SOLAR MARKET IN TURKEY

FARUK TELEMCIOGLU GUNDER (ISES – TR )

info@gunder.org.tr

INTERNATIONAL SOLAR ENERGY SOCIETY TURKEY SECTION

REPRESENTING TURKEY IN

WE ARE THE MEMBER OF :

DOĞAL GAZ + LNG 21190,69 MW

% 31,06

DİĞER 5964,4 MW

% 8,95KÖMÜR & LİNYİT14034,28 MW

% 20,57

KÜÇÜK HİDROLİK6868,29 MW

% 10,07

BARAJLI HİDROLİK 16586,64 MW

% 24,31

JEOTERMAL358,42 MW

% 0,53

RÜZGAR3483,94

MW% 5,11

GÜNEŞ35 MW% 0,05

TOTAL INSTALLED POWER CAPACITY IN TURKEY (68 GW )

WIND3483,94

MW % 31,6

SOLAR35 MW 0,3%

GEOTHERMAL358,42 MW

% 3,25

MICRO HYDRAULIC6868,29 MW

% 62

RENEWABLE + WASTE

267,67 MW 2,4%

TOTAL INSTALLED RENEWABLE POWER CAPACITY

(11 GW )

PROJECTION

TOTAL CAPACITY: 125 GW TOTAL PRODUCTION: 424 TWh

RENEWABLE ENERGY PRODUCTION PROJECTION

12

• 160,000 GWh/a. ECO. HYDRO • 48,000 MW WIND• 1,500 kWh/m²-year AGSR• 31,500 MWt GEOTHERMAL• 8.6 MTEP BIOMASS• 1.5-2 MTEP BIOGAS

RENEWABLE POTENTIAL OF TURKEY

13

Schedule I (Provision of the law dated 29/12/2010 and numbered 6094)

Type of Production Facility Based onRenewable Energy Resources

Prices Applicable(US Dollar cent/kWh)

a. Hydroelectric production facility 7.3

b. Wind power based production facility 7.3c. Geothermal power based production facility

10.5

d. Biomass based production facility(including landfill gas) 13.3

e. Solar power based production facility 13.3

FEED IN TARIFFS

According to Law on Utilization of Renewable Energy Resources for the Purpose of Generating Electrical Energy

14

The whole economically feasible hydropower potential of Turkey will be provided for generating

electrical energy,

20,000 MW capacity of wind power plant will be in operation

Minimum 3000 MW of solar energy capacity will be reached

Minimum 600 MWe geothermal will be implemented

TARG

ETS

FOR

2023

1500 MWe installed capacityfor Biomass energy

SOLAR ENERGY IN TURKEY

SOLAR WATER HEATING SYSTEMS

18

SOLAR THERMAL MARKET• PRODUCER : MORE THAN 90 COMPANIES RETAILERS: 800 - INSTALLERS : 3000 • TOTAL POWER : 18.000.000 M2

• PER 1000 INHABITANTS 5TH PLACE IN THE WORLD• THIRD BIGGEST PRODUCER IN THE WORLD• 2013 PRODUCTION : 1.600.000 M2

• FOR 2013 MARKET SHARE: %70 FLAT PLATE - %30 EVACUATED TUBE

SOLAR THERMAL PRODUCERS

PV MARKET

• PV PANEL PRODUCER : 14 COMPANIES (LAMINATION) • TOTAL EPC COMPANIES : MORE THAN 100• TOTAL POWER PLANT : 35 MW UNLICENSED• UNLICENSE LIMIT : 1 MW• LICENSE LIMIT : 50 MW• LICENSE APPLICATION : 496 FILES – 7873 MW • TOTAL PERMITTED CAPACITY 600 MW • LICENSE TIME : BY END OF 2014

TOP 5 PV MARKET

PHOTOVOLTAIC PRODUCERS

SOLAR INVESTMENTS

• LICENCED• UNLICENCED

LICENSED INVESTMENT PROCESS

SOLAR MEASUREMENT INSIDE THE PROJECT SITE

PRE-LICENSE APPLICATION TO EMRA

TECHNICAL EVALUATION BY THE MENR

COMPETITION TENDER

GRANTED PRE-LICENSE

GRANTED LICENSE

PERMISSIONS FROM RELATED AUTHORITIES

INSTALLATION & PROJECT ACCEPTANCE FROM THE MENR

OPERATION

REGION NO REGIONANNOUNCED

REGIONAL CAPACITY(MW)

NUMBER OF APPLICATION

TOTAL CAPACITY(MW)

1 4. ANTALYA 29 12 155,262 5. ANTALYA 29 10 147,43 ADANA-OSMANİYE 9 5 454 BİTLİS 16 6 65,25 BURDUR 26 24 402,446 DENİZLİ 18 20 228,247 ELAZIĞ 8 5 36,28 ERZURUM 5 2 9,99 HAKKARİ 21 1 21

10 ISPARTA - AFYON 18 30 420,0411 KAHRAMANMARAŞ – ADIYAMAN 27 28 442,912 KARAMAN 38 62 1128,1213 KAYSERİ 25 31 521,9714 KONYA - 1 46 36 657,9415 KONYA - 2 46 67 1266,0316 MALATYA - ADIYAMAN 22 30 427,1517 MERSİN 35 14 197,518 MUĞLA - AYDIN 20 18 264,7519 MUŞ 9 1 920 NİĞDE – NEVŞEHİR -AKSARAY 26 51 794,121 SİİRT – BATMAN - MARDİN 9 4 3222 SİVAS 9 6 5423 ŞANLIURFA - DİYARBAKIR 7 10 5824 ŞIRNAK 11 1 725 VAN - AĞRI 77 22 538,6726 BİNGÖL - TUNCELİ 11 0 027 ERZİNCAN 3 0 0

  TOTAL 600 496 7929,79

LOCATIONS APPLIED FOR LICENSE

The Central Anatolian region and Konya are the leading applied provinces.

INVITATION LETTER

PERMISSIONS FROM RELATED AUTHORITIES

CONNECTION APPLICATION TO DISTRUBITION COMPANY

TECHNICAL EVALUATION BY THE MENR

PROJECT ACCEPTANCE FROM THE MENR

UN LICENSEDINVESTMENT PROCESS

OPERATION

THE PREDICTIONS FOR PV MARKET

• 2023 TARGET : OFFICALLY 3 GW EXPECTATION : 10 – 12 GW• UNLICENSE LIMIT : 1 MW• NEW LICENSE APP. DATE : APRIL 2015• MEASUREMENT : MIN 6 MONTHS• TOTAL PERMITTED CAPACITY : 1,2 GW IN 2015

Renewable power plants that have come into operation since 18 May 2005 or will come into operation

before 31 December 2020 will be eligible to receive the feed-in tariffs for the first 10 years of their operation.

In addition, if the mechanical or electro-mechanical equipment of the power plant is produced locally,

a premium shall be added to the feed-in tariffs during the first five years of operation.

RENEWABLE ENERGY SUPPORT MECHANISM

FEED-IN TARRIF AND LOCAL EQUIPMENT BONUS

SOCIAL PROJECTS

• ORKOY • ILBANK• IPRAD 1 AND IPRAD 2 PROJECTS• TURSEFF • RE COOPERATIVE

SHC CONFERENCE 2015 İstanbul

Let’s meet where the continents meet...

THANK YOU FOR YOUR ATTENTION….

Faruk TELEMCİOĞLU

info@gunder.org.tr