Statistical Quality Control

بسمه تعالي

2

V. Baradaran 2011

3

•SPC

•Minitab

V. Baradaran 2011

4

3

V. Baradaran 2011

5

• Juran: Quality is fitness for use.

• Crosby: quality is conformance to requirements

• Deming: Quality is present and future needs of

the customer.

• Quality means delighting the customer.

V. Baradaran 2011

6

4

V. Baradaran 2011

7

•–

V. Baradaran 2011

8

Inspection

Quality Control

Quality Assurance

TQM Total Quality Management

Six Sigma

Zero DefectInspection

QC

QA

TQM

5

V. Baradaran 2011

9

•Statistical Quality Control

V. Baradaran 2011

10

Statistical Methods in Q.C.

•Statistical process control (SPC)––

–OnLine

•Designed experiments (DOE)–

–OffLine

•Acceptance Sampling–

SQC

Statistical Quality Control

SPC Acceptance Sampling DOE

6

V. Baradaran 2011

11

DOE Acceptance

Sampling

SPC

What is SPC?Statistical Process Control

SQC

V. Baradaran 2011

12

SQCStatistical Process Control

AcceptanceSampling Process

Control

Design OfExperiment

0

100

7

V. Baradaran 2011

13

V. Baradaran 2011

14

8

V. Baradaran 2011

15

V. Baradaran 2011

16

9

V. Baradaran 2011

17

SIPOC

•Supplier

•Input

•Process steps

•Resource

•Output

OutputsProcess

SIPOCS

U

P

P

L

I

E

R

S

C

U

S

T

O

M

E

R

S

Inputs

V. Baradaran 2011

د ن ي :آ موز ش ف رآ

start

هاي از ن ي ي اساي ن ش

ي موز ش آ

ه اج ي ن ا آحن ي آ ي ش موز آزي دوزه هاي آ رگ ر ب

ود دآزد؟ وج

ي ش موز سه سطح آ اي مق

ي ش موز هاي آ

از ن ا ي ان ي کازکن

رآت ف ر آساش ن ي ب ش موز امه آ ري ن ب دوي ي

ي ش موز ع آ ي مرآج اساي ن ش

د ف رآزدآد عق

ش موز رآي آ آج

ي ش ج رب ش آب ج

شن

آزي رگ ر ه ب اج ي ن ا آحن ي آ ود موز ش وج دد آ مج

دآزد؟

ق گ هدآزي سوآن ي

End

No

Yes

Yes

No

11

V. Baradaran 2011

V. Baradaran 2011

SIPOC

ان دگ ن ن کن امي ي وزودي ها د ن رآي ف ان ري ت مس

ام 1گ

ي ها روج ج

ام 2گ ام 3گ ام 4گ

See Below

ام 5گ

12

V. Baradaran 2011

V. Baradaran 2011

13

V. Baradaran 2011

بسته بندي و مونتاژ

Bluing Fitting Tightening Packaging Leak TestQA

Release

Suppliers:سازنده‌هاي‌•

(خارجي-داخلي)سوپاپ-داخلي)سازنده‌هاي‌بدنه•

(خارجيتامين‌كنندگان‌مواد‌‌‌‌‌•

بسته‌بنديبرنامه‌ريزي‌خريد•برنامه‌ريزي‌توليد•

Inputs:سوپاپ•بدنه•مواد‌بسته‌بندي•برنامه‌توليد•

Outputs:سوپاپ‌هاي‌توليد‌•

شده‌يا‌بسته‌بندي‌شده

گزارش‌مواد‌مصرفي•گزارشات‌تست‌•

محصول

Customers:(داخلي)انبار•مصرف‌كننده‌•

(خارجي)نهاييبرنامه‌ريزي‌توليد•خريد•تضمين‌كيفيت•

PROCCESS

V. Baradaran 2011

26

ن دز ،آي دزوش ن ي هف رآ ان لحاظ ي ري رزشي موزدهادآدهوآطلاعات ج ردف رآزب گ ت .من

رآي ادهب ق ن آز آشت لموآزدمدلآي ي ي زآد ست اي ردزي ظ

ت ن :گ رف

دآ • صدومن ان مق ري صهادآدهج

خ مش

ود ش .مي

ه• دآ هاکلن صدهاومن دمق ن وآي ت ،من صي

خ ش

،وآحد مان عساز ي مرآج ازج د...وخ ن اش ت کهي عالن اصي ف امآطلاعات /دآدهزوي زآخ ح دآب دهن .من

