300

5080

6mm OPEN-GRADED CRUSHED ROCK JOINTING AGGREGATE TO ALL JOINTSLAYING COURSE50mm COMPACTED DEPTH PRIORA LAYING COURSE AGGREGATE IN ACCORDANCEWITH THE MANUFACTURER'S RECOMMENDATIONS AND BS 7533:13 2009

SUB-BASE300mm THICK OPEN GRADED CRUSHED ROCK (OGCR) SUB-BASEIN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS

SUB-GRADE TO BE PROOF ROLLEDWITH ANY SOFT SPOTS REMOVEDAND REPLACED WITH OGCR MATERIAL

MARSHALLS MT120 FILTRATIONTEXTILE TO BE INSTALLED AS PERMANUFACTURER'S INSTRUCTIONS

BLOCK PAVINGCONSTRUCTION BUILD UP SPECIFICATION BASED UPONMARSHALLS PRIORA PERMEABLE BLOCK PAVING (OR SIMILAR)SIZE - 200mm x 100mm x 80mmCOLOUR: STAFF / DISABLED BAYS - BRACKEN (PV6522250)

PARENT / VISITOR BAYS - NATURAL (PV6520250)TO BE LAID IN 45° HERRINGBONE PATTERNTO BE LAID IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS AND WITH BS 7533:3.JOINTS TO BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

CONSTRUCTION BUILD UP TO PERMEABLE BLOCK PAVING *(VEHICULAR ACCESS NOT PERMITTED)(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER

5030

T3000 BY TERRAMTO BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS25

0

POROUS MACADAM SURFACE COURSE BY LANDSCAPE ARCHITECT.ALLOW 30mm THICK

BINDER COURSE - 50mm AC20 OPEN BIN 160/220

250mm THK. DOT 3 SUB-BASE

CONSTRUCTION BUILD UP TO POROUS MACADAM PEDESTRIAN AREAS *(VEHICULAR ACCESS NOT PERMITTED)(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER

SURFACE COURSE - 40mm PE6 SURF 70/100

BINDER COURSE - 70mm AC20 OPEN BIN 160/220

500mm THK. O/A DOT 3 SUB-BASE

7040

FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%

T3000 BY TERRAMTO BE INSTALLED IN ACCORDANCE WITHMANUFACTURER'S RECOMMENDATIONS20

020

0

CONSTRUCTION BUILD UP TO PERMEABLE SURFACING TOPARKING BAYS ONLY *(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT BY SUPPLIER

FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%

150mm THK. CONCRETE WITH 1 LAYER A252 MESH IN TOP FACE (50mm COVER)SURFACE FINISH TO ARCHITECTS DETAILS

150mm THK. O/A DOT 1 SUB-BASE

150

FORMATION TO BE FREE FROM DELETERIOUSMATERIAL AND HAVE A MINIMUM CBR VALUE OF 3%

DPM - TO ARCHITECTS DETAILS ON25mm SAND BLINDING

150

CONSTRUCTION BUILD UP TO CONCRETE FOOTPATH *(*) PRELIMINARY SPECIFICATION - FINAL DESIGN IS TO BE CARRIED OUT ON RECEIPT

OF GROUND INVESTIGATION REPORT

ST02

ST01

ST03

ST04

ST05

ST06

ST07

ST08

ST09

ST10

3.90

3.92

3.92

3.89

3.79

3.85

4.11

ToW

4.00

4.09

4.09

4.10

4.05

4.07

4.10

4.17

ToW

4.14

ToW

4.13

ToW

4.13

ToW

4.12

ToW

3.86

3.90

3.85

3.90

3.85

3.91

3.94

4.17

ToW

3.94

3.97

4.00

4.04

4.06

4.07

4.07

4.043.99

3.97

3.91

3.99

4.08

4.00

PO

8.10

RL

8.10

RL

8.33

RL

8.00

RL

8.01

RL

8.15

RL

8.12

RL

8.22

RL

8.08

RL

5.69

EL

5.74

EL

5.72

EL

5.74

EL

5.73

EL

5.66

EL

5.93

EL

4.63

4.64

4.68

4.64

4.19

4.26

4.27

PO

4.30

4.34

4.28

4.08

4.08

4.17

4.34

Brambles 0.5h

4.15

4.27

4.68

4.58

4.68

4.67

4.65

4.69

4.61

4.66

4.17

4.16

4.12

4.37

4.88

FL

8.09

RL

8.09

RL

DP

DP

Sycamore 7h

Sycamore 7h

Sycamore 8h

Silver Birch 9h

3.81

3.92

4.03

4.61

4.62

4.58

4.56

4.65

4.65

4.68

4.67

4.65

4.69

CL 4.30

IC

CL 4.42

IC

4.77

4.50

4.50

4.70

4.68

4.48

4.52

4.34

4.39

CL 4.42

IC

4.41

4.38

4.38

4.39

4.30

4.36

1.5H

4.90

4.51

4.91

FL

4.89

Ramp

4.40

4.42

4.44

4.50

4.67

4.49

4.49

4.34

4.29

4.22

4.19

4.20

4.14

4.05

4.07

4.14

4.21

4.21

4.32

4.47

4.52

4.49

4.49

4.62

4.53

4.47

4.39

4.61

4.40

4.30

4.17

4.26

4.134.40

4.34

4.57

4.22

4.41

4.18

4.374.33

4.42

4.49

4.52

4.54

4.46

4.43

4.39

4.424.44

4.39

4.35

4.48

4.35

4.49

4.48

DP

DP

DP

8.09

RL

7.53

RL

7.51

RL

7.57

RL

9.21

RL

10.27

RL

8.78

RL

7.51

RL

Sapling

Sapling

Sapling

Sapling

Silver Birch 6h

Sycamore 7h

UK 7h

Sapling

Sapling

Sycamore 7h

UK 4h

UK 4h

UK 4h

Silver Birch 13h

Silver Birch 13h

Sycamore 15h

14.03

RL

7.76

RL

4.50

4.57

4.59

4.59

4.61

4.57

4.57

4.58

4.59

4.62

4.62

4.61

PO

PO

PO

PO

PO

PO

PO

4.92

4.54

4.51

4.92

4.92

4.53

4.54

4.90

4.65

4.53

4.92

4.53

4.53

4.54

4.48

4.51

4.524.50

4.89

4.44

4.50

4.41

4.42

4.43

4.39

4.42

4.44

4.50

4.50

4.52

4.51

4.55

4.59

4.65

4.62

4.67

WM

6.64

ToW

6.66

ToW

7.51

RL

7.67

RL

DP

DP

DP

DP

CL 4.54

MH

4.55

BH

CL 4.51

MH

CL 4.49

IC

WM

WM

4.75

4.70

4.70

4.76

4.73

4.66

4.56

4.50

4.44

4.51

4.51

4.67

4.67

4.61

7.81

RL

7.54

RL

7.53

RL

8.81

RL

7.94

RL

7.78

RL

DP

Sycamore 12h

4.64

4.65

4.65

4.62

4.63

4.60

4.46

4.48

4.63

4.64

4.64

4.65

DR

DR

CL 4.58

IC

DR

4.61

4.59

4.68

4.52

Sapling

4.86

4.86

4.84

4.69

4.44

4.39

4.46

4.47

4.46

4.45

4.44

4.44

4.73

Threshold

4.73

Threshold

4.48

