tunnelling - obermann systemsmuehlhaeuser-obermann.com/sites/default/files/tunnelling_pre... ·...

Post on 06-Feb-2018

223 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Mühlhäuser - Obermann GmbH

In den Dorfwiesen 23 64720 Michelstadt/Germany

Phone +49 6061 7009 0 Fax +49 6061 7009 800

e-mail: info@obermann.com

www.obermann.com

Tunnelling Pre-excavation grouting

Product range/ contents Page

Tunnelling with compact units 3 MGU-6 Tunnelling with compact units 4-10 MGU-2 Tunnelling 11-13 Tunnel drive in hard rock

Tunnelling with single units 14-16 Tunnelling with single units on construction site 17-19

www.obermann.com 2

Compact unit MGU-6

Cement silo and mixing plant plus grout pump on truck

www.obermann.com 3

Tunnelling with compact units MGU-6 Tunnelinjektion mit Kompaktgeräten MGU-6

Tunnelling with compact units MGU-2

www.obermann.com 4

www.obermann.com 5

Mixing plant control with data registration

Cleanout opening at cement storage tank

www.obermann.com 6

Hand pump for expanding of the foot grids

Water dosing tank of stainless steel

2 Cement storage tanks with cement charging auger

Machine with folded foot grids and protective roofs

www.obermann.com 7

2 Storage tank, working capacity 800 l each Agitator drives with adjustable rotation speed

Level control at the storage tank Rotary knob for adjustment of the agitator rotation speed

www.obermann.com

8

1 Colloidal mixer type MP 500 suitable for micro cement

Operating elements for data recording Grout pump no. 1 feeds 3 grouting places (No. 1-3) Grout pump no. 2 feeds 3 grouting places (no. 4-6)

Bottom outlet valve at storage tank

www.obermann.com 9

PC LOG, for grouting data indication and registration, for 6 grouting places

2 grouting distributors for 3 grouting places each

Flow and pressure measuring

www.obermann.com 10

Tun

ne

l d

rive

in

ha

rd r

ock

Drilli

ng

/bla

sting

an

d p

re-e

xca

va

tio

n g

rou

ting

Com

mo

n d

ata

fo

r d

rilli

ng

an

d g

rou

tin

g

A =

drilli

ng

da

ta

B =

gro

utin

g d

ata

A+

B =

drilli

ng

da

ta p

lus g

rou

ting

da

ta

www.obermann.com 11

Tunnelling Tunnel drive in hard rock

www.obermann.com 12

Tunnel drive in hard rock Drilling/blasting and pre-excavation grouting Common data for drilling and grouting

Drilling / blasting in hard rock

Cavity grouting in hard rock by MGU

www.obermann.com 13

www.obermann.com 14

Tunnelling with single units

Cement silo, mixing plant plus delivery pump

Storage tank plus grout pumps on platform truck

www.obermann.com 15

Grouting data recording with LOG Indication and registration of 4 respectively 6 grouting places

System sketch

www.obermann.com 16

www.obermann.com 17

Tunnelling with single units on construction site

Grouting work

www.obermann.com 18

Tunnelling work

Drilling and grouting work

www.obermann.com 19

Sales Renting Service Consultancy Equipments and Know How

Dosing system for all grouts

Grout pumps

Jet-grouting pumps

Mixer / mixing plants

Registration units

Drill rigs and drill tools

Accessories and material

Slurry walls

Cave and mine backfilling

Horizontal drilling

Micro piles

Water wells

Prestressed concrete

Trenchless technology

Structural rehabilitation

Repair work

top related