Manuf. TPI Client
1 PreInspectionMeeting Spec. Spec. MOM H H H
2ApprovalofMechanical
CalculationBooksDatasheets,PO,Spec. API650,Spec. CalcualtionBook H H A
3ApprovalofFabrication
DrawingsDWG,Spec. API650,Spec. DWG H H A
4Reviewmilltest
certificatesofplatesDWG,Certificates ASMESECII Certificates H W R
5Reviewmilltest
certificatesofpipe,flange,etc.
DWG,Certificates ASMESECII,16.5 Certificates H W R
6Reviewmilltest
certificatesofweldingconsumablematerial
WPS,Certificates ASMESECII Certificates H W R
7Visual&Dimensional
CheckDWG,Spec. ASMESECII Report H W R
8 BottomPlates DWG,WPS,Spec. API650,Spec. Report H SW R
9 AnnularPlates DWG,WPS,Spec API650,Spec. Report H SW R
StorageTankInspectionandTestPlanActivityBy
No. InspectionandTestPlan ReferenceDocument AcceptanceCriteria VerifyingDocument
BeforManufacturing
Materials
DuringmanufacturingMarking,Cutting,BevelingandGrinding
-
www.inspectionforindustry.com10 ShellCourses DWG,WPS,Spec API650,Spec. Report H SW R
11 RoofPlates DWG,WPS,Spec API650,Spec. Report H SW R
12 RoofStructures DWG,WPS,Spec API650,Spec. Report H SW R
13 WindGriders(Ifrequired) DWG,WPS,Spec API650,Spec. Report H SW R
14 TopAngles(ifrequired) DWG,WPS,Spec API650,Spec. Report H SW R
15 ReinforcementPads DWG,WPS,Spec API650,Spec. Report H SW R
16ManholeNozzleNeck
(FromPlates)DWG,WPS,Spec API650,Spec. Report H SW R
17PipeForColumn(if
required)DWG,WPS,Spec API650,Spec. Report H SW R
18 PipeForNozzles DWG,WPS,Spec API650,Spec. Report H SW R
19 InternalPipes DWG,WPS,Spec API650,Spec. Report H SW R
20InternalorExternal
SupportsDWG,WPS,Spec API650,Spec. Report H SW R
21 Sumps DWG,WPS,Spec API650,Spec. Report H SW R
22SpiralStairway&
PlatformsDWG,WPS,Spec API650,Spec. Report H SW R
23Visual&DimensionalCheckofLooseParts
DWG,WPS,Spec API650,Spec. Report H H R
24 ShellCourses DWG,Spec. API650,Spec. Report H W R
25 Sumps DWG,Spec. API650,Spec. Report H SW R
26 TopAngles DWG,Spec. API650,Spec. Report H W R
27ManholeNozzleNeck
(FromPlates)DWG,Spec. API650,Spec. Report H SW R
DuringmanufacturingFormingandRolling
-
www.inspectionforindustry.com28
Visual&DimensionalCheck
DWG,Spec. API650,Spec. Report H H R
29LevelnessofRingWall(ifapplicable)
DWG,Spec. API650,Spec. Report H H R
30 CenterPointandRadius DWG,Spec. API650,Spec. Report H H R
31 Flatness&Slope DWG,Spec. API650,Spec. Report H H R
32 Orientation DWG,Spec. API650,Spec. Report H H R
33
Anchorbolts(Distance,
Projection,etc.)asrequired
DWG,Spec. API650,Spec. Report H H R
34 WPS&PQR DWG,WPS,PQR,Spec ASMESECIX Report H R/A R
35Welder/Welding
OperatorQualification
DWG,WPS,WQT,Spec ASMESECIX Report H R/A R
36NDTOperator
CertificateCheckCertificates API650,Spec. Report H R/A R
37 Fitupofbottomplates DWG,WPS,Spec API650,Spec. Report H H R
38Weldingsequenceimplementation
DWG,WPS,Spec API650,Spec. Report H H R
39Visualinspectionof
weldmentDWG,WPS,Spec API650,Spec. Report H H R
40Vacuumboxtestof
bottomplatesSpec. API650,Spec. Report H H R
DuringManufacturingFoundation
