stephen burke-design portfolio 2015
Post on 18-Aug-2015
29 Views
Preview:
TRANSCRIPT
stephen burke: residential interior design
stephen burke - design portfolioresidential interior design
m. +44 7523 128254e. stephenburke555@gmail.com
stephen burke: residential interior design
CHRISTCHURCH – NEW ZEALAND THE GRANGE
FORMAL DINING: BEFORE AND AFTER
GUEST BEDROOM INFORMAL DINING
CONSERVATORY
ARCHITECTURAL FEATURES
FORMAL LIVING
CLIENT: MELBOURNE, AUSTRALIALATE 1800’s NEW ZEALAND COLONIAL HOMESTEAD
• Returning the homestead to its former glory: Extensive Exterior and Interior renovations including the modernisation of plumbing and general services to offer modern family living• Traditional elements maintained and further incorporated• Furniture,lightingandfinsheschosentoreflectthearchitectural period of the home• Naturalfinishesandtexturesareusedthroughout• A monochromatic base colour scheme with accents of reds and greens
stephen burke: residential interior design
CONTRACTORS PLEASE NOTE:
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
C:\Users\stephen\Documents\F+B Documents\Foster & Burke Logo.JPG
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
foster and burke interior design45/71 VICTORIA STREETPOTTS POINTNSW 2011M. 0404948585E. stephen@fosterburke.com
This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
CLIENT NAME AND ADDRESS
LEGEND:
11122013
STEPHEN BURKE
1:50 @ A3
LASH
LAURIE LASHUNIT 437 BENNELONG APARTMENTSCIRCULAR QUAYSYDNEYNSW 2000
FURNITURE FLOOR PLAN
DATE REV11.12.2012 PRELIMINARY ISSUE:
FURNITURE PLAN20.12.2012
11.01.2013
15.01.2013
MODULAR SOFA, OFFICE FURN,+ 2ND BDRM FURN CHOSEN
RUGS AND SIZE OF RUGSDECIDED ONSTORAGE UNIT CHOSEN
15.01.2013 BEDSIDE UNITS CHOSEN
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
SYDNEY – AUSTRALIA CIRCULAR QUAY
LIVING ROOM LIGHTING, FABRICS AND FURNITURE
DINING ROOM FURNITURE
CLIENT: SYDNEY, AUSTRALIARESIDENCE: RENTED QUAY SIDE APARTMENT
• Seeking a sophisticated, yet feminine interior• Italian designed furniture and lighting pieces chosen for their unique design elements• The colour base is predominantly neutral. individuality is given using pops of purple, magenta and complimentary green
stephen burke: residential interior design
SYDNEY – AUSTRALIA CIRCULAR QUAY
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
OPT
ION
1.
OPT
ION
2.
FINISHED SHELF IN SITUE
BEDROOM LIGHTING AND FURNITURE
COLOUR PALETTE AND ARTWORK
OFFICE LIGHTING ABD FURNITURE
WORKING DRAWINGS: BESPOKE BALCONY SHELF
My client asked me to design a small shelf for her balcony. The requirements were that it should only be big enough to hold a wine glass/whiskey tumbler or two and that it be dis-creet to the point of being invisible to passers by below. it also had to be removeable.Myfirstdesign‘Option1’waswithdrawnonthebasisitwasunsafeforpeoplebelow,asnoted by the joiners concerns:
“I have reservations about doing a job like this, as the reason the balcony rails have a cir-cular or oval section, is to prevent people from putting things such as wine botttles etc. on them, as this represents a significant hazard to people below”
Onthisbasis,Iredesignedtheshelf‘Option2’toincorporateatoughenedclearglassbackthat would prevent items falling. It is now in Situe.
stephen burke: residential interior design
QUEENSTOWN – NEW ZEALAND QT HAUS
EXTERIOR ASPECTS
HOME THEATRE
DINING AND LIVING
KITCHEN AND DINING
CLIENT: SYDNEY, AUSTRALIAHOLIDAY HOME FOR FAMILY SKIING HOLIDAYS
• Open plan living designed to have a relaxed, holiday atmosphere that is maintainance free• Pared back interior using simple design elemnets so as not to overly detract from the spectacular lake and mountain views• Amoderncontemporarydesignthatisinfluencedby scandinavian design elements• Organic:Naturalfinishes,coloursandtextures• Editorial: Featured in NZ Trends magazine
stephen burke: residential interior design
SINGAPORE PRIVATE RESIDENCE
DINING ROOM MIRROR: SECONDARY MIRROR FRAME
NEW ENTRY SLIDING SCREENS
FORMAL DINING ROOM LIGHTING AND FURNITURE
ENTRANCE LIGHTING AND FURNITURE
INFORMAL DINING ROOM FURNITURE
CLIENT: ENGLISH EXPAT AND FAMILYCONTEMPORARY CONCRETE AND GLASS RESIDENCE
• Throughtheuseofcolour,texturesandfinishes, change the feel of the home from utilitarian to a space conducive to family living• Specify a mix of contemporary and rustic furniture to work with existing furniture pieces• Choose art works and feature lighting to add character to the living and dining areas
stephen burke: residential interior design
SINGAPORE PRIVATE RESIDENCE
SIDETABLE
FLOORLAMP
SIDETABLE
CHAIR
CO
NS
OLE
1800
x500
LOUNGECHAIR
LOUNGECHAIR
COFFEETABLE
3 SEATERSOFASIDE
TABLE
SIDETABLES 3 SEATER
SOFA
AU
DIO
/VIS
UA
L P
LATF
OR
M
CHAMPAGNESIDE TABLE
BUILT-IN JOINERY
Date Amendment Rev
Preliminary issue -3x 3 Seater Sofa Layout Options
CONTRACTORS PLEASE NOTE:This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
LEGEND:
04062014
FURNITURE LAYOUT
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
foster and burke interior designStephen BurkeM. 0403 759 214E. stephen@fosterburke.com
CLIENT NAME AND ADDRESS
04-06-2014
STEPHEN BURKE
NOT SCALED
HICKMAN
Paul and April Hickman12 Queen Astrid GardensSingapore
C:\Users\stephen\Documents\F+B Documents\LOGOS\fb logo.JPG
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
LIVING ROOM LIGHTING AND FURNITURE
stephen burke: residential interior design
SYDNEY – AUSTRALIA POTTS POINT TERRACE
DINING AREA: BEFORE AND AFTER
LIVING ROOM
CLIENT: SYDNEYCONVERTED APARTMENT
• Specify specialised colour scheme for colour blind client: discuss client colour needs and choose a colour palette that is both harmonious and readable• Furniture to be modern classics or of a contemporary design• Specify modern feature lighting
stephen burke: residential interior design
