uganda 100-day tpt scale upcquin.icap.columbia.edu/wp-content/uploads/2019/12/... · 2020. 12....

Post on 23-Jan-2021

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Uganda 100-day TPT scale up

Dr. Kiggundu Josen

Senior Program Officer – DSD

Ministry of Health – AIDS Control Program

13th November 2019

The CQUIN Project

• Introduction

• Trends in IPT uptake in Uganda

• National IPT Targets

• The 100-Day Accelerated IPT Scale-Up plan

• TB Prevention for PLHIV in DSDM

• Results

• Conclusions

2

Outline

The CQUIN Project 3rd Annual Meeting | November 10-14, 2019

Introduction

❑ In 2018 the UNHLM political declaration put TB prevention as one of the key elements to ending the TB epidemic.

❑A ¼ of the world’s population (1.8 billion) have LTBI and carry a lifetime risk of getting sick with active TB disease.

❑This risk can be substantially reduced by TB Preventive Treatment (60% among PLHIV and 70% in U5 contacts).

❑Tuberculosis is the leading cause of death among People living with HIV even in the era of ART

Introduction

❑In 2017, 32% of the AIDS related deaths were due to TB globally

❑To End TB, it is not only essential to treat active TB when it happens but to prevent it from happening. “Closing the tap”

❑Uganda endorsed a form of TPT called Isoniazid preventive therapy (IPT) and has been providing IPT to PLHIV for about 5 years now

Trends in IPT uptake in Uganda

❑ Prior 100-day IPT scale up plan, uptake of this important intervention was still low even with Surge efforts.

0

10000

20000

30000

40000

50000

60000

70000

80000

Jan-Mar2015

Apr-Jun2015

Jul-Sep2015

Oct-Dec2015

Jan-Mar2016

Apr-Jun2016

Jul-Sep2016

Oct-Dec2016

Jan-Mar2017

Apr-Jun2017

Jul-Sep2017

Oct-Dec2017

Jan-Mar2018

Apr-Jun2018

Jul-Sep2018

Oct-Dec2018

Jan-Mar2019

Mar-Jun2019

Start of IPT in

Uganda

Start of IPT surge

❑ The 100-day plan is a critical intervention that will put Uganda back on track towards achieving the UNHLM and END TB targets.

National IPT Targets

2018 2019 2020 2021 2022

TB prevention

Among PLHIV

and children

under 5 yrs Gap to be covered

by the 100 day

scale-up plan

The 100-Day Accelerated IPT Scale-Up plan

❑On 3rd July 2019 was the launch of an accelerated plan to reach 300,000 PLHIV with TPT within 100 days

❑AIM;

▪ To help initiate 50% of all PLHIV in need of this life saving treatment

❑The 100 days was the first step towards complete roll out of IPT

❑MOH organized and set in place all the tools & supplies needed to accomplish this task (IPT scale up toolkit)

Systems Approach to TPT coverage and retention

8

• INH/ B6

• Competent H/W

• Data tools – IPT registers

• Job aids, guidelines, ICF tools

• Coaches/ district mentors

Inputs

• System to identify all eligible clients ( line listing, file review, separating files and stickers)

• System to reach all eligible clients ( clients brought to the facility, H/W goes out to the clients, phone calls, CHWS)

• Efficient system to attend to the clients when they come ( identified clients, pre-packing of INH with ARVs, fast tracking stable clients, education and counselling)

• System to follow up and retain clients on TPT

• Data management systems

• System to sustain INH/ B6 stock levels

Processes to improve coverage and retention

• All eligible clients identified

Output

Outcome

• Reduced TB incidence and mortality

Impact

QI

All eligible clients receive TPT; TPT clients complete therapy

Key Action Areas

2. INH/ B6 Stocks• Improve Provider

Skills for Stock Management.

1.Systems for IPT Delivery: • Address Client Flow and Facility

systems for delivery for Fast track clients, new clients,

• Plan to reach stable clients in the community based DSDM

3. H/W competence and skills• Provide ‘just in time’ skills

building to a multi-disciplinary team and job aids

• Focus on reducing ‘know-do’ gap

5. Create awareness/ demandSimple key messages DAILY for the clients to address adherence and increase demand

4. Availability of data tools and use:• Share targets, create a

plan for meeting the daily clinic targets.

