1 Safe Work Procedure: 8
Bordertown Pumps and Refrigeration 22 Milne St
BORDERTOWN SA 5268 Phone 08 8752 1959 Fax 08 8752 1181 Email: btpumps@lm.net.au
Safe Work Method Statement
Job Task: conduit installation in the ground RISK IDENTIFICATION & CONTROLS
SWMS Created: 27/09/2013 Date of Last Review: June 2015
Authorised By : Daniel Staude Date for Next Review: June 2016
Personal Protective Equipment (where applicable):
Procedural step(s) Possible Hazard(s) Safety Control(s)
Entry to site Unknown site hazards and conditions
Site induction & familiarisation of site conditions
Check area for other services and confirm locations of any gas lines, power cables, telephone cables, water or sewer lines and tree roots
Hitting other services
Dial before you dig notification
Visual inspections
Instructions to employees to watch for marker tape
Check layout and mark out
Tripping Ensure area is clear
Wear safety footwear
2 Safe Work Procedure: 8
Excavate trenches (less than 1.5 meters deep and do not permit person entry)
Manual handling Falling in trenches Trench collapse Use of chain digger or excavator
Implement manual handling risk control procedures
Ensure trenches are as even and flat as practicable
Keep soil away from trench edge
Barricade work area
Backfill, cover or barricade the excavations if left overnight
Trained and competent operators of powered mobile plant
Lay conduit Chemical glues Hazardous manual tasks Power tools for cutting conduits
Use conduit glue in accordance with SDS
Ventilate area, if necessary
Two man lift for large dia. conduits
Team work for pressing large conduit fittings
Employees trained in power tool use
Fitting draw wire Hazardous manual tasks
Backfilling and restore ground to client specifications
Manual handling Tripping
Refer to manual handling SWMS
Ensure area is clear
Waste disposal Tripping hazards Environmental impact
Do not to bury waste in trench backfill
All waste removed from sites or disposed of in rubbish bin
Overall risk rating: Significant RISK RATING GUIDE Consequence
Death Catastrophic Illness/Injury
Major Extensive Injuries
Moderate Medical treatment
required
Minor No injuries
Lik
elih
oo
d
Almost certain Occurred before/expected
H H S S
Likely Probably will occur
H S S S
Moderate May occur at some time
H S L L
Unlikely Unusual or rare situation
S L L L
High (H) – cease exposure immediately until protection, approved at senior management level, implemented.
Significant (S) – procedures alone may not be enough, senior management attention required.
Low (L) – may be managed by routine procedures, some risks in this category may be acceptable.
SPECIFIC TASK REQUIREMENTS
Qualificat lic
Training co
Engineeri n/
Relevant Sa W W
Plant/equ
Maintenan
tions or expcenses applic
onduit installa
ing details, /a
codes of prafe Work SA
Work Health aWork Health auipment
nce checks,
perience cable to pow
ation in the g
certificates,
ractice, legisA Code of Praand Safety Acand Safety R
, site/workp
wered mobile
ground safe w
, WorkCove
slation or stactice: Hazarct 2012 (SA)
Regulations 2
place inspec
3
plant, as ap
work method
r approvals
tandards rdous Manua)
2012 (SA)
ctions
plicable
d statement
al Tasks
SSafe Work Proocedure: 8
top related