SUMMARYOFEXPERIENCE

Dr. Jonathan Lesser is the President of Continental Economics, Inc., and has over 25yearsof experienceworking for regulatedutilities, governments, and as an economicconsultant. He has extensive experience in valuation and damages analysis, fromestimatingthedamagesassociatedwithbreakingcommercialleasestovaluingnuclearpower plants. Dr. Lesser has performed due diligence studies for investment banks,testifiedongeneratingplantstrandedcosts,assesseddamagesincommerciallitigationcases,andperformedstatisticalanalysisforclasscertification.Hehasalsoservedasanarbiterincommercialdamagesproceedings.

Hehasanalyzedeconomicandregulatoryissuesaffectingtheenergyindustry,includingcost‐benefitanalysisoftransmission,generation,anddistribution investment,gasandelectricutilitystructureandoperations,generatingassetvaluationunderuncertainty,mergersandacquisitions,costallocationandratedesign,resourceinvestmentdecisionstrategies, cost of capital, depreciation, risk management, incentive regulation,economicimpactstudiesofenergyinfrastructuredevelopment,andgeneralregulatorypolicy.

Dr. Lesser has prepared expert testimony and reports in cases before utilitycommissions in numerous U.S. states; before the Federal Energy RegulatoryCommission (FERC); before international regulators in Latin America and theCaribbean; in commercial litigation cases; and before legislative committees inConnecticut,Maryland,NewJersey,Ohio,Texas,Vermont,andWashingtonState.Hehasalso served as an independent arbiter in disputes involving regulatory treatment ofutilitiesandvaluationofenergygenerationassets.

Dr.Lesser is theauthorofnumerousacademicandtradepressarticles.He isalsothecoauthorofEnvironmentalEconomicsandPolicy,publishedin1997byAddisonWesleyLongman, Fundamentals of Energy Regulation, published in 2007 by Public UtilitiesReports, Inc., andPrinciplesofUtilityCorporateFinance, published in 2011 by PublicUtilitiesReports, Inc. Dr. Lesser is also a contributing columnist andEditorialBoardmemberforNaturalGas&Electricity.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page2of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

AREASOFEXPERTISE

• State,federal,andinternationalrateregulation–costofcapital,depreciation,costofservice,costallocation,ratedesign,incentiveregulation,andregulatoryframeworkdesign

• Commercialdamagesestimationandlitigation• Cost‐benefitanalysis• Regulatorypolicyandmarketdesign• Economicimpactanalysisandinput‐outputstudies• Environmentalcomplianceandlitigation• Marketpoweranalysis• Loadforecastingandenergymarketmodeling• Energyassetvaluationandduediligence

SELECTEDEXPERTTESTIMONYANDREPORTS

FirstEnergySolutionsCorp.

ProceedingbeforetheOhioPublicUtilitiesCommission(CaseNos.11‐346‐EL‐SSOand11‐348‐EL‐SSO)

Subject:RevisedAEPOhioenergysecurityplan,benefitsofretailmarketcompetition.

ProceedingbeforetheOhioPublicUtilitiesCommission(CaseNo.10‐2929‐EL‐UNC)

Subject:AppropriatepriceforcommercialretailelectricsupplierstobechargedbyAEPOhioforinstalledcapacityunderthePJMFixedResourceRequirementtariffoption.

SouthwesternElectricCooperative

FERCproceedingregardingwholesaledistributionrateapplicationofAmerenIllinois(Re:MidwesternISOandAmerenIllinois,DocketNo.ER11‐2777‐002,etal.)

Subject:Allowedrateofreturnandcapitalstructure

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page3of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

ExelonCorporation

ProceedingbeforetheNewJerseyBoardofPublicUtilities(DocketNo.EO‐11050309)

Subject:PJMCapacityMarket,CapacityProcurement,andTransmissionPlanning

FirstEnergySolutionsCorp.

ProceedingbeforetheOhioPublicUtilitiesCommission(CaseNos.11‐346‐EL‐SSOand11‐348‐EL‐SSO)

Subject:AEPOhioenergysecurityplan,benefitsofretailmarketcompetition.

IndustrialEnergyUsersofOhio

ProceedingbeforetheOhioPublicUtilitiesCommission(CaseNo.08‐917‐EL‐SSO)

Subject:Determinationofcostassociatedwith“provider‐of‐last‐resort”(POLR)serviceandAEPOhio’suseofoptionpricingmodels.

SouthwestGasCorporation

FERCproceedingregardingrateapplicationofElPasoNaturalGasCompany(DocketNo.RP10‐1398‐000)

Subject:Developmentofrisk‐sharingmethodologyforunsubscribedanddiscountcapacitycosts.

PortlandNaturalGasShippers

FERCrateproceedingregardingtherateapplicationbyNorthernBorderPipelineCompany(Re:PortlandNaturalGasTransmissionSystem,DocketNo.RP10‐729‐000)

FERCrateproceedingregardingtherateapplicationbyNorthernBorderPipelineCompany(Re:PortlandNaturalGasTransmissionSystem,DocketNo.RP08‐306‐000)

Subject:Naturalgassupplies,economiclifetime,anddepreciationrates.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page4of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

IndependentPowerProducersofNewYork

FERCproceeding(NewYorkIndependentSystemOperator,Inc.,DocketNo.ER11‐2224‐000)

Subject:ReasonablenessoftheproposedinstalledcapacitydemandcurvesandcostofnewentryvaluesproposedbytheNewYorkIndependentSystemOperator.

MarylandPublicServiceCommission

MergerapplicationofFirstEnergyCorporationandAlleghenyEnergy,Inc.(I/M/OFirstEnergyCorpandAlleghenyEnergy,Inc.,CaseNo.9233)

Subject:ProposedmergerbetweenFirstEnergyCorporationandAlleghenyEnergy.Testimonydescribedthestructureandresultsofacost‐benefitanalysistodeterminewhethertheproposedmergermetthestate’spositivebenefitstest,andincludedanalysisofmarketpowerandmergersynergies.

