truemove

Post on 15-Aug-2015

34 Views

Category:

Services

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2013 Comba Telecom. All Rights Reserved 1

TrueMove IBS Upgrade Thailand

Site: Multiple sites including offices,

plazas and residential building

Scope:

3G upgrades in 37 sites (add

Node B, upgrade DAS, revise

configuration, optimization and

acceptance test)

Equipment

Installed:

Retrofit antennas and

optimization

Coverage

Area/Floors: 37 sites

Technologies

& Frequencies:

2G (800 / 1800 MHz)

3G (850 / 2100 MHz)

Input Signal: BTS / NodeB

All Seasons Place, Bangkok

top related