SAP Note 1115080 - ITSmobile and sizing
Note Language: English Version: 1 Validity: Valid Since 15.11.2007
Summary
Symptom
The integrated ITS is beeing used to connect mobile devices to the SAP
backend (ITSmobile). How does this use influence the sizing of the backend?
Other terms
ITSmobile, ITS Mobile, sizing
Reason and Prerequisites
Solution
When beeing used as ITSmobile the ITS itself only requires a very small
footprint on the backend server. As a very first approach you can assume
0,01 - 0,02 SAPS per dialoge step per hour.As long as you don't have an allready very high loaded system or a high
number of mobile devices working on the system concurrently you might not
need to put this load in consideration at all.
Anyway, don't forget that behind ITSmobile there is still an ABAP program
running which also requires computing time. this time has got to be put
into consideration, too.
Header Data
Release Status: Released for Customer
Released on: 15.11.2007 22:08:36
Master Language: English
Priority: Recommendations/additional info
Category: Performance
Primary Component: BC-FES-ITS SAP Internet Transaction Server