the ramses multi-pass interferometry campaign in...

Post on 19-Feb-2020

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The RAMSES multi-pass interferometry campaign in X-band

FRINGE 2007Sébastien Angelliaume, Hélène Oriot, Xavier Dupuis

2

Outline of the presentation

• The campaign• RAMSES• Imaged Sites

• Processing• SAR processing• trajectory adjustment

• Temporal decorrelation and permanent scatterers in X band HR SAR imagery

• Oil storage tank filling

• Conclusion

3

The sensor

ONERA / RAMSES

* P, L, X, Ku : GMTI capabilityX, Ku, Ka : Interferometry capability

•Multi-band•Very high resolution•Polarimetric•Interferometric•Multi-channel

Band P*

0,43GHz

70MHz

V / H

V and H

L*

1,3GHz

200MHz

V / H

V and H

S

3,2GHz

300MHz

V / H

V and H

C

5,3GHz

300MHz

V / H

V and H

X*

9,6GHz

1200MHz

V / H

V and H

Ku*

14,3GHz

1200MHz

V / H

V and H

Ka*

35GHz

1200MHz

V or H

V and H

W

95GHz

500MHz

L or R

L and R

CenterFrequency

Bandwidth

TransmitPolarization

ReceivePolarization

4

Salon de Provence• Town• Flat, sloppy and montaneous area

Fos sur Mer• oil storage tank area

Puylaurent•mountaneaous area with a dam

Séchilienne•mountaneous area•landslide

The campaign (1/2)

from november 2005 to november 2006

5

The campaign (2/2)

X band

Resolution (HR & VHR) : 1 agility : 0.5m (264 MHz).2 agilities : 0.26m (504 MHz) on La Séchilienne

Incidence angles : 75, 60 and 40°.

Ping pong mode for instantaneous interferometry

Multi-pass airborne interferometry• Each flight composed of 4 to 6 passes with the same configuration• 3 flights with a one day to one week delay• Flights several months apart on Séchilienne

Challenges:• Altitude ambiguity monitoring

• flight precision : performant DGPS/INS on board

• Processing of HR interferograms with non linear trajectories

6

Fos sur Mer : instantaneous interferometry

Amplitude image

Interferogram : Ha ≈ 50m

7

Salon de Provence : instantaneousinterferometry

Amplitude image

interferogram: Ha ≈ 50m

8

Séchilienne : instantaneous interferometry

Amplitude image

Interferogram : Ha ≈ 50m

9

SAR Processing

• SAR processing with a common geometry (Pamela processor)• Focusing on DTED-2

Common geometry

P

Master trajectory

Slave trajectory

• Master and slave images processed so that thewavefronts on point P comingfrom M and S are tangencial

M

S

10

Results of the processing

11

Trajectory refinement

• modelling of the slave trajectory correction by a sum of cosinesfunctions

• Least square minimisation using the unwrapped interferogram

• Processing with the new slave trajectory

0 cm

10 cm

20 cm Example of trajectory refinement

Coherence analysis

13

Coherence false color representation

Amplitude image

0 (no coherent) 1 (coherent)

Interferometric coherence

False color representation

14

Coherent change detection : nature of the ground (1/4)

20 minutes 2 days

0 (no coherent) 1 (coherent)

Risk ofdecorrelation

15

Very High Resolution : Séchilienne area

Coherence :

simultaneous acquisition

Coherence :

Half an hour

Coherence :

10 months

16

Very High Resolution : Séchilienne area

17

Very High Resolution : Séchilienne area

Coherence representation interferometric representation

10 months between the 2 acquisitions, in X-band

Permanent scatterers visible on 25 cm resolution images

Oil storage area

19

Gas storage area

• Données amplitude

Simultaneousinterferogram : Ha ≈ 50 m

20

Gas storage area

Interferogram

1 hour

Ambiguity altitude

21

Residual interferogram

• Withdraw of oil storage altitude using the simultaneousinterferogram

• Phase variations are due to:• Residual altitude information due to the low ambiguity altitude of

the multi-pass interferogram• Misestimation of the trajectory• Atmospehric artefacts• Changes in the oil storage roofs

22

Oil storage area analysis

Radar illumination direction

Range direction

R1 R2

R3 R4

Computation of φA – φC :

Computation of φB – φC

Local measure insensitive to• trajectory mis-estimation

• Atmospheric propagation artefacts

A B C

23

Results

• Change detection on R2

• Consistent with ground truth• R2 was being emptied during the acquisition (roof displacement of

the order of 8cm)

• R1, R3 and R4 : no movement

10°2°166°31°Residual phase difference between top of the tank and floating roof

8°62°169°2.9°Residual phase difference between ground and floating roof

R4R3R2R1Tank #

24

Conclusion

• Very interesting campaign

• Not completely exploited

• Main results• Coherence analysis for several temporal intervals

• Change detection on oil storage field

• Work is on going to further analyze the oil storage field

• ONERA has developed a new sensor for civilian applications : SETHI

25

SETHI

Thank you for your attention …

top related