Travertine/Salton Sea Development

www.formacompanies.com

LEGEND

Solar Energy Project

Geothermal Energy Project

Biofuels Energy Project

Current Project

Future Project

28

Dike

Recreational Estuary Lake

Salt Tolerant Vegetation

Dedicated Habitat Zone

Channel toNorth Lake

ProtectiveSalt Flat

Total Current & Planned = 1970 Megawatts

TravertinePoint

Infrastructure Finance District

Anza-BorregoDesert

State Park

Riverside CountyImperial Country

Geothermal Explorationand Expansion Area

Railroad

MeccaKohlRanch

OasisCommunities

Salton Sea

Salt Sink

Bridge/Dike

Recreational Saltwater Lake

Saline Habitat

Complex

Railroad

Railroad

Railroad

Power Transmission Lines

Coachella Canal

Rai

lroad

 

Recirculation Canal from North Lake

8

13

3

4 14

5

11

21

7

6

9 10

12

17

16

15

18

19

Reference Type Status Company Description Megawatts Cost in Millions1 Solar Under Construction ‐ Completion September 2011 SunPeak Solar 20 1002 Biofuel In Operation/Under Expansion SunEco   903 GeoThermal Fully Permitted by CEC ‐ Begin Construction 2012, 2013 & 2014 CalEnergy Blackrock 1 (2012), 2 (2013), & 3 (2014) 165 8004 GeoThermal Under Permit by CEC ‐ Begin Construction 2015 CalEnergy Blackrock 4, 5 & 6 165 8005 GeoThermal Under Construction ‐ Completion April 2012 Energy Source Hudson Ranch 1 50 3506 GeoThermal Under Permit by Imperial County ‐ Begin Construction November 2011 Energy Source Hudson Ranch 2 50 3507 Solar Fully Permitted ‐ Begin Construction 2012 Energy Source Solar Project 80 4008 Solar Fully Permitted ‐ Begin Construction September 2011 8 Minute Energy Chocolate Mountain 50 3009 GeoThermal In Operation Since 2009 Ormat Brawley North 40 P 50 25010 GeoThermal Under Permit by Imperial County ‐ Begin Construction September 2011 Ormat Brawley East 200C/40P 50 25011 Solar Under Application Permit by Imperial County ‐ Begin Construction Late 2011 8 Minute Energy 300C/20P 300 120012 Solar Under Application by BLM ‐ Status Pending SunPeak Solar Superstition 200C/25P 500 150013 GeoThermal Under Application Permit by Imperial County ‐ Begin Construction 2012 Ormat Wister 200C/40P 50 25014 GeoThermal In Operation CalEnergy 220P 340 170015 Solar Planned Torres Martinez Phase 1 5 2516 Solar Planned Torres Martinez Phase 2 20 10017 Biofuel Fully Constructed Kent BioEnergy 160 acres facility in Mecca18 Biofuel Planned Solar Capture19 Solar Planned Col Green 480 acres 75

Total 1895 8465

DesertShores

Salton SeaBeach

Torres MartinezCasino - Red Earth

SaltonCity

NorthShore

Mecca BeachState Campground

BombayBeach

ARCO Travel Center

Corvina StateCampground

Salt CreekBeach Camp

CorvinaMobileHomes

Fingers Marina & Homes

84th StreetBeach

ArcoTravelCenter

New HomeConstruction

Zone

International

City ofWestmoreland

Del RioCountry Club

Sonny Bono National Wildlife Refuge

500-AcreWildlifeRefuge Niland

Bashford’s HotMineral Spa

Fountain ofYouth Spa

Imperial SpaRV Park

TravertineRock

City ofCalipatria

JacquelineCochranRegionalAirport

Red HillMarinaNAFTA

Highway

ThermalMotor

Sports Club

Historical Yacht Club

Marina Homes

Former Salton Sea Military Test Base -

Proposed Solar Farm

Calipatria State Prison (1500 Employees)

Oxidation ProcessSand Filtration

top related