STATE OF NEW YORK
DEPARTMENT OF PUBLIC SERVICE
CHANGE NOTICE
October 29, 2021
TO: TAMMY MITCHELL
DIRECTOR
OFFICE OF ELECTRIC, GAS AND WATER
FROM: ROBERT LEMIEUX, Utility Analyst Trainee 2 (Environmental)
Environmental Certification & Compliance Section
Office of Electric, Gas and Water
SUBJECT: 11-T-0534 – EM&CP Change for Rochester Area
Reliability Project (RARP) Station 80 Shunt Reactor
RECOMMENDATION: Approval of Change Notice MC-10 as Requested
*** *** ***
In accordance with Ordering Clause 31 of the Order Adopting the
Terms of a Joint Proposal and Granting Certificate of Environmental
Compatibility and Public Need, with Conditions, issued and effective
in this case on April 23, 2013, Rochester Gas and Electric
Corporation (RG&E) has notified Staff of the Department of Public
Service (DPS Staff) of one proposed minor change.
Change Notice MC-10 - RG&E proposes the installation of a shunt
reactor at its Station 80 Substation in the Town of Henrietta in
Monroe County. The proposed installation will occur on the northern
end of the 345 kilovolt (kV) Bus #1 inside the existing footprint of
Station 80, and all work required for this installation will be
completed within the station’s existing fence line. Subsequently,
CASE 11-T-0534
- 2 -
due to no expansion of the existing station footprint and no
improvements required for access to the Station, there will be no
increase in temporary or permanent environmental impacts.
Additionally, all new equipment associated with the reactor’s
installation is compatible with existing components and will not
create any significant increase in noise or visual impact. This
installation is in support of NextEra’s Empire State Line, a project
in which Station 80 was one of multiple network facilities
identified as requiring upgrades.
Staff has reviewed this proposed change and believes it will
not result in any net increase of adverse environmental impact, nor
is it directly related to any issues contested during the
proceedings. DPS Staff recommends that this change be approved, and
RG&E be so notified.
REVIEWED & APPROVED: ________________________
TAMMY MITCHELL
DIRECTOR
OFFICE OF ELECTRIC, GAS AND WATER
cc: Carol Howland, (CAHowland@nyseg.com)
Bob Lemieux, DPS (robert.lemieux@dps.ny.gov)
DPS Central File
Attachments
1
Internal Use
ENVIRONMENTAL MANAGEMENT & CONSTRUCTION PLAN
NOTICE OF CHANGE
PROJECT: Station 80 Shunt Reactor Installation NYSPSC Case No. 11-T-0534
Refer to Dwg #: 2 New Drawings 33203-200 Remove / Install Sheet Nos.: 1 of 1
Location: 474 Lehigh Station Road, Henrietta, Monroe County, NY
RG&E is proposing to install a shunt reactor at its Station 80 in the Town of Henrietta, Monroe County, NY. The shunt reactor is
needed to support NextEra’s Empire State Line Project (ESL Project). The foundations for the shunt reactor are expected to
begin in January 2022, with the overall construction start of March 2022. All work will be completed within the existing station
80 fence line.
Feature(s) Changed: RG&E is proposing the installation of a 345kV 100 MVAR shunt reactor on the northern end of 345kV
Bus #1 within the existing footprint of Station 80. Associated protection and control items will also be installed. This work
would include the installation of the following new major electrical and physical equipment:
• One (1) 100 MVAR Shunt Reactor
• One (1) Shunt reactor foundation with oil Containment
• One (1) three phase, surge arrester/bus support structure
• One (1) 362 kV, 40 kA, 3000 A Special Purpose IPO Circuit Breaker with Synchronous Switching Control
• One (1) 345 kV, Circuit Breaker Foundation
• One (1) 345 kV dead-end structure and foundation (with integrated switch truss)
• One (1) 362 kV 3000A, 63kA, 1300 kV BIL upright mounted double side-break switch
• Three (3) single phase CCVT structures and foundations
• CCVT junction box
• Grounding materials
• Conduit materials
• Control cabling
• Miscellaneous bus work
• Three new relay panels (#11, #9 and #28).
