• HRTPO staff has analyzed congestion in Hampton Roads through various efforts.

INTRODUCTION

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 2

• However, average congestion levels don’t tell the whole story.

INTRODUCTION

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 3

Eastbound Hampton Roads Bridge-Tunnel Approach4:30 pm, Monday 4/1/13 (left) and Tuesday 4/2/13 (right)Source: VDOT.

• Travel time reliability is defined as how much travel times vary from day to day over the course of time.

• Since the level of consistency and dependability in travel times is important for so many roadway users, analyzing both typical congestion levels and travel time reliability are important.

TRAVEL TIME RELIABILITY

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 4

Free-Flow Travel Time = 11.5 minutes

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 5

VDOT

Distribution of Trips by Travel Time

Average Travel Time = 15.9 minutes 95th percentile Travel Time = 22.7 minutes

Image source: FHWA.

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 6

VDOT

Travel Time Index

Travel Time Index = Average Travel Time / Free-Flow Travel Time

= 15.9 minutes / 11.5 minutes

= 1.38

Index used to describe typical congestion levels by comparing average travel conditions during a particular time of day with free-flow conditions.

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 7

VDOT

Buffer Time

Buffer Time = 95th percentile Travel Time - Average Travel Time

= 22.7 minutes - 15.9 minutes

= 6.8 minutes

Measure used to describe the extra time that travelers must add to their average travel time to ensure they will arrive on-time 95% of the time.

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 8

VDOT

Buffer Index

Buffer Index = Buffer Time / Average Travel Time

= 6.8 minutes / 15.9 minutes

= 0.43

Index used to measure travel time reliability relative to average conditions, and compare the reliability of various roadways.

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 9

VDOT

Planning Time

Planning Time = 95th percentile Travel Time

= 22.7 minutes

Measure that includes boththe average travel time and the buffer time to measure the total amount of time that travelers must budget to ensure they will arrive on-time 95% of the time.

DELAY AND TRAVEL TIME RELIABILITY TERMS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 10

VDOT

Planning Time Index

Planning Time Index = Planning Time / Free-flow Travel Time

= 22.7 minutes / 11.5 minutes

= 1.97

Index used to measure congestion and reliability by comparing travel times during some of the most congested conditions with free-flow conditions.

• New technologies have been created in recent years that collect travel time and speed data on a continuous basis, allowing for the calculation of travel time reliability measures.

• Using INRIX data, HRTPO staff was able to determine 2012 weekday AM and PM Peak Period buffer indices and planning time indices for most CMP roadways in Hampton Roads.

TRAVEL TIME RELIABILITY

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 11

BUFFER INDEX – PM PEAK PERIOD

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 12

VDOT

BUFFER INDEX – PM PEAK PERIOD

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 13

VDOT

PLANNING TIME INDEX – PM PEAK PERIOD

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 14

VDOT

PLANNING TIME INDEX – PM PEAK PERIOD

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 15

VDOT

• Incorporate travel time reliability data into the Project Prioritization Process.

• Incorporate this data into the Congestion Management Process.

NEXT STEPS

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 16

• The draft version of the “Hampton Roads Regional Travel Time Reliability Study” will be open for public review until June 19th.

• Approval of the final document is expected at the July TTAC and TPO Board meetings.

DRAFT REPORT

HAMPTON ROADS REGIONAL TRAVEL TIME RELIABILITY STUDY 17

HAMPTON ROADS

REGIONAL

TRAVEL TIME

RELIABILITY STUDY

Presented by:

Keith Nichols, PETransportation Technical Advisory Committee MeetingAgenda Item #14June 5, 2013

top related