AlliancetoProtectNantucketSound

ProceedingbeforetheMassachusettsDepartmentofPublicUtilities(CaseNo.D.P.U.10‐54)

Subject:ApprovalofProposedLong‐TermContractsforRenewableEnergyWithCapeWindAssociates,LLC.

BrookfieldEnergyMarketing,LLC

FERCproceeding(NewEnglandPowerGeneratorsAssociation,etal.v.ISONewEngland,Inc.,DocketNos.ER10‐787‐000,ER10‐50‐000,andEL10‐57‐000(consolidated)).

Subject:ProposedforwardcapacitymarketpaymentsforimportedcapacityintoISO‐NE.

PublicServiceCompanyofNewMexico

ProceedingbeforetheNewMexicoPublicRegulationCommission(CaseNo.10‐00086‐UT)

Subject:Loadforecastforfuturetestyear,residentialpriceelasticitystudy.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page5of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

M‐S‐RPublicPowerAgency

FERCproceeding(SouthernCaliforniaEdisonCo.,DocketNo.ER09‐187‐000andER10‐160‐000)

Subject:Allowedrateofreturnforconstructionworkinprogress(CWIP)expendituresforcertaintransmissionfacilities.

FERCproceeding(SouthernCaliforniaEdisonCo.,DocketNo.ER10‐160‐000)

Subject:Allowedrateofreturnforconstructionworkinprogress(CWIP)expendituresforcertaintransmissionfacilities.

FinancialMarketers

FERCproceeding(BlackOakEnergy,LLCvPJMInterconnection,L.L.C.,DocketNo.EL08‐014‐002)

Subject:AllocationofsurplustransmissionlinelossesunderthePJMtariff.

SouthwestGasCorporationandSaltRiverProject

FERCproceedingregardingrateapplicationofElPasoNaturalGasCompany(DocketNo.RP08‐426‐000)

Subject:Analysisofproposedcapitalstructureandrecommendedcapitalstructureadjustments

NewYorkRegionalInterconnect,Inc.

ProceedingbeforetheNewYorkPublicServiceCommission(CaseNo.06‐T‐0650)

Subject:Analysisofeconomicandpublicpolicybenefitsofaproposedhigh‐voltagetransmissionline.

OccidentalChemicalCorporation

FERCProceeding(WestarEnergy,Inc.ER07‐1344‐000)

Subject:ComplianceofwholesalepowersalesagreementwithFERCstandards

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page6of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

EPICMerchantEnergy,LLC,etal.

FERCProceeding(AmerenServicesCompanyv.MidwestIndependentSystemOperator,Inc.,DocketNos.EL07‐86‐000,EL07‐88‐000,EL07‐92‐000(Consolidated)

Subject:Allocationofrevenuesufficiencyguaranteecosts.

CottonwoodEnergy,LP

ProceedingbeforethePublicUtilityCommissionofTexas(ApplicationofKelsonTransmissionCompany,LLCforaCertificateofConvenienceandNecessityfortheAmendedProposedCanaltoDeweyville345kVTransmissionLinewithChambers,Hardin,Jasper,Jefferson,Liberty,Newton,andOrangeCounties,DocketNo.34611,SOAHDocketNo.473‐08‐3341)

Subject:Benefitsoftransmissioncapacityinvestments.

RedbudEnergy,LP

ProceedingbeforetheOklahomaCorporationCommission(RequestofPublicServiceCompanyofOklahomafortheOklahomaCorporationCommissiontoRetainanIndependentEvaluator,CauseNo.PUD200700418)

Subject:ReasonablenessofPSO’s2008RFPdesign.

TheNRGCompanies

FERCProceeding(ISONewEnglandInc.andNewEnglandPowerPool,DocketNo.ER08‐1209‐000)

Subject:CompensationofRejectedDe‐listBidsUnderISO‐NE’sForwardCapacityMarketDesign

DynegyPowerMarketing,LLC

• FERCproceeding,KeySpan‐Ravenswood,LLCv.NewYorkIndependentSystemOperator,Inc.,DocketNo.EL05‐17‐000

Subject:EstimationofdamagesaccruingtoDynegyarisingfromafailurebytheNYISOtoaccuratelycalculatelocationalinstalledcapacityrequirementsinNYISOduringthesummerof2002.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page7of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

ConstellationEnergyGroup

FERCproceeding(MarylandPublicUtilityCommission,etal.,v.PJMInterconnection,LLC,DocketNo.EL08‐67‐000)

Subject:“Justandreasonableness”ofPJM’sReliabilityPricingMechanism.

GovernmentofBelize,PublicUtilityCommission

ProceedingbeforetheBelizePublicUtilityCommission,IntheMatterofthePublicUtilitiesCommissionInitialDecisioninthe2008AnnualReviewProceedingforBelizeElectricityLimited.

Subject:ArbitrationandIndependentExpert’sreport,indisputebetweentheBelizePUCandBelizeElectricityLimitedinanannualelectricratetariffreview,asrequiredunderBelizelaw.

FederalEnergyRegulatoryCommission

Technicalhearingsonwholesaleelectriccapacitymarketdesign.

Subject:AnalysisofproposaltoreviseRTOcapacitymarketdesigndevelopedbytheAmericanForestandPaperAssociation.

DogwoodEnergy,LLC

ProceedingbeforetheMissouriPublicServiceCommission,IntheMatteroftheApplicationofAquila,Inc.,d/b/aAquilaNetworks‐MPSandAquilaCaseNo.EO‐2008‐0046,Networks‐L&PforAuthoritytoTransferOperationalControlofCertainTransmissionAssetstotheMidwestIndependentTransmissionSystemOperator,Inc.,CaseNo.EO‐2008‐0046.

Subject:Cost‐benefitanalysistodeterminewhetherAquilashouldjoineithertheMidwestIndependentSystemOperator(MISO)ortheSouthwestPowerPool(SPP).