4.49

4.42

4.47

4.48

Bench

4.44

4.45

4.49

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Sapling

Silver Birch 10h

Silver Birch 8h

Sapling

Sapling

Sapling

Sapling

4.47

4.42

4.45

4.47

4.42

4.44

4.46

4.47

4.46

4.47

4.64

4.48

4.44

4.38

4.44

4.51

4.61

4.66

4.58

4.48

4.44

4.45

4.53

4.64

4.83

4.80

4.74

PO

PO

PO

PO

PO

PO

PO

PO

4.45

4.42

4.48

4.52

4.55

4.56

4.57

4.55

4.55

4.53

4.52

4.47

4.50

4.52

4.61

4.60

4.55

4.59

4.65

4.62

4.62

4.64

4.52

4.43

4.42

4.43

4.46

4.64

4.82

4.73

4.73

Sapling

Sapling

Sapling

Sapling

Sapling

Beech 7h

Crape Myrtle 8h

4.61

4.62

4.62

4.66

4.69

4.78

4.76

4.77

4.72

4.76

DR

DR

4.73

4.71

4.71

4.67

4.66

4.66

4.63

4.69

DR

CL 4.66

IC

4.64

4.67

4.64

4.65

4.67

4.64

4.58

4.63

4.58

4.82

5.59

5.60

4.83

5.75

Threshold

4.72

4.75

4.91

Threshold

4.64

4.69

4.66

4.66

4.69

4.68

4.67

4.59

4.60

4.53

4.45

4.46

4.48

4.55

4.49

4.52

4.51

5.44

ToW

5.45

ToW

7.91

RL

9.94

RL

14.96

RL

7.94

RL

7.97

RL

Tap

Sapling

Sapling

Silver Birch 5h

Silver Birch 7h

4.69

4.73

4.75

4.72

4.71

4.74

4.74

4.99

Threshold

4.79

4.63

4.57

4.54

4.53

4.61

4.61

4.63

4.67

8.82

RL

DP

PO

PO

PO

4.55

4.54

4.52

4.55

4.52

4.50

CL 4.57

IC

4.82

ToW

4.76

Grass

4.55

4.58

4.52

S101

4.52

4.68

4.69

4.75

4.59

4.63

4.60

SI

4.58

4.60

4.62

4.62

4.75

4.72

4.65

4.64

4.68

4.71

4.73

4.54

4.51

4.51

4.54

4.61

PO

4.760.15Ø

SI

SI

Cooper Beech 5h

Crape Myrtle 7h

9.96

RL

8.70

RL

4.30

4.37

4.40

4.36

4.33

4.39

4.34

4.32

4.52

4.55

4.70

4.62

4.61

4.68

4.70

4.65

4.74

4.75

4.77

4.67

4.61

4.61

4.65

4.69

4.61

4.62

4.68

4.67

4.59

4.60

4.58

4.67

PO

BU

4.54

4.55

4.58

4.59

4.65

4.66

4.59

4.62

4.68

4.68

4.62

4.59

4.65

4.62

4.56

4.41

4.47

CL 4.37

IC

CL 4.39

IC

4.42

CL 4.60

IC

CL 4.61

IC

DR

4.67

4.69

4.69

BU

4.65

4.62

FB

CL 4.60

IC

DR

4.60

4.71

4.70

4.69

4.68

4.67

4.69

4.71

4.62

4.58

4.57

4.64

4.71

4.71

4.72

4.70

4.71

4.67

4.67

4.68

4.65

4.69

4.74

DR

4.74

4.66

4.92

Timber

4.87

ToW

4.83

ToW

4.85

ToW

4.31

BL

4.75

WL

BU

4.87

4.92

ToW

4.82

4.83

Stone Board

4.77

4.71

4.79

4.86

4.71

4.69

4.69

4.92

4.80

4.94

FL

4.77

DR

4.67

4.70

4.70

4.71

4.70

4.71

4.72

4.72

4.72

4.71

4.72

4.71

5.46

ToW

4.62

4.72

4.67

4.73

4.67

4.61

4.58

4.57

4.56

4.55

4.57

4.34

4.32

4.39

4.34

4.45

4.50

4.37

4.37

4.35

4.34

4.33

4.33

4.38

4.53

4.53

4.56

4.57

4.53

4.55

4.54

4.57

CL 4.35

IC

DR

4.29

4.32

4.30

4.32

7.58

RL

7.56

RL

7.57

RL

8.81

RL

7.97

RL

Sapling

Cherry Tree 5h

S103

3.96

4.07

4.21

4.10

4.24

4.35

4.44

4.34

4.35

4.45

4.47

4.38

4.40

4.50

4.45

4.44

4.47

4.58

4.60

4.49

4.46

4.56

4.55

4.45

4.62

4.63

4.62

4.58

4.60

4.60

4.64

4.62

4.60

4.55

4.50

4.51

4.54

4.49

4.39

CL 4.37

