TRANSITION PLAN Winter 2013 -2014Briefings
Brussels, Belgium November 05-13
NMD/NOM/OPL/PLA
Performance driven process
• From 2012 delay targets set for a full year (previously targets were referring to the summer periods)
• Capacity planning process focuses on the whole year• Despite lower traffic levels during winter, large scale project implementations
can impact on the yearly delay targets
• Synchronisation needed between multiple project implementations
• Coordination of all constraints at network level
Summary & lessons learnt
•Better recording of delays associated with the plan ned events, especially those which are subject to transition planning process;
•Advanced planning allowed improved preparation for each transition;
•Advanced coordination allowed early identification of conflicting areas;
•Good responsiveness of ANSP’s concerned including f lexibility on implementation dates;
•Shared operational experience from ANSP’s that had successfully implemented new ACC/System – provided encouragement also for ANSP’s pre-implementation;
•Good participation of ANSP’s in Transition Plan Mee tings.
19/11/2013 - 6 -
LKAA – Prague New Sectorisation completed
LKAA PeriodImpact on network
performanceMitigation measures
TrainingSeptember 2013 –
October 2013None No
Implementation 17 October 2013 Low No
Transition phase
capas -20%
17 October – 21
OctoberLow No
Normal
operations21 October 2013 None No
19/11/2013 - 8 -
LSAG – Geneva Stripless CH Step 2LSAG Period
Impact on network
performanceMitigation measures
Training 26 Aug - 4 Nov 2013 None No
Switch over 5 Nov 2013 Low No
Transition period 1
Capas -30% ACC+INI
Capas -20% APP
5 Nov 2013 Low No
Transition period 2
Capas -20% ACC+INI
Capas -20% APP
6 Nov – 13 Nov 2013
Changed on 11/11/13Low No
Transition period 3
Capas -10% ACC+INI
Capas -20% APP
13 Nov – 24 Nov 2013 Low No
Transition period 4
Capas -20% APP25 Nov – 10 Dec 2013 Low No
Normal operations 11 Dec 2013 None No
19/11/2013 - 10 -
EDGG EBG 02 + 08 Paperless Strip System
EDGG Period
Impact on
network
performance
Mitigation
measures
TrainingJuly 2013 - September
2013Low No
Operational Weekend 1
Capas -20%19/20 October 2013 Medium Yes
Operational Weekend 2
Capas -20%02/03 November 2013 Medium Yes
Switch over 16/17 November 2013 Medium Yes
Transition period 1
Capas -20%
17. November -
29.November 2013Medium Yes
Transition period 2
Capas -10%
30. November -
13.December 2013Low/Medium Yes
Normal operations 14. December 2013 None No
19/11/2013 - 12 -
EPWW Warsaw ACC New ATM SystemEPWW
Period
Impact on network
performanceMitigation measures
Training – shadow mode 20 Sept – 14 Nov 2013 Low/Medium No
Cut over 25 November 2013 High Yes
Transition period – Phase 1 -35% 25 Nov – 20 Dec 2013 High Yes
Transition period – Phase 2 -30% 21 Dec – 15 Jan 2014 High Yes
Transition period – Phase 3 -25% 16 Jan – 31 Jan 2014 High Yes
Transition period – Phase 4 -15-20% 1 Feb – 15 Mar 2014 Medium Yes
Transition period – Phase 5 -15% 16 Mar – 15 Apr 2014 Low/Medium Yes
Transition period – Phase 6 -10% 16 Apr – 31 Apr 2014 Low/Medium Yes
Transition period – Phase 7 -5% 1 May – 15 May 2014 Low Yes
Transition period – Phase 8 -0% 16 May – 25 May 2014 Low No
Normal operations 26 May 2014 No No
Denmark/SwedenLatvia
EHAM – Amsterdam Excl UMMS and UK**EURR 11 / 12 EPWW
Denmark/SwedenLithuania
LFP. – Paris TMA Excl UMMS and UK**EURR 9 / 10 EPWW
Denmark/SwedenLatvia
EG – United Kingdom Excl UMMS and UK**EURR 7 / 8 EPWW
UkraineLO – Austria Excl ULLI and UMMSEURR 5 / 6 EPWW
HungaryUkraine
LE – Spain Excl ULLI and UMMSEURR 3 / 4 EPWW
UkraineLI – Italy Excl ULLI and UMMSEURR 1 / 2 EPWW
RemarksONLOADS
From U*** TO / FROMEU Restriction –Westbound / Eastbound
EU Restrictions needed daily 0900 – 1500 for ex Russ ian Federation Westbounds from 25/11/13 Until 15/01/ 14 then on Fridays and Saturdays only.Exception : Not applied 24/25/26, 31 December and 0 1 January .Use of EU restrictions will reduce delays by up to 50%. Will still have up to 8,000 minutes delay till mid January.
EU Restrictions for Eastbounds to Russian Federation – Cherry Picking or D-1 if requiredEmergency
Note: Time Parameters for UseReroute Scenarios – normal D-1 Pretactical CDMNote: Unplanned staff shortage(s) could result in h igher delays and need for Reroute Scenarios being u sedin Pretactical and Tactical.