QUEENSTOWN – NEW ZEALAND 21 MATHIAS TERRACE
HAND SKETCH: BATHROOM ARTIST: HOPE GIBBONS
EXTERIOR ASPECTS
KITCHENLIVING AND DINING
STEPHEN BURKE AND JEAN FOSTER IN ASSOCIATION WITH JUST BUILD ITCOLLABORATION: SPEC HOME-BUILD AND FIT-OUT
• Style: contemporary country with European elements• Furniture, fabrics and accessories chosen to echo the clean architectural lines and the monochromatic colour scheme• Design outcome: a simple design that emphasises clean lines, comfortable living with an added sense of luxury• Editorial: Featured in NZ Trends magazine
stephen burke: residential interior design
QUEENSTOWN – NEW ZEALAND THE LORDENS
OFFICE: FLOOR PLAN FOR JOINERY - SCALE: 1:50 @ A3
BOOKCASE
OVER DESKCUPBOARDS
FREE STANDINGDESK :ADJUSTABLEHEIGHT
W1
W2W4
W3
FIXED HEIGHT DESK
VOID
UNDER-DESKDRAWERS
UNDER-DESK HANGINGA4 FILING CABINETS
FREE STANDINGDESK - ADJUSTABLEHEIGHT
700
40
740
PAUL'S OFFICE: ELEVATION W3AMENDMENT D: 03062012 SCALE 1:50 @ A3
40
350
20
350
40
1560
800
800
420
OFFICE: ELEVATION W1 - SCALE 1:50 @ A3
FIXED SHELF
DESK
VENEEREDBACK PANEL
BULKHEAD TO MATCHWALL COLOUR
MOVE ELECTRICALFROM INSIDE WALL TOOUTSIDE HALLWAY WALL
OVER DESKCUPBOARDS
VENEEREDPANELING
BOOKCASEADJUSTABLESHELVES
740
OFFICE: ELEVATION W4 - SCALE 1:50 @ A3
HANGING A4 FILINGCABINETS 4 DRAWERS82
0800
2360
40
425
40
425
40
425
40
425
40
425
40
320
40305
305
90
40 530 530 40 530 530 40 530 530 40
3660
BULKHEADTO MATCHWALL COLOUR
VENEERED PANEL1400mm FROM INSIDECORNER
VENEEREDPANELING
NEW GPO
2630
MOVE GPO AND I.T.UP THE WALLABOVE DESK TOP
Date Amendment Rev
Preliminary issue -
CONTRACTORS PLEASE NOTE:
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
CLIENT NAME AND ADDRESS
LEGEND:
C:\Users\stephen\Documents\F+B Documents\Foster & Burke Logo.JPG
foster and burke interior design45/71 VICTORIA STREETPOTTS POINTNSW 2011M. 0404948585E. stephen@fosterburke.com
17052012
STEPHEN BURKE
1:50 @ A3
PAUL'S OFFICE - NEW JOINERY
SINNOTT
PAUL AND REBECCA SINNOTT20 ROSLYNDALE AVENUEWOOLLAHRANSW, 2025
17052012
JOINERY;SUBSTRATE-18mm or double 18mm MDF (orsimilar) depending on shown carcass/shelfthickness's.FINISH-Veneer: True Grain- Black Onyx suppliedby Briggs Veneers, finished in Satin Finish ClearPolyurethaneCUPBOARD/DRAWER INTERIOR FINISH:Melamine - Colour: TBACUPBOARD/DRAWER HANDLES: Handle-lessshark nose drawer and cupboard door openingsDRAWER SLIDES: Soft close drawer slides
FREE STANDING ADJUSTABLE HEIGHT DESK:TOP FINISH: Solid Timber to match Black OnyxVeneerBASE: Alluminium-electronically height adjustable
03062012 REDRAWN BASED ON ON-SITEMEETING AND MEASURE OFROOM HEIGHTADJUSTABLE BOOKCASESHELVES NOW MEASURE 20mmMDF NOT 40mmNEW VENEER CHOSEN
A
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
OFFICE: FLOOR PLAN FOR JOINERY - SCALE: 1:50 @ A3
BOOKCASE
OVER DESKCUPBOARDS
FREE STANDINGDESK :ADJUSTABLEHEIGHT
W1
W2W4
W3
FIXED HEIGHT DESK
VOID
UNDER-DESKDRAWERS
UNDER-DESK HANGINGA4 FILING CABINETS
FREE STANDINGDESK - ADJUSTABLEHEIGHT
700
40
740
PAUL'S OFFICE: ELEVATION W3AMENDMENT D: 03062012 SCALE 1:50 @ A3
40
350
20
350
40
1560
800
800
420
FIXED SHELF
DESK
VENEEREDBACK PANEL
BULKHEAD TO MATCHWALL COLOUR
MOVE ELECTRICALFROM INSIDE WALL TOOUTSIDE HALLWAY WALL
OVER DESKCUPBOARDS
VENEEREDPANELING
BOOKCASEADJUSTABLESHELVES
420
OFFICE: ELEVATION W1 - SCALE 1:50 @ A3
380
775
40 40
705
40
705
1530
740
OVER DESK CUPBOARDSW ADJUSTABLE SHELVES
OFFICE: ELEVATION W4 - SCALE 1:50 @ A3
HANGING A4 FILINGCABINETS 4 DRAWERS82
080
0
2360
40
425
40
425
40
425
40
425
40
425
40
320
4030
530
590
40 530 530 40 530 530 40 530 530 40
3660
BULKHEADTO MATCHWALL COLOUR
VENEERED PANEL1400mm FROM INSIDECORNER
VENEEREDPANELING
NEW GPO
2630
MOVE GPO AND I.T.UP THE WALLABOVE DESK TOP
Date Amendment Rev
Preliminary issue -
CONTRACTORS PLEASE NOTE:
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
CLIENT NAME AND ADDRESS
LEGEND:
C:\Users\stephen\Documents\F+B Documents\Foster & Burke Logo.JPG
foster and burke interior design45/71 VICTORIA STREETPOTTS POINTNSW 2011M. 0404948585E. stephen@fosterburke.com
17052012
STEPHEN BURKE
1:50 @ A3
PAUL'S OFFICE - NEW JOINERY
SINNOTT
PAUL AND REBECCA SINNOTT20 ROSLYNDALE AVENUEWOOLLAHRANSW, 2025
17052012
JOINERY;SUBSTRATE-18mm or double 18mm MDF (orsimilar) depending on shown carcass/shelfthickness's.FINISH-Veneer: True Grain- Black Onyx suppliedby Briggs Veneers, finished in Satin Finish ClearPolyurethaneCUPBOARD/DRAWER INTERIOR FINISH:Melamine - Colour: TBACUPBOARD/DRAWER HANDLES: Handle-lessshark nose drawer and cupboard door openingsDRAWER SLIDES: Soft close drawer slides
FREE STANDING ADJUSTABLE HEIGHT DESK:TOP FINISH: Solid Timber to match Black OnyxVeneerBASE: Alluminium-electronically height adjustable
03062012 REDRAWN BASED ON ON-SITEMEETING AND MEASURE OFROOM HEIGHTADJUSTABLE BOOKCASESHELVES NOW MEASURE 20mmMDF NOT 40mmNEW VENEER CHOSEN
A
PRO
DUCE
D BY
AN
AUTO
DESK
EDU
CATI
ONA
L PR
ODU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRODUCED BY AN AUTO
DESK EDUCATIONAL PRO
DUCT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
OFFICE: FLOOR PLAN FOR JOINERY - SCALE: 1:50 @ A3
BOOKCASE
OVER DESKCUPBOARDS
FREE STANDINGDESK :ADJUSTABLEHEIGHT
W1
W2W4
W3
FIXED HEIGHT DESK
VOID
UNDER-DESKDRAWERS
UNDER-DESK HANGINGA4 FILING CABINETS
FREE STANDINGDESK - ADJUSTABLEHEIGHT
700
40
740
PAUL'S OFFICE: ELEVATION W3AMENDMENT D: 03062012 SCALE 1:50 @ A3
40
350
20
350
40
1560
800
800
420
OFFICE: ELEVATION W1 - SCALE 1:50 @ A3
FIXED SHELF
DESK
VENEEREDBACK PANEL
BULKHEAD TO MATCHWALL COLOUR
MOVE ELECTRICALFROM INSIDE WALL TOOUTSIDE HALLWAY WALL
OVER DESKCUPBOARDS
VENEEREDPANELING
BOOKCASEADJUSTABLESHELVES
740
OFFICE: ELEVATION W4 - SCALE 1:50 @ A3
HANGING A4 FILINGCABINETS 4 DRAWERS82
0800
2360
40
425
40
425
40
425
40
425
40
425
40
320
40305
305
90
