sino iron project concentrator pipework

Post on 25-Jan-2022

5 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

www.kgc.net.au 3/55 John St. Bentley WA 6102

P: +61 8 9258 4393 F: +61 8 9258 4417 E: admin@kgc.net.au

4 LOCATION CAPE PRESTON, WA

4 CLIENT MCC MINING (WA) PTY LTD

4 STATUS: COMPLETED

4 PERIOD OF ASSIGNMENT YEAR 2012

4 CONTRACT VALUE $8 M

4 PROJECT OVERVIEW

INSTALLATION OF CARBON STEEL, STAINLESS AND PLASTIC PROCESS AND SERVICE PIPING IN THE CONCENTRATOR LINES 1 AND 2 AREAS

The project is consisted of

Over 3,000m of process piping to AS4041

Over 6,000m filed run service piping

Critical path, truncated timeframe with slow client procurement yet completed on time

Pipe insulation

4 MAIN SUBCONTRACTOR Burgess BLA CPC Goldfields

4 REFEREE Xingyong ZHAO Principal’s Representative MCCM Construction Department 1 Sino Iron Project at Cape Preston Tel: 08 9184 8827 Mobile: 0467 444 867 Email: zhaoxingyong@mccmining.com.au

4 PROJECT MANAGER Mark Fidler & Klaus Hartmann

4 SITE MANAGER Wenge Liu

4 CHIEF ENGINEER Harry Yang

PROJECT REFERENCE

PROJECT NAME: SINO IRON PROJECT CONCENTRATOR PIPEWORKS

top related