This work would also include the relocation of three existing 345 kV CCVT’s. In addition, the following electrical and physical
equipment will be removed:
• One (1) 345 kV lattice type dead-end structure and four (4) foundations.
• Five (5) 345 kV bus support pedestal structures and foundations.
• Three (3) CCVT lattice type structure and foundations.
• Minimal conduit removal.
• One (1) Disconnect Switch Stand and foundations. The structure is currently being used as a bus support for supporting
rigid bus over the existing 345kV Bus CCVTs.
Access to Station 80 for the installation / removal of the above components will be from the permanent existing access road
currently servicing Station 80, which requires no improvements. Since all construction activities will be within the existing
Station 80 fence line, there will be no material increase in any environmental impacts. The new components are consistent with
other equipment within the existing Station and will present no significant increase in visual or noise from existing conditions.
The Station is approximately ¼ mile from Lehigh Station Road. No environmental controls are deemed necessary at this time.
Rationale for Change: As part of Q#545A Empire State Line Project, multiple network facilities have been identified as requiring
upgrades, which includes Station 80.
2
Internal Use
Related Filings:
9/30/2011 – RG&E filed an Application for a Certificate of Environmental Compatibility and Public Need for the Rochester Area
Reliability Project (RARP) which included a new 345 KV line to RG&E’s existing Station 80.
4/23/2013 – A Certificate of Environmental Compatibility and Public Need was issued for the RARP.
10/11/2013 – RG&E filed EM&CP 1 which included Drawing C-004 showing the entire Station 80.
12/20/2013 – Order Issued approving EM&CP 1
5/7/2015 – RG&E filed an application to amend the RARP Certificate for construction of a 5th Bay at Station 80. Station 80
would be expanded to the south for the new bay.
7/21/2015 - Order approving amendment application & 5th Bay.
1/8/2021 – RG&E filed notice of RARP being placed in service. (Restoration activities still ongoing).
Sent To DPS Staff By: Carol Howland Date: 10/5/2021
DPS Staff Approval By: Date:
Refer to attached project drawings.
33203-200 REM – Station 80 Site Plan; Removal
33203-200 SH 1 – Station 80 Site Plan; Install
1217
+
+
+
+
+
+
+
+
1061
1062
1063
1064
1217
101
N88°19'03"E
1141.05
F
O
U
N
D
R
E
B
A
R
R
G
&
E
C
A
P
I
N
S
I
D
E
1
"
P
I
P
E
D
O
W
N
B
O
X
W
IR
E
F
E
N
C
E
W
IT
H
P
O
S
T
100
N
we
s
100
N
8
8
°
1
9
'0
3
"
E
L
A
N
D
S
N
/F
L
IV
O
N
IA
A
V
O
N
L
A
K
E
V
IL
L
E
R
A
IL
R
O
A
D
T
A
X
M
A
P
P
A
R
C
E
L
N
O
. 1
7
4
.0
4
-
1
-
1
0
.1
109
N88°24'23"E
479.75
N88°25'47"W
462.44
N
2
2
°
2
0
'0
8
"
E
2
8
6
.
3
9
OV
ER
HE
AD
E
LE
CT
RIC
O
N
ST
EE
L B
AS
ES
ROCHESTER PANNELL 2
RP-2
NYPA CIRCUIT
SR1-39B
NYPA CIRCUIT
NR-1
RGE CIRCUIT
40
ROCHESTER PANNELL 1
RP-1
NO. 2, 280 MVA 3Ø
AUTOTRANSFORMER
NO. 3, 420 MVA 3Ø
AUTOTRANSFORMER
NO. 5, 420 MVA 3Ø
AUTOTRANSFORMER
Aø Bø Cø
EXISTING FENCE
EXISTING CABLE TRENCH
B14
B14
C14
C14
++++++++
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
++
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1030
1050
1060
1170
1031
1131
1051
1052
1162
1053
1163
1185
1224
1054
1164
11741184
1025
1125
1055
1165
1175
1187
1056
1166
1186
1057
1167
1028
1058
1168
1188
1049
1059
1169
+
+
+
+
104105
108
110
N
2
2
°
2
0
'0
8
E
5
0
0
.
0
0
S88°19'03"W
1322.59
R
=
5
6
9
6
.