DuringManufacturingWelding
-
www.inspectionforindustry.com41
Annularplateorientationcheck
DWG,Spec. API650,Spec. Report H H R
42Fitup&weldingof
annularplateDWG,WPS,Spec API650,Spec. Report H H R
43NDTofannularplate
/VacuumTest(Ifrequired)Spec. API650,Spec. Report H H R
44 FitupofShellPlate DWG,WPS,Spec API650,Spec. Report H H R
45 WeldingofShellPlate DWG,WPS,Spec API650,Spec. Report H H R
46 PWHT(ifRequired) WPS,Spec API650,Spec. Report H H R
47 NDTofShellPlate Spec. API650,Spec. Report H H R
48OilTestofAnnularPlate
toshellPlateSpec. API650,Spec. Report H H R
49Fitup&welding
compressionring&roofplate
DWG,WPS,Spec API650,Spec. Report H H R
50 Weldingofroofplates DWG,WPS,Spec API650,Spec. Report H H R
51 Airtestofroofplate Spec. API650,Spec. Report H H R
52Airtestof
reinforcementsSpec. API650,Spec. Report H H R
53 Plumbness DWG,Spec. API650,Spec. Report H H R
54 Roundness DWG,Spec. API650,Spec. Report H H R
55 Peaking&Banding DWG,Spec. API650,Spec. Report H H R
DuringManufacturingDimentionalCheck
-
www.inspectionforindustry.com
56NozzleElevation,
OrientationandProjectionDWG,Spec. API650,Spec. Report H H R
57ManholeElevation,
OrientationandProjectionDWG,Spec. API650,Spec. Report H H R
58VerificationofTestPackage
Reports API650,Spec. Report H H R
59Hydrotest(Waterlevel/Holdingtime)
Spec. API650,Spec. Report H H H
60Settlementcheck
(Refertoapplicableprocedure)
DWG,Spec. API650,Spec. Report H H R
61 Waterdischarge Spec. API650,Spec. Report H W R
62 Cleaningcheck Spec. API650,Spec. Report H H R
63Paintingmaterial
identification/checkSpec. API650,Spec. Report H H R
64Weathercondition&SurfacePreparation
(Blasting)Spec. API650,Spec. Report H H R
65PrimerLayerInspection(IncludingDryThickness
check)Spec. API650,Spec. Report H H R
66Intermediate/FinalLayerInspection(IncludingDryThicknesscheck)
Spec. API650,Spec. Report H H R
DuringManufacturingHydroStaticTest
DuringManufacturingPaintingActivities
DuringManufacturingCathodicProtectionandElectrical
-
www.inspectionforindustry.com67
Checkofmaterialpriortoinstallation
Spec. API650,Spec. Report H H R
68InstallationofEarthing
BossesSpec. API650,Spec. Report H H R
69 AnodeInstallation Spec. API650,Spec. Report H H R
70CheckofAnode&
conductorSpec. API650,Spec. Report H H R
71ChecktheBonding
ofUGPipeSpec. API650,Spec. Report H H R
72 CableInstallation Spec. API650,Spec. Report H H R
73ChecktheTestBox,ReferenceElectrode
Spec. API650,Spec. Report H H R
74installationofreferenceelectrodeincludingcable
Spec. API650,Spec. Report H H R
P.O:PurchaseOrder
MOM:MinuteofMeeting
Abbreviations:
H:HoldPoint=HoldontheproductiontillTPIInspectorperformsinspectionandsupervisetherequiredtest
W:WitnessPoint=ManufactureshallnotifyclientandTPIInspectorbutthereisnoholdontheproduction;ClientcanwaivethisinspectionbasedonhisdiscretionandinformsTPIInspectoraccordingly.
R:DocumentReview=ReviewmeansReviewdocument,whichincludesofmaterialtestcertificates,WPS,PQR,NDTProceduresandetc.