40 530 530 40 530 530 40 530 530 40
3660
BULKHEADTO MATCHWALL COLOUR
VENEERED PANEL1400mm FROM INSIDECORNER
VENEEREDPANELING
NEW GPO
2630
MOVE GPO AND I.T.UP THE WALLABOVE DESK TOP
Date Amendment Rev
Preliminary issue -
CONTRACTORS PLEASE NOTE:
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
CLIENT NAME AND ADDRESS
LEGEND:
C:\Users\stephen\Documents\F+B Documents\Foster & Burke Logo.JPG
foster and burke interior design45/71 VICTORIA STREETPOTTS POINTNSW 2011M. 0404948585E. stephen@fosterburke.com
17052012
STEPHEN BURKE
1:50 @ A3
PAUL'S OFFICE - NEW JOINERY
SINNOTT
PAUL AND REBECCA SINNOTT20 ROSLYNDALE AVENUEWOOLLAHRANSW, 2025
17052012
JOINERY;SUBSTRATE-18mm or double 18mm MDF (orsimilar) depending on shown carcass/shelfthickness's.FINISH-Veneer: True Grain- Black Onyx suppliedby Briggs Veneers, finished in Satin Finish ClearPolyurethaneCUPBOARD/DRAWER INTERIOR FINISH:Melamine - Colour: TBACUPBOARD/DRAWER HANDLES: Handle-lessshark nose drawer and cupboard door openingsDRAWER SLIDES: Soft close drawer slides
FREE STANDING ADJUSTABLE HEIGHT DESK:TOP FINISH: Solid Timber to match Black OnyxVeneerBASE: Alluminium-electronically height adjustable
03062012 REDRAWN BASED ON ON-SITEMEETING AND MEASURE OFROOM HEIGHTADJUSTABLE BOOKCASESHELVES NOW MEASURE 20mmMDF NOT 40mmNEW VENEER CHOSEN
A
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
BESPOKE CONSOLEMASTER BEDROOM
DINING AND KITCHENLIVING AREA
CLIENT: SYDNEYAPARTMENT: EXCLUSIVE HOLIDAY ACCOMMODATION
• New build: Managed Apartments• Refinedcolourpaletteofgreysandblackwithaccentsof orangeandredtoworkbackwiththetimberfloor• Modern Contemporary style, juxtaposed with traditional chinese elements• Editorial: interior featured in the loacl Queenstown Newspaper,the‘Mirror’
stephen burke: residential interior design
PRES
ENTA
TIO
N B
OAR
DS: V
ARIO
US
POWERPOINT PRESENTATION
stephen burke - design portfoliohospitality and corporate interior design
stephen burke: hospitality and corporate interior design
SCALE MODEL
ESPRESSO COLOUR SCHEME LATTE COLOUR SCHEME
CLIENT: WENSLEY DEVELOPMENTS LTD.
Hotel
• New build on steep lake edge site: Located on the scenic lakeWakatipu,‘OaksShores’isaluxuriouslyappointed Queenstown, 83 apartment style hotel• Each spacious apartment is impeccably styled with chic, contemporary furniture and furnishings• Balconies offer stunning views over the lake and mountain ranges
Interior Design
• Involved from the outset; this 3 year project included concept designthroughtofinaldesignchoices,furniture,fabricand accessory orders, supply and installation• Introduce the essence of the landscape through use of neutral colours and textures, without detracting from the views• Makedesigndecisionsthatreflecttheuseoftheapartments; choose robust furniture and fabrics whilst endeavouring to retain comfort and visual appeal
QUEENSTOWN:NEW ZEALAND
stephen burke: hospitality and corporate interior design
HAND RENDER: PENTHOUSE MASTER BDRM CAMPAIGN IMAGE FOR AN INTERIOR
ARTIST: PAULINE BELLAMY - LTD. EDITIONS
HOTEL RESTAURANT: DINING
PENTHOUSE SUITE: DINING PENTHOUSE SUITE: LIVING
HOTEL BAR: LOUNGE
APARTMENT MASTER BDRM: LATTE SCHEMEAPARTMENT LIVING AREA: LATTE SCHEME
QUEENSTOWN:NEW ZEALAND
stephen burke: hospitality and corporate interior design
500
8575
500
2350
3560
RECEPTION
QUIETCONFERENCE
EXIST KITCHEN
TRAINING
BREAKOUT
FIRE STAIR
FIRE STAIRLIFT LOBBY
WC's
full h
eight
stor
age
broc
hure
s
IT Server Room
AUDI
TORS
oven
benc
hcopier
SAI logo in CB glass
fabric panelling/CB glass to detail
ceil recessed motorised proj screen with ceil mtd data proj
cred
enza
bar c
ount
er
3M opaque glazing film up to 1800mm high on windows
water cooler
bin
sill ht credenza
F/H
stora
ge cu
pbs
9605
0 1m 2m
scale
door with keypad security access
sound rate partitions to IT Room
DOUBLE GPO
TRIPLE RJ45 OUTLET (DATA & VOICE)
ELEC LEGEND
P
D
PANIC BUTTON MOUNTED UNDER DESKTOP
DOOR BELL (type TBC)
POWER POLE
D01
D02
D03
D04
D05
D06
D08
D07
D01
D09
EXIST PARTITIONS TO REMAIN
NEW F/H GLAZED PARTITION IN 100mm NAT ANOD AL FRAMENEW F/H 64mm STUD + 13mm GYPROCK PARTITION WITH 100mm NAT ANOD AL SKIRTING
NEW F/H 64mm STUD + 2 x 16mm GYPROCK PARTITION WITH 100mm NAT ANOD AL SKIRTING
PARTITION LEGEND
3480
3400
2110
1680
600
100
100
840
800
800
1815
J1
J2
J3
J5 J4
6400
4500centre desk between doors 2 & 3
new return bench & cupbs over
640
4670
PARTITION SET OUT NOTE:
Designer to check set out on site before studs are installed.
1200 J6
1273
surface ceiling mtd manual proj screen
3715
500 1485
DRAWING No.
PROJECT No.
DRAWING
DATE.
AMENDMENT
No.
DATE
DRAWN
SCALE
STATUS
CHECKED
APPROVED
CAD FILE No.
DRAWING TYPE
SUBURB
STATE
STREET No.
P/CODE
COUNTRY
STREET NAME
REVDATE ISSUE
23.7.07 A
Level 3 Partition, Furniture & Electrical Plan
3-01 7.07 L
preliminary ARCHITECTURAL
1:50 SB
Jul 07 XXX
np C:NICK\foster burke\sai adelaide\dwg\tender\3-02.dwg
preliminary issue for site check.
NSW AUSTRALIA
Level 3, 199 Grenfell Street
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PREPARING ANY SHOP DRAWINGS.
© UNLESS OTHERWISE AGREED THIS DRAWING AND THE INTELLECTUAL PROPERTY CONTAINED HERE-ON REMAINS THE PROPERTY OF:
Mob: +61 404 948 585Email: stephen@fosterburke.comWeb: www.fosterburke.com
Adelaide SA 8000
FB 207/10
NORTH
25.7.07 Bbase plan revised to suit site dims; layout added for prelim discussion.
30.7.07 CAuditors hot desks added; Conf Rm moved west; Kitchen oven, servery & bar seats added; w/s replanned; Training Rm mirrored; 3 seater, new credenza & wall signage shown in Reception.
31.7.07 DServery replaced with Server Room; w/s reduced to 1200mm each side; Barcelona reception chairs deleted.
01.8.07 ETraining tables rotated; screen, OHP, fabric panelling added; op wall access doors centralised; stools deleted, cupbs added Breakout; plasma added to Conf Rm.
