kleen ENV911, or
Tide, inspection of Sump Tank 2 and RO system drip trays is performed during
CIP tank draining to avoid foam overflow.
5.8.7 IF cleaning chemical used is one of the following, GO TO step 5.8.12:
Terg-A-Zyme
MC-4
Tide
Kleen ENV911.
Special Instructions
CIP pump suction valve 60F-315 must be closed before draining CIP tank, or CIP pump
will need to be re-primed before restarting.
5.8.8 ENSURE valve 60F-315 is CLOSED.
5.8.8.1 IF valve is open, INFORM SOM.
5.8.9 OPEN valve 60F-314.
5.8.10 IF directed by SOM, USE hose AND
ADD water.
5.8.11 WHEN CIP tank is fully drained, PERFORM the following:
5.8.11.1 THROTTLE valve 60F-052 half to full OPEN to flush all
chemical residue from CIP tank.
5.8.11.2 WHEN at least five minutes has elapsed, CLOSE 60F-052.
5.8.11.3 CLOSE valve 60F-314.
5.8.11.4 PROCEED TO step 5.8.20.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
29 of 40
5.8 Drain Transfer Piping (Cont.)
Drain Terg-A-Zyme, MC-4, Kleen ENV911 or Tide from CIP Tank to Sump
5.8.12 IF the last batch of chemical drained to Sump Tank 2 contained any of these
listed:
Terg-A-Zyme
MC-4
Tide
Kleen ENV911.
PERFORM the following:
5.8.12.1 INSPECT Sump Tank 2 for residual foam.
5.8.12.2 IF residual foam is present, FLUSH Sump Tank 2 per
ETF-20B-001 to clear foam.
5.8.13 CLOSE valve 60F-315.
5.8.14 OPEN valve 60F-314 to approximately 41 OPEN.
5.8.15 OBSERVE liquid level in CIP tank decreasing.
NOTE - Foaming in Sump Tank 2 is deemed excessive when a level of foam is within
three feet of the sump hatch.
5.8.16 INSPECT for excessive foaming as follows:
5.8.16.1 OPEN Sump Tank 2 hatch inspection lid to observe foam level.
5.8.16.2 IF foam appears to be excessive, PERFORM the following:
a. CLOSE 60F-314.
b. PERFORM Sump Tank 2 washdown for five to
ten minutes per ETF-20B-001.
c. OPEN 60F-314 to approximately 41 OPEN.
d. GO TO step 5.8.16.1 to re-inspect Sump Tank 2.
5.8.16.3 INSPECT the drip trays for foam backup under the following:
CIP tank 1st RO banks
2nd RO banks 2nd RO feed tank.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
30 of 40
5.8 Drain Transfer Piping (Cont.)
Drain Terg-A-Zyme, MC-4, Kleen ENV911 or Tide from CIP Tank to Sump (Cont.)
5.8.17 IF directed by SOM, USE hose AND
ADD water.
5.8.18 WHEN CIP tank is fully drained, PERFORM the following:
5.8.18.1 THROTTLE 60F-052 half to full OPEN to flush all chemical
residues from CIP tank.
5.8.18.1 PERFORM inspection for excessive foaming per step 5.8.16.
5.8.18.2 WHEN at least five minutes has elapsed, CLOSE 60F-052.
5.8.18.3 CLOSE valve 60F-314.
5.8.19 REQUEST RadCon survey the following to ensure no contamination has
occurred from foam overflow or backup:
Sump 2 area
RO system drip trays
CIP tank drip tray.
5.8.20 CLOSE the following valves:
60F-318
60B-171.
5.8.21 CLOSE the following valves:
Rough Filter Fine Filter
60B-156 60B-157
60B-027 60B-029
5.8.22 CLOSE the following valves:
Rough Filter Fine Filter
AOV-60B007 AOV-60B037
AOV-60B009 AOV-60B039
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
31 of 40
5.8 Drain Transfer Piping (Cont.)
5.8.23 FILL filter with verification water as follows:
5.8.23.1 OPEN valve (AOV-60B007) [AOV-60B037].
5.8.23.2 ENSURE valve (60B-006) [60B-036] is OPEN.
5.8.23.3 OPEN valve (60H-045) [60H-114].
5.8.23.4 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B111) [LSH-60B211]
On graphic (rough filter) [fine filter], (LSH111) [LSH211]
OPEN valve (AOV-60B009) [AOV-60B039].
5.8.23.5 CLOSE valve (AOV-60B007) [AOV-60B037].
5.8.23.6 WHEN one of the following level switches indicates ON:
On group display (3) [15], (LSH-60B112) [LSH-60B212]
On graphic (rough filter) [fine filter](LSH112) [LSH212]
WAIT approximately ten seconds AND
CLOSE the following valves:
Rough Filter Fine Filter
60H-045 60H-114
60B-006 60B-036
AOV-60B009 AOV-60B039
5.8.24 ON graphic Sump Tank, TURN OFF RO/filter cleaning switch.
5.8.25 IF rough filter has been cleaned or laid up, THEN ON graphic Rough,
TURN OFF rough filter Normal Operation switch.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
32 of 40
5.9 Lay Up Filter with Sodium EDTA
Special Instructions
This section is to be performed at the direction of process memo or SOM if rough or fine filter is
expected to be shut down for an extended period of time. The (rough) [fine] filter, transfer
piping, CIP tank, and CIP filter contain sodium EDTA solution after completing Section 5.5.