• Use data on PLHIV in care and ever enrolled on IPT to determine gap

TB Prevention for PLHIV in DSDM

❑All PLHIV & U5 contacts have their IPTinitiated at the Facility where thehealth worker;▪ Screens clients to exclude active TB &

contra-indications of isoniazid

▪ Prepares the patient or caretaker for IPT

▪ Prescribes the recommended dose for theclient’s weight

▪ Records in the IPT register

❑Align IPT and ART refills

❑Developed SOPs for guidance onproviding IPT in community models

Monitoring for IPT 100-day scale-up intervention

❑Indicators reported on weekly by districts

▪ Number of individuals initiating IPT

▪ Number of individuals completing IPT from among the previous cohort (quarterly).

❑Weekly dashboard shared with NTF, IPs and DHOs every Friday

❑Detailed analysis at all levels on performance of districts and facilities. Those not achieving targets were engaged for improvement.

Role of District Health Teams

❑Commissioning of TPT at facilities to be undertaken to re-assure confidence of HCW and clients

❑Oversight for IPT implementation in the district

❑DHOs/MMS ensure drug availability, emergency drug redistribution, adverse drug reaction reporting etc.

❑With support from IPs, assist in quantification and redistribution of child courses to facilities in district

❑Conduct weekly monitoring meetings with all stakeholders including Networks of PLHIVs

❑Ensure reporting of IPT coverage from implementing facilities

❑Ensure accountability for performance on IPT uptake and completion at facilities

The Role of the Implementing Partner

❑ Collaborate with MoH NTF to plan & execute a multi-stakeholder response

❑ Support the identification of health facilities suitable for increase in coverage and uptake of TPT for PLHIV and retention through CQI approach

❑ Conduct entry meeting with DHO & DHT to sensitize about the 100 Days

❑ Analyse & address capacity building & mentorship gaps at the H/Facilities

❑ Facilitate the collection and transmission of routine weekly data from sites

❑ Support collection of monthly data on medicines

❑ Ensure drug availability, emergency drug redistribution, adverse drug reaction reporting, etc

❑ Support conducting CQI projects to strengthen IPT implementation

❑ Engage DHTs in the TPT scale up process and share weekly dashboard with the DHO and health facility teams

13

Expected results

Primary Result

❑ 300000 PLHIVs screened and initiated on IPT at 382 selected H/facilities

❑ 100% completion rates for individuals that initiated IPT in quarters: October-December 2018, and January-February 2019.

Outcomes

❑ Increase in availability of INH 300mg and Vitamin B6 at central stores and at initiating sites

❑ Increased routine screening use of diagnostics to rule out active tuberculosis amongst PLHIV

❑ Increase in collaboration and integration of planning and implementation for HIV and TB services at national, district, facility and community levels.

❑ Increase health worker skill and confidence in initiating IPT

❑ Increased in the application of quality improvement science in identifying and in action on barriers to IPT uptake.

RESULTS

Over half a million PLHIV initiated on TB IPT between 1st Oct 2018 & 6th Oct 2019