06.8.07 FNotes re film to Training Rm facade added; watercooler added to Breakout; credenza added behind 90° w/s; door added to Kitchen and f/h storage added outside; Boardroom enlarged to accom 16 & moved west; 1 x Quiet Rm deleted and other enlarged; Reception seats moved to suit; w/s rev back to 1500mm 120°; dims added.
05.08.07 2FOption 2 issued for approval06.08.07 GSouth East door to Breakout deleted;
door to Kitchen added off Recept; Server Rm walls shown insulated.
10.08.07 HTraining Breakout moved to western wall; kitchen barstools deleted & cupb over added; power & data, partition types, set out dims & joinery nos. & door nos. shown.
14.08.07 freestanding sign deleted; 2 x proxi card readers added; new Kitchen bench widened w cupbs over; set out note added.
I
14.08.07 northern facade glazing by D08 rev to glazed; FHR cupb moved east in Conf.
J
23.08.07 exist Kitchen walls rev to suit site; J6 added.
K
23.08.07 Auditor's wall nibs del; Board eastern cred del; man proj screen added in lieu of plasma TV; Open office area F/H joinery nibs del; Recept desk rev; J4 rev to 500 deep; proxi card rev to keypad.
L
PRESENTATION BOARD: LIFT ENTRY GLASS WALL AND SEATING
SYDNEY RECEPTION AREA: NEW GLASS WALL INCORPORATING COMPANY COLOURS AND GRAPHICS
85
ELEVATION: GROUND FLOOR RECEPTION REAR WALLS 1,2 AND 3
BOARDROOM CHAIR
RECEPTION LIGHT: BORG BY OTY RECEPTION SEATING
ADELAIDE RECEPTION AREA
WORKSTATION W GREEN PARTITION
GR
AP
HIC
S FO
R S
YD
NE
Y GLA
SS
WA
LL
CORPORATE OFFICES FOR SAI GLOBAL
• Design,spaceplanning,newpartition,electricalandlightingforofficesinSydney, Melbourne, Adelaide and Perth• HeadOffice,Sydney:designforupgradeinreceptionandfrontofhouseareas• Incorporate company colours and graphics into the reception and work areas• DesignforrelocationtonewpremisesforAdelaideandPerthoffices
stephen burke: hospitality and corporate interior design
MONTAGE INTERIORS
2000
1100
900
350
50
50
680
330 350
5050
4527
350
350
5050
900
19mm THICK GLASS TOP THREE PIECES WITH MITRED JOINTS @ FRONT CORNERS
2 x FREESTANDING MOBILE PEDS UNDER
750mm HIGH DESK TOP IN "Parchment" LAMINATE
4527
680
330 350
350
1050
2070
860
100
750
30
FRONT, SIDE & TOP FACES OF RECEPTION DESK IN 2 x PACK POLYURETHANE COL "HOT LIPS" 30% GLOSS
19mm THICK GLASS TOP THREE PIECES WITH MITRED JOINTS @ FRONT CORNERS
30
750
2070
860
100
1050
680
330350
2000
1100 900
30
750
2070
860
100
1050
800
800
L SHAPED BENCH 800mm DEEP x 750mm HIGH CUT AROUND COLUMNS
600mm DIA LINISHED STAINLESS STEEL DISC BASE SUPPORTS
BRACKET DESKTOP TO COLUMN FACES AS REQ FOR STABILITY
L SHAPED BENCH 800mm DEEP x 750mm HIGH CUT AROUND COLUMNS
600mm DIA LINISHED STAINLESS STEEL DISC BASE SUPPORTS
BRACKET DESKTOP TO COLUMN FACES AS REQ FOR STABILITY
650 WINDOW SILL
COLUMNS
J1 RECEPTION DESK PLANSCALE 1:20
DRAWING No.
PROJECT No.
DRAWING
DATE.
AMENDMENT
No.
DATE
DRAWN
SCALE
STATUS
CHECKED
APPROVED
CAD FILE No.
DRAWING TYPE
SUBURB
STATE
STREET No.
P/CODE
COUNTRY
STREET NAME
REVDATE ISSUE
27.8.07 A
J1 Reception Desk & J3 Auditors' Desk Joinery Details
3-05 8.07 A
preliminary ARCHITECTURAL
1:50 SB
Jul 07 XXX
np C:NICK\foster burke\sai adelaide\dwg\tender\3-05.dwg
preliminary issue for approval.
NSW AUSTRALIA
Level 3, 199 Grenfell Street
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PREPARING ANY SHOP DRAWINGS.
© UNLESS OTHERWISE AGREED THIS DRAWING AND THE INTELLECTUAL PROPERTY CONTAINED HERE-ON REMAINS THE PROPERTY OF:
Mob: +61 404 948 585Email: stephen@fosterburke.comWeb: www.fosterburke.com
Adelaide SA 8000
FB 207/10
J1 RECEPTION DESK FRONT ELEVATIONSCALE 1:20
J1RECEPTION DESK REAR ELEVATIONSCALE 1:20
J1 RECEPTION DESK SIDE ELEVATIONSCALE 1:20
1
2 3
J3 AUDITORS' DESK PLANSCALE 1:20
J3 AUDITORS' DESK FRONT ELEVATIONSCALE 1:20
4
2000
1100
900
350
50
50
680
330 350
5050
4527
350
350
5050
900
19mm THICK GLASS TOP THREE PIECES WITH MITRED JOINTS @ FRONT CORNERS
2 x FREESTANDING MOBILE PEDS UNDER
750mm HIGH DESK TOP IN "Parchment" LAMINATE
4527
680
330 350
350
1050
2070
860
100
750
30
FRONT, SIDE & TOP FACES OF RECEPTION DESK IN 2 x PACK POLYURETHANE COL "HOT LIPS" 30% GLOSS
19mm THICK GLASS TOP THREE PIECES WITH MITRED JOINTS @ FRONT CORNERS
30
750
2070
860
100
1050
680
330350
2000
1100 900
30
750
2070
860
100
1050
800
800
L SHAPED BENCH 800mm DEEP x 750mm HIGH CUT AROUND COLUMNS
600mm DIA LINISHED STAINLESS STEEL DISC BASE SUPPORTS
BRACKET DESKTOP TO COLUMN FACES AS REQ FOR STABILITY
L SHAPED BENCH 800mm DEEP x 750mm HIGH CUT AROUND COLUMNS
600mm DIA LINISHED STAINLESS STEEL DISC BASE SUPPORTS
BRACKET DESKTOP TO COLUMN FACES AS REQ FOR STABILITY
650 WINDOW SILL
COLUMNS
J1 RECEPTION DESK PLANSCALE 1:20
DRAWING No.
PROJECT No.
DRAWING
DATE.
AMENDMENT
No.
DATE
DRAWN
SCALE
STATUS
CHECKED
APPROVED
CAD FILE No.
DRAWING TYPE
SUBURB
STATE
STREET No.
P/CODE
COUNTRY
STREET NAME
REVDATE ISSUE
27.8.07 A
J1 Reception Desk & J3 Auditors' Desk Joinery Details
3-05 8.07 A
preliminary ARCHITECTURAL
1:50 SB
Jul 07 XXX
np C:NICK\foster burke\sai adelaide\dwg\tender\3-05.dwg
preliminary issue for approval.
NSW AUSTRALIA
Level 3, 199 Grenfell Street
CONTRACTOR TO CHECK ALL DIMENSIONS ON SITE BEFORE COMMENCING ANY WORK OR PREPARING ANY SHOP DRAWINGS.
