university of utah – medical education & discovery (med)/rehabilitation hospital
Post on 22-Jan-2018
1.330 Views
Preview:
TRANSCRIPT
IN THE FACILITIES OF THE PAST
Vivian S. Lee, M.D., Ph.D., M.B.A.Senior Vice President, University of Utah Health Sciences
CEO, University of Utah Health Care
Dean, University of Utah School of Medicine
TRAINING THE PROVIDERS
OF THE FUTURE
A Vision from 1965
50 years ago, UUSOM was given a home with the goal that the University Hospital “would facilitate carrying on the highest grade of scientific work, which by the quality and reputation of its clinical work would attract patients from the whole Mountain Region irrespective of their economic status.”
“…The building’s seismic issues are significant enough that the building is unsuitable for continued use as a clinical care and research facility.
The deficiencies cited are considered a hazard to occupants and a liability to the university.” – 2013 Study
• School of Medicine is the only Medical School in the State and Region
• Over 80% of Students are Utah residents or UT high school or college graduates
• We train 2/3rds of the physicians in the state
• Departments provide telehealth services to remote clinics across the state and region
Training Providers to be the Best in the Nation
Training the Providers of the Future in the Facilities of the Past
A Vision for the Future
INTERPROFESSIONAL MEDICAL INNOVATION
POPULATION HEALTHBIG DATA
Building 521: School of Medicine
University of Utah Hospital
Huntsman Cancer Institute
Primary Children’s Medical Center School of Medicine
Medical Education & Discovery
Medical Education and Discovery Center
Rehabilitation Hospital
Ambulatory Care Center
Ambulatory Care Center
School of Medicine
Ambulatory Care Center
Rehabilitation Hospital
Rehabilitation Hospital
Ambulatory Care Center
School of Medicine
Medical Education & Discovery
Medical Education and Discovery Center
Rehabilitation Hospital
Ambulatory Care Center
The MED Complex:
Doing More With Less
Existing Space to be Demolished (GSF) 639,174
New Space to be Constructed (GSF) 500,000
Projected Timeline: 2020
Estimated Costs
Questions?
top related