the mobility crisis strategies of rio de janeiro to …...secretaria de transportes delmo pinho...

Post on 28-Feb-2021

1 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

SECRETARIADE TRANSPORTESSECRETARIADE TRANSPORTES

Delmo Pinho

Subsecretary of Transport

Tokyo – May/2016

THE MOBILITY CRISIS

STRATEGIES OF RIO DE JANEIRO TO SOLVE IT

SECRETARIADE TRANSPORTES RIO DE JANEIRO STATE

Source: IBGE/IMF

Location: southeast of Brazil (57% of the GNP);

Area: 43.910 km² (0,5% of the area of the country)

Population: 15,4 million (8,4% of the country total)

GNP: US$ 185 Billion(11,2% of Brazil´s GNP)

SECRETARIADE TRANSPORTES

Source: PDTU 2012

21 municipalities4.700 km²

11,9 million people

22,5 million trips /day

15,4 million motorized trips /day11 million in Public Transport

75% of thestate population

RIO METROPOLITAN REGION (2012)

Metropolitan Region - The growth of the urban area(Between 1980 and 2010, it expanded an average of 60

km²/year)

Fonte: PDTU 2003 Fonte: ZEE/RJ

1975 2007

Fonte: projeção Firjan

2025

60km x 45km = 2.700 km2

2013

SECRETARIADE TRANSPORTES

Red - 425m Yellow - 850m Blue - 1,700mGreen - 2,000m

TOD – Pilot Project Queimados / RJ

SECRETARIADE TRANSPORTES

Concessionaire

Strategic Project ofImmediate Surroundings

Densification andRequalification. Mixed

land use

Area of Influence.

TOD Transit Oriented Development

SECRETARIADE TRANSPORTES

Vision

According to the experience of the state, investingin intramural infrastructure is not enough.

Thus, the goal is to further strengthen the TODphilosophy, as a part of public policies related tometropolitan planning.

Smaller scale TOD projects can have a significant impact for the metropolitan region.

TOD – Pilot Project

SECRETARIADE TRANSPORTES

Rio - AGENDA OF INTERNATIONAL EVENTS

2011 – World Military Games/ Rock in Rio2012 – UN / Rio+202013 – World Youth Day (Catholic Church)

– FIFA Confederations Cup2014 – FIFA World Cup2015 – Rio 450 year anniversary - Copa América2016 – Olympic Games

SECRETARIADE TRANSPORTES

HIGH PERFORMANCE BELT

SECRETARIADE TRANSPORTES

More than US$ 4,5 billion in investiments

Construction of 4 BRTs and Line 4 ofthe metro

Modernization of themetro-rail system

Refurbishing of 89 stations andpurchase of 520 new rail cars, refurbished ofothers and 35 newmetro trais

PUBLIC TRANSPORT 2007/2016

“HIGH PERFORMANCE BELT”

SECRETARIADE TRANSPORTES

BRT SYSTEM

Transoeste

Transcarioca BRT Av. Brasil

Transolímpica

SECRETARIADE TRANSPORTES PUBLIC TRANSPORT IN RIO

GOLS FOR 2016 / 2018

Trains

1,0 milliontrips/day

Metro - Lines1+2

1,1 milliontrips/day

Ferries

120.000 trips/day

BRS

500.000 trips /day

BRTs

800.000 trips /day

Metro – Line 4300.000 trips/day

35% of thetrips in Public

Transportof goodquality

made bymediun and

highcapacitysystens

LIGHT RAIL – DEPLOYMENT IN 3 STEPS

berths in operation

SECRETARIADE TRANSPORTES

Avenida Rio Branco

SECRETARIADE TRANSPORTES

Avenida Rio Branco

SECRETARIADE TRANSPORTES

Thank you!

top related