© UNLESS OTHERWISE AGREED THIS DRAWING AND THE INTELLECTUAL PROPERTY CONTAINED HERE-ON REMAINS THE PROPERTY OF:
Mob: +61 404 948 585Email: stephen@fosterburke.comWeb: www.fosterburke.com
Adelaide SA 8000
FB 207/10
J1 RECEPTION DESK FRONT ELEVATIONSCALE 1:20
J1RECEPTION DESK REAR ELEVATIONSCALE 1:20
J1 RECEPTION DESK SIDE ELEVATIONSCALE 1:20
1
2 3
J3 AUDITORS' DESK PLANSCALE 1:20
J3 AUDITORS' DESK FRONT ELEVATIONSCALE 1:20
4
3D RENDER: WORKSTATION FOR SALES
HAND RENDER: RECEPTION SCALE MODEL: RECEPTION DESK
3D RENDER: FURNITURE DISPLAY AREA 3D RENDER: RECEPTION
PROPOSED HERITAGE LISTED INTERIOR CONVERSION FOR RETAIL OFFICE SPACE, FURNITURE DISPLAY AND SALES
• Space plan for reception, boardroom, kitchen/breakout, directors office,accountsofficeandfurnitureshowroomthatincludestwo sales desks• Adhere to local council heritage guidelines• Recommendfurniture,finishesandcoloursthatreflectthe sustainable direction of the organisation
stephen burke: hospitality and corporate interior design
Driv
eway
Stai
rs U
pTo
Lev
el 1
Rol
ler S
hutte
rH
eigh
t 3.7
mW
idth
4.1
m
Male
MainEntry
ShowerKitc
hen
Female
Reception
Boardroom
Accounts
CommsRoom
WarehouseNet Lettable Area 179 m²
Ceiling Height 4.4 m
Land
scap
ing
Ground Level: Furniture Plan
BreakoutArea
FF
Benc
h
LoungeArea
Internal Driveway
FilmStudio
Relocated Cupboards andOverhead Cupboards
Adjustable heightworkstations
WineFridge
A/V Low Unit
A/V Sideboard
Editorial
Table TennisTable
2 SeaterSofa
CoffeeTable
2 SeaterSofa
Pendant Light
Loose Seating [Stools]
Display Shelf
BarcelonaChair
BarcelonaChair
SideTable
Date Amendment Rev
Preliminary issue -Furniture Plan
CONTRACTORS PLEASE NOTE:
©UNLESS OTHERWISE AGREED THIS DRAWINGAND THE INTELLECTUAL PROPERTYCONTAINED HERE-ON REMAINS THEPROPERTY OF:
SCALE
DATE
DRAWN BY
DRAWING TITLE
PROJECT NAME/No.
DRAWING NUMBER
foster and burke interior designStephen BurkeM. 0403 759 214E. stephen@fosterburke.com
This Drawing shows design intent only. Verify allmeasurements and dimensions on site prior tofabrication, roughing in or construction.Contractor is to provide detailed shop drawings oradjust figured dimensions to suit site conditions andseek approval for designs for same prior toproceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation for client(or their agents) approval.Contractor to coordinate all mechanical, electrical,hydraulic and fire services requirements to suit thearchitectural design intent and seek approval forthese before proceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing site accessand installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
CLIENT NAME AND ADDRESS
LEGEND:
07042014
STEPHEN BURKE
1:100 @ A3
CARADVICE
CarAdvice.com.au Pty LtdGround Floor52 Victoria StreetMcMahons PointNSW 2060
07042014
FURNITURE PLAN:Recommended Furniture layout as per clientmeeting
C:\Users\stephen\Documents\F+B Documents\LOGOS\fb logo.JPG
Move Stand-Up Task DesksInclude additional furniture
26072014 A
Swap Positions of Stand-UpTask Desks with Editorial
04082014 B
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
TASK CHAIR
BREAKOUT: TABLE AND CHAIRS
BOARDROOM: FURNITURE AND LIGHTING
CARADVICE.COM.AU IS A COMPANY FOCUSED ON GETTING PEOPLE INTO THE RIGHT CAR THROUGH THE INTERNET AND MULTI-MEDIA ANALYSIS AND REVIEWS
• Spaceplanforagrowingoffice:Increase Workstations by 10, relocate boardroom and include a breakout area• Adhere to local council building compliance• Recommendfurniture,finishesandcoloursthatreflect the company’s corporate identity and youth culture
stephen burke: hospitality and corporate interior design
SUSS
EXST
REET
ERSKINE STREET
meetingroom A
tea
secureentry
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riserboardroom
openmeeting
openmeeting
lift 1
lift 2
lift 3
trainingroom
meetingroom B
resource
Task Desks to be broken down bycontractor and delivered to LandlordBuilt in Joinery to be demolishedand removed by contractorNB: Task Chairs to remain
Landlord to remove:Task DesksStorage CabinetsNB: Task Chairs to remain [No. TBA]Projector and Projector ScreenCompactus
Demolition-Contractor:Gyprock wall between training roomand compactusTraining Room Glass Panel Partitions[NB: Reuse Glass Partitions wherepossible in the New Build]Built in joinery
Demolition:Built in Kitchen Joinery
Landlord to remove:Storage Cabinets
electronic sliding door entry doorand 2x glass panel:remove and re-use in breakout
Landlord to remove:storage cabinets
Landlord to remove PlantsPlant Boxes to bedismantled and removedby contractor
Landlord to remove:Sofa, Side Chairs and Coffee Table
Possible Removal:Sofa, Sofa Chairs and Coffee TableClient To Confirm
DESIGN 1A: DEMOLITION
Kitchen IslandMay be re-used in Breakout TBA
K008
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
NOT TO SCALE
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
23.01.2015
STEPHEN BURKE
K008
DESIGN 1A: NEW BUILD
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: NEW BUILDFloor Plan and Furniture Layout based on telephoneconversation with John Connor on the 16-01-2015
Design 1A: DEMOLITIONRefer to Plan Notes for Furniture and Joinery Removal andfor Demolition
09.02.2015 Plan Notations updated based on sitemeeting on the 06022015Clarification given on parties responsiblefor removal of loose and fixedfurniture/joinery.Feature lighting to remain at this point
C
ERSKINE STREET
meetingroom A
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riserboardroom
entry
lift 1
lift 2
lift 3
access wc
FCE2
FCE1
waitingmeetingroom B
resource
3000
3150
3100
2600
1900
secureentry
DESIGN 1A
internal telephone 2 of 2
internal telephone 1 of 2
2364
server
breakout
meeting 1
meeting 2
meeting 3
2900
2900
3970
1650
sliding glass doortaken from existing entry
electronic entry:same entry code as forbuilding level 3 accessautomatic opening onactivation of the firedetection system
job seek
K007
room dividing blindstyle/type tba
1540
1950
3836
3536
4800
fhr
fire hose reel
fhr
fire hose reel
Electronic Sliding Glass Door entry
1200
1200 1200
slidingdoor
fridgefreezer
walk-instorage
over bench cupboards
bench toparea forappliancesbehindtambour door
slidingdoor
new build:breakoutservermeeting rooms 1, 2, + 3job seekeraccessible wcFCE rooms 1 + 2
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
PROJECT NAME:
LEGEND
Date Amendment Rev
NOT TO SCALE
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
23.01.2015
STEPHEN BURKE
K007
FLOOR PLAN AND FURNITURELAYOUT: DESIGN 1A
KONEKT
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A:Floor Plan and Furniture Layout based on telephoneconversation with John Connor on the 16-01-2015
16.01.2015 Secondary Doors to Breakout removed,Existing Boardroom Doors returned,server moved close to entry,meetingrooms follow. Sliding door accessremoved.
A
16.01.2015 Walkway added between boardroom andbreakout room
B
19.01.2015 4x Units of Storage removed. Breakoutreduced by 676mm and sliding glassdoors added. Size altered for Meetingand Server Rooms. Seating increasedMeeting Rooms and Job Seek. Doorentry location to Server changed. Tablew telephone added to entry and waitingareas.
