update of booster alignment & magnet moves february 20, 2013
Post on 22-Feb-2016
28 Views
Preview:
DESCRIPTION
TRANSCRIPT
Update of Booster Alignment & Magnet Moves
February 20, 2013
Bill Marsh, Kiyomi Seiya, Dean Still, Kent Triplet Alex Waller
Long 7 Aligned beam pipeLong 10 Aligned beam pipe
Long 11 Aligned beam pipe
Long 12 kicker Rotated V H Alignment
Short 12 Corr. & BPM New BPM Alignment
Long 13 Absorber new
Long 14 BRF#1,#2 Missing BRF#1
Long 15 BRF#3,#4 Missing BRF#3
Long 16 BRF#5,#6 15Hz Op. cavities Alignment
Long 17 BRF#7,#8 15Hz Op. cavities Alignment
Long 18 BRF#19
Long 19 BRF#17,#18 PA SS upgrade
Long 20 RWM
Long 21 BRF#9,#10 PA SS upgrade
Long 22 BRF#11,#12 PA SS upgrade on #11
Long 23 BRF#13,#14 PA SS upgrade
Long 24 BRF#15,#16 PA SS upgrade
Moved components during Shutdown
VL04 Replaced RF module
HL10 Replaced RF module
HL11 Found jumpers and no connection to BPMsVL11 Found jumpers and no connection to BPMs
HL12 Replaced RF module
HS12 New BPM , Replaced RF module, Changed gain and offset on frontendVS12 New BPM , Replaced RF module, Changed gain and offset on frontend
HS23 It still has issue.
BPMs which didn’t work after shutdown
Aperture scan analysis: offline to online
*Comparison has to be done with two software.
-20
-15
-10
-5
0
5
10
15
20
0 5 10 15 20 25
VL-lower-before (Feb. 2012)VL-upper-before(Feb. 2012)VL-lower-norm-center(Feb. 2013)VL-upper_norm-center(Feb. 2013)
[mm
]
period #
-20
-15
-10
-5
0
5
10
15
20
0 5 10 15 20 25
VS-lower-before(Feb. 2012)VS-upper-before(Feb. 2012)VS-lower-after-norm-center(Feb. 2013)VS-upper_after-norm-center(Feb. 2013)
[mm
]
period #
Aperture (90%) before and after shutdownLong Short
* Assuming beam size was same.*Central position from the data after shutdown was normalized to the data before.
10
15
20
25
30
0 5 10 15 20 25
Vertical aperture
VL_upper-lowerVS-upper-lower
uppe
r - lo
wer
[mm
]
period #
Aperture: Upper - Lower
-0.004
-0.002
0
0.002
0.004
1 1.5 2 2.5 3
1.5 2 2.5 3 3.5
perood #
MAD per iod #
-0.004
-0.002
0
0.002
0.004
3 3.5 4 4.5 5
3.5 4 4.5 5 5.5
perood #
MAD per iod #
-0.004
-0.002
0
0.002
0.004
5 5.5 6 6.5 7
5.5 6 6.5 7 7.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
7 7.5 8 8.5 9
7.5 8 8.5 9 9.5
perood #
MAD per iod #
-0.004
-0.002
0
0.002
0.004
9 9.5 10 10.5 11
9.5 10 10.5 11 11.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
11 11.5 12 12.5 13
11.5 12 12.5 13 13.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
13 13.5 14 14.5 15
13.5 14 14.5 15 15.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
15 15.5 16 16.5 17
15.5 16 16.5 17 17.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
17 17.5 18 18.5 19
17.5 18 18.5 19 19.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
19 19.5 20 20.5 21
19.5 20 20.5 21 21.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
21 21.5 22 22.5 23
21.5 22 22.5 23 23.5
perood #
MAD period #
-0.004
-0.002
0
0.002
0.004
23 23.5 24 24.5 25
23.5 24 24.5 25 25.5
perood #
MAD period #
#1D F F D D F F D
#2 #3D F F D D F F D
#4 #5D F F D D F F D
#6 #7D F F D D F F D
#8 #9D F F D D F F D
#10 #11D F F D D F F D
#12
#13D F F D D F F D
#14 #15D F F D D F F D
#16 #17D F F D D F F D
#18 #19D F F D D F F D
#20 #21D F F D D F F D
#22 #23D F F D D F F D
#24
+5mm
-5mm
0
+5mm
-5mm
0
RF CorrectorF DFD
Period #22 Period #23 Period #24
1.3 mm 1.3 mm
Move1
Magnet move 2Two magnets were realigned in Feb. 18, 2013
period 22: F-up magnet (upstream of the magnet by +1.3mm) period 24: F-up magnet (upstream of the magnet by +1.3mm)
Magnet Move Program MAD
Orbit difference with the vertical alignment error.
10mm
-10mm
Orbit difference before and after the magnet move
-20
-15
-10
-5
0
5
10
15
20
5 10 15 20 25
aperture_long
VL-upperVL-lowerVL-centerVL-upper-move2VL-lower_move2VL-center_move2
[mm
]
period#
-20
-15
-10
-5
0
5
10
15
20
5 10 15 20 25
aperture_short
VS-upperVS-lowerVS-centerVS_upper_move2VS_lower_move2VS_center_move2
[mm
]
period #
V apertires before and after the magnet move
V_Long V_Short
After move2 before move2
VS22 before and after the magnet move
Plan
Redo scans at 20 – 23.
Measure beam size with MW.
Fix BPM HS23.
Move magnet
top related