sap int q.docx

Post on 28-Jan-2016

9 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Wher

e in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

1)What are the organizational level used by the r/3 manufacturing business process?

2) which are different planning process/LEVELS

3) major pp data objects?

4) What are material master?where used

5) What is material and types

6) Define bom ?where the data used

7) Where in pp bom is used

8) What is multilevel BOM

9) SIGNIFICANCE OF BOM USAGE

10) WIEVS OF WORK CENTER AND DATA ENTERD.

11) WHAT IS ROUTING AND DATA IN IT.

12) DIFFERNACE ROUTING SEQUENCE TYPE.

13) HOW DATE AFFECT IN WORK CENTER AFFECT THE OPERATION

14)WHAT IS COMPONANT ASSIGNED

15)WHAT IS PRT AND HOW IT ASSIGNED

16)COST CONTROL AS CONTROLLING MASTER DATA IN R/3

17)WHAT IS REQUIREMENT?INDEPENDANT REQUIRMRNT.

18)WHAT DO U MEAN BY CONSUMPTION.

BATCH MANAGEMEMNT

11)

Significance of bom usage/bom group what is work center and its usage/viws of wc and data entered

What is routing and data in it/differnant routing sequesce type.

ASAP technology

Level l2 and l3 support

top related