Traditional “stick built” house under construction.

Modular house “boxes” that are ready to be set on the foundation.

Crane getting ready to pick up one of the modular house “boxes”.

Crane setting one of the modular house “boxes”

on the foundation.

Crane sets the final modular house “box”. Next step is

to raise the roof.

The modular house “boxes” are set, and the roof starts to get raised.

The roof is raised.

The modular house is completely set with the roof

raised – all in one day.

Next step is to complete the siding installation and then move on to the interior work.

Kitchen was completed in the factory, and is ready for the appliances to be put in.

Flooring to be installed on-site that was shipped from the factory.

This modular home will be finished and ready to move into in a few short weeks.

Remember the “stick built” house from the first slide? It will most likely be

several months before it is completed.