IndependentPowerProducersofNewYork

• FERCproceeding(Re:NewYorkIndependentSystemOperator,Inc.,DocketNo.ER08‐283‐000)

Subject:Revisionstotheinstalledcapacity(ICAP)marketdemandcurvesintheNewYorkcontrolarea,whicharedesignedtoprovideeconomicincentivesfornewgenerationdevelopment.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page8of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

EmpresaEléctricadeGuatemala

• RateproceedingbeforetheComisiónNacionaldeEnergíaEléctrica

Subject:Rateofreturnforanelectricdistributioncompany

ElectricPowerSupplyAssociation

• FERCproceeding(Re:MidwestIndependentTransmissionSystemOperator,Inc.,DocketNo.ER07‐1182‐000)

Subject:Critiqueofcost‐benefitanalysisbyMISOIndependentMarketMonitorconcludingthatpermanentestablishmentofBroadConstrainedAreamitigationwasappropriate.

ConstellationEnergyCommoditiesGroup,LLC

• FERCproceedingregardingrateapplicationforancillaryservicesbyAmerenEnergy(Re:AmerenEnergyMarketingCompanyandAmerenEnergy,Inc.,DocketNos.ER07‐169‐000andER07‐170‐000)

• Subject:Analysisandtestimonyonappropriate“opportunitycost”ratesforancillaryservices,includingregulationserviceandspinningreserveservice.Casesettledpriortotestimonybeingfiled.

SuizaDairyCorporation

• RateproceedingbeforetheOfficeofMilkIndustryRegulatoryAdministrationofPuertoRico.

• Subject:AnalysisandtestimonyontheappropriaterateofreturnforregulatedmilkprocessorsintheCommonwealthofPuertoRico.

DPLInc.

• ProceedingbeforetheOhioBoardofTaxAppeals(DPL,Inc.anditssubsidiariesv.WilliamW.Wilkins,TaxCommissionerofOhio,CaseNo.2004‐A‐1437)

Subject:Economicimpactsofgenerationinvestmentandqualificationofelectricutilityinvestmentsas“manufacturing”investmentsforpurposesofstateinvestmenttaxcredits.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page9of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

IGIResources,LLCandBPCanadaEnergyMarketingCorp.

• FERCproceedingregardingtherateapplicationbyGasTransmissionNorthwestCorporation(Re:GasTransmissionNorthwest,DocketNo.RP06‐407‐000)

Subject:Naturalgassupplies,economiclifetime,anddepreciationrates.

BaltimoreGasandElectricCo.

• MarylandPublicServiceCommission(CaseNo.9099)

Subject:StandardOfferServicepricing.Testimonyfocusedonfactorsdrivingelectricpriceincreasessince1999,andestimatesofratesundercontinuedregulation

• MarylandPublicServiceCommission(CaseNo.9073)

Subject:Strandedcostsofgeneration.Testimonyfocusedonanalysisofbenefitsofcompetitivewholesalepowerindustry.

• MarylandPublicServiceCommission(CaseNo.9063)

Subject:OptimalstructureofMaryland’selectricindustry.Testimonyfocusedonthebenefitsofcompetitivewholesaleelectricmarkets.Presentedindependentestimatesofbenefitsofrestructuringsince1999.

Pemex‐GasyPetroquímicaBásica

• Expertreportinarateproceeding.PresentedanalysisbeforetheComisiónReguladoradeEnergíaontheappropriaterateofreturnforthenaturalgaspipelineindustry.

BPCanadaMarketingCorp.

• FERCproceedingregardingtherateapplicationbyNorthernBorderPipelineCompany(Re:NorthernBorderPipeline,DocketNo.RP06‐072‐000)

Subject:Naturalgassupplies,economiclifetime,anddepreciationrates.

TransmissionAgencyofNorthernCalifornia

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNo.ER09‐1521‐000)

Subject:Analysisofappropriatereturnonequity,capitalstructure,andoverallcostofcapital.Casesettledpriortofilingexperttestimony.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page10of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNo.ER08‐1318‐000)

Subject:Analysisofappropriatereturnonequity,capitalstructure,andoverallcostofcapital.Casesettledpriortofilingexperttestimony.

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNo.ER07‐1213‐000)

Subject:Analysisofappropriatereturnonequity,capitalstructure,andoverallcostofcapital.Casesettledpriortofilingexperttestimony.

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNo.ER06‐1325‐000)

Subject:Analysisofappropriatereturnonequity,capitalstructure,andoverallcostofcapital.Casesettledpriortofilingexperttestimony.

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNo.ER05‐1284‐000)

Subject:Analysisofappropriatereturnonequity,capitalstructure,andoverallcostofcapital.Casesettledpriortofilingexperttestimony.

• FERCrateproceeding(Re:PacificGas&ElectricCompany,DocketNos.ER03‐409‐000,ER03‐666‐000)

Subject:Analysisanddevelopmentofrecommendationfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

StateofNewJerseyBoardofPublicUtilities

• MergerapplicationofPublicServiceEnterpriseGroupandExelonCorporation(I/M/OTheJointPetitionOfPublicServiceElectricAndGasCompanyAndExelonCorporationForApprovalOfAChangeInControlOfPublicServiceElectricAndGasCompanyAndRelatedAuthorizations,BPUDocketNo.EM05020106,OALDocketNo.PUC‐1874‐050)

Subject:ProposedmergerbetweenExelonCorporationandPSEGCorporation.Testimonydescribedthestructureandresultsofacost‐benefitanalysistodeterminewhethertheproposedmergermetthestate’spositivebenefitstest,andincludedanalysisofmarketpower,valueofchangesinnuclearplantoperations,andmergersynergies.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page11of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

SierraPacificPowerCorp.

• FERCproceedingregardingtherateapplicationbyPaiutePipelineCompany(RePaiutePipelineCompanyDocketNo.RP05‐163‐000)

Subject:Depreciationanalysis,negativesalvage,andnaturalgassupplies.Casesettledpriortofilingexperttestimony.