7
0
T
=
2
3
9
.
1
1
L
=
4
7
7
.
9
3
D
E
L
T
A
=
4
°
4
8
'2
5
"
S
2
0
°
2
2
'1
3
"
W2
3
.
5
1
F
O
U
N
D
P
I
P
E
W
O
O
D
C
O
R
N
E
R
P
O
S
T
4
'
T
A
L
L
B
O
X
W
I
R
E
F
E
N
C
E
GA
TE
B
O
X
W
I
R
E
F
E
N
C
E
A
L
O
N
G
L
I
N
E
F
E
N
C
E
F
A
D
E
S
O
U
T
R
R
S
P
I
K
E
4
'
T
A
L
L
B
O
X
F
E
N
C
E
R
A
I
L
R
O
A
D
T
R
A
C
K
S
E
L
E
V
:
5
4
6
.
8
5
N
:
1
1
1
4
3
0
1
.
2
6
E
:
1
3
9
2
3
0
7
.
3
1
OV
ER
HE
AD
E
LE
CT
RIC
ON
S
TE
EL B
AS
ES
R
A
I
L
R
O
A
D
T
R
A
C
K
S
A B C F M1 N PJ K MC1 E
A
6
7
B C F
85'
M1 N PJ
6
7
5 5
4 4
3
2
1
3
2
1
80'
80'
80'
65'
115kV CONTROL
BUILDING
345 kV CONTROL
BUILDING
80'
EXISTING
EXISTING
6" WATER
6" WATER
8""
WA
TE
R
8" W
AT
ER
HYDRANT HYDRANT
MH A
K MC1 E
8 8
345 kV CONTROL
BUILDING
EXISTING
75'
35' 44' 18' 95' 40' 113' 40' 95' 18' 35'
NO. 3, 420 MVA 3Ø
AUTOTRANSFORMER
Cø
44'
Aø Bø
Cø
Aø Bø Cø
Aø Bø Cø
Aø Bø Cø
EXISTING FENCE
Bø
Aø
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
16'16'
34'-6" 20' 20' 22' 22'
16'16'
EXISTING DUCT BANK
20'
20'
37'-6"
37'-6"
37'-6"
10'
40'
40'
40'
40'
40'
40'
40'
40'
37'-6"
+
+
1185
WH
IT
E M
AR
KE
R P
OS
T
E
M
P
I
R
E
S
T
A
T
E
P
I
P
E
L
I
N
E
F
O
U
N
D
R
E
B
A
R
LANDS N/F
SYLVESTER & BETTY ANN DUHART
TAX MAP PARCEL NO. 174.04-1-12.111
50'
EASEMENT
50'
NEW ACCESS ROAD
16'
266'-3"
30'
35'
5
0
'-
4
"
75'
35'
319'
127'-6"
18' 8'12'
127'-11"
18'8' 12' 22' 22' 22' 22'
35'
99'
NEW FENCE
75'
319'
NO. 1, 420 MVA 3Ø
AUTOTRANSFORMER
Aø Bø CøAø Bø Cø
5-0B
5-0B
8"ø WATER
SEE CONSTRUCTION
NOTE 3
SEE CONSTRUCTION
NOTES 1 & 2
5-0C
NO.
DATE:
APP.
CK.
DR. SCALE: FILE:
REV.
BY APP.DATEREV. DESCRIPTION
PE Stamp
AN
SI D
C
AD
D D
raw
ing, D
O N
OT
R
EV
IS
E M
AN
UA
LLY
.
AVANGRID ENGINEERING
CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION
Property of AVANGRID, Inc.
RG&E
STATION: 80
SITEPLAN
SHEET 1 OF 1
33203-200 REM 5-0C
JEP/EPRODTB/EPRODTB/EPRO12/2005
NONE 33203-200 SH 1 REM.DWG
SEE DOCUMENT MANAGEMENT FOR PREVIOUS REVISIONS
3 01/06/2015 RW/UDI INSTALL SPARE TRANSFORMER PMS
4 09/05/2017 MLM/RUE GRTA. STA 80 - AS-BUILT JJT/RUE
Time: 10:35 A.M. Date: 10/5/2018
REFERENCE DRAWINGS:
33203-204 SH.2 345KV PLOT PLAN
33203-205 SH.12, 14 & 15 FOUNDATION PLAN 33203-3217 SH 2
33203-3217 SH 2 PLAN VIEW GENERATOR
THIS DRAWING HAS BEEN DRAWN BY, OR REPRODUCED
FROM, A DRAWING PREPARED BY AN ORGANIZATION
OTHER THAN SARGENT & LUNDY. SARGENT & LUNDY
IS NOT RESPONSIBLE FOR WORK BY OTHER ORGANIZATIONS.
