Presentation given by Mick Fothergill of the Talybont Flood Group - also known as the Talybont Floodees - at the Gweithdy COBWEB yn Machynlleth / COBWEB Workshop in Machynlleth on 20th May 2014. Find out more about this event (in Welsh or English/yn Cymraeg neu Saesneg) on the COBWEB Project website: http://bit.ly/1nMjmUP

TRANSCRIPT

Talybont Flood GroupTalybont Floodees

8th and 9th June 2012

The event An intense low pressure system stalled over the catchment areas of the Rivers Leri and Ceulan.

Over 190mm of rain fell in 36 hours on already saturated land.The resultant flooding was widespread and severe.

27 properties in Talybont were flooded and the A487 through the village was closed for a number of hours.

The event

Our Problem

The Leri/Ceulan catchment is a relatively small steep sided, funnel shaped catchment which reacts very quickly to rainfall.

It ranges from over 1300ft to sea level

Hydrographs for the rivers Leri, Ystwyth, Clarach and Rheidol.

The Leri exhibits a highly peaked graph which provides little opportunity for an adequate warning period.

Our Problem

Our Problem

Our Problem

The Solution - Knowledge

Two river gauges Leri and CeulanTalybont

Two remote rain gauges at top of catchment

Farson digital webcams Talybont

The Solution - KnowledgeExpression of interest to the ‘Nature Fund’

Developing and testing a catchment-based approach for flood alleviation in upland Wales using ecosystem services

Cobweb will play a central role in allowing us to collect information within the catchment and bring issues to the notice of the authorities

Allow the community to participate in and be pro-active in its own monitoring of the catchment

We will ‘own’ the information that will allow us to fight the flood risk.