MatanuskaElectric

• RegulatoryCommissionofAlaskarateproceeding(IntheMatteroftheRevisiontoCurrentDepreciationRatesFiledbyChugachElectricAssociation,Inc.,DocketNo.U‐04‐102)

Subject:AnalysisofthereasonablenessofChugachelectric’sdepreciationstudy.

DukeEnergyNorthAmerica,LLC

• FERCproceeding(Re:DevonPower,LLC,etal.,DocketNo.ER03‐563‐030)

Subject:AppropriatemarketdesignforlocationalinstalledgeneratingcapacityintheNewEnglandmarkettoensuresystemreliability.

Keyspan‐Ravenswood,LLC

• FERCproceeding,KeySpan‐Ravenswood,LLCv.NewYorkIndependentSystemOperator,Inc.,DocketNo.EL05‐17‐000

Subject:EstimationofdamagesarisingfromafailurebytheNYISOtoaccuratelycalculatelocationalinstalledcapacityrequirementsinNewYorkCityduringthesummerof2002.

ElectricPowerSupplyAssociation

• FERCproceeding(Re:PJMInterconnection,LLC,DocketNo.EL03‐236‐002)

Subject:AnalysisandcritiqueofproposedpivotalsuppliertestsformarketpowerinPJMidentifiedloadpockets.

VermontDepartmentofPublicService

• VermontPublicServiceBoardRateProceedings

o Concurrentproceedings:Re:GreenMountainPowerCorp.,DocketsNo.7175and7176.Subject:Costofcapitalandallowedreturnonequity

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page12of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

undercostofserviceregulation,aswellasunderaproposedalternativeregulationproposal.

o Re:ShorehamTelephoneCompany,DocketNo.6914.Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

o Re:VermontElectricPowerCompany,DocketNo.6860.Subject:Developmentofaleast‐costtransmissionsysteminvestmentstrategytoanalyzetheprudenceofamajorhigh‐voltagetransmissionsystemupgradeproposedbytheVermontElectricPowerCompany.

o Re:CentralVermontPublicServiceCompany,DocketNo.6867.Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

o Re:GreenMountainPowerCorporation,DocketNo.6866.Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

Pipelineshippers

• FERCproceedingregardingtherateapplicationofNorthernNaturalGasCompany(Re:NorthernNaturalGasCompany,DocketNo.RP03‐398‐000)

Subject:Gassupplyanalysistodeterminepipelinedepreciationratesaspartofanoverallrateproceeding.

ArkansasOklahomaGasCorp.

• OklahomaCorporationCommissionrateproceeding(Re:ArkansasOklahomaGasCorporation,DocketNo.03‐088)

Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

• ArkansasPublicServiceCommissionrateproceedings

o IntheMatteroftheApplicationofArkansasOklahomaGasCorporationforaGeneralChangeinRatesandTariffs,DocketNo.05‐006‐U.Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

o IntheMatteroftheApplicationofArkansasOklahomaGasCorporationforaGeneralChangeinRatesandTariffs,DocketNo.02‐24‐U.Subject:Analysisand

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page13of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

developmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

EntergyNuclearVermontYankee,LLC

• VermontPublicServiceBoardproceeding(Re:PetitionofEntergyNuclearVermontYankeeforaCertificateofPublicGood,DocketNo.6812)

Subject:AnalysisoftheeconomicbenefitsofnuclearplantgeneratingcapacityexpansionasrequiredforanapplicationforaCertificateofPublicGood.

CentralIllinoisLightingCompany

• IllinoisCommerceCommissionrateproceeding(Re:CentralIllinoisLightingCompany,DocketNo.02‐0837)

Subject:Analysisanddevelopmentofrecommendationsfortheappropriatereturnonequity,capitalstructure,andoverallcostofcapital.

CitizensUtilitiesCorp.

• VermontPublicServiceBoardrateproceeding(TariffFilingofCitizensCommunicationsCompanyrequestingarateincreaseintheamountof40.02%totakeeffectDecember15,2001,DocketNo.6596)

Subject:Analysisoftheprudenceandeconomicused‐and‐usefulnessofCitizens’long‐termpurchaseofgenerationfromHydroQuebec,includingtheestimatedenvironmentalcostsandbenefitsofthepurchase.

DynegyLNGProduction,LP

• FERCproceeding(Re:DynegyLNGProductionTerminal,LP,DocketNo.CP01‐423‐000).September2001

Subject:AnalysisofmarketpowerimpactsofproposedLNGfacilitydevelopment.

MissouriGasEnergyCorp.

• FERCrateproceeding(Re:KansasPipelineCorporation,DocketNo.RP99‐485‐000)

Subject:Gassupplyanalysistodeterminepipelinedepreciationratesaspartofanoverallrateproceeding.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page14of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

GreenMountainPowerCorp.

• VermontPublicServiceBoardrateproceedings

o IntheMatterofGreenMountainPowerCorporationrequestinga12.93%RateIncreasetotakeeffectJanuary22,1999,DocketNo.6107.Subject:Analysisoftheappropriatediscountrate,treatmentofenvironmentalcosts,andthetreatmentofriskanduncertaintyaspartofamajorpower‐purchaseagreementwithHydro‐Quebec.

o InvestigationintotheDepartmentofPublicService’sProposedEnergyEfficiencyUtility,DocketNo.5980.Subject:Analysisofdistributedutilityplanningmethodologiesandenvironmentalcosts.

o TariffFilingofGreenMountainPowerCorporationrequestinga16.7%RateIncreasetotakeeffect7/31/97,DocketNo.5983.Subject:Analysisofdistributedutilityplanningmethodologiesandavoidedelectricitycosts.

o TariffFilingofGreenMountainPowerCorporationrequestinga16.7%RateIncreasetotakeeffect7/31/97,DocketNo.5983.Subject:Valuationofalong‐termpowerpurchasecontractwithHydro‐Quebecinthecontextofadeterminationofprudenceandeconomicused‐and‐usefulness.

UnitedIlluminatingCompany

• ConnecticutDept.ofPublicUtilityControlproceeding(ApplicationoftheUnitedIlluminatingCompanyforRecoveryofStrandedCosts,DocketNo.99‐03‐04)

Subject:Developmentandapplicationofdynamicprogrammingmodelstoestimatenuclearplantstrandedcosts.