5.9.1 ENSURE the following valves CLOSED:
Rough Filter Fine Filter
60B-156 60B-157
60B-006 60B-036
5.9.2 DRAIN transfer piping as follows:
5.9.2.1 OPEN valve (60B-027) [60B-029].
5.9.2.2 OPEN the following valves:
60B-160
60B-165
60B-166
60B-167.
5.9.2.3 ENSURE the following valves OPEN:
60B-161
60B-162
60B-171.
5.9.2.4 WHEN draining stops, CLOSE the following valves:
60B-165
60B-166
60B-167.
5.9.3 DRAIN CIP tank as follows:
5.9.3.1 ENSURE valve 60F-315 CLOSED.
5.9.3.2 OPEN valve 60F-314.
5.9.3.3 WHEN CIP tank is fully drained, CLOSE valve 60F-314.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
33 of 40
5.9 Lay Up Filter with Sodium EDTA (Cont.)
5.9.4 FLUSH transfer piping as follows:
5.9.4.1 OPEN valve (60H-045) [60H-114].
5.9.4.2 WAIT approximately two minutes, OPEN valve 60B-167.
5.9.4.3 WAIT approximately two minutes, CLOSE valve (60H-045)
[60H-114].
5.9.4.4 CLOSE valve (60B-027) [60B-029].
5.9.5 FLUSH CIP tank and pump transfer line as follows.
5.9.5.1 CLOSE the following valves:
60B-171
60B-167.
5.9.5.2 ENSURE CIP tank level on one of the following is above 10%:
On 2nd RO graphic LI-60F303
Locally on LCU-2A group 25 LT-60F-303.
5.9.5.3 OPEN valve 60F-318 to approximately 41 OPEN.
5.9.5.4 OPEN valve 60F-315.
5.9.5.5 START VD-235466, CIP pump on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25.
5.9.5.6 WHILE maintaining PIT-60F-304 between 30 and 50 psig,
SLOWLY OPEN valve 60F-318 until valve is full OPEN.
5.9.5.7 WAIT approximately five minutes, SHUT DOWN VD-235467,
CIP pump on one of the following:
On graphic 2nd RO
Locally on LCU-2A group 25.
5.9.5.8 CLOSE valve 60F-318.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
34 of 40
5.9 Lay Up Filter with Sodium EDTA (Cont.)
5.9.6 DRAIN CIP tank as follows:
5.9.6.1 CLOSE valve 60F-315.
5.9.6.2 OPEN valve 60F-314.
5.9.7 FLUSH CIP tank as follows:
5.9.7.1 IF directed by SOM, USE hose AND
ADD water.
5.9.7.2 WHEN CIP tank is fully drained, PERFORM the following:
a. THROTTLE valve 60F-052 half to full OPEN to flush all
chemical residue from CIP tank.
b. WHEN at least five minutes has elapsed, CLOSE valve
60F-052.
c. CLOSE valve 60F-314.
5.9.8 DRAIN piping as follows:
5.9.8.1 OPEN the following valves:
60B-165
60B-166
60B-167.
5.9.8.2 WHEN draining stops, CLOSE the following valves:
60B-160 60B-161
60B-162 60B-165
60B-166 60B-167.
5.9.9 ON graphic Sump Tank, TURN OFF RO/filter cleaning switch.
5.9.10 IF rough filter has been cleaned or laid up, THEN ON graphic Rough,
TURN OFF rough filter Normal Operation switch.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
35 of 40
5.10 Drain CIP Filter per Filter Change
5.10.1 ENSURE CIP pump is shut down.
5.10.2 CLOSE the following valves:
60B-161
60B-162.
5.10.3 OPEN valve 60B-167.
5.10.4 OPEN the following valves:
60B-165
60B-166.
5.10.5 CONFIRM PDI-60B-301 reads “0”.
5.10.6 REQUEST maintenance to replace filter cartridges.
5.10.7 CLOSE the following valves when filters have been replaced.
60B-165
60B-166.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
36 of 40
5.11 Records
5.11.1 PERFORM the following for records identified within this procedure.
5.11.1.1 RECORD the number of times the record was generated in
applicable column
OR
PLACE a check mark () in the N/A column.
5.11.1.2 SUBMIT the package for verification of completed records.
Records Submittal Checklist
Number
of times
completed
N/A
()
Data Sheets
Data Sheet 1 – Chemical Cleaning Startup Valve Lineup
Data Sheet 2 – Chemical Cleaning
FWS/OE/Shift Manager SEND the completed records to the Central Shift Office for
records retention.
/ /
Signature Print (First & Last) Date
FWS/OE/Shift Manager
The record custodian identified in the Company Level Records Inventory and Disposition
Schedule (RIDS), is responsible for record retention in accordance with
TFC-BSM-IRM_DC-C-02.
