site plan - saint paul, minnesota › sites › default › files › media...email:...
Post on 23-Jun-2020
1 Views
Preview:
TRANSCRIPT
a
Rondo Education Center
Top of Hill
Top of Hill
MainEntry
DriveEntry
Fence
Existing Retaining Wall
ExistingRetaining W
all
DriveExit
Drainage
Martin Luther KingCommunity Recreation Center
Tennis Courts
Sign
Sign
Tots
GradeSchool
Grade School
Refurbish existing drinking fountain
Compacted soil from overuse. Potentially install �ltration/ in�ltration basin to treat stormwater runo� if funding available. Install low maintenance plant material.
Install additional bike parking
Potential mural to be painted on surface
Ernie “Duke” Greene Monument to remain
Entry to be formalized. Existing seating area and susceptible ash trees to be removed. Install seatingand shade trees to create corridor toward main entry.
Compacted soil from overuse. Regrade and install low maintenance plants and mulch.
Relocate existing sign at parking exit here
Combination of poured in place rubber surface and sand
Concrete walk
Install new site furniture at pickup/dropo� area
Install new entry sign if budget allows. Sign to conform with current sign
standards. Move existing sign to corner of Mackubin and Marshall.
Pave open space with seat walls to reduce turf erosion. Paint four-square and hopscotch
Install new play equipment to meet today’sstandards and ADA accessible standards.
Refer to preferred play equipment layout board.
ADA picnic table
Plant shade trees along activity area
Remove existing box elder and ash trees
Install new play equipment to meet today’s standards and ADA accessible standards. Refer to preferred play equipment layout board.
Lilac shrubs appear old and planting location is random. Remove to increase visibility and safety of users.
Concrete walk
Concrete walk
Playable art! 3’-0” ADA acessible metal letters. FollowsConsumer Protection Safety Commission Guidelines.Uses slip resistant paint.
“MLK” Dual Public Art/Play Feature
Features:ADA AccessibleSlip Resistance Paint3’-0” Tall Steel Letters
MARTIN LUTHER KINGPlay Area ImprovementsProject Manager: Brett Hussong
Contact: 651-266-6420Email: brett.hussong@ci.stpaul.mn.us
North
April 2016
SITE
PLA
N
0 4020 80 Feet
Site Plan
Roadway
Existing utility
Fence
Existing contour
Concrete Walk (Existing)
Sand Surface
Proposed Trees
Existing Evergreen Tree
Potential Play Equipment (TBD)
Parking Requirements
Retaining Wall
Portable Restroom
Existing Pedestrian Lights
Proposed Bench/ Picnic Table
Existing Catch Basin
Existing Bench
Martin Luther KingCommunity Recreation Center/
Concrete Walk (Proposed)
Plant Bed
Poured-in-Place Rubber Surface
Legend
Wooden Park Sign
New Park Sign
Existing Trees
top related