TANZANIA-ZAMBIA RAILWAY AUTHORITY
STREAMLINING CROSS-BORDER RAILWAY OPERATIONS – TZR CASE
A PRESENTATION TO
Creating successful cross-border railway servicesSUMMIT
16th – 18th November, 2020By
Eng. Bruno T. Ching’andu – MD/CEO
-
Presentation Outline
BackgroundRationale for Cross-border RailwaysChallenges faced by International RailwaysStrategies to make Cross-border Railways
SuccessfulOpportunities for streamlining operationsConclusion
-
Historically, railways built and operated by private capital -from mine or Timber forests to the Port.
No respect for borders until in 50s & 60s when railways were taken over by newly independent nations.
Each Country introduced its own set of rules and regulations for running of trains.
Adhoc and uncoordinated acquisition of equipment.
Background
-
To foster regional Integration
Contribute to GDP through commercial operations at competitiverates.
Allowing international trains on open access to maximize railwayinfrastructure utilization
Attract independent private capital to invest in railways
To achieve Political and economic goals. TAZARA is a case in point for cross-border railway construction to
achieve political and commercial goals.Ownership by both Governments on a 50-50 basis Common operation rules and regulations on both sides
Rationale for Cross-border Railway operations
-
Rationale - TAZARA
1975 – 1976, One year of trial operations 1975
14th July 1976, Start of commercial operations
1970 – 1975, Construction
1968, Agreement between China, Tanzania & Zambia
821 × 1024
https://www.google.com/imgres?imgurl=https://media.gettyimages.com/photos/president-kenneth-kaunda-of-zambia-and-president-julius-nyerere-of-picture-id992107558&imgrefurl=https://www.gettyimages.com/detail/news-photo/president-kenneth-kaunda-of-zambia-and-president-julius-news-photo/992107558&docid=-jPa2GOZ2MWatM&tbnid=k1OZxy2aQbZnuM:&vet=12ahUKEwj_-r2V89jdAhWD2CwKHV0yDTk4yAEQMyhUMFR6BAgBEFU..i&w=821&h=1024&bih=441&biw=800&q=tazara%20railway%20photos&ved=2ahUKEwj_-r2V89jdAhWD2CwKHV0yDTk4yAEQMyhUMFR6BAgBEFU&iact=mrc&uact=8https://www.google.com/imgres?imgurl=https://media.gettyimages.com/photos/president-kenneth-kaunda-of-zambia-and-president-julius-nyerere-of-picture-id992107558&imgrefurl=https://www.gettyimages.com/detail/news-photo/president-kenneth-kaunda-of-zambia-and-president-julius-news-photo/992107558&docid=-jPa2GOZ2MWatM&tbnid=k1OZxy2aQbZnuM:&vet=12ahUKEwj_-r2V89jdAhWD2CwKHV0yDTk4yAEQMyhUMFR6BAgBEFU..i&w=821&h=1024&bih=441&biw=800&q=tazara%20railway%20photos&ved=2ahUKEwj_-r2V89jdAhWD2CwKHV0yDTk4yAEQMyhUMFR6BAgBEFU&iact=mrc&uact=8
-
Lowest output of 88,000mt in 2014/2015 FY
Improved to 171,000mt by 2016/2017
Improved to 221,000mt in 2017/2018FY
175,597mt in 2018/19
Attained182,302 mt in 2019/2020
Operational Performance,Freight
Open Access brought in an extra 196,676 mt 2019/20
88 130
171 221
176 182
39
187197
88
130
171
260
363 379
-
50
100
150
200
250
300
350
400
2014/2015 2015/2016 2016/2017 2017/2018 2018/2019 2019/2020
TAZARA Operational Performance MT "000"
TAZARA Mt "000" Open Access Mt "000" Total Mt "000"
-
No consideration of interconnectivity of operations bygovernments
Investment dependent on individual Governments capacitythat at times have different priorities.Very little private funding on infrastructure due to high cost and long
return on investmentFunding adhoc for most times depending on capacity and priorities of
administration.
Different operational standards designed to suit each railwayDifferent equipment or lack of Signaling and telecoms systemLanguage barriers Swahili at Tunduma and French in DRCUnsynchronized boarder formality Systems – 6 documents 0
Challenges
-
TAZARA Cross Border Operations
Customs SystemsTanzania – TansisZambia - AscudaDRC - SYDONIA
DRCTANZ
ZMB
-
Agree on one-stop-single window formalities at thebordersStreamline commercial documentationsInstall equipment such as scanners for containers and
EDI for commercial documentationDeveloping human resources for cross border railway
operationsAllow private participation for investmentHarmonize railway operational standards.
Strategies to make Cross-border Railways Successful
-
Conclusion Cross border trains play an indisputably major role
in the growth of regional economies.
TAZARA is one of the cross border train that hasexisted for about 50 years.
There is need to invest in resolving highlightedchallenges to create efficiencies.
Take advantage of the existing political will, supportby regional institutions to create efficient railways.
-
Thank You
There is light ahead 4 Raiways.
��TANZANIA-ZAMBIA RAILWAY AUTHORITY��STREAMLINING CROSS-BORDER RAILWAY OPERATIONS – TZR CASE��A PRESENTATION TO �Creating successful cross-border railway services SUMMIT �16th – 18th November, 2020�By�Eng. Bruno T. Ching’andu – MD/CEO Presentation Outline �Background Rationale for Cross-border Railway operationsSlide Number 5Rationale - TAZARAOperational Performance,�FreightChallengesTAZARA Cross Border OperationsStrategies to make Cross-border Railways Successful ConclusionSlide Number 12