هت • مآز زشمج لعلائ ي ادهد ق گ رددآشت :من

ان • ري هج کظرف آطلاعات /دآدهي

ان • ري هج آطلاعات /دآدهدوطرف

ت گ ره• عالن ول/ف مست

ول ام مست ي

ت عالن ام ف ي

DFD

14

V. Baradaran 2011

DFD

V. Baradaran 2011

15

V. Baradaran 2011

Turtle Diagram

Process

With What?(Materials/Equipment)

With Who?(Competence/Skills/

Training)

Input Output

How?(Methods/Procedure/

Techniques)

Key Criteria?(Measurement/

Assessment)

V. Baradaran 2011

الگوريتم

فرآيند

بهره وري

و

تعميرات

استفاده بهينه از-1

تاسيسسات گاز

PMاجراي سيستم -2

GWA-QR/GPD-02-01GWA-QR/GPD-07-01GWA-QR/GPD-08-01GWA-QR/GPD-10-01GWA-QR/GPD-11-01GWA-QR/GPD-12-01

برنامه تعميراتي و گزارشهاي -1

مربوطه

تحويل گرفتن شبکه-2

ثبت گزارشات حفاظت -3

کاتدي و ارسال به بازرسي

واحدهاسايروامدادواحدازشبکهتعميراتانجامدرخواست-1

اجراواحدازگرماتصالعملياتانجامجهتگازقطع-2

اجراواحدازگازتزريقعملياتانجام-3

تعميراتانجاموهاايستگاهبررسي-4

اجراومهندسيازجديدهايشبکهويزيتسايتانجام-5

وفنيبازرسيکاتديحفاظتگزارشهايارائهوبازديدانجام-6

ايمني

ابزار آالت اندازه گيري و کنترل-1

کامپيوتر-2

وسايل نقليه موتوري-3

دستگاه هاي آزمايش و جوشکاري-4

نرم افزار تعميرات-5

پرسنل متخصص تعميرات و نگهداري-1

پرسنل متخصص فني و ايمني-2

نيروهاي امدادي-3

ISO9001:2000استاندارد •

ISO14001:2004استاندارد •

OHSAS18001:1999استاندارد •

روشها و دستورالعملهاي نگهداري و تعميرات•

دستورالعملهاي نگهداري و تعميرات•

اسنادو

سوابق

ورودي خروجي

16

V. Baradaran 2011

Octopus model

V. Baradaran 2011

Input

Output

17

V. Baradaran 2011

33

Operation

Process

Chart

V. Baradaran 2011

34

Statistical Methods in Q.C.

18

V. Baradaran 2011

35

Y1

Y2

Y3

Y4

Y5

V. Baradaran 2011

36

19

V. Baradaran 2011

37

SPC

Statistical Process Control

•SPC

V. Baradaran 2011

38

SPC

9mm<Y1<10mm

0<Y2<3

9.2<Y3<10.2

10pas<Y4

Y5>5KM

20

V. Baradaran 2011

39

V. Baradaran 2011

40

•.

