UF Health Heart Vascular & Neuromedicine Hospital

A Model of Sustainability for Complex Healthcare

EnvironmentsMay 15th, 2018

2018 Green Globes Annual User Summit

UF Health Heart Vascular & Neuromedicine Hospital

• 540,000 SF Cardio Vascular & Neuroscience Hospital

• 216 Bed Hospital• 10 OR’s; 5 Hybrid OR’s• Phase II of the Shands Campus

(Phase I Cancer Hospital; LEED Gold)• Project achieved 4 Green Globes

Certification

Case Study

UF Health Heart Vascular & Neuromedicine Hospital

• Reflective + Green Roof• 93% of irrigation provided by

municipal reclaimed water• Tree Preservation Plan• Native/Adaptive Species• Limited Uplighting (<1%)• Erosion Control during construction

Site

UF Health Heart Vascular & Neuromedicine Hospital

• Energy – Path C (CO2eq); 230 EUI• 90% VAV (AHCA; ICU & OR’s)• SEC CHP – Reclaimed Heat• HVAC Submetering• Airside Economizing• 72% Interior Lighting LED• 89% Exterior Lighting LED

• Overall LPD = 0.24 W/SF• Enhanced BAS Capability

Energy

UF Health Heart Vascular & Neuromedicine Hospital

Exterior-Terrace: LED tape light under handrail system and under benches Integrated lighting at canopies & special features-Node: highlighting “moments” to while keeping LPD lowInterior-Smart use of tiered lighting design to provide required light levels while achieving low LPD

Lighting

UF Health Heart Vascular & Neuromedicine Hospital

• Campus served by South Energy Center with municipally delivered reclaimed water

• 1,511,000 gal/yr condensate water recovered and delivered to the pond

• 7,956,000 gal/yr cooling tower makeup water provided by municipal reclaimed water

Water for Cooling

UF Health Heart Vascular & Neuromedicine Hospital

Flush/Flow Fixtures• 8-Story facility; 2 Wings; 4 Patient

Floors

Patient Rooms• ½ Patient Beds equipped with

1.28 gpf water closets• All equipped with 0.5 gpm faucets• Showers = 1.5 gpm• 1,363,932 gal/yr. savings

Flush & Flow

UF Health Heart Vascular & Neuromedicine Hospital

Public Areas• 1.28 gpf water closets• All equipped with 0.5 gpm

faucets• Urinals = 0.5 gpf• 1,042,754 gal/yr. savings

Flush & Flow

UF Health Heart Vascular & Neuromedicine Hospital

Landscape Water• Hydro-zoning; High Efficiency

Nozzles; Drip Heads; Smart Control

• 93% of Irrigation provided by municipal reclaimed water. Reduction in potable water = 1,375,248 gal/year

Landscape

UF Health Heart Vascular & Neuromedicine Hospital

• Conventional Once-Through Cooled Sterilizer = 39 cycles/day @ 146 gal/cycle

• Chilled Water Cooled Sterilizer = 39 cycles/day @ 1 gal/cycle2,064,075 gal/yr saved

Overall WUI of 11 gallons/ft/yr.2012 CBECS for Inpatient Healthcare = 50 gal/ft/yr.

Process

UF Health Heart Vascular & Neuromedicine Hospital

• Lifecycle Assessment of Core & Shell: Fly Ash Content

• Lifecycle Assessment for Interior: Electronic Sound Masking – gypsum wallboard reduction (STC 50 – STC 40)

• Construction Waste Management – Concrete, Metal, Wood, Cardboard, Drywall, Office Paper

Materials

UF Health Heart Vascular & Neuromedicine Hospital

• Low-VOC materials• MERV 13+ filtration on main air handling

units• Daylight & Views – mechoshading; fritted

glazing• Ventilation (ASHRAE 170) – ongoing

measurement of OA• Acoustic Comfort – double drywall +

electronic sound masking system

Indoor Environment

UF Health Heart Vascular & Neuromedicine Hospital

Green Globes Certification

88.0%

93.1%

76.0%

93.5%

83.9%

90.3%

77.4%

84.0%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

Overall Score

Indoor Environment

Emissions

Materials & Resources

Water

Energy

Site

Project Management

Percentage Scores for UF Health

UF Health Heart Vascular & Neuromedicine Hospital

• Begin LCA Discussions early in the project• Consider Energy Modeling Approach• Work closely with cogen plant management• Secure early buy-in from Ownership via education• Balancing water conservation with clinical

requirements• Streamline Green Globes coordination via checklist

and charrette presentations• Leverage Assessor recommendations• Understand your team and engage accordingly

Lessons Learned

UF Health Heart Vascular & Neuromedicine Hospital

A Model of Sustainability for Complex Healthcare Environments

QUESTIONS?JOHN CHYZ P.E., LEED AP, GGA, WELL APSUSTAINABLE & WELLNESS STRATEGY

AEI | AFFILIATED ENGINEERS, INC. Tioga Town Center, 12921 SW 1st Road Ste 205 | Newberry, FL 32669

P: 352.264.3314 | F: 352.375.3479jchyz@aeieng.com | www.aeieng.com

aeieng.comAEI/Affiliated Engineers, Inc.

@AEITweets

top related