san diego high school · san diego high school november 19, 2019 conceptual draft . site work •...
Post on 04-Jul-2020
0 Views
Preview:
TRANSCRIPT
SAN DIEGO HIGH SCHOOL
NOVEMBER 19, 2019
CONCEPTUAL DRAFT
SITE WORK • QUAD
• LOWER QUAD
• EAST PARKING LOT
• ATHLETIC FIELDS
NEW STRUCTURES • BLDG 100 EXPANSION
• QUAD FOOD KIOSK
• LOWER QUAD FOOD KIOSK
• CONCESSIONS AND RESTROOMS
• SOFTBALL DUGOUTS
MODERNIZATION • BLDGS 100 – EXTENSIVE MODERNIZATION TO
THE INTERIOR & EXTERIOR OF THE BUILDING
• BLDGS 200 & 800 – PROVIDE AIR
CONDITIONING PER DISTRICT STANDARDS
• BLDG 300 – MODERNIZATION TO THE
COUNSELOR’S OFFICES
• BLDG 400 – FINISH UPGRADES
• BLDG 500 – EXTENSIVE MODERNIZATION,
PROVIDE AIR CONDITIONING PER DISTRICT
STANDARDS
• BLDG 600 – FINISH UPGRADES, PROVIDE AIR
CONDITIONING PER DISTRICT STANDARDS
• BLDGS 900 &1000 – REMOVE AND REPLACE AIR
CONDITIONING UNITS, REPAIR EXTERIOR
STEEL COATING
CONCEPTUAL DRAFT
(0)
UPPER QUAD
FOOD KIOSK
LOWER QUAD
SITE PLAN QUAD AND
LOWER QUAD
LOWER QUAD
FOOD KIOSK
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
BUILDING 100
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
This slide to be bldg. 300
COUNSELING
SUITE
BUILDING 300
LOWER LEVEL
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CTE
ENGINEERING
OUTDOOR
PATIO
BUILDING 500
LOWER LEVEL
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
CONCEPTUAL DRAFT
ATHLETIC
FIELDS
SITE PLAN
ATHLETIC FIELDS
CONCEPTUAL DRAFT
HOME
DUGOUT
VISITOR
DUGOUT
CONCESSIONS
AND
RESTROOMS
top related