COMMERCIALLITIGATIONEXPERIENCE

• U.S.DistrictCourt,DistrictofPuertoRico,CivilCaseNo.04‐1840.(VacqueriaTresMonjitasandSuizaDairy,Inc.v.JoseO.Laboy,inhisOfficialcapacity,astheSecretaryoftheDepartmentofAgriculturefortheCommonwealthofPuertoRico,andJuanR.Pedro‐Gordian,inhisofficialcapacity,asAdministratoroftheOfficeoftheMilkIndustryRegulatoryAdministrationfortheCommonwealthofPuertoRico)Determinedtheappropriate“countryrisk”premiumforthefreshmilkdairyindustryintheCommonwealthofPuertoRico.

• Lorali,Ltd.,etal.v.SempraEnergySolutions,LLC,etal.Damagesassociatedwithabrogationofretailelectricsupplycontract.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page15of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• IMOIndustriesv.Transamerica.Estimatedtheappropriatediscountratetouseforestimatingdamagesovertimeassociatedwithafailureoftheinsurancecompaniestoreimburseasbestos‐relateddamageclaimsandtheresultinglossestothefirm’svalue.

• JohnC.LincolnHospitalv.MaricopaCounty.Performedstatisticalanalysistodeterminethevalueofaclassofunpaidhospitalinsuranceclaims.

• Catamount/Brownell,LLC.v.RandyRowland.Preparedanexpertreportonthedamagesassociatedwithbreachofcommerciallease.

• Lyubnerv.SizzlingPlatters,Inc..Performedaneconometricanalysisofdamageclaimsbasedonsalesimpactsassociatedwithadvertising.

• Pietrov.Pietro.Estimatedpensionbenefitsarisingfromadivorcecase.

• U.S.DistrictCourtfortheDistrictofVermont.Nat’l.AssociationofElectricManufacturersv.Sorrell.Expertreportandtestimonyonthecostsoflabelingfluorescentlampsandtheimpactsoflabelinglawsonthedemandforelectricity.

ARBITRATIONCASES

TransCanadaHydroNortheast,Inc.v.TownofLittleton,NewHampshire,(CPRFileNo.G‐09‐24).

Subject:disputeregardingvaluationforpropertytaxpurposesofahydroelectricfacilitylocatedontheConnecticutRiver.

Servedasneutralonathree‐personarbitrationpanel.

BelizeElectricityLimitedv.BelizePublicUtilitiesCommission(ClaimNo.512of2008).

Subject:ProceedingbeforetheSupremeCourtofBelizeallegingthattheFinalDecisionbytheBelizePublicUtilitiesCommissionsettingelectricratesandtariffsforthe2008‐2009periodwereunreasonableandnon‐compensatory.

PreparedindependentreportonbehalfoftheBelizeSupremeCourtforarbitrationofthedispute.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page16of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

SELECTEDBUSINESSCONSULTINGEXPERIENCE

• FortheCOMPETECoalition,preparedreportonhowelectriccompetitioncreateseconomicgrowth.

• Foranindustrygroup,developedeconometricmodelsoftheimpactsofshalegasproductiononU.S.naturalgasandelectricprices.

• Foranenvironmentaladvocacygroup,criticallyevaluatedthefinancialimplicationsofoperatingrestrictionsforanoff‐shorewindgeneratingfacilitystemmingfromrequirementsundertheU.S.EndangeredSpeciesAct.

• Foramajorinvestor‐ownedutilityintheUS,preparedanewsystemofshort‐termpeakandenergyforecastingmodels.

• Foramajorwholesaleelectricgenerationcompany,preparedcomprehensiveeconomicimpactstudiesforuseinFERChydroelectricrelicensingproceedings.

• Foramajorinvestor‐ownedutilityintheSouthwestUS,preparedadetailedeconometricmodelandwroteacomprehensivereportonresidentialpriceelasticitythatwasrequiredbyregulators.

• Foramajorinvestor‐ownedutilityintheSouthwestUS,developedamethodologytovaluenuclearplantleasesthatincorporatedfutureuncertaintyregardinggreenhousegasregulations.

• Facultymember,PURC/WorldBankInternationalTrainingProgramonUtilityRegulationandStrategy,UniversityofFlorida,PublicUtilityResearchCenter,Gainesville,FL,2008–2009.Coursestaught:

o SectorIssues:BasicTechniques–Energyo SectorIssuesinRateDesign:Energyo SectorIssuesinRateDesign:Energy–CaseStudieso TransmissionPricingIssues

• Foramajorsolarenergyfirm,evaluatedcostsandbenefitsofalternativesolartechnologies;assistedwithsitingandtransmissionaccessissues.

• ForindustrialcustomersintheStateofVermont,preparedapositionpaperontheimpactsofdemandsidemanagementfundingonelectricratesandcompetitiveness.

• ForamajorNewYorkbrokeragefirm,performedafairnessopinionvaluationofagas‐firedelectricgeneratingfacility.

• Forelectricutilitiesundergoingrestructuring,developedcomprehensiveeconomicmodelstovaluebuyeroffersassociatedwithnuclearpowerplantdivestitures.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page17of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• ForalargemunicipalelectricutilityinFlorida,analyzedrealoptionvaluesofalternativeproposedpurchasedgenerationcontractswhosestrikepricesweretiedtofuturenaturalgasandoilprices,anddevelopedcontractrecommendations.

• ForamunicipalelectricutilityinFlorida,developedananalyticalmodeltodeterminerisk‐returntradeoffsofalternativegenerationportfolios,identifyanefficientfrontierofgenerationassetportfolios,andrecommendedassetpurchaseandsalestrategies.

• ForCentralVermontPublicServiceCorp.andGreenMountainPowerCorp.,developedanalysesofdistributioncapacityinvestmentsaccountingforuncertaintyoverfuturepeakloadgrowth.