C
19.01.2015 1 Set of Storage Units returned nearcorner fire exit
D
22.01.2015 To meet compliance:Hallway to FCE1 and FCE2 widened to1240mmJob Seeker Room redrawn to allow fordoor entry w 530mm clearancePlants removed to create wider passageNotation added to Secure Entry for fire
E
30.01.2015 Kitchen and Breakout Plan Added forconsideration. 1 Cubicle in both Mensand Womens toilets made Ambulant.
F
05.02.2015 Hallway to FCE1 and FCE2 widened to1540mm to meet compliance. MeetingRooms 2 and 3 reduced by 100mm andKitchen/Breakout reduced by 200mmFire Hydrant Placement: Noted
G
04.03.2015 Ambulant Toilet Cubicles removed H
KO08: PLAN-DEMOLITIONKO07: PLAN-DESIGN 1A
KONEKTS ROLE IS TO HELP ORGANISATIONS MINIMISE THE IMPACT OF WORKPLACE INJURY AND RELATED WORKPLACE COSTS
• Spaceplananexistingfurnishedofficetomeetthe requirements of Konekt• Relocatethebreakoutareaandaddtotheflooran accessible wc and six meeting rooms• Provide working drawings for local council compliance• Recommendfurniture,appliances,finishesand colours etc.
stephen burke: hospitality and corporate interior design
microwave
tambour door[appliances behind]
open shelves
drawer
integrateddish washer
integrateddish washer
cupboardsslide out unitfor waste bin/s
double sink w right hand drainage
fridgefreezer
walk-instorage
over bench cupboards
bench top[see detailed drawing]area for
appliancesbehindtambour door
2100
1200
slidingdoor
4800
800
fridgefreezer +walk-instorage
2800
microwave
drawer
drawer
500
300
650
hydro taptap-single mixer
glasssplashback
cupboardsw adjustable shelf open shelvescupboards
w adjustable shelfcupboardsw adjustable shelf
600 1000 600 600 600 582
80
195
195
390
372
372
40
273
273
466 466 467 467467467 573 573
1000
482
1700
2200
32361000
4800
tap-single mixerhydro tap
hole cut in benchfor garbage
150
300
150
150300
600
600
2800
04
03
detail floor plan - kitchen011:20 @ A1
detail bench plan - kitchen021:20 @ A1
elevation: front - kitchen031:20 @ A1
elevation: side - kitchen041:20 @ A1
cavity:fridgefreezer
walk-instorage
sectionbench
section:abovebenchcupboards
slidingdoor
fixedshelving300mmD
900
600
600
1000 500
1000
glasssplashback
332
332
332
332
332
332
2100
400
600
back foropen shelves
tambour door
microwave
microwave
cavity:appliances
open shelves
open shelves
S1
section S1S11:20 @ A1
DESIGN 1A : KITCHEN JOINERYK018
slidingdoor
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
1:20 @ A1
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
20.02.2015
STEPHEN BURKE
K018
DESIGN 1A:KITCHEN JOINERY
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: KITCHEN JOINERY
NB: Measurements are a 'guide' only. Verify allmeasurements and dimensions on site priorto fabrication, roughing in or construction.
Construction 18mm MDF
Joinery FinishExterior Finish: Laminex Col: WhiteInterior Finish: Laminex Melamine Col: WhiteBench Top: Laminex TBAGlass Splash Back: Col: Dulux-Citrus Hit PB1B8
ElectricalRefer to the plan for position of GPO's
circulation spaceline at doorway
300
110
850 c
lear
op
enin
g510
1420
floor wastepeno 1. 125 dia.
2600 c
lear
detail floor plan - penetration for drainage01
GR2
02
fall to
floor waste
FW
circulation spaceline of washbasin
circulation spaceline of water closet
1420
1:20 @ A1
400
900
500
B
in-wall wastepeno 2. 50dia
level 3plant room
level 3accessible wc
level 2accessible wc
level 2plant room
smokeexhaustriser
980 125 1600 50
elevation - penetration for drainage021:20 @ A1
floor wastepeno 1. 125 dia.
in-wall wastepeno 2. 50dia
level 2ceiling
drainage toplant room drain
NB: drainage to plant room drainvertically to shaft wall and into serviceslocated in level 2 plant room
drainage toplant room drain
DESIGN 1A : PENETRATION FOR DRAINAGEK019
smokeexhaustriser
plantroom
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
1:20 @ A1
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
05.03.2015
STEPHEN BURKE
K019
DESIGN 1A:PENETRATION FOR DRAINAGE
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: PENETRATION FOR DRAINAGE
Slab penetration for accessible wc drainage
05.03.2015 Remainder of 'smoke exhaust riser' andthe plan room added to the plan view
A
circulation spaceline at doorway
800
300
110
850 c
lear
op
enin
g510
1420
300 min
300mm stainless steel grab rail@ 800mm AFL
460
floor wastepeno 1. 125 dia.
2600 c
lear
460
detail floor plan - accessible wc01
elevation 02 - accessible wc02 03
04 05
600 x 300 wall tilesfull height
600 x 300 wall tilesfull height
600 x 300 wall tilesfull height
600 x 300 wall tilesfull height
position for portablesanitary disposal [by others]
GR1
GR2
GR2GR1
GR1
GR2
TP
TP
TP
02
05
04
03
position for portablesanitary disposal [by others]
double toilet paper dispensercentred 600mm AFL
356 x 125 stainless steel shelf@ 900mm AFL
stainless steel grab rail@ 800mm AFL
wall basin-base @ 720mmAFL + single tap
wall faced care 800 toiletw backrest
soap dispenser@ 900mm AFL
tilt mirror above basin460w x 910h mmtop of mirror @ 1850mm AFL
robe hook @1300mm AFL
fall to
floor waste
600 x 300 floor tiles
RH
RH
RH
SD
SD
MR
MRMR
HD
SF
FW
BN + BTP
RH
SFSF
BN + BTP BN + BTP
RH
FFL
FFL
SUSPENDEDCEILINGHEIGHT
SUSPENDEDCEILINGHEIGHT
2500
2500
elevation 03 - accessible wc
elevation 04 - accessible wc elevation 05 - accessible wc
notes
circulation spaceline of washbasin
circulation spaceline of water closet
1420
all dimensions + clearances are critical for complianceall work + installations to comply with AS1428.1 and BCA
toilet pan [TP] Caroma Care 800 wall faced suite with backrestand pedigree II care single flap seat-whitecode: 901800BW
basin [BN] Caroma Concorde 500 wall basin [single tap hole]
basin tap [BTP] Alpha Self Closing Tap-Push ButtonRBA1043-400-Series: RBA Group
toilet roll holder [TRH] Surface Mounted Double Toilet Roll HolderB6999-Series: RBA Group
paper dispenser [PD] Paper Towel Dispenser - ClassicB262: RBA Group
soap dispenser [SD] Surface Mounted Soap Dispenser - ConturaB4112-Series: RBA Group
