TBTS Phase 2.1 TD24 and T24 Ø45mm
G. Riddone, A. SOLODKO – 12.01.2011
2
TBTS Phase 2.1
3
Objective during shut-down for AS tanksPreparation of two AS tanks and one waveguide
network Tank with the existing structure (problem: 15
MHz out of frequency – 2 MHz only before beam test
Tank with a new structure
At the end of shut down, decision on which tank to install in CLEX
TBTS Phase 2.1 TD24 Ø80mm
5
TBTS Phase 2.1 TD24 Ø80mmSTANDARD DISK
6
TD24 in tank
7
TD24 tank in CLEX
8
Main activities for TD24 tank1. Tank with TD24 (existing)
1. Dismounting from CLEX (RP issues) – transport to B169
2. RF measurements3. Brazing of tuning studs to allow for tuning by
pulling + brazing of cooling circuits4. Tuning 5. Baking 6. Assembly7. RF check
9
TBTS Phase 2.1 T24 Ø45mm
Option 1: Existing waveguide circuit
10
TBTS Phase 2.1 T24 Ø45mm
Missing components
Option 2: New waveguide circuit foreseen for CEA structures
11
TBTS Phase 2.1 T24 Ø45mmSTANDARD DISK
Missing component
Smaller disk diameter, but 80 mm coupler (the same as TD24)
12
TBTS Phase 2.1 T24 Ø45mm (new components)
New cooling tubes
13
Main activities for T24 tank1. Tank with T24 (new / tuned on 17.07)
1. Baking (needed ad-hoc support)2. Procurement of missing components
2 cooling tubes (O1) 3 missing waveguides (O2) The new set of more compact waveguides (for the
future CEA accelerating structure) (O2) Modified tank (for the future CEA accelerating structure)
(O2) Modified support (for the future CEA accelerating
structure) (O2)
3. Assembly4. RF check
14
Conclusions A lot of work during CLEX shutdown! Aim: to be ready for installation at the end of