MH

4.47

4.48

4.47

CL 4.45

MH

4.44

GG

4.21

4.30

4.36

4.40

4.46

4.47

4.48

4.52

4.54

4.55

4.56

4.45

4.48

4.52

4.42

4.38

4.42

4.50

4.41

4.38

4.48

4.39

4.37

4.36

4.46

4.37

4.34

4.32

4.42

4.31

4.21

4.07

4.14

4.21

GG

4.34

GG

4.40

GGRS

RS

LP

LP

LP

9.87

EL

9.90

EL

9.95

EL

10.06

EL

9.78

EL

9.71

EL

9.75

EL

9.78

EL

9.82

EL

9.81

EL

9.78

EL

9.77

EL

9.51

EL

13.11

RL

13.13

RL

13.14

RL

12.63

RL

12.74

RL

12.70

RL

13.11

RL13.08

RL

13.04

RL

12.90

RL

TP

TP

3.95

4.06

4.01

3.89

3.88

3.91

3.89

GG

3.89

GG

3.98

3.95

3.89

3.92

3.91

3.82

3.77

3.75

3.83

3.91

3.66

3.54

3.62

3.50

3.60

3.70

3.70

WM

3.70

3.76

3.70

3.82

3.92

4.05

3.92

3.87

3.74

3.52

GG

MP

MP

MP

SV

SV

SV

CL 3.93

MH

4.01

GG

3.65

3.74

3.87

4.04

4.15

4.28

LP

6.25

EL

6.27

EL

9.39

RL

7.92

RL

4.44

ToW

4.64

ToW

RS

TP

8.49

RL

10.41

RL

8.93

RL

6.95

EL

4.73

4.74

CL 4.71

IC

4.73

4.53

4.61

4.64

4.68

4.69

4.60

4.56

4.58

4.49

4.50

4.47

4.46

3.87

3.88

4.18

4.39

4.43

4.63

4.68

4.59

4.60

4.61

4.62

4.66

Sapling

4.70

4.73

Cooper Beech 7h

UK 7h

UK 3h

6.42

RL

6.43

RL

Sycamore 10h

4.01

4.17

4.22

4.24

4.21

4.21

4.21

4.27

4.27

4.33

4.27

4.22

4.23

4.29

4.28

4.34

4.31

4.21

4.13

CL 4.40

IC

CL 4.35

MH

CL 4.26

MH

CL 4.53

IC

DR4.52

4.39

4.40

4.53

4.50

4.52

4.42

Concrete

4.38

4.43

4.48

4.51

4.56

4.55

4.54

4.55

4.56

4.56

4.55

4.53

4.44

4.41

4.48

4.55

4.86

4.57

4.84

4.59

4.83

4.52

4.84

4.51

4.81

4.57

4.83

4.57

4.56

4.61

4.57

4.54

4.55

DR

DR

DR

4.51

4.53

4.46

4.48

4.48

DR

Tap

DR

4.47

4.47

4.56

4.53

4.55

4.56

4.58

4.63

DR

4.43

4.42

4.63

PO

PO

PO

PO

PO

PO

PO

PO

Board

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

Sapling

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

BU

Sapling

BU

BU

BU

BU

Sapling

BU

BU

BU

4.34

4.29

4.24

4.28

4.17

4.17

4.14

4.104.00

3.93

3.87

3.81

3.86

3.82

4.00

4.24

4.35

4.10

4.02

4.35

4.16

4.17

Sycamore 7h

Sycamore 12h

BU

BU

Sapling

Sapling

6.45

RL

PO

PO

DP

DP

DP

DP

DP

4.66

4.54

4.68

4.53

4.58

4.52

4.57

4.57

Gravel

4.58

4.59

4.55

8.10

RL

8.08

RL

7.89

RL

BU

BU

Sapling

4.20

4.25

4.22

4.07

4.00

4.15

4.50

4.49

4.18

4.17

4.20

4.19

4.19

4.15

4.01

4.07

4.23

4.07

4.03

3.93

4.00

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

Paved

Concrete

Paved

Concrete

Steps

Concrete

Paved

Paved

Paved

Concrete

Concrete

Concrete

Concrete

Asphalt

Concrete

Grass

Concrete

Paved

Concrete

Paved

Grass

Flower Bed

Concrete

Grass

DR

Silver Birch 10h

Chair

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 10h

Silver Birch 8hSilver Birch 8h

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

PO

Cooper Beech 7h

Beech 7h

Asphalt

Footway - Asphalt

Footway - Asphalt

Pipe (Conc.)