16

526,354

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

-

100,000

200,000

300,000

400,000

500,000

600,000

WK

40_

2018

WK

41_

2018

WK

42_

2018

WK

43_

2018

WK

44_

2018

WK

45_

2018

WK

46_

2018

WK

47_

2018

WK

48_

2018

WK

49_

2018

WK

50_

2018

WK

51_

2018

WK

52_

2018

WK

01_

2019

WK

02_

2019

WK

03_

2019

WK

04_

2019

WK

05_

2019

WK

06_

2019

WK

07_

2019

WK

08_

2019

WK

09_

2019

WK

10_

2019

WK

11_

2019

WK

12_

2019

WK

13_

2019

WK

14_

2019

WK

15_

2019

WK

16_

2019

WK

17_

2019

WK

18_

2019

WK

19_

2019

WK

20_

2019

WK

21_

2019

WK

22_

2019

WK

23_

2019

WK

24_

2019

WK

25_

2019

WK

26_

2019

WK

27_

2019

WK

28_

2019

WK

29_

2019

WK

30_

2019

WK

31_

2019

WK

32_

2019

WK

33_

2019

WK

34_

2019

WK

35_

2019

WK

36_

2019

WK

37_

2019

WK

38_

2019

WK

39_

2019

WK

40_

2019

Wkly

Incr

em

ent

Cum

m. I

nitia

ted o

n T

PT

Period

Overall TPT Initiation Trends

Cum. Initiated on TPT Wkly Increment

Pre-Campaign Mobilization

100-Days Campaign launch

65.3% of all initiations were during the 100-days period

17

Overall 100-day performance is 343,674/ 304,391 (113%)

NON-PRIORITY sites contributed 17% of the total IPT initiation during the campaign period

343,674

19,789

26,549

30,558

36,475

33,061

35,855

31,971 30,400

24,344

19,791 18,711

15,688

13,516

6,966

-

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

-

50,000

100,000

150,000

200,000

250,000

300,000

350,000

400,000

wkly

incr

em

ent

Cum

. In

itia

ted o

n T

PT

Period

100 Day Cumulative and weekly TPT Initiation Trends

Cum. Initiated Wkly Increment

86%

84%85%

80% 83% 81%84%

82%

84%83% 85%

85%82%

84%

19,673

26,449

30,444

36,030 32,989

35,811

31,904 30,253

24,201

19,742 18,672

15,649

13,491

6,866

0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

# o

n IPT

# o

n IPT

Reporting Period

83% of IPT initiations were in Priority SITES and this was

relatively uniform every week of the campaign period

Total # Initiated on TPT , Pink Bar represents % in Non-Priority sites

# and % Initiated on TPT in Priority sites

Weekly Target

100-Days weekly performance trends by priority facility status

100-Days IPT Performance by HF level

11/13/2019 18

38,653

16,710

101,161

85,475

72,456

27,719

1,500

48,191

11,653

53,906

75,866 79,655

35,121

0

80%

143%

188%

113%

91%

79%

0%

20%

40%

60%

80%

100%

120%

140%

160%

180%

200%

-

20,000

40,000

60,000

80,000

100,000

120,000

Clinics (includes

special clinics in

MNRH)

HC II HC III HC IV Gen. Hosp RR Hosp. Other

Perc

enta

ge initia

ted o

n IPT

# o

n IPT

Axis Title

# initiated on IPT Target Target Performance

There was variability in Performance by HF level with GH,RR hospitals and Clinics

including those in Mulago performing lower than their target

11/13/2019 19

AGE & GENDER DISSAGREGATION FOR PLHIV WHO INITIATED IPT DURING 100-DAYS CAMPAIGN

PLHIV, < 5 Yrs, 2,499 , 1%

PLHIV, 15+ Yrs, Female,

211,506 , 62%

PLHIV, 15+ Yrs, Male,

117,729 , 34%

PLHIV, 5-14Yrs, 11,940 , 3%

• Overall, 526,354 PLHIV have initiated IPT, representing ~ 41.5% of the MoH UG TX_CURR

target for FY19

• 65.3% of the IPT initiations above occurred in the 100-DAYS campaign period

• The 100-DAYS IPT scale up campaign performance was successful with 113% performance

of the targeted 304,391 PLHIV.

• Overall, HC IIs, HC IIIs & HC IVs exceeded their targets while RR hospitals and General

hospitals did not achieve their 100-days target

• 17% of the clients initiated on IPT during the campaign period were in NON-PRIORITY IPT

facilities

• PLHIV aged <15 yrs constituted 4% of those who initiated IPT in the campaign period. A

total of 3,467 HIV negative children initiated IPT in FY19 of whom 32% were initiated during

the campaign period

11/13/2019 20

Conclusions

Acknowledgements

❑MoH, ACP and NTLP

❑Development and Technical partners

❑CDC

❑USAID

❑Defeat TB

❑Global Fund

❑ DLGs

❑Implementing Partners

❑Civil Society Organizations and PLHIV networks

PREVENT TB

top related