7/24/2019 sapnote_ITSMobileSizing

http://slidepdf.com/reader/full/sapnoteitsmobilesizing 1/1

10.01.2013 Page 1 of 1

  SAP Note 1115080 - ITSmobile and sizing

 Note Language: English Version: 1 Validity: Valid Since 15.11.2007

Summary

Symptom 

The integrated ITS is beeing used to connect mobile devices to the SAP

backend (ITSmobile). How does this use influence the sizing of the backend?

Other terms

ITSmobile, ITS Mobile, sizing

Reason and Prerequisites

Solution

When beeing used as ITSmobile the ITS itself only requires a very small

footprint on the backend server. As a very first approach you can assume

0,01 - 0,02 SAPS per dialoge step per hour.As long as you don't have an allready very high loaded system or a high

number of mobile devices working on the system concurrently you might not

need to put this load in consideration at all.

Anyway, don't forget that behind ITSmobile there is still an ABAP program

running which also requires computing time. this time has got to be put

into consideration, too.

Header Data

Release Status: Released for Customer

Released on: 15.11.2007 22:08:36

Master Language: English

Priority: Recommendations/additional info

Category: Performance

Primary Component: BC-FES-ITS SAP Internet Transaction Server

 Valid Releases

Software Component Release From

Release

To

Release

and

SubsequentSAP_BASIS 60 640 640 X

SAP_BASIS 70 700 701 X

SAP_BASIS 71 710 711 X