21

V. Baradaran 2011

41

•ab

0 1X=

a=0.1 b=0.6

1

V. Baradaran 2011

42

22

V. Baradaran 2011

43

6,5,4,3,2,16

1)( xxP

0

0.05

0.1

0.15

0.2

1 2 3 4 5 6

V. Baradaran 2011

44

The seven major tools are1) Histogram or Stem and Leaf plot

2) Check Sheet

3) Pareto Chart

4) Cause and Effect Diagram

5) Defect Concentration Diagram

6) Scatter Diagram

7) Control Chart

23

V. Baradaran 2011

45

V. Baradaran 2011

46

24

V. Baradaran 2011

47

Histogram

for discrete

data

V. Baradaran 2011

48

•Minitab

•Minitab

25

V. Baradaran 2011

49

•SPC

–Stratification

Check Sheet

V. Baradaran 2011

50

.1

.2

.3

.4

.5

.6

.7

Check Sheet

26

V. Baradaran 2011

51

V. Baradaran 2011

52

27

V. Baradaran 2011

53

Check Sheet

V. Baradaran 2011

54

28

V. Baradaran 2011

55

Pareto Diagram

V. Baradaran 2011

56

•PVC

C1

C2

pvcC3

C4

C5

pvcC6

C7OthersC3C7C4C1C2

20 20 25 55 55470

3.1 3.1 3.9 8.5 8.572.9

100.0 96.9 93.8 89.9 81.4 72.9

600

500

400

300

200

100

0

100

80

60

40

20

0

Defect

Count

Percent

Cum %

Perc

en

t

SU

M

Pareto Chart for C1

/

29

V. Baradaran 2011

57

تعداد رخ دادعمليات دوباره کاري جهت رفعدرجه رضايتمندي مشتريپارامتر کيفي

400(تومان10000)ضايعات (20)نياز اساسي پارگي

5(تومان1000)جوشکاري، سنگ زني،سابو سنباده زدن (5)نياز عملکردي نک

180(تومان2000)صافکاري (15)نياز اساسي چروک

175(تومان2000)صافکاري (5)نياز عملکرديموج

10(تومان500)سنباده زدن (5)نياز عملکردي خط و خش

75(تومان2500)صافکاري و ساب زني (5)نياز عملکردي نيش قري

4( تومان750) سوهان کشي صافکاري و ساب زني (5)نيازعملکردي شکست

82(تومان800)صافکاري (5)نياز عملکردي جابجايي خطوط

50(تومان120)ساب زني (5)نياز عملکردي داغي

7(تومان2000)صافکاري و ساب زني (5)نياز عملکردي شوک الين

210(تومان2000)صافکاري و ساب زني (5)نياز عملکردي برآمدگي و فرورفتگي

2(تومان10000)ضايعات (20)نياز اساسي کامل نبودن فرم و عمل کشش

V. Baradaran 2011

58

Co

un

t

Pe

rce

nt

Dfective

Count 344

Percent 25.3 15.5 14.9 13.4 10.8 5.6 5.4 4.5

1896

4.6

Cum % 25.3 40.8 55.7 69.1 79.9 85.5 90.9 95.4

1160

100.0

1120 1001 810 418 406 338

Othe

rne

k

nish

gho

ri

paregi

jabe

jaie

bar a

mad

edi v

a forofafte

gi

khat va kh

ash

moj

chorok

8000

7000

6000

5000

4000

3000

2000

1000

0

100

80

60

40

20

0

pareto chart2

Co

un

t

Pe

rce

nt

Dfective

Count

Percent 30.8 22.3 13.4 12.4 7.3 6.8 4.7 2.3

Cum %

382

30.8 53.1 66.5 78.9 86.2 93.0 97.7 100.0

276 166 154 90 84 58 29

Other

dagh

i

nish

gho

ri

jabe

jaie

moj

chor

ok

bar a

mad

edi v

a foro

fafte

gi

khat va kh

ash

1400

1200

1000

800

600

400

200

0

100

80

60

40

20

0

pareto chart 1

30

V. Baradaran 2011

59

V. Baradaran 2011

60

•Minitab

31

V. Baradaran 2011

61

•Fish BoneCause and Effect

•4MManpowerMaterial

MethodsMachine

V. Baradaran 2011

62

مشكل مورد نظر

مواد اوليه

تغيير در مواد اوليه

موادخالصينا

همگن نبودن مواد

نيروي انساني

كمي آموزش

خستگي كارگر

تغيير كارگر

كاهش مهارت

يتغيير در وسائل اندازه گير

وسائل اندازه گيري

خراب شدن وسائل

كاليبره نبودن

ماشينهاي قديمي

كم يا زياد شدن سرعت

از بين رفتن ابزار

تغير در روشها

روشهاي قديمي نور

روز و شب

رطوبت

دما

32

V. Baradaran 2011

63

V. Baradaran 2011

64

chorok va

moj

method

Environment

personnel

material

ghaleb

machines

tonazhe koshin

tonazhe eslay d

tanzime gey jha

tanzime gey jha

tanzime gazpad

tanzime koshin

tanzime gey jha

tamiziy e ghaleb

farsodegi

polish

ghoriy e v aragh

zang zadegi

bargashte labe

tole bad az tirim

mizane khoshki

jense v aragh

pilise

deghat dar tanzimev aragh

ghad

ghad

niro

nor

gardo ghobar

shift

zamane tolid

amare tolid

sorae tolid

Cause-and-Effect Diagram

33

V. Baradaran 2011

65

V. Baradaran 2011

66

34

V. Baradaran 2011

67

•Minitab

V. Baradaran 2011

68

Defect Concentration Diagram

35

V. Baradaran 2011

69

V. Baradaran 2011

70

36

V. Baradaran 2011

71

V. Baradaran 2011

72

37

V. Baradaran 2011

73

Scatter Plot

•(Scatter Diagram)

•YXYX

•YXYX

•XY

XY

V. Baradaran 2011

74

الگوهاي مختلف نمودار پراكندگي

38

V. Baradaran 2011

75

•YX

V. Baradaran 2011

76

•Minitab

39

V. Baradaran 2008

V. Baradaran 2011

78

Introduction to Control

charts

40

V. Baradaran 2011

79

V. Baradaran 2011

80

41

V. Baradaran 2011

81

V. Baradaran 2011

82

42

V. Baradaran 2011

83

•Chance causesCommon Causes

–Background Noise

•Special CausesAssignable Causes

V. Baradaran 2011

84

9mm<Y1<10mm

0<Y2<3

9.2<Y3<10.2

10pas<Y4

Y5>5KM

43

V. Baradaran 2011

85

TIME

A

B

C

D

USL=10

LSL=9

Y1=9.5

V. Baradaran 2011

86

TIME

A

B

C

D

USL=10

LSL=9

Y1=9.5

B

C

A

44

V. Baradaran 2011

87

TIME

A

B

C

D

USL=10

LSL=9

B

A

V. Baradaran 2011

88

45

V. Baradaran 2011

89

The eventual goal of SPC is reduction or elimination of

variability in the process by identification of assignable causes.