55 EAST MONROE ST., CHICAGO, ILL.
PROJ. No.
PREPAREDREV DATE DESCRIPTION APPROVEDREVIEWED
5-0A 07/31/2020 ISSUED FOR 30% DESIGNSV
JGO KVP
5-0B 02/17/2021 ISSUED FOR 70% DESIGNSV
BLM
--
5-0C 06/11/2021 ISSUED FOR BIDSV
BLM
--
--
NOTES:
1. UNDER NEW YORK STATE EDUCATION LAW ARTICLE 145 (ENGINEERING),
SECTION 7209 (2), IT IS A VIOLATION OF THE LAW FOR ANY PERSON,
UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTER THIS DOCUMENT.
2. DRAWINGS PREPARED UNDER - LICENSED PROFESSIONAL
ENGINEER IN THE STATE OF NEW YORK.
5-0B
CONSTRUCTION NOTES:
1. TEMPORARILY DISCONNECT STRAIN BUS AND THE CORRESPONDING
CONNECTIONS TO THE LOW BUS.
2. RECONNECT EXISTING STRAIN BUS TO THE NEW DEAD END STRUCTURE AND
EXISTING LOW BUS.
3. THE CURRENT PLAN IS TO CUT BACK AND CAP OFF EXISTING WATER PIPE. THIS
PLAN IS CURRENTLY BEING DISCUSSED AND SUBJECT TO CHANGE.
4. ALL WORK DONE BY CONTRACTOR/INSTALLER PURSUANT TO THIS DRAWING
SHALL: (A) CONFORM TO THE GOVERNING CONTRACT DOCUMENTS; (B) BE
PERFORMED EXCLUSIVELY BY ITS TRAINED, COMPETENT PERSONNEL OR,
WHERE PERMITTED, THAT OF ITS SUBCONTRACTOR(S); AND (C) COMPLY WITH
ALL APPLICABLE SAFETY LAWS, REGULATIONS, PROGRAMS AND PRACTICES TO
ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING
THE CONTRACTOR'S/INSTALLER'S PERSONNEL (OR THAT OF ITS
SUBCONTRACTOR(S)) PERFORMING THE WORK.
5. UNDERGROUND OR EMBEDDED UTILITIES [MAY] EXIST WITHIN THE AREA OF AND
ADJACENT TO THE LIMITS OF THE LOCATION OR IDENTIFICATION OF SUCH
UTILITIES HAS NOT BEEN VERIFIED BY OWNER OR BY S&L.
CONTRACTOR/INSTALLER IS RESPONSIBLE FOR FIELD LOCATING AND
IDENTIFYING UNDERGROUND OR EMBEDDED UTILITIES AND ANY OTHER
UNDERGROUND OR EMBEDDED UTILITY DIMENSIONS.
6. REFERENCES USED HAVE BEEN IDENTIFIED ON
EXCAVATION/FOUNDATION/DEMOLITION DRAWINGS AND HAVE BEEN PROVIDED
TO ASSIST THE CONTRACTOR/INSTALLER IN THE FIELD LOCATING EXISTING
UTILITIES AND OTHER POTENTIAL UNDERGROUND OR EMBEDDED
INTERFERENCES. THESE REFERENCES ONLY SHOW THE APPROXIMATE
LOCATION OF POTENTIAL UNDERGROUND OR EMBEDDED UTILITIES AND MAY
NOT INDICATE OR REFLECT ALL EXISTING UNDERGROUND OR EMBEDDED
UTILITIES OR THEIR ACTUAL LOCATIONS.