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
37 of 40
Table 1 – Quantity Requirement for Filter Cleaning Chemicals
Rough or Fine Filter
Chemical Quantity (400-gal batch)
MC-4 13.4 lb
Kleen ENV911 13.4 lbs.
Tide 100 fl oz
MC-1 73 lb
MemChem MCT201 73 lbs.
Sodium-EDTA 25.0 lbs. (11.4 kg, 2.2 gal, 8.2 liters)
TERG-A-ZYME 25 to 30 lb
TRITON X - 100 1 gallon
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
38 of 40
Data Sheet 1 – Chemical Cleaning Startup Valve Lineup
Sheet 1 of 2
Valve
Number Valve Name & Location
Required
Position Initials Date
Manual Valve Lineup
60F-314 CIP Tank Drain CLOSED
60F-322 CIP Pump Drain CLOSED
60F-319 CIP Pump Discharge Drain CLOSED
65C-310 CIP Tank Caustic Add CLOSED
60F-055 CIP to 1st RO CLOSED
60F-056 CIP to 2nd RO CLOSED
60F-324 CIP Seal Loop Drain CLOSED
60F-325 Tank Overflow Loop Seal Fill CLOSED
60F-318 CIP Pump Discharge CLOSED
60F-315 CIP Pump Suction CLOSED
60F-311 Cleaning Chem Return to CIP Tank CIP TANK
60F-316 PIT-60F-304 Isolation OPEN
60F-057 Return from 1st RO CLOSED
60F-058 Return from 2nd RO CLOSED
60F-323 PIT-60F-304 Calibration CLOSED
60F-052 Verification Water Isolation CLOSED
60F-320 Verification Water to CIP OPEN
60F-326 Sample Recirculation Loop Isolation OPEN
60F-327 CIP Tank Sample CLOSED
60B-160 CIP Tk-Cleaning Filter Recirculation CLOSED
60B-161 Cleaning Filter Inlet CLOSED
60B-162 Cleaning Filter Outlet CLOSED
60B-163 Sample CLOSED
60B-164 Sample CLOSED
60B-165 Cleaning Filter Dirty-Side Drain CLOSED
60B-166 Cleaning Filter Clean-Side Drain CLOSED
60B-172 Drain Line Hose Connection Isolation CLOSED
60B-167 Cleaning Filter Vent CLOSED
60B-168 PDI-60B-301 Isolation OPEN
60B-169 PDI-60B-301 Isolation OPEN
(Continued on Next Sheet)
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
39 of 40
Data Sheet 1 – Chemical Cleaning Startup Valve Lineup (Cont.)
Sheet 2 of 2
Valve Number Valve Name & Location Required
Position Initials Date
Manual Valve Lineup (Cont.)
60B-171 CIP to Rough and Fine Filters CLOSED
60D-381 Peroxide Addition to CIP (in compressor room) CLOSED
(60H-045)
[60H-114]
Verification Water to Filter CLOSED
(60B-156)
[60B-157]
Chem Cleaning In CLOSED
(60B-027)
[60B-029]
Chem Cleaning Out CLOSED
(60B-006)
[60B-036]
Verification Water to Filter CLOSED
Remote Valve Lineup
(AOV-60B010)
[AOV-60B040]
Backwash Air In MAN/CLOSED
(AOV-60B009)
[AOV-60B039]
Filter Upper Vent MAN/CLOSED
(AOV-60B007)
[AOV-60B037]
Filter Lower Vent MAN/CLOSED
(AOV-60B005)
[AOV-60B035]
Filter Drain MAN/CLOSED
(SOV-60B021)
[SOV-60B051]
Backwash Air Supply MAN/OPEN
(AOV-60B004)
[AOV-60B034]
Process In to Filter CLOSED(3)
(AOV-60B015)
[AOV-60B038]
Process Out from Filter CLOSED(3)
Comments:
/ / /
Signature Print (First & Last) Initials Date
NCO or SOE
/ / /
Signature Print (First & Last) Initials Date
NCO or SOE
/ / /
Signature Print (First & Last) Initials Date
SOM Completion Review
Rough/Fine Filter Chemical Cleaning and Layup
Type
CONTINUOUS Document No.
ETF-60B-002 Rev/Mod
A-7 Release Date
12/26/2018 Page
40 of 40
Data Sheet 2 – Chemical Cleaning
Rough or Fine Filter _________________
Chemical _______________________
Step Number Date/Time FIT/FI-60F-301/PDI-60B-301 Initials
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.30.1
Chemical _______________________
Step Number Date/Time FIT/FI-60F-301/PDI-60B-301 Initials
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.30.1
Chemical _______________________
Step Number Date/Time FIT/FI-60F-301/PDI-60B-301 Initials
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.26/5.5.27
Step 5.5.30.1
/ / /
Signature Print (First & Last) Initials Date
NCO or SOE
/ / /
Signature Print (First & Last) Initials Date
NCO or SOE
/ / /
Signature Print (First & Last) Initials Date
SOM Completion Review