V. Baradaran 2011

90

!!!.

8:00 8:30

46

V. Baradaran 2011

91

8:00 10:00 10:208:30

V. Baradaran 2011

92

47

V. Baradaran 2011

93

V. Baradaran 2011

94

Out of Control Action Plan (OCAP)

48

V. Baradaran 2011

95

V. Baradaran 2011

96

•3

LCL UCL

x3x3

X

49

V. Baradaran 2011

97

•Variables Control Charts

•Attributes Control Charts

V. Baradaran 2011

98

50

V. Baradaran 2011

99

•L

WW

W

WW

LLCL

LineCenter

LUCL

W

W

V. Baradaran 2011

100

51

V. Baradaran 2011

101

V. Baradaran 2011

102

WLineCenter

WWLCL 3

WWUCL 3

WWUCL 2

WWLCL 2

L=3

52

V. Baradaran 2011

103

V. Baradaran 2011

104

Sample Size and Sampling Frequency

53

V. Baradaran 2011

105

•Rational Subgroup

V. Baradaran 2011

106

54

V. Baradaran 2011

107

10

Solid circles

representsubgroupaverage

XXXXXX XXXXXX XXXXXX XXX . . .

9:00

9:00a.m. 10:00 11:00 12:00 1:00

Process

Sample data

9:30 10:00 :30

Subgroups

V. Baradaran 2011

108

Rational Subgroup

55

V. Baradaran 2011

109

Rational Subgroup

V. Baradaran 2011

110

واخده در اگر نقاط واقعا به صورت تصادفي باشند آنگاه بايدد انتظدار داشده بده يدور يكن•.داخل حدود كنترل توزيع شده اند

دنباله -1يک سلسله از مشاهدات يكسان را دنباله نامند.وندنقايي كه از روند صعودي برخوردارند يک دنباله به سمه باال ناميده مي ش.وندنقايي كه از روند نزولي برخوردارند يک دنباله به سمه پايين ناميده مي ش.

قسدي عالوه بر دنباله مشاهدات به دو دسته مشاهدات باالي خط مركز و پايين خط مركز ت.مي شوند

خيلي ك خواهد بود بنابراين هر 8در يک نمونه تصادفي احتمال ايجاد يک دنباله به يول . يا بيشتر بيانگر حاله خارج از كنترل مي باشد8گونه دنباله به يول

56

V. Baradaran 2011

111

•Pattern is very nonrandom in appearance

• 19 of 25 points plot below the center line, while only 6 plot

above

• Following 4th point, 5 points in a row increase in magnitude, a

run up

• There is also an unusually long run down beginning with 18th

point

V. Baradaran 2011

112

قوانين وسترن الكتريک( 1956)قوانين براي شناسايي روندهاي غيرتصادفي در نمودارهاي كنترل در كتاب راهنماي وسترن الکتريک

انحراف معيار3يک نقطه خارج از حدود -1

دو نقطه از سه نقطه متوالي خارج از حدود هشدار دو انحراف معيار-2

نقطه متوالي خارج از حدود يک انحراف معيار5چهار نقطه از -3

نقطه متوالي در يک يرف خط مركز8رس -4

:توجه استفاده از قوانين در هر زمانفقط در يک سمه خط مركز

57

V. Baradaran 2011

113

ش مي گرچه استفاده از چندين قانون به طور همزمان حساسيت نمودار كنترل را افزاي: نکته .دهد ولي ميزان زنگ خطر اشتباهي نيز افزايش مي يابد

V. Baradaran 2011

114

: يرفتار سيکلي يا دوره ا

گربيانمعموالروندهااينگونهقبيلازمشكالتيبروز

جهدرافزايشاپراتور،خستگي.باشندميفرآينددرحرارت

58

V. Baradaran 2011

115

V. Baradaran 2011

116

59

V. Baradaran 2011

117

V. Baradaran 2011

118

60

V. Baradaran 2011

119

V. Baradaran 2011

120

61

V. Baradaran 2011

121

فاز 1

2فاز

Phase I is a retrospective

analysis of process data to

construct trial control limits

In phase II, the control

chart is used to monitor

the process