Siemens Building Technologies Renewable Energy
Laura Berland-ShaneSiemens Building Technologies
OCBC Presentation July 14, 2009
Agenda
Introduction
Laura Berland-shane, Alternative Energy BDM
About Siemens Building Technologies, US
Discussion on Renewable Technologies
Case Study: Solar
Financial Options
Regions for Best Opportunity
Questions
How we help our customers
BuildingAutomation
BuildingAutomation
Energy &Environmental
Energy &Environmental
Fire SafetyFire Safety
SecuritySecurity
SiemensBuilding
Technologies
SiemensBuilding
Technologies
HVACHVAC
About Siemens Building Technologies, United States
National Leadership – Local Presence
Customer Satisfaction is our core value
We improve facilities by making them comfortable, safe and secure, and less costly to operate
Energy and Environmental Solutions
Market leader in energy savings performance contracting
Extensive experience in key vertical markets – Government, Public Housing, Education
Building Automation and Controls
Full featured, customized solutions
Integration of multiple building systems
Industry’s first wireless system
Security Systems and Solutions
Seamless systems integration and management
Remote location monitoring
Diverse product and solution portfolio
Fire Safety
Seamless integration with existing building management systems
Broadest product line in industry
High risk and specialty applications
Siemens Building Technologies U.S.
Siemens Building Technologies U.S.
Employees (thousands)
Sales (billions of US$)
Locations
Customers (thousands)
7.4 1.8 100 45
HQ Buffalo Grove, IL
Siemens Qualifications
Siemens and Energy
Over 275 energy professionals nationally
Over 2 Billion dollars in guaranteed energy savings for projects implemented since 1995
Over 6,000 energy related patents
Thousands of energy audits and LEED assessments performed annually throughout US
Global Presence
The Challenges:
• Clean Energy Generation
• Water Filtration/Reclamation
• Green Buildings
• Emissions Control
• Output Efficiency
• Energy Star Lighting
• Waste to Energy
• Energy Management Consulting
• Intelligent Traffic Systems
• Mobility Communications
• Hybrids/Green Diesel
• Research/Modeling
Our Answers:
What We Offer: Innovation, Efficiency, Sustainability
Fresh Water
Clean Air
Energy Supply
Saving Resources
Mobility
Renewable Energy: Project Types
Solar
Wind
Biomass
Landfill Gas
Digester Gas
Waste-to-
Energy
Solar Electric Power
Recognizable environmental commitment/reduces carbon footprint
Uses local resources, reduces demand for imported fossil fuels (NG, Oil)
Solar panels have a 25-year warranty, 35+ year life
Solar power provides peak power, offsets most expensive electricity
Warranties backed by substantial companies, e.g. BP, Shell, Sharp, Kyocera
Low maintenance (~1% total project cost/yr)
Available in various configurations (rooftop, parking canopy, ground mount)
Solar Power
Rule of thumb: 1MW solar power needs 80,000 square feet of roof space
Technology improvements – thin film, increased panel efficiency, storage
Project costs continue to decline
Solar Economic Incentives
Federal tax incentives (30% now avail as a grant per ARRA)
5 Year MACRS accelerated depreciation available + 50% Bonus Depreciation (ARRA)
California Solar Initiative- SoCal Ed step 5 at 0.15/kwh
Some examples of Municipal utility rebates available- Anaheim: $2.80/watt AC or $.39/kwh
- LA DWP: upfront 20yr payment $.11- $.14/kwh.(Equiv. of $4.50/watt AC)
- Glendale: 4 year PBI $.49/kwh
- Pasadena: 5 year PBI ($.553 - $.632/kwh)
Renewable Energy Certificates (RECs)
As a tax-exempt institution, you can not monetize most incentives…unless you go with a Power Purchase Agreement (PPA)
Financial Options for Solar-Tax Exempt Entity
Purchase Capital Lease PPA
Upfront Cash Outlay √ x xMonetize Federal Tax
Incentives x x √Monetize Accelerated
Depreciation x x √Maintain Equipment x √ x
Contract Termx
10-15 years 15-20 years
Ownership√ √ Buyout available
after 7 yrs.
REC Ownership√ √
maybe
Benefits of a Power Purchase Agreement (PPA)
Allows tax-exempt institutions to monetize tax credits and depreciation
Green power for less cost than “brown power”
Fixed price hedge against significant utility cost increases
All the benefits of solar power without the hassles of ownership No capital required No complicated rebates and tax credits to manage No maintenance and repair responsibilities
Highly visible solar project drives green marketing
Solar power reduces fuel price volatility impact on electric costs
PPA Model
Host Customer
Project Developer
SIEMENS
Manufacturer&
Installer
Investor
Purchases electricity services at a fixed price schedule
Provides legal access to facility
No capital requirement
Receives revenue from sale of panels, inverters
Provides warranties for equipment and performance
Receives low risk ROI from electricity sales, state & federal incentives
Provides capital and owns equipment
Arranges financing, system design and construction
On-site solar PV system
15-20 Solar Services
Agreement
Equipment, installation, &
warranties
Sales and O&M
revenues
Financing
Solar Services
1.16 MW Solar PV Project
Case Study: Solar Energy Installation
Siemens Transportation ServicesSacramento, CA
Key Challenges
• Need for additional parking to accommodate growth
• Support corporate-wide sustainability initiatives
• Address need for greater predictability in energy pricing
Solution
• 180 new parking stalls
• Expedited permitting process with solar component
• 1 MW solar project; over 5,000 panels, supplying ~50% of building load
• Weekend generation sold back to electricity grid
• Prevents over 700 tons of CO2 annually
Siemens/ Shaw Waste to Steam Plant
Carpet and wood to energy
– Project has been completely operational for 2 years on July 1
– 10,000 tpy of both carpet edge trim and wood waste are shredded and gasified to produce 50,000 pph of steam
– Carpet plant has the lowest energy cost of all Shaw carpet plants
– Two people per shift operate and provide day to day maintenance
– Plant has 85% uptime
– Plant utilizes almost 80% of waste
Questions?