sustainable management in mysore zoo by mr b p ravi
Post on 12-Aug-2015
59 Views
Preview:
TRANSCRIPT
SUSTAINABLE MANAGEMENTB.P. Ravi IFS., Executive director
Sri Chamarajendra Zoological Gardens, Mysuru
Water ManagementWater Management
Rain Water HarvestingRain Water Harvesting
Rooftop: Total Roof Area = 10,630 sqmt Large roof area = 7,736 sqmt
Surface Runoff: Lawns, gardens, roads,
pathways, habitat area=77.05 Acres
Sl. No.
Rainwater Harvesting
Quantity ( cum per annum)
1 Roof top 3,095
2 Surface Runoff 99,783
Total 1,02,878
Quantum of water that can be collected
Path of water flow from Chamundi hill Path of water flow from Chamundi hill to Karanji Laketo Karanji Lake
Water ChannelsWater Channels
Improvement of PondsImprovement of Ponds
PondsPonds
PondsPonds
Kalyani Improvement Kalyani Improvement
Kalyani Improvement Kalyani Improvement
Water Channels at Water Channels at animal enclosureanimal enclosure
Construction of CascadesConstruction of Cascades
Development of Sprinklers in ZooDevelopment of Sprinklers in Zoo
Recirculation and Aeration StreamRecirculation and Aeration Stream
Recirculation and Aeration StreamRecirculation and Aeration Stream
Recharge PitRecharge Pit
Other Lakes under developmentOther Lakes under development
Siddhartha LayoutSiddhartha Layout KurugahalliKurugahalli
Other Lakes under developmentOther Lakes under development
Sakkahalli LakeSakkahalli Lake
Waste Waste ManagementManagement
Collecting littersCollecting litters
Loading litter to Loading litter to trucktruck
Litter - dumpedLitter - dumped
Collecting DungsCollecting Dungs
Dumping dung at Dumping dung at Vermicompost Vermicompost
Yard Yard
ProcessProcess
ProcessProcess
ProcessProcess
ProcessProcess
Sale of VermicompostSale of Vermicompost
Vermi Compost details for the last 10 years
Sl.No Year Sale Quantity in Kgs.
Sale Amountin Rs.
1 5/03/2005 To 31/03/2006 148331 4449932 01/04/2006 To 31/03/2007 144492 4363603 01/04/2007 To 31/03/2008 168903 5077954 01/04/2008 To 31/03/2009 227953 7596915 01/04/2009 To 31/03/2010 153510 6162756 01/04/2010 To 31/03/2011 233232 9353837 01/04/2011 To 31/03/2012 180628 8208558 01/04/2012 To 31/03/2013 169445 8872279 01/04/2013 To 31/03/2014 88508 713394
10 01/04/2014 To 31/01/2015 73911 7391101588913 6861083
Biogas PlantBiogas Plant
ProcessProcess
ProcessProcess
ProcessProcess
Cooking food for animals from Cooking food for animals from gas generated through biogasgas generated through biogas
Stickering the bottlesStickering the bottles
Returning the bottlesReturning the bottles
Loaded for recyclingLoaded for recycling
Land ManagementLand Management
PlantingPlanting
Planting and GreeneryPlanting and Greenery
Trenches at KurugahalliTrenches at Kurugahalli
Planting at KurugahalliPlanting at Kurugahalli
Planting at KaranjiPlanting at Karanji
LawnsLawns
Green House - OrchidsGreen House - Orchids
Wetland ManagementWetland Management
Islands at KaranjiIslands at Karanji
Wetland ManagementWetland Management
Lake cleaningLake cleaning
Thank Thank
YouYou
top related