shelf [SF] Compliant Stainless Steel Shelf 125d x 356w mmB295-14: RBA Group
robe hook [RH] Hook-Cubicle B542: RBA Groupgrab rail [GR1] Straight Grab Rail, Stainless Steel, 300mm
RBA4000-Series: RBA Groupgrab rail [GR2] 40 degree, Grab Rail, Left Hand, Stainless Steel
B819488: RBA Groupmirror [MR] Tilt Mirror 460w x 910h mm
B293-Series: RBA Group
1:20 @ A1
1:20 @ A1 1:20 @ A1
1:20 @ A1
1:20 @ A1
DESIGN 1A : ACCESSIBLE WC - DETAILSK013
light switchcentred 1050mm AFL
double GPO@ 900mm AFL
PD
paper dispenser@ 900mm AFL
400
900
500
B
in-wall wastepeno 2. 50dia
1900 clear
2000
drainage toplant room drain
smokeexhaustriser
plantroom
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
1:20 @ A1
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
28.01.2015
STEPHEN BURKE
K013
DESIGN 1A:ACCESSIBLE WC DETAILS
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: ACCESSIBLE WC - DETAILDetailed Floor plan and Elevations for Accessible WC
Please refer to notes on the plans for bathroom furniture andaccessories: Supplier Name and description/codes
NB: Nil floor height variation between Hallway andAccessible WC
29.01.2015 As per meeting w John Connor: RemovePaper Towel dispenser and replace wHand Dryer. Remove Handle Tap Mixerand Replace w Push Button Tap Mixer.Add a Double GPOHeight Notations added to meetcompliance
A
05.02.2015 To meet complianceAdjust and notate heights for grab rails,basin and mirrorReplace toilet w compliant Toilet wbackrest.Replace hand dryer w compliant papertowel dispenser
B
09.02.2015 Toilet Roll Holder and GPO moved basedon site visit to Level 2 Accessible WC on06022015
C
05.03.2015 Location for Floor Waste moved andIn-wall waste and drainage line added.Smoke Exhaust Riser and Plant Roomadded to Floor Plan
D
stephen burke: hospitality and corporate interior design
SUSS
EXST
REET
ERSKINE STREET
meetingroom A
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riserboardroom
entry
lift 1
lift 2
lift 3
server
access wc
FCE2
FCE1
waiting
job seek
meetingroom B
resource
breakout
meeting 1
secureentry
DESIGN 1A: NEW BUILD
meeting 2
meeting 3
point of kitchendemolitionmake good walls
pole
Electronic Sliding Glass Door
accessible wcsee detailed plans
electronic entry:same entry code as forbuilding level 3 accessautomatic opening onactivation of the firedetection system
line fixed panel edge upwith boardroom glass wall
key locks on allfiling/storage units
key locks on 5x doors
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W1
W3
W3
W3
W2
W1
D3
D1
D8
D2
D2
D2
D3
D3
D4
D6
K009
D7
D7
D7D7
D7
D7 D7
Add fin for privacyNB: NOT Glass
pole
pole
polepoleceiling fixed mounting poles fortelevision [see electrical plan]
NB: KONEKT REQUEST THAT NODUCTING OR ELECTRICAL BEPLACED IN THE CEILING OF THISAREA WITHOUT PRIORDISCUSSION
slidingdoor
fridgefreezer
walk-instorage
over bench cupboards
bench toparea forappliancesbehindtambour door
slidingdoor
D5
sliding glass doortaken fromexisting entry
automatic opening on activation offire detection system
pole
pole
pole
new build:breakoutservermeeting rooms 1, 2, + 3job seekeraccessible wcFCE rooms 1 + 2NB: refer to drawingKO07 DESIGN 1A for dimensions
pole
all televisions ceiling fixed on a
for meeting room A: centre tv inroom in front of glasssee also:consultants areait areaboardroommeeting room Bmeeting room 1breakoutwaiting area
pole
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
1:100 @ A1
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
23.01.2015
STEPHEN BURKE
K009
DESIGN 1A: NEW BUILD
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: NEW BUILDRefer to Drawing K007 - DESIGN 1A for dimensions
Refer to notes on this plan
Wall construction details:W1: Gyprock WallsW2: Gyprock w 1200mmW Floor to Ceiling Glass Panelsand Laminate Finish [See Elev dwg KO17]W3: Glass Panels [Re-use from Demolition]
Door Details:D1:
05.02.2015 New Design to meet complianceNotations Updated and Server Room Doordetails updated
A
04.03.2015 Ambulant Toilet Cubicles Removed andDoor Bell/Buzzer removed
B
secureentry
SUSS
EXST
REET
ERSKINE STREET
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riser
lift 1
lift 2
lift 3
access wc
FCE2
FCE1F1
F1
D1
F2
F6
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riser
lift 1
lift 3
lift 2
F1
F1
F1
F1
F1
D1
F1
D1
D1
D1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D5
D5
D5
D4
D4
D4
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
LV1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D1
D3D3
EXIT
EM1F2
EM1F2
F2
EM1
EXIT
EXIT
D2
D2
D2
D2
D2
EM1
EM1
EM1 EM1
EM1
EM1 EM1EM1 EM1 EM1D5
D5
D5
EM1 EM1
EM1
EM1
MD
MD
MD
MD
MD
MD
LV1
LV1
LV1LV1
LV1
EM1
D4D5D5
MD
F1
F??
F6
server
breakout
meeting 1
meeting 2
meeting 3
job seek
waiting
NB: KONEKT REQUEST THAT NODUCTING OR ELECTRICAL BEPLACED IN THE CEILING OF THISAREA WITHOUT PRIORDISCUSSION
F1
F1
F1
S1
S1
D1 D1
D1D1
D1
D1
D1
D1
D1
D1
D1
D1
N N NN N
N N
N N
N N
N N
N N
N N
N N N
N
N
N
N
N
N
move lights sideways tocentre on corridor
remove these lights
add F1 lights centred overnew workstations[use lights removed frombreakout room]
DESIGN 1A : RCP LIGHTINGK012
remove F1 lighting[reuse over newworkstations]move lights sideways to
centre on corridor
move lights sideways[to the right]
newworkstations
new lightsdownlight spot light[to spotlight wall]
S1
12
00 sliding
door
fridgefreezer
walk-instorage
over bench cupboards
bench toparea forappliancesbehindtambour door
slidingdoor
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
NOT TO SCALE
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
23.01.2015
STEPHEN BURKE
K012
DESIGN 1A: RCP-LIGHTING
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: LIGHTINGRefer to PDF 'RCP EXISTING' for 'existing' lighting assupplied by the previous design company
Please check for interruption of lighting by new build wallsand be aware that the passageway to FCE1 and FCE2 andJob Seek must be well lit.