• ForamajorelectricutilityinLatinAmerica,developedriskmanagementstrategiesforhedgingnaturalgassupplieswithminimalup‐frontinvestment;preparedtrainingmaterialsforutilitystaff;andwrotetheutility’sriskmanagementPoliciesandProceduresManual.

• ForamajornuclearplantownerandoperatorintheU.S.,preparedreportsoftheeconomicbenefitsofnuclearplantoperationanddevelopment.

• FortheElectricPowerSupplyAssociation,preparednumerouspolicypapersaddressingwholesaleelectricmarketdesignandcompetition.

• FortheCaliforniaEnergyCommission,developedanewpolicyapproachtorenewablesfeed‐intariffsanddevelopedportfolioanalysismodelstodevelopan“efficientfrontier”ofgenerationportfoliosforthestate.

• Foramajornuclearplantownerandoperator,assessedthelikelihoodofrelicensingaspecificnuclearplantinNewEngland,givenstateregulatoryconcernsoveron‐sitespentfuelstorage.

• Foralargeinvestor‐ownedutilityintheSoutheast,analyzedalternativeenvironmentalcompliancestrategiesthatdirectlyincorporateduncertaintyoverfutureemissionscosts,environmentalregulations,andalternativepollutioncontroltechnologyeffectiveness.

• ForaSpecialLegislativeCommitteeoftheProvinceofNewBrunswick,servedasanexpertadvisoronthedevelopmentofaderegulatedelectricpowermarket.

• FortheBonnevillePowerAdministration,developedmodelstoassesstheeconomicimpactsoflocalgenerationresourcedevelopmentinWashingtonStateandOregon.

• ForanelectricutilityinthePacificNorthwest,assistedinnegotiationssurroundingrelicensingofalargehydroelectricgeneratingfacility.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page18of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• ServedasanexpertadvisorfortheNorthwestPowerPlanningCouncilregardingfuturepowersupplies,loadgrowth,andeconomicgrowth.

EDUCATION

• PhD,Economics,UniversityofWashington

• MA,Economics,UniversityofWashington

• BSc,MathematicsandEconomics(withhonors),UniversityofNewMexico

EMPLOYMENTHISTORY

2009–Present:ContinentalEconomics,Inc.,President.

2004–2009:BatesWhite,LLC,Partner,EnergyPractice.

2003–2004:VermontDept.ofPublicService,DirectorofPlanning.

1998–2003:NavigantConsulting,SeniorManagingEconomist.

1996–1998:AdjunctLecturer,SchoolofBusiness,UniversityofVermont.

1993–1998:GreenMountainPowerCorporation,Manager,EconomicAnalysis.

1990–1993:AdjunctLecturer,Dept.ofBusinessandEconomics,SaintMartin’sCollege.

1986–1993:WashingtonStateEnergyOffice,EnergyPolicySpecialist.

1984–1986:PacificNorthwestUtilitiesConferenceCommittee,EnergyEconomist.

1983–1984:IdahoPowerCorporation,LoadForecastingAnalyst.

PROFESSIONALACTIVITIES

• Reviewer,Energy

• Reviewer,TheEnergyJournal

• Reviewer,EnergyPolicy

• Reviewer,JournalofRegulatoryEconomics

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page19of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

PROFESSIONALASSOCIATIONS

• EnergyBarAssociation

• InternationalAssociationforEnergyEconomics

• SocietyforBenefit‐CostAnalysis

PUBLICATIONS

Peer‐reviewedjournalarticles

• Lesser,J.,“Gresham’sLawofGreenEnergy,”Regulation,Winter2010‐2011,pp.12‐18.

• Lesser,J.,andE.Nicholson,“AbandonallHope?FERC’sEvolvingStandardsforIdentifyingComparableFirmsandEstimatingtheRateofReturn,”EnergyLawJournal30(April2009):105‐132.

• Lesser,J.andX.Su.“DesignofanEconomicallyEfficientFeed‐inTariffStructureforRenewableEnergyDevelopment.”EnergyPolicy36(March2008)981–990.

• Lesser,J.“TheEconomicUsed‐and‐UsefulTest:ItsOriginsandImplicationsforaRestructuredElectricIndustry.”EnergyLawJournal23(November2002):349–82.

• Lesser,J.,andC.Feinstein.“ElectricUtilityRestructuring,RegulationofDistributionUtilities,andtheFallacyof‘AvoidedCost’Rules.”JournalofRegulatoryEconomics15(January1999):93–110.

• Lesser,J.,andC.Feinstein.“DefiningDistributedUtilityPlanning.”TheEnergyJournal,SpecialIssue,DistributedResources:TowardaNewParadigm(1998):41–62.

• Lesser,J.,andR.Zerbe.“WhatCanEconomicAnalysisContributetotheSustainabilityDebate?”ContemporaryPolicyIssues13(July1995):88–100.

• Lesser,J.,andR.Zerbe.“TheDiscountRateforEnvironmentalProjects.”JournalofPolicyAnalysisandManagement13(Winter1994):140–56.

• Lesser,J.,andD.Dodds.“CanUtilityCommissionsImproveonEnvironmentalRegulations?”LandEconomics70(February1994):63–76.

• Lesser,J.“EstimatingtheEconomicImpactsofGeothermalResourceDevelopment.”Geothermics24(Winter1994):52–69.

• Lesser,J.“ApplicationofStochasticDominanceTeststoUtilityResourcePlanningUnderUncertainty.”Energy15(December1990):949–61.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page20of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• Lesser,J.“ResaleoftheColumbiaRiverTreatyDownstreamPowerBenefits:OneRoadFromHeretoThere.”NaturalResourcesJournal30(July1990):609–28.

• Lesser,J.,andJ.Weber.“The65M.P.H.SpeedLimitandtheDemandforGasoline:ACaseStudyfortheStateofWashington.”EnergySystemsandPolicy13(July1989):191–203.

• Lesser,J.“TheEconomicsofPreferencePower.”ResearchinLawandEconomics12(1989):131–51.