25th November 2013 – 12th January 2014ALL EURR
OFF POLAND Off Belarus Off Czech Rep Off Austria Off Slovenia On Ukraine On Hungary On Denmark On Sweden On Latvia On Lithuania
Mon 25 Nov 2013 -169 -139 -15 -9 -9 52 13 78 78 40 30
Tue 26 Nov 2013 -118 -100 -11 -6 -6 31 9 62 62 33 23
Wed 27 Nov 2013 -124 -99 -13 -10 -10 38 8 51 51 27 18
Thu 28 Nov 2013 -123 -101 -11 -8 -8 30 9 63 63 28 29
Fri 29 Nov 2013 -139 -114 -13 -8 -8 42 11 66 66 37 26
Sat 30 Nov 2013 -153 -116 -20 -14 -14 44 14 59 59 32 21
Sun 01 Dec 2013 -151 -124 -15 -9 -9 37 11 78 78 43 25
Mon 02 Dec 2013 -124 -97 -16 -9 -9 36 14 54 54 34 11
Fri 06 Dec 2013 -134 -111 -12 -9 -9 34 9 69 69 40 25
Thu 12 Dec 2013 -118 -95 -13 -8 -8 35 13 54 54 18 30
Fri 13 Dec 2013 -117 -95 -12 -7 -7 35 9 52 52 23 23
Sun 15 Dec 2013 -138 -107 -19 -11 -11 44 14 52 52 26 15
Wed 18 Dec 2013 -100 -82 -10 -6 -7 28 8 45 45 16 24
Fri 20 Dec 2013 -118 -94 -13 -9 -9 36 10 49 49 17 30
Sat 28 Dec 2013 -211 -146 -36 -22 -22 86 25 37 37 18 13
Thu 02 Jan 2014 -107 -84 -11 -7 -7 41 11 38 38 12 20
Sat 11 Jan 2014 -236 -171 -33 -23 -23 103 23 45 45 18 20
Sun 12 Jan 2014 -140 -109 -16 -11 -11 51 11 46 46 19 22
19/11/2013 - 15 -
EPWA- Warsaw TMA
EPWA PeriodImpact on network
performance
Mitigation
measures
Recurrent training 18 July – 31 July Low No
Training – shadow mode20 September – 14
November 2013Low No
Cut over 25 November 2013 Low No
Transition period –
Phase 1 -25%25 Nov – 15 Dec 2013 Low No
Transition period –
Phase 2 -15%16 Dec – 15 Jan 2014 None No
Transition period –
Phase 3 – 5%16 Jan – 15 Feb 2014 None No
Transition period –
Phase 4 -5-0%15 Feb – 28 Feb 2014 None No
Normal operations 1 March 2014 - -
19/11/2013 - 17 -
LSAZ – Zurich Stripless CH Step 2
LSAZ PeriodImpact on network
performance
Mitigation
measures
Training 16 Sept – 9 Dec 2013 None No
Switch over 10 Dec 2013 Low No
Transition period 1 -20% 10 Dec - 16 Dec 2013 Low No
Transition period 2 -10% 17 Dec - 27 Dec 2013 Low No
Normal operations 28 Dec 2013 None No
New Sector Structure Munich South
18
FUE: GND-FL315 FUESSEN
FUE: GND-FL315 FUESSEN
ZUE: GND-FL315 Zugspitze
ZUE: GND-FL315 Zugspitze
STA: GND-FL315 Starnberg
STA: GND-FL315 Starnberg
NDG: GND-FL315
NDG: GND-FL315
19/11/2013 - 19 -
New Sectors Munich South (EDMMCTAS)12/12/13 – 23/12/13-20% Capacity Reductions
1.ATFCM Measures
3544TegernseeEDMMTEG
3240ZugspitzeEDMMZUG
3442StarnbergEDMMSTA
3240FussenEDMMFUE
-20% CapacityNormal CapacityNameAIRSPACE
* Note EDMMNDG Normally combined with EDMMWLD known as EDMMCN2 belongs to the Cluster North.
19/11/2013 - 22 -
Spring 2014 – Same Principles – Continuous Process
Croatia - LDZO Transition:
13 Feb – 15 Apr
New COOPANS
Azerbaijan - UBBA Transition:
March – July
New ACC
Spain - LECS Transition:
April
SACTA CF2 Upgrade
Germany - EDGG Transition:
19 Apr – 18 May
PSS EBG 03+04
Italy –
LIBB/MM/PP/RR
Transition:
01 May – 10 May
Airspace
Reorganisation
19/11/2013 - 23 -
E conferences / Teleconferences
Pre EDGG
One Week in Advance
08/11/13 *
Not required
D-1 Update
15/11/13
Pre EPWW
One Week in Advance
18/11/13
D-1 Update
25/11/13 *
19/11/2013 - 24 -
AIM + NOP
Specific AIM for each ACC undergoing Transition wit h reference to NOP