7. REFERENCES IDENTIFIED SHALL NOT SUBSTITUTE FOR THE
CONTRACTOR'S/INSTALLER'S OBLIGATION TO FIELD LOCATE ANY
UNDERGROUND OR EMBEDDED UTILITIES OR INTERFERENCES THAT MAY
AFFECT THE WORK.
8. DUE CAUTION SHALL BE TAKEN DURING ANY
EXCAVATION/FOUNDATION/DEMOLITION WORK WITHIN THE AREA OF AND
ADJACENT TO THE LIMITS OF THE WORK DUE TO POSSIBLE INTERFERENCES
THAT MAY NOT BE REFLECTED ON THE REFERENCES IDENTIFIED.
DEMOLITION DRAWING
= FIELD TO DISCONNECT AND REMOVE EQUIPMENT
5-0C
1217
+
+
+
+
+
+
+
+
1061
1062
1063
1064
1217
101
N88°19'03"E
1141.05
F
O
U
N
D
R
E
B
A
R
R
G
&
E
C
A
P
I
N
S
I
D
E
1
"
P
I
P
E
D
O
W
N
B
O
X
W
IR
E
F
E
N
C
E
W
IT
H
P
O
S
T
100
N
we
s
100
N
8
8
°
1
9
'0
3
"
E
L
A
N
D
S
N
/F
L
IV
O
N
IA
A
V
O
N
L
A
K
E
V
IL
L
E
R
A
IL
R
O
A
D
T
A
X
M
A
P
P
A
R
C
E
L
N
O
. 1
7
4
.0
4
-
1
-
1
0
.1
109
N88°24'23"E
479.75
N88°25'47"W
462.44
N
2
2
°
2
0
'0
8
"
E
2
8
6
.
3
9
OV
ER
HE
AD
E
LE
CT
RIC
O
N
ST
EE
L B
AS
ES
ROCHESTER PANNELL 2
RP-2
NYPA CIRCUIT
SR1-39B
NYPA CIRCUIT
NR-1
RGE CIRCUIT
40
ROCHESTER PANNELL 1
RP-1
NO. 2, 280 MVA 3Ø
AUTOTRANSFORMER
NO. 3, 420 MVA 3Ø
AUTOTRANSFORMER
NO. 5, 420 MVA 3Ø
AUTOTRANSFORMER
Aø Bø Cø
EXISTING FENCE
EXISTING CABLE TRENCH
B14
B14
C14
C14
++++++++
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
++
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
+
1030
1050
1060
1170
1031
1131
1051
1052
1162
1053
1163
1185
1224
1054
1164
11741184
1025
1125
1055
1165
1175
1187
1056
1166
1186
1057
1167
1028
1058
1168
1188
1049
1059
1169
+
+
+
+
104105
108
110
N
2
2
°
2
0
'0
8
E
5
0
0
.
0
0
S88°19'03"W
1322.59
R
=
5
6
9
6
.
7
0
T
=
2
3
9
.
1
1
L
=
4
7
7
.
9
3
D
E
L
T
A
=
4
°
4
8
'2
5
"
S
2
0
°
2
2
'1
3
"
W2
3
.
5
1
F
O
U
N
D
P
I
P
E
W
O
O
D
C
O
R
N
E
R
P
O
S
T
4
'
T
A
L
L
B
O
X
W
I
R
E
F
E
N
C
E
GA
TE
B
O
X
W
I
R
E
F
E
N
C
E
A
L
O
N
G
L
I
N
E
F
E
N
C
E
F
A
D
E
S
O
U
T
R
R
S
P
I
K
E
4
'
T
A
L
L
B
O
X
F
E
N
C
E
R
A
I
L
R
O
A
D
T
R
A
C
K
S
E
L
E
V
:
5
4
6
.
8
5
N
:
1
1
1
4
3
0
1
.
2
6
E
:
1
3
9
2
3
0
7
.