Booksandcontributedchapters

• Lesser,J.,andL.R.Giacchino,PrinciplesofUtilityCorporateFinance,Vienna,VA:PublicUtilitiesReports,2011.

• Lesser,J.,andL.R.Giacchino.FundamentalsofEnergyRegulation,Vienna,VA:PublicUtilitiesReports,2007.

• Lesser,J.,andR.Zerbe.“APractitioner’sGuidetoBenefit‐CostAnalysis.”InHandbookofPublicFinance,editedbyF.Thompson,221–68.NewYork:RowanandAllenheld,1998.

• Lesser,J.,D.Dodds,andR.Zerbe.EnvironmentalEconomicsandPolicy,Reading:MA:AddisonWesleyLongman,1997.

Tradepresspublications

• Lesser,J.“HowwillEPA’sNewestRegulationsAffectElectricMarkets?”NaturalGasandElectricity(June2012):30‐32.

• Lesser,J.“PipelinePetulance,”NaturalGasandElectricity(March2012):27‐29.

• Lesser,J.“GlobalWarming,ClimateChange,erClimateVolatility:2012andBeyond,”NaturalGasandElectricity(January2012):22‐24.

• Lesser,J.,“Sunburnt:Solyndra,Subsidies,andtheGreenJobsDebacle,”NaturalGas&Electricity(November2011):30‐32..

• Lesser,J.,“IllinoisanExampleofwhentheWindDoesn’tBlow,”NaturalGas&Electricity(September2011):27‐29.

• Lesser,J.,“SalmonandWindDuelingforSubsidiesinthePacificNorthwest,”NaturalGas&Electricity(July2011):18‐20.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page21of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• Lesser,J.,“NuclearFallout,”NaturalGas&Electricity(May2011):31‐33.

• Lesser,J.,“TexasTwo‐Step:EPA’sGreenhouseGasPermittingTakeover,”NaturalGas&Electricity(March2011):21‐23.

• Lesser,J.,“LookingForward:EnergyandtheEnvironmentthrough2012,”NaturalGas&Electricity(January2011):30‐32.

• Lesser,J.,“First‐MoverDisadvantage:OffshoreWind’sFalseEconomicPromises,”NaturalGas&Electricity(November2010):26‐28.

• Lesser,J.,“WilltheBPDisasterAffectNaturalGasandElectricityMarkets?,”NaturalGas&Electricity(August2010):23‐24.

• Lesser,J.,“RenewableEnergyandtheFallacyof‘Green’Jobs,”TheElectricityJournal(August2010):45‐53.

• Lesser,J.,“LettheToughChoicesBegin:AffordableorGreen?,”NaturalGas&Electricity(June2010):27‐29.

• Lesser,J.,“WillShaleGasProductionbeDamagedbyTooManyFraccingComplaints?,”NaturalGas&Electricity(April2010):31‐32.

• Lesser,J.,“AstheClimateTurns:TheSagaContinues,”NaturalGas&Electricity(February2010):29‐32.

• Lesser,J.andN.Puga,“PublicPolicyandPrivateInterests:WhyTransmissionPlanningandCost‐AllocationMethodsContinuetoStifleRenewableEnergyPolicyGoals,”TheElectricityJournal(December2009):7‐19.

• Lesser,J,“ShortCircuit:WillElectricCarsProvideEnergyandEnvironmentalSalvation?”NaturalGas&Electricity(November2009):27‐28.

• Lesser,J.,“GreenistheNewRed:TheHighCostofGreenJobs,”NaturalGas&Electricity(August2009):31‐32.

• Lesser,J.,“RegulatingGreenhouseGasEmissions:EPAGetsDown,”NaturalGas&Electricity(June2009):31‐32.

• Lesser,J.,“BeingReasonableWhileRegulatingGreenhouseGasEmissionsundertheCleanAirAct,”NaturalGas&Electricity(April2009):30‐32.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page22of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• Lesser,J.,“Renewables,BecomingCheaper,AreSuddenlyPassé,”NaturalGas&Electricity(February2009):30‐32.

• Lesser,J.,“MeasuringtheCostsandtheBenefitsofEnergyDevelopment,”NaturalGas&Electricity(December2008):30‐32.

• Lesser,J.,“ComparingtheBenefitsandtheCostsofEnergyDevelopment,”NaturalGas&Electricity(October2008):31‐32.

• Lesser,J.,“NewSourceReviewIsStillAnythingbutRoutine,”NaturalGas&Electricity(August2008):31‐32.

• Lesser,J.,andN.Puga,“PVversusSolarThermal,”PublicUtilitiesFortnightly146(July2008),pp.16‐20,27.

• Lesser,J.,“Cap‐and‐TradeforGasoline?,”WallStreetJournal,June14,2008,A14.

• Lesser,J.,“KansasSecretaryUnilaterallyBansCoalPlants,”NaturalGas&Electricity(June2008):30‐32.

• Lesser,J.,“SeeingThroughaGlass,Darkly,BanksApproachCoal‐FiredPowerFinancing,”NaturalGas&Electricity(April2008):29‐31.

• Lesser,J.,“TheEnergyIndependenceandSecurityActof2007:NoSubsidyLeftBehind,”NaturalGas&Electricity(February2008):29‐31.

• Lesser,J.,“ControlofGreenhouseGases:DifficultwithEitherCap‐and‐TradeorTax‐and‐Spend.”NaturalGas&Electricity(December2007):28‐31.

• Lesser,J.,“DéjàvuAllOverAgain:TheGrasswasnotGreenerUnderUtilityRegulation.”TheElectricityJournal20(December2007):35–39.

• Lesser,J.,“Blowin’intheWind:RenewableEnergyMandates,ElectricRates,andEnvironmentalQuality.”NaturalGas&Electricity(October2007):26‐28.

• Lesser,J.,“NoLegtoStandOn.”NaturalGas&Electricity(August2007):28–31.

• Lesser,J.,“GoldilocksChillsOut.”NaturalGas&Electricity(July2007):26–28.