Grass

Grass

Concrete

Brambles 1.2h

Grass

BU

Board

Asphalt

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Crape Myrtle 7h

Grass

UK 5h

Crape Myrtle 6h

UK 7h

Crape Myrtle 6h

UK 9h

Unable to Survey

Pound

Frame

Bx

Grass

Grass

Bicycle Park

Car Park

Car Park

Bicycle Park

Concrete

Asphalt

Asphalt

Car Park

Concrete

Paved

Concrete

Grass

Grass

Grass

Flat Roof

Outbuilding

Brick Construction

Flower Bed

Gravel

Doll

House

Grass

Grass

Grass

Grass

Grass

Grass

PO

PO

PO

PO

PO

PO

PO

PO

PO

Concrete

Concrete

PO

PO

Concrete

Concrete

Concrete

Concrete

Concrete

Paved

Paved

Paved

Flower Bed

Shed

Shed

Green House

Shed

Shed

Concrete

Grass

Grass

Grass

Grass

Grass

Grass

Wall

Grass

Grass

Ramp

Concrete

Ramp

Concrete

Concrete

Conc.

Concrete

Conc.

Pound

Grass

Grass

Grass

Paved

Paved

Paved

Paved

PO

PO

PO

PO

PO

PO

PO

Grass

Grass

Grass

Grass

Grass

Grass

Sycamore 12h

Sycamore 12h

Sycamore 12h

Sycamore 12h

Sycamore 12h

Sycamore 12h

Sycamore 12h

Sycamore 12h

OHL

OHL

OHL

Sycamore 7h

Sycamore 7h

Sycamore 7h

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Grass

Asphalt

Asphalt

Asphalt

Asphalt

Asphalt

Private Garden

Private Garden

Private Garden

Private Garden

Private Garden

Private Garden

Single Storey - Concrete Construction

Private Dwelling

Single Storey - Brick Construction

Private Dwelling

Single Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Two Storey - Brick Construction

Private Dwelling

Private Dwellings

Private Dwellings

Private Dwellings

Private Dwellings

Brick Construction

Westwood Comunity Primary School

Flat Roof

Brick Construction

Westwood Comunity Primary School

Flat Roof

Brick Construction

Westwood Comunity Primary School

Flat Roof

DR

20

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

21

22

23

24

25

26

27

28

29

42

41

40

34

31

39

30

35

36

37

38

RW

P

W

T01

R

W

D

P

RW

DP

RW

DP

SAFE SURFACING - REFERTO ARCHITECT FOR DETAILS

PAINTED TARMAC - REFERTO ARCHITECT FORCOLOUR SPECIFICATION

P01

NWF

09.05.17

SD

09.05.17

SD

09.05.17

First Issue

DO NOT SCALE THIS DRAWING - Work to writtendimensions only. No reliance is to be made on theaccuracy of this drawing in its 'Electronic Model' form

GENERAL NOTES:1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER RELEVANT

DRAWINGS (ENGINEERING AND ARCHITECTURAL) AND THE SPECIFICATION.

2. USE ONLY GIVEN DIMENSIONS. DO NOT SCALE.

3. FOR EXTERNAL WORK GENERAL ARRANGEMENT REFER TO ARCHITECT.

P02

NWF

15.05.17

SD

15.05.17

SD

15.05.17

Site landscaping plan added.

Concrete footpath build up detail added

NOTES

Drawing Title

Project Name

Client

E-mail

Internal Project Number

Original SizeScale

Author Checked Approved

Revision

Status

A0

RIBA Stage

Date of First Issue

Issuing Office Telephone

Liverpool 0151 600 5500

Originator Volume Level Type Role NumberProject

Version

Drawn

& Date

Checked

& Date

Approved

& Date

Amendment

c

Kier copyright

1078782

1078782-KWS-01-XX-DR-C-0003

P04

S1

Stage 4

CAMBRIDGESHIRE COUNTY COUNCIL

WESTWOOD PRIMERY SCHOOL

- PROPOSED EXTENSIONS

EXTERNAL WORKS: SUB-BASE DETAILS TO

AREAS OF EXTERNAL HARD-LANDSCAPING

1:200 1:10

Steven.P.Davies@Kier.co.uk

09.05.2017 NWF SD SD

P03

NWF

22.05.17

SD

22.05.17

SD

22.05.17

Outdoor classroom & cycle store paving

areas amended.

P04

NWF

19.07.17

SD

19.07.17

SD

19.07.17

Formation details updated following

receipt of ground investigation report.

Plan updated to suit latest

architectural layout.

Drawing number amended.

P04

P04

P04

P04