3
1
OV
ER
HE
AD
E
LE
CT
RIC
ON
S
TE
EL B
AS
ES
R
A
I
L
R
O
A
D
T
R
A
C
K
S
A B C F M1 N PJ K MC1 E
A
6
7
B C F
85'
M1 N PJ
6
7
5 5
4 4
3
2
1
3
2
1
80'
80'
80'
65'
115kV CONTROL
BUILDING
345 kV CONTROL
BUILDING
80'
EXISTING
EXISTING
6" WATER
6" WATER
8""
WA
TE
R
8" W
AT
ER
HYDRANT HYDRANT
MH A
K MC1 E
8 8
345 kV CONTROL
BUILDING
EXISTING
75'
35' 44' 18' 95' 40' 113' 40' 95' 18' 35'
NO. 3, 420 MVA 3Ø
AUTOTRANSFORMER
Cø
44'
Aø Bø
Cø
Aø Bø Cø
Aø Bø Cø
Aø Bø Cø
EXISTING FENCE
Bø
Aø
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
AC
CE
SS
R
OA
D
16'16'
34'-6" 20' 20' 22' 22'
16'16'
EXISTING DUCT BANK
20'
20'
37'-6"
37'-6"
37'-6"
10'
40'
40'
40'
40'
40'
40'
37'-6"
+
+
1185
WH
IT
E M
AR
KE
R P
OS
T
E
M
P
I
R
E
S
T
A
T
E
P
I
P
E
L
I
N
E
F
O
U
N
D
R
E
B
A
R
LANDS N/F
SYLVESTER & BETTY ANN DUHART
TAX MAP PARCEL NO. 174.04-1-12.111
50'
EASEMENT
50'
NEW ACCESS ROAD
16'
266'-3"
30'
19'
5
0
'-
4
"
75'
35'
319'
127'-6"
18' 8'12'
127'-11"
18'8' 12'
22'
22' 22' 22'
35'
99'
NEW FENCE
75'
319'
NO. 1, 420 MVA 3Ø
AUTOTRANSFORMER
Aø Bø CøAø Bø Cø
30'-0"
5
0
'-
0
"
28'-0"
16'-0"
10'
DEADEND
345KV
5-0B 22'-0"
7'
HYA
MYA
TYA
LYA
SYA
HOLD
Aø Bø Cø
8"ø WATER
SEE CONSTRUCTION
NOTE 3
SEE CONSTRUCTION
NOTES 1 & 2
8"ø WATER
SEE CONSTRUCTION
NOTE 3
5-0C
5-0C
NO.
DATE:
APP.
CK.
DR. SCALE: FILE:
REV.
BY APP.DATEREV. DESCRIPTION
PE Stamp
AN
SI D
C
AD
D D
raw
ing, D
O N
OT
R
EV
IS
E M
AN
UA
LLY
.
AVANGRID ENGINEERING
CONFIDENTIAL, PROPRIETARY and TRADE SECRET INFORMATION
Property of AVANGRID, Inc.
RG&E
STATION: 80
SITEPLAN
SHEET 1 OF 1
33203-200 5-0C
JEP/EPRODTB/EPRODTB/EPRO12/2005
NONE 33203-200 SH 1.DWG
SEE DOCUMENT MANAGEMENT FOR PREVIOUS REVISIONS
3 01/06/2015 RW/UDI INSTALL SPARE TRANSFORMER PMS
4 09/05/2017 MLM/RUE GRTA. STA 80 - AS-BUILT JJT/RUE
Time: 10:35 A.M. Date: 10/5/2018
REFERENCE DRAWINGS:
33203-204 SH.2 345KV PLOT PLAN
33203-205 SH.12, 14 & 15 FOUNDATION PLAN 33203-3217 SH 2
33203-3217 SH 2 PLAN VIEW GENERATOR
NOTES:
1. UNDER NEW YORK STATE EDUCATION LAW ARTICLE 145 (ENGINEERING),
SECTION 7209 (2), IT IS A VIOLATION OF THE LAW FOR ANY PERSON,
UNLESS ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTER THIS DOCUMENT.
2. DRAWINGS PREPARED UNDER - LICENSED PROFESSIONAL
ENGINEER IN THE STATE OF NEW YORK.
5-0B
HOLD NOTES:
1. HOLD PENDING VENDOR DRAWINGS.
LEGEND:
- DENOTES BILL OF MATERIAL (BOM) CALL OUTS, SEE DWG. 11159-306 SH2
XXX
CONSTRUCTION NOTES:
1. TEMPORARILY DISCONNECT STRAIN BUS AND THE CORRESPONDING
CONNECTIONS TO THE LOW BUS.
