TUJUNGA SPREADING

GROUNDS ENHANCEMENT

PROJECT

Southern California Water Coalition’s

Stormwater Workshop

September 27, 2019

Multi-Agency Collaboration to Achieve Co-Benefits and Cost Sharing

ladwp.com

AGENDA

• Project Objective

• Partnerships

• Project Location

• Project Overview

• Multi-Benefits

• Cost Sharing

ladwp.com

PROJECT OBJECTIVE

Including capture 150,000 acre-ft/year of stormwaterIncluding capture 150,000

AFY of stormwater

ladwp.com

MULTI-AGENCY PARTNERSHIPS

LADWP

Water Resources Division

Watershed Mangement

LA County Flood Control DistrictDesign, Construction

Management & Inspection

Basins

W.A. Rasic Inc.

Intakes

Los Angeles Engineering Inc.

Open Space Enhancement

TBD

ladwp.com

PROJECT LOCATION

Tujunga SG)

ladwp.com

PROJECT OVERVIEW

Basins (Completed)

Consolidate 20 existing basins into 9 larger and deeper basins

Intakes (Nov 2019 completion)

2 new intakes and rubber dams

Open Space (Dec 2020 completion)

Improve perimeter fencing, recreational space and landscaping

ladwp.com

PHASE 1- BASIN ENHANCEMENTS

7

ladwp.com

CONVEYOR BELT SYSTEM

Disposal site

Tujunga Spreading Grounds

ladwp.com

CONVEYOR BELT SYSTEM

ladwp.com

PHASE 2 – INTAKE IMPROVEMENTS

New Intake No. 2

New Intake No. 1

Existing Intake

ladwp.com

PHASE 2 – INTAKE IMPROVEMENTS

Tujunga SG)

ladwp.com

PHASE 2 – INTAKE IMPROVEMENTS

ladwp.com

PHASE 2 – INTAKE IMPROVEMENTS

ladwp.com

PHASE 3 - OPEN SPACE ENHANCEMENTS

ladwp.com

MULTI-BENEFITS

Improve

Downstream

Water

Quality

Open Space

Recreation

Improve

Communities

Increase

Stormwater

Capture and Water

Supply Reliability

Promote Economic

GrowthFlood control by

attenuating peak

flow

Supply water to 48,000 homes per yr

ladwp.com

COST SHARING

LADWP $52 M

Total Budget ~ $52 Million

~$130/AF of water

ladwp.com

COST SHARING

District$6.3 M

LADWP $47.5 M

Total Budget ~ $52 Million

~$114/AF of water

ladwp.com

COST SHARINGProp 84 Grant$3.2 M

Prop 1 Grant $7M

District$6.3 M

LADWP $35.3 M

Total Budget ~ $52 Million

~$85/AF of water

ladwp.com

Thank you

Art Castro, PEManager, Watershed Management

Los Angeles Department of Water & Power