RUBBER LINING

Surface Protection

Presented by :PT Ranadityo Sukses Makmur

Authorized Distributor of Bando Rubber LiningJl. Bakti 4 Kav. 52, Cilandak KKO, Cilandak Timur, Pasar Minggu, Jaksel 12560

Phone. (021) 30338828 / 7823856 ; Fax. (021) 7823856Email. sales@ranadityo.co.id / ranadityo_suksesmakmur@yahoo.com

Website. www.ranadityo.co.id

Purpose Use of Rubber Lining

The purpose of the use of rubber lining is toprotect an equipment against corrosion / rust andchemicals that abbrasive and other ingredients suchas sea water, acid, sand, slurry, etc., which candamage an equipment.

1. HOT BONDING

Process Rubber Sheet Unvulcanized

2.COLD BONDING

Process Rubber Sheet Vulcanized

Application Method of Rubber Lining

FOR COLD BONDING FOR HOT BONDING

LAYING OF SHEET ON THE SURFACE TO BE LINED

RAW MATERIAL

WEIGHING

PLASTICIZING/MIXING(BANBURY/KNEADER/OPEN MILL)

FORMING / SHEETING(ROLLER HEAD – EXTRUDER / CALENDER)

WINDING OF GREEN SHEET

DELIVERYDELIVERY

CURING OF SHEET( ROTO CURE )

BUFFING OF SURFACE TO BE APPLIED

TANK

SHOT BLASTING OF SURFACE TO BE LINED

APPLICATION OF BONDING AGENT

ROOM TEMPERATURE CURING AUTO CLAVE

FINISHINGFINISHING

FINAL INSPECTIONFINAL INSPECTION

GREEN SHEET CUTTING INTO REQUIRED LENGTH

FLOW CHART RUBBER SHEET PROCESS AND

APPLICATION

Material Type Method ServiceTemperature

Recommended Usage In Industry

Hard Rubber

BI-H-10 Hot Bonding Below 90 C Brine Storage, Hcl Storage, Caustic soda storage tank, H3PO4Tank, H2SO4 etc.

BI-H-20 Hot Bonding Below 90 C Brine Storage, Hcl Storage, Caustic soda storage tank, H3PO4Tank, H2SO4 etc.

BI-H-30 Hot Bonding Below 90 C Aplication where low Ca, Mg ions are demanded

Soft Rubber

BI-S-N Cold Bonding Below 90C Acid Storage tank, Anion, cation, Cation Exchanger, waterStorage tank etc.

BI-S-A Hot & Cold Bonding

Below 90C

BI-S-11 Hot & Cold Bonding

Below 90C Acid Storage tank, Anion, Cation Exchanger, Hcl Storage Tank,Phosphoric acid storage tank, ZnCl2 Reaction tank

EPDMRUBBER

BI-EP-V Cold Bonding Below 135C Sea water piping, Cooling system piping, water boxes etc.

CLOROPRENERUBBER

BI-CR-V Hot & Cold Bonding

Below 100C Sea water piping, Cooling system piping, water boxes etc.

NITRILERUBBER

BI-NBR-V Cold Bonding Below 100C Storage tank for petroleum oils

BUTYLRUBBER

BI-BUTYL-V Hot & Cold Bonding

Below 125C Corosive Chemicals, Hypochlorite etc

Material & Specification

Lining Method for Hot Bonding

- All substrate surface to be lined is inspected visually before shotblasting.

- All Surfaces to be lined shall be blasted.

Rubber Sheet

Rubber Adhesive

Bonding Agent

Substrate/Steel

2. Adhesive Application

1. Surface Preparation

Primer

Application of the Rubber Sheet1. Individual sheet shall be spread on

the working table and edges shall bebeveled to make overlap scraf joints.Overlap scraf joints shall be made sothat the overlap follow the directionof flow.

2. Applying the lining sheet to thesubstrate.

3. All sheet and joints shall be checkedvisually and pinholes testing shall bedone to detect defects.

4. Rubber sheet edge shell be cutscantly at the width about 2,5t usingsoldering iron of knife.

5. For joints, the length of overlap isabout 10 – 30 mm for shell and flatarea, and internal support andflange area will be 10 – 30 mm.

Rubber Sheet

10mm – 30 mm

t

2.5 x t

Rubber Sheet

Substrate/Steel

Curing Procedure

- Steam pressure shall be kept constantly

- Curing Steam pressure max 4,0 kg/cm²

- Time max 4 hours

1. Autoclave Cure

2. Exhaust Steam Cure

The equipment which can notbe put into autoclave shall becured with steam at ambientpressure.

Inspection Procedure

1. Surface Cleanliness2. Quality of the lining and bonding materials3. Visual check before curing4. Visual check after curing5. Hardness Test6. Spark Test / Pinhole Test7. Bonding Strength Test

Lining Method for Cold Bonding

1. Surface Preparation

2. Sheet Preparation

3. Application Rubber SheetRubber Sheet

AdhesivePrimer

Substrate

Inspection Procedure

1. Surface Cleanliness 2. Spark Test

3. Hardness 4. Thickness

Production Facility

ROLLER HEAD ROTO-CURE

Laboratory Facility

Our Quality Assurance

procedures are based on ISO-9001-2000/ISO-TS 16949-2002 recommendations andcover related activities tocontrol the manufacturingprocess. We have a full-fledged laboratory withsophisticated testingequipments for analysis ofraw-materials, in-processmaterial and finish goods.

Rheometer Mooney Viscosity

Abrasion Tester Type DIN

Work Reference

15