2. RECONNECT EXISTING STRAIN BUS TO THE NEW DEAD END STRUCTURE AND
EXISTING LOW BUS.
3. THE CURRENT PLAN IS TO CUT BACK AND CAP OFF EXISTING WATER PIPE. THIS
PLAN IS CURRENTLY BEING DISCUSSED AND SUBJECT TO CHANGE.
4. ALL WORK DONE BY CONTRACTOR/INSTALLER PURSUANT TO THIS DRAWING
SHALL: (A) CONFORM TO THE GOVERNING CONTRACT DOCUMENTS; (B) BE
PERFORMED EXCLUSIVELY BY ITS TRAINED, COMPETENT PERSONNEL OR,
WHERE PERMITTED, THAT OF ITS SUBCONTRACTOR(S); AND (C) COMPLY WITH
ALL APPLICABLE SAFETY LAWS, REGULATIONS, PROGRAMS AND PRACTICES TO
ENSURE THE SAFETY OF ALL PEOPLE LOCATED ON THE WORK SITE, INCLUDING
THE CONTRACTOR'S/INSTALLER'S PERSONNEL (OR THAT OF ITS
SUBCONTRACTOR(S)) PERFORMING THE WORK.
5. UNDERGROUND OR EMBEDDED UTILITIES [MAY] EXIST WITHIN THE AREA OF AND
ADJACENT TO THE LIMITS OF THE LOCATION OR IDENTIFICATION OF SUCH
UTILITIES HAS NOT BEEN VERIFIED BY OWNER OR BY S&L.
CONTRACTOR/INSTALLER IS RESPONSIBLE FOR FIELD LOCATING AND
IDENTIFYING UNDERGROUND OR EMBEDDED UTILITIES AND ANY OTHER
UNDERGROUND OR EMBEDDED UTILITY DIMENSIONS.
6. REFERENCES USED HAVE BEEN IDENTIFIED ON
EXCAVATION/FOUNDATION/DEMOLITION DRAWINGS AND HAVE BEEN PROVIDED
TO ASSIST THE CONTRACTOR/INSTALLER IN THE FIELD LOCATING EXISTING
UTILITIES AND OTHER POTENTIAL UNDERGROUND OR EMBEDDED
INTERFERENCES. THESE REFERENCES ONLY SHOW THE APPROXIMATE
LOCATION OF POTENTIAL UNDERGROUND OR EMBEDDED UTILITIES AND MAY
NOT INDICATE OR REFLECT ALL EXISTING UNDERGROUND OR EMBEDDED
UTILITIES OR THEIR ACTUAL LOCATIONS.
7. REFERENCES IDENTIFIED SHALL NOT SUBSTITUTE FOR THE
CONTRACTOR'S/INSTALLER'S OBLIGATION TO FIELD LOCATE ANY
UNDERGROUND OR EMBEDDED UTILITIES OR INTERFERENCES THAT MAY
AFFECT THE WORK.
8. DUE CAUTION SHALL BE TAKEN DURING ANY
EXCAVATION/FOUNDATION/DEMOLITION WORK WITHIN THE AREA OF AND
ADJACENT TO THE LIMITS OF THE WORK DUE TO POSSIBLE INTERFERENCES
THAT MAY NOT BE REFLECTED ON THE REFERENCES IDENTIFIED.
THIS DRAWING HAS BEEN DRAWN BY, OR REPRODUCED
FROM, A DRAWING PREPARED BY AN ORGANIZATION
OTHER THAN SARGENT & LUNDY. SARGENT & LUNDY
IS NOT RESPONSIBLE FOR WORK BY OTHER ORGANIZATIONS.
55 EAST MONROE ST., CHICAGO, ILL.
PROJ. No.
PREPAREDREV DATE DESCRIPTION APPROVEDREVIEWED
5-0A 07/31/2020 ISSUED FOR 30% DESIGNSV
JGO KVP
5-0B 02/17/2021 ISSUED FOR 70% DESIGNSV
BLM
--
5-0C 06/11/2021 ISSUED FOR BIDSV
BLM
--
--
5-0C