sustainable management in mysore zoo by mr b p ravi

Post on 12-Aug-2015

59 Views

Category:

Environment

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SUSTAINABLE MANAGEMENTB.P. Ravi IFS., Executive director

Sri Chamarajendra Zoological Gardens, Mysuru

Water ManagementWater Management

Rain Water HarvestingRain Water Harvesting

Rooftop: Total Roof Area = 10,630 sqmt Large roof area = 7,736 sqmt

Surface Runoff: Lawns, gardens, roads,

pathways, habitat area=77.05 Acres

Sl. No.

Rainwater Harvesting

Quantity ( cum per annum)

1 Roof top 3,095

2 Surface Runoff 99,783

Total 1,02,878

Quantum of water that can be collected

Path of water flow from Chamundi hill Path of water flow from Chamundi hill to Karanji Laketo Karanji Lake

Water ChannelsWater Channels

Improvement of PondsImprovement of Ponds

PondsPonds

PondsPonds

Kalyani Improvement Kalyani Improvement

Kalyani Improvement Kalyani Improvement

Water Channels at Water Channels at animal enclosureanimal enclosure

Construction of CascadesConstruction of Cascades

Development of Sprinklers in ZooDevelopment of Sprinklers in Zoo

Recirculation and Aeration StreamRecirculation and Aeration Stream

Recirculation and Aeration StreamRecirculation and Aeration Stream

Recharge PitRecharge Pit

Other Lakes under developmentOther Lakes under development

Siddhartha LayoutSiddhartha Layout KurugahalliKurugahalli

Other Lakes under developmentOther Lakes under development

Sakkahalli LakeSakkahalli Lake

Waste Waste ManagementManagement

Collecting littersCollecting litters

Loading litter to Loading litter to trucktruck

Litter - dumpedLitter - dumped

Collecting DungsCollecting Dungs

Dumping dung at Dumping dung at Vermicompost Vermicompost

Yard Yard

ProcessProcess

ProcessProcess

ProcessProcess

ProcessProcess

Sale of VermicompostSale of Vermicompost

Vermi Compost details for the last 10 years

Sl.No Year Sale Quantity in Kgs.

Sale Amountin Rs.

1 5/03/2005 To 31/03/2006 148331 4449932 01/04/2006 To 31/03/2007 144492 4363603 01/04/2007 To 31/03/2008 168903 5077954 01/04/2008 To 31/03/2009 227953 7596915 01/04/2009 To 31/03/2010 153510 6162756 01/04/2010 To 31/03/2011 233232 9353837 01/04/2011 To 31/03/2012 180628 8208558 01/04/2012 To 31/03/2013 169445 8872279 01/04/2013 To 31/03/2014 88508 713394

10 01/04/2014 To 31/01/2015 73911 7391101588913 6861083

Biogas PlantBiogas Plant

ProcessProcess

ProcessProcess

ProcessProcess

Cooking food for animals from Cooking food for animals from gas generated through biogasgas generated through biogas

Stickering the bottlesStickering the bottles

Returning the bottlesReturning the bottles

Loaded for recyclingLoaded for recycling

Land ManagementLand Management

PlantingPlanting

Planting and GreeneryPlanting and Greenery

Trenches at KurugahalliTrenches at Kurugahalli

Planting at KurugahalliPlanting at Kurugahalli

Planting at KaranjiPlanting at Karanji

LawnsLawns

Green House - OrchidsGreen House - Orchids

Wetland ManagementWetland Management

Islands at KaranjiIslands at Karanji

Wetland ManagementWetland Management

Lake cleaningLake cleaning

Thank Thank

YouYou

top related