S Evans & Sons 4 Arch Bridge Demolition Presentation

4 No of Excavators equipped with breaker attachments to position facing the bridge in the direction of demolition.

Layer by layer the excavators to reduce the parapet

Excavators working in situ to demolish arches in 500mmSections from pier/abutment to pier/abutment

Excavators working in situ to demolish arches in 500mmSections from pier/abutment to pier/abutment

Excavators working in situ to demolish arches in 500mmSections from pier/abutment to pier/abutment

Excavators working in situ to demolish arches in 500mmSections from pier/abutment to pier/abutment

Excavators working in situ to demolish parapet layer bylayer

Excavators working in situ to demolish the last remaining Section arches

Excavators to reposition and begin to reduce centre Piers down to clients specified levels

Excavators to reposition and begin to reduce centre Piers down to clients specified levels

Excavators to reposition and begin to reduce centre Piers down to clients specified levels

Excavators to reposition and begin to reduce centre Piers down to clients specified levels

S Evans operatives and plant to vacate site