Lights to be added, removed or moved are shown in 'Green'
Please add ceiling lighting to NEW rooms as required:[Refer to Notations on Plan]Meeting Rooms 1,2 and 3, Job Seeker Room, Server Roomand Breakout Room and ceiling over the 'New Workstation'area have new lightingPlease light Accessible WC to meet complianceNB: It is probable that with existing lights in what will beRooms FCE1 and FCE 2 may not need additional oralterations to lighting.[will be led by your professional opinion if you would like torecommend alternative lighting suggestions to these areas]
All new lights are shown with an 'N'
Existing Feature Lighting to remain as is/where is
09.02.2015 Based on site meeting on the 06022015this plan has been renamed'RCP-LIGHTING'Notations have been added both on theplan and in the legend for lights: removal,moving and new [shown in thecolour-green]
A
SUSS
EXST
REET
ERSKINE STREET
female
fire stair 1
toilets
male toilets
roomplant
r
fire stair 2
riser
lift 1
lift 2
lift 3
access wc
FCE2
FCE1
secureentry
DESIGN 1A : FIRE DETECTION AND EWIS
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riser
lift 1
lift 2
lift 3
K014
server
breakout
meeting 1
meeting 2
meeting 3
job seek
fhr
fire hose reel
fhr
fire hose reel
smokeexhaust
hyd
I/O
I/O
I/O
Addressable I/O modulefor Test Solenold, FlowSwitch and Tampers
recessed speaker
horn speaker
Addressable P/OSmoke Detector [AS1668]
manual call point
I/O module
warden intercom point
meetingroom A
00.16.01.01
00.16.01.124
00.16.01.125
00.16.01.02
00.16.01.03 00.16.01.04
00.16.01.05
00.16.01.06
00.16.01.0700.16.01.08
00.16.01.09
00.16.01.1000.16.01.1100.16.01.12
00.16.01.13 00.16.01.14
00.16.01.15
00.16.01.16
00.16.01.17
00.16.01.18
00.16.01.19
00.16.01.20
00.16.01.21
00.16.01.22
00.16.01.23
00.16.01.24
00.16.01.25
00.16.01.26
00.16.01.100
waiting
New Smoke Detector andSpeaker As Shown
N
N
N
N
N
N
N
N
N
N
N
slidingdoor
fridgefreezer
walk-instorage
over bench cupboards
bench toparea forappliancesbehindtambour door
slidingdoor
CONTRACTORS PLEASE NOTE:
This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
Date Amendment Rev
NOT TO SCALE
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
28.01.2015
STEPHEN BURKE
K014
DESIGN 1A:FIRE DETECTION AND EWIS
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: FIRE DETECTION AND EWIS
Locate/check existing and Install additional Fire Alarms andSmoke Detectors etc. as indicated on the plan
05.02.2015 Area for New Smoke Detectors andRecessed Speakers Noted
A
SUSS
EXST
REET
ERSKINE STREET
meetingroom A
fire stair 1
female toilets
male toilets
plant room
r
fire stair 2
riser
boardroom
entry
lift 1
lift 2
lift 3
access wc
FCE2
FCE1
meetingroom B
resource
secureentry
DESIGN 1A: ELECTRICAL
internal telephone 2 of 2telephone port and electricalrequired
internal telephone 1 of 2telephone port and electricalrequired
Lighting:[see RCP]Add additional ceilinglighting as required. ThisHallway must be well lit
install clientsown copiershere
New Task Desk GroupingAllow for New Data, Phone andElectrical here
all televisions ceiling fixed on a
for meeting room A: centre tv inroom in front of glasssee also:consultants areait areaboardroommeeting room Bmeeting room 1breakoutwaiting area
Electronic Sliding Glass Door entry 2x
electronic entry:same entry code as forbuilding level 3 accessautomatic opening onactivation of the firedetection system
pole
server
breakout
meeting 1
meeting 2
meeting 3
sliding glass doortaken fromexisting entry
automatic opening on activation ofthe fire detection systemK010
waiting
1265
550 1100 1100
500
500
500
500
500
500
3000
500
500
500
500
GPO [SEE DETAILED PLANS FOR WC]
pole
pole
NB: KONEKT REQUEST THAT NODUCTING OR ELECTRICAL BEPLACED IN THE CEILING OF THISAREA WITHOUT PRIORDISCUSSION
DBL GPODBLGPO
DBL GPO
4x DBL GPO LOCATION TBA
2x DBL GPO2x DATA
DBLGPO
DBLGPO
2xDBL GPO2xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO2xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2x DBL GPO1x DATA1xTEL
2x DBL GPO1x DATA
slidingdoor
fridgefreezer
walk-instorage
over bench cupboards
bench toparea forappliancesbehindtambour door
slidingdoor
see kitchen joinery drawing K015for electrical
pole
pole
pole
2400
1900
behind tv:
DBL GPO+ TEL
SINGLE GPO FORWALL MOUNTEDFAN
500
DBLGPO
chase floor for table topmount: 4x DBL GPO, HDMI,1x Data, 1x TEL + Space tolocate TV remote control
DBL GPO + HDMI2 x DATA
chase floor for table topmount: 4x DBL GPO, HDMI,1x Data, 1x TEL + Space tolocate TV remote control
chase floor for table topmount: 4x DBL GPO, HDMI,1x Data, 1x TEL + Space tolocate TV remote control
DBL GPO+ TEL
DBL GPO+ TEL
DATA INCEILING
DATA INCEILING
DATA INCEILING
DATA INCEILING
1400
2x DATA
400
2x DATA
2xDBL GPO4xDATA
pole
DBL GPODATA+ TEL
DBL GPO+ DATA
DBL GPO+ DATA
DBL GPO+ DATA+ TEL
DBL GPO+ DATA+ TEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
2xDBL GPO1xD 1xTEL
consultants
it area
chase floor for table topmount: 4x DBL GPO, HDMI,1x Data, 1x TEL + Space tolocate TV remote control
banquetseating
DBLGPO
DBLGPO
DBLGPO
DBLGPO
*DEDICATED POWERTO SERVER ROOM
*ALLOW ENOUGHCABLING FORTHIS TELEVISIONTO REACH LIFT 1.
pole
2xDBL GPO4xDATA
DBL GPO + HDMI2 x DATA +Aerial
DBL GPO + HDMI2 x DATA +Aerial
DBL GPO + HDMI2 x DATA
DBL GPO + HDMI2 x DATA
DBL GPO + HDMI2 x DATA
DBL GPO + HDMI2 x DATA + Aerial
DBL GPO + HDMI2 x DATA + Aerial
pole
CONTRACTORS PLEASE NOTE:This Drawing shows design intent only. Verifyall measurements and dimensions on site priorto fabrication, roughing in or construction.Contractor is to provide detailed shop drawingsor adjust figured dimensions to suit siteconditions and seek approval for designs forsame prior to proceeding.Mark and set out all walls, joinery and serviceslocations prior to construction/installation forclient (or their agents) approval.Contractor to coordinate all mechanical,electrical, hydraulic and fire servicesrequirements to suit the architectural designintent and seek approval for these beforeproceeding with works on site.Contractor to ensure all items are fit for purposeincluding structural integrity and methods ofmanufacture in accordance with the BCAContractor responsible for assessing siteaccess and installation of all finished joinery.DO NOT SCALE OFF DRAWINGS
© UNLESS OTHERWISE AGREED THISDRAWING AND THE INTELLECTUALPROPERTY CONTAINED HERE-ONREMAINS THE PROPERTY OF:
foster and burke interior designStephen BurkeM. 0403 759214E. stephen@fosterburke.com[sub-contractor to Montage Interiors]
CLIENT NAME AND SITE ADDRESS
DATE
DRAWN BY
SCALE
DRAWING NUMBER
DRAWING TITLE:
LEGEND
NOT TO SCALE
LVL 3 / 33 ERSKINE STREETSYDNEYNSW 2000
22.01.2015
STEPHEN BURKE
K010
DESIGN 1A: ELECTRICAL
Montage InteriorsStephen BryantM. 0425 306468E. stephenbryant@montage-interiors.com
Design 1A: ELECTRICALRefer to Plan notes and the following:*Refer to:-RCP for lightingGPO's:Unless otherwise specified all GPO's are DoublesUnless otherwise specified all GPO's are 250mm AFL[Excluding GPO's for TV's and Kitchen (see Kitchen Joinery)
TELEVISIONS:All televisions are to be ceiling pole fixed and able to swivelRefer to plan for electrical and data information
CABLESChase Cabling in Meeting Rooms A, B and 1 andBoardroom-NB:Ensure Cables are not exposed across thefloor in Meeting Rooms etc, when cabling data is to a table
Work Stations:All INDIVIDUAL workstations to have PER 61 PERSONS[1x Additional Data added to 2x workstations at back of bldg]1x Data [D]1x Telephone [TEL]2x Double GPO's [DBL GPO]Meeting Room A:Refer to notes on planMeeting Room BRefer to notes on planBoardroomRefer to notes on planKitchen/BreakoutRefer to notes on plan and Kitchen Joinery Details drawingKO15Meeting Rooms 1, 2 and 3 [each room]Refer to notes on planFCE 1 and FCE 2Refer to notes on planJob Seeker Room [per Desk]Refer to notes on planExit SignsPlace ceiling fixed exits signs as required to meet currentregulations
Updated: 04032015 [Submission 5]
stephen burke: hospitality and corporate interior design
PR
ES
EN
TATI
ON
BO
AR
DS
: VA
RIO
US
SALES OFFICE: BLOCK COLOUR PAINT DESIGN FOR WALLS
top related