3/24/20093/24/2009 State Construction ConferenceState Construction Conference 11
STATE CONSTRUCTION STATE CONSTRUCTION CONFERENCECONFERENCEMarch 24, 2009March 24, 2009
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 22
PRESENTERSPRESENTERSTOM CHAMBERS ASSISTANT BUREAU TOM CHAMBERS ASSISTANT BUREAU CHIEF OF THE ELEVATOR AND CHIEF OF THE ELEVATOR AND AMUSEMENT DEVICE BUREAUAMUSEMENT DEVICE BUREAU
JONATHAN BROOKS BUREAU CHIEF JONATHAN BROOKS BUREAU CHIEF ELEVATOR AND AMUSEMENT DEVICE ELEVATOR AND AMUSEMENT DEVICE BUREAUBUREAU
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 33
OBJECTIVES FOR THE SESSIONOBJECTIVES FOR THE SESSION
BUREAU OVERVIEWBUREAU OVERVIEWINSPECTION NUMBERSINSPECTION NUMBERSPERMIT REVIEWPERMIT REVIEWINSPECTION PROCESSESSINSPECTION PROCESSESSASME A17.1/B44.1 SAFETY CODE FOR ASME A17.1/B44.1 SAFETY CODE FOR ELEVATORS AND ESCALATORSELEVATORS AND ESCALATORS
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 44
BUREAU OVERVIEWBUREAU OVERVIEW32 FIELD 32 FIELD INSPECTORSINSPECTORS5 FIELD SUPERVISORS5 FIELD SUPERVISORS5 OFFICE STAFF INCLUDING THE 5 OFFICE STAFF INCLUDING THE BUREAU ENGINEERBUREAU ENGINEERASSISTANT CHIEFASSISTANT CHIEFBUREAU CHIEFBUREAU CHIEF
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 55
INSPECTION NUMBERS FOR FY INSPECTION NUMBERS FOR FY 20072007--20082008
APPLICATION FOR NEW INSP. APPLICATION FOR NEW INSP. -- 1,2151,215
ROUTINE INSEPRCTIONS ROUTINE INSEPRCTIONS –– 19,18019,180
AMUSEMENT DEVICE INSP. AMUSEMENT DEVICE INSP. –– 6,1316,131
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 66
INSTALLATION PERMIT REVIEWINSTALLATION PERMIT REVIEWPERFORMED BY BUREAU ENGINEER PERFORMED BY BUREAU ENGINEER JOE ADAMSJOE ADAMSSTATE CONSTRUCTION JOBSSTATE CONSTRUCTION JOBSELEVATOR SPECIFICATIONS ELEVATOR SPECIFICATIONS TRACTION AND HYDRAULICTRACTION AND HYDRAULICREVIEW OF STATE CONSTRUCTION REVIEW OF STATE CONSTRUCTION JOBSJOBSLETTER DATED LETTER DATED –– FEBRUARY 7,2005FEBRUARY 7,2005
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 77
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 88
ASME A17.1/B44.1ASME A17.1/B44.1BIBI--NATIONAL STANDARD SINCE 2007NATIONAL STANDARD SINCE 2007ADOPTED BY REFERENCE LATEST ADOPTED BY REFERENCE LATEST EDITIONEDITIONCODE ISSUESCODE ISSUESCHANGES IN THE CODECHANGES IN THE CODE
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 99
CODE ISSUESCODE ISSUES
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1010
SUMP PUMPS/DRAINSSUMP PUMPS/DRAINSSUMP PUMP REQUIREMENTSUMP PUMP REQUIREMENT
Sump pump / drain capacity now Sump pump / drain capacity now required to be a minimum of 11.4 required to be a minimum of 11.4 mm33 / hr (3,000 gal / hr) per elevator/ hr (3,000 gal / hr) per elevator
EFFECTIVE IN OCTOBER 6, 2007EFFECTIVE IN OCTOBER 6, 2007
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1111
2.27.82.27.8FEO Switch KeysFEO Switch Keys
TubularTubular7 pin7 pinStyle 137Style 137BittingBitting code 6143521code 6143521
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1212
SPRINKLERS SPRINKLERS LOCATIONLOCATIONHYDRAULIC ELEVATOR PITHYDRAULIC ELEVATOR PITINTIATING PHASE I FIRE SERVICEINTIATING PHASE I FIRE SERVICESHUNT TRIP ELEVATOR SHUT DOWN, SHUNT TRIP ELEVATOR SHUT DOWN, DELAY NFPA 72DELAY NFPA 72VENTILATION OF ELEVATOR VENTILATION OF ELEVATOR EQUIPMENT ROOMEQUIPMENT ROOM
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1313
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1414
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1515
INITIATING DEVICES 2.27INITIATING DEVICES 2.27PHASE 1 FIRE SERVICEPHASE 1 FIRE SERVICENFPA 72NFPA 72LOCATIONLOCATIONMACHINE ROOMMACHINE ROOMHOISTWAYHOISTWAYELEVATOR LOBBYELEVATOR LOBBY
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1616
CODE CHANGESCODE CHANGES
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1717
CODE CHANGESCODE CHANGES
NEW TECHNOLOGY ASME NEW TECHNOLOGY ASME A17.7/BB44.7A17.7/BB44.7
MACHINEROOMLESS ELEVATORSMACHINEROOMLESS ELEVATORS
ALTERNATIVE SUSPENSION MEANS ALTERNATIVE SUSPENSION MEANS ASME A17.6/B44.6ASME A17.6/B44.6
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1818
QUESTIONS?QUESTIONS?
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 1919
CONTACT INFORMATIONCONTACT INFORMATIONRALEIGH OFFICE (919) 807RALEIGH OFFICE (919) 807--27702770WWW.NCLABOR.COMWWW.NCLABOR.COMTOM CHAMBERS TOM CHAMBERS -- ASSISTANT CHIEFASSISTANT CHIEFEMAIL EMAIL –– TOM.CHAMBERS@LABOR.NC.GOVTOM.CHAMBERS@LABOR.NC.GOVCELL CELL –– (919) 868(919) 868--11161116JOE ADAMS JOE ADAMS –– BUREAU ENGINEERBUREAU ENGINEEREMAIL EMAIL –– JOE.ADAMS@LABOR.NC.GOVJOE.ADAMS@LABOR.NC.GOVCELL CELL –– (919) 868(919) 868--74057405
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 2020
CONTACT INFORMATION CONTACT INFORMATION CONTCONT’’DD
JONATHAN BROOKS BUREAU CHIEFJONATHAN BROOKS BUREAU CHIEFEMAILEMAIL--JONATHAN.BROOKS@LABOR.NC.GOJONATHAN.BROOKS@LABOR.NC.GOVVCELL (919) 868CELL (919) 868--11191119
3/24/20093/24/2009 State Construction ConferenceState Construction Conference 2121
THANK YOU FOR YOUR TIME THANK YOU FOR YOUR TIME AND ATTENTION!!!AND ATTENTION!!!