• Lesser,J.,“GoldilocksandtheThreeClimates.”NaturalGas&Electricity(April2007):22–24.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page23of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• Lesser,J.,“Command‐and‐ControlStillLurksinEveryLegislature.”NaturalGas&Electricity(February2007):8–12.

• Lesser,J.,andG.Israilevich,“TheCapacityMarketEnigma.”PublicUtilitiesFortnightly143(December2005):38‐42.

• Lesser,J.,“OverblownPromises:TheHiddenCostsofSymbolicEnvironmentalism.”Livin’Vermont1(January/February2005):7,27.

• Lesser,J.,“RegulationbyLitigation.”PublicUtilitiesFortnightly142(October2004):24–29.

• Lesser,J.,“ROE:TheGorillaisStillattheDoor.”PublicUtilitiesFortnightly144(July2004):19–23.

• Lesser,J.,andS.Chapel,“KeystoTransmissionandDistributionReliability.”PublicUtilitiesFortnightly142(April2004):58–62.

• Lesser,J.,“DCFUtilityValuation:StilltheGoldStandard?”PublicUtilitiesFortnightly141(February15,2003):14–21.

• Lesser,J.,“WelcometotheNewEraofResourcePlanning:WhyRestructuringMayLeadtoMoreComplexRegulation,NotLess.”TheElectricityJournal15(July2002):20–28.

• Lesser,J.,andC.Feinstein,“IdentifyingApplicationsforDistributedGeneration:Hypevs.Hope.”PublicUtilitiesFortnightly140(June1,2002):20–28.

• Lesser,J.,etal.,“UtilityResourcePlanning:TheNeedforaNewApproach.”PublicUtilitiesFortnightly140(January15,2002):24–27.

• Lesser,J.,“DistributionUtilities:ForgottenOrphansofElectricRestructuring?”PublicUtilitiesFortnightly137(March1,1999):50–55.

• Lesser,J.,“RegulatingDistributionUtilitiesinaRestructuredWorld.”TheElectricityJournal12(January/February1999):40–48.

• Lesser,J.,“IsitHowMuchorWhoPays?AResponsetoRothkopf.”TheElectricityJournal10(December1997):17–22.

• Lesser,J.,andM.Ainspan,“UsingMarketstoValueStrandedCosts.”TheElectricityJournal(October1996):66–74.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page24of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• Lesser,J.,“EconomicAnalysisofDistributedResources:AnIntroduction.”Proceedings,FirstAnnualConferenceonDistributedResources,ElectricPowerResearchInstitute,KansasCity,MO,July1995.

• Lesser,J.,“DistributedResourcesasaCompetitiveOpportunity:TheSmallUtilityPerspective.”Proceedings,FirstAnnualConferenceonDistributedResources,ElectricPowerResearchInstitute,KansasCity,MO,July1995.

• Lesser,J.,andM.Ainspan,“RetailWheeling:DejavuAllOverAgain?”TheElectricityJournal7(April1994):33–49.

• Lesser,J.,“AnEconomicallyRationalApproachtoLeast‐CostPlanning:Comment.”TheElectricityJournal4(October1991).

• Lesser,J.,“Long‐TermUtilityPlanningUnderUncertainty:ANewApproach.”PaperpresentedfortheElectricPowerResearchInstitute:InnovationsinPricingandPlanning,May1990.

• Lesser,J.,“Centralizedvs.DecentralizedResourceAcquisition:ImplicationsforBiddingStrategies.”PublicUtilitiesFortnightly(June1990).

• Lesser,J.,“MostValue—TheRightMeasurefortheWrongMarket?”TheElectricityJournal2(December1989):47–51.

Selectedspeakingengagements

• “EPARegulationofGeneratorEmissions–KeyMarketIssues,”EnergyBarAssociation,AnnualMeeting,April28,2012.

• “CompetitiveEnergyMarkets:HowaretheyWorking?”ConstellationExecutiveEnergyForum,November2,2011.

• “TheFailuresofTransmissionPlanningandPolicy,”HarvardElectricPolicyGroup,February25,2010.

• “FinancingtheSmartGrid,”EnergyBarAssociationSeminar,Washington,DC,December4,2009.

• “RenewablePower:AttheCrossroadsofEconomicsandPolicy,”PresentationtotheUtilitiesStateGovernmentOrganization,Newport,RhodeIsland,July13,2009.

• “TheStimulusActandLawstheyDidn’tTeachYouinLawSchool,”presentationtothe27thNationalRegulatoryConference,Williamsburg,VA,May19,2009.

• “RateRecoveryforCapitalIntensiveGeneration:RateBaseandConstructionWorkinProgress,”LawSeminarsInternational,LasVegas,NV,February5,2009.

DocketNo.11‐035‐200UIECExh.__(JAL‐1)

Page25of25

  6 Real Place • Sandia Park, NM  87047 • main: 505.286.8833 • DC Office: 202.446.2062 www.continentalecon.com

• “FinancialRisksFacedbyRegulatedUtilities:ImplicationsfortheCostofCapitalandRatemakingPolicies,”LawSeminarsInternational,LasVegas,NV,February7,2008.

• “AlternativeRegulatoryStructuresandTariffMechanisms:Practicalapproachestoprovidinglow‐cost,environmentallyresponsibleenergyandhowtoavoidsomedangerouspitfalls.”WesternEnergyInstitute,October1,2007.

• “EconomicsandEnergyRegulation.”LawSeminarsInternational,Washington,DC,March15‐16,2007.

• “EnergyintheNortheast:ResourceAdequacy&Reliability.”LawSeminarsInternational,Boston,MA,October16–17,2006.

• “EnergyintheSouthwest:NewDirectionsinEnergyMarketsandRegulations.”LawSeminarsInternational,SantaFe,NM,July14,2006.

• “EnergyandtheEnvironment.”VermontJournalofEnvironmentalLaw,SouthRoyalton,VT,March10,2006.

• “ElectricityandNaturalGasRegulation:AnIntroduction.”LawSeminarsInternational,Washington,DC,March17–18,2005.

top related