Appendix J Seven Basin States’

Proposals Regarding Colorado River Interim Operations

The seven Colorado River Basin States developed and submitted a Preliminary Proposal Regarding Colorado River Interim Operations to the Secretary of the Department of the Interior (Secretary) in a letter dated February 3, 2006. As a comment on the Draft EIS, the seven Colorado River Basin States revised their preliminary proposal and submitted it to the Secretary in a letter dated April 30, 2007. The full text of the seven Colorado River Basin States’ revised and preliminary proposals regarding the Final EIS are provided in this appendix.

Appendix J

Seven Basin States’ Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-1 October 2007

J.1 Revised Basin States’ Proposal – Letter to Secretary of the Interior

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-2 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-3 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-4 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-5 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-6 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

This page left intentionally blank.

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-7 October 2007

Attachment A Agreement Concerning Colorado River

Management and Operations

This attachment to Appendix J contains the text of Attachment A to the Revised Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-8 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-9 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-10 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-11 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-12 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-13 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-14 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-15 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-16 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-17 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-18 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-19 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-20 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-21 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-22 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-23 October 2007

Attachment B Proposed Interim Guidelines

for Colorado River Operations

This attachment to Appendix J contains the text of Attachment B to the Revised Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-24 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-25 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-26 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-27 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-28 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-29 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-30 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-31 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-32 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-33 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-34 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-35 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-36 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-37 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-38 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-39 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-40 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-41 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-42 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-43 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-44 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-45 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-46 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-47 October 2007

Attachment C Forbearance Agreement

This attachment to Appendix J contains the text of Attachment C to the Revised Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-48 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-49 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-50 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-51 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-52 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-53 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-54 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-55 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-56 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-57 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-58 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-59 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-60 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-61 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-62 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-63 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-64 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-65 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-66 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-67 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-68 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-69 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-70 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-71 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-72 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

This page left intentionally blank.

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-73 October 2007

Attachment D Shortage Sharing Agreement between Arizona and Nevada

This attachment to Appendix J contains the text of Attachment D to the Revised Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-74 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-75 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-76 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-77 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-78 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-79 October 2007

J.2 Preliminary Proposal - Letter to Secretary of the Interior

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-80 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-81 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-82 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

This page intentionally left blank.

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-83 October 2007

Attachment A Preliminary Proposal Regarding

Colorado River Interim Operations

This attachment to Appendix J contains the text of Attachment A to the Preliminary Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-84 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-85 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-86 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-87 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-88 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-89 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-90 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-91 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-92 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-93 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-94 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-95 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-96 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-97 October 2007

Attachment B Draft Agreement

This attachment to Appendix J contains the text of Attachment B to the Preliminary Basin States’ Proposal.

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-98 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-99 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-100 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-101 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-102 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-103 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-104 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-105 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-106 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-107 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-108 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

Appendix J

Seven Basin States’Proposals Regarding

Colorado River Interim Operations

Final EIS – Colorado River Interim Guidelines for Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

J-109 October 2007

Seven Basin States’ Proposals Regarding Colorado River Interim Operations

Appendix J

October 2007 J-110 Final EIS – Colorado River Interim Guidelines for

Lower Basin Shortages and Coordinated Operations for Lake Powell and Lake Mead

This page intentionally left blank.