tna overview and prospects · • herve aussel, centre energie atomic, saclay, france (2013-14) •...

Post on 24-Aug-2021

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

TNA Overview and Prospects

John Davies OPTICON Project Scientist

UKATC

www.astro-opticon.org

www.astro-opticon.org

A smaller telescope suite than in earlier contracts

All time since 2010B allocated solely on scientific merit via CTAC

CTAC 2013-4 • Niall Deacon, MPIA Hiedleberg, Germany • Heidi H Korhonen, Copenhagen, Denmark [Chair] • Herve Aussel, Centre Energie Atomic, Saclay, France (2013-14) • Julia de Leon (Univ of La Laguna, Tenerife, Spain- 2013B only) • René Duffard, Instituto de Astrofísica de Andalucía, (Since 2013B ) • Simon Hodgkin, University of Cambridge, UK (Until 2015A) • Marcella Longhetti, Osservatorio Astronomica di Brera, Italy • Maciej Konacki, University of Torun, Poland (Since 2013B) • Laszlo Kiss, Konkoly Observatory (2013A only) • Guilane Lagache , LAM, France (from 2015A)

www.astro-opticon.org

Proposals and Allocations 2013A 17/41 2013B 18/71 2014A 13/55 2014B 18/70 2015A 21/60

www.astro-opticon.org

www.astro-opticon.org

0

2

4

6

8

10

12

14

16

18

PI

PI's that received Time 2013A-2014B

www.astro-opticon.org

0

20

40

60

80

100

120

Total Team Members awarded Time 2013A-2014B

www.astro-opticon.org

0

50

100

150

200

250

300

Total Team Members across all Proposals 2013A-2014B

www.astro-opticon.org

050

100150200250300

Total Team Members across all Proposals 2013A-2014B

020406080

100120

Total Team Members awarded Time 2013A-2014B

Allocations and Budget by telescope to date

INT WHT NOT TBL OHP CFHT AAT TCS TNG LT MPG22 CAHA35 CAHA22

13A Total Allocation 0 0 20.5 3.5 15 4 4.5 0 7 0 0 0 5

13B Total Allocation 0 3.5 8.2 1 13 3.4 0 0 11.5 20 6 0 0

14A Total Allocation 0 6 1 0 8 8 6 0 8 4 3.5 0 0

14B Total Alloaction 0 4.5 10 3 13 1.8 2 0 12 4 6 2 0

15A Total Request 0 2 7.2 4.2 12 2.75 3 0 8.6 9 4 2 2

totals 0 16 46.9 11.7 61 19.95 15.5 0 47.1 37 19.5 4 7 PLAN 11 10 80 32 60 12 56 16 16 320 12 30 24 Delta (nights) -11 6 -33.1 -20.3 1 7.95 -40.5 -16 31.1 -283 7.5 -26 -17 unit cost 1906 9092 4284 2673 1893 15588 9484 1449 7171 280 2110 9864 3709

anticipated contribution 20971.28 90920.5 342740.8 85525.44 113608.8 187056.8 531106.8 23178.72 114738.4 89449.6 25320.48 295907.4 89011.68 contribution to date 0 145472.8 200931.8 31270.24 115502.3 310982 147002.8 0 337761.2 10342.61 41145.78 39454.32 25961.74

delta (euro) -20971.3 54552.3 -141809 -54255.2 1893.48 123925.2 -384104 -23178.7 223022.8 -79107 15825.3 -256453 -63049.9

www.astro-opticon.org

Total committed to date ~1.405KEuro, so ~ 600KEuro remaining

Allocations and Budget by telescope to date (updated)

www.astro-opticon.org

Total committed to date ~1.24 KEuro, so ~ 750KEuro remaining

INT WHT NOT TBL OHP CFHT AAT TCS TNG LT MPG22 CAHA35 CAHA22 13A Total Allocation 0 0 20.5 3.5 15 0 4.5 0 7 0 0 0 5 13B Total Allocation 0 3.5 8.2 1 13 3.24 0 0 11.5 20 6 0 0 14A Total Allocation 0 6 1 0 8 1.79 6 0 8 4 3.5 0 0 14B Total Alloaction 0 4.5 10 3 13 1.8 2 0 12 4 6 2 0 15A Total Request 0 2 7.2 4.2 12 2.75 3 0 8.6 9 4 2 2

totals 0 16 46.9 11.7 61 9.58 15.5 0 47.1 37 19.5 4 7 PLAN 11 10 80 32 60 12 56 16 16 320 12 30 24 Delta (nights) -11 6 -33.1 -20.3 1 -2.42 -40.5 -16 31.1 -283 7.5 -26 -17 unit cost 1906 9092 4284 2673 1893 15588 9484 1449 7171 280 2110 9864 3709

anticipated contribution 20971.28 90920.5 342740.8 85525.44 113608.8 187056.8 531106.8 23178.72 114738.4 89449.6 25320.48 295907.4 89011.68 contribution to date 0 145472.8 200931.8 31270.24 115502.3 149333.7 147002.8 0 337761.2 10342.61 41145.78 39454.32 25961.74

delta (euro) -20971.3 54552.3 -141809 -54255.2 1893.48 -37723.1 -384104 -23178.7 223022.8 -79107 15825.3 -256453 -63049.9

The Future in FP7

www.astro-opticon.org

Existing contract runs out 31/12/16 Last CTAC call proposed to be 2016A to minimise ‘end of contract’ problems Potential for new contract in H2020, but nothing is certain.

Options for H2020 • A few of the existing telescopes seem

willing to continue, but the network will continue to shrink.

• Perhaps re-invent TNA to involve robonets, data access, pipelines, alerts but how?

www.astro-opticon.org

Time for me to leave.

www.astro-opticon.org

OPTICON has received funding from the European Community's Seventh Framework Programme (FP7/2013-2016) under grant agreement number 312430 (OPTICON).

top related