31st May 2013Projct Manager,Qserve ( Pvt. ) Ltd.,No. 31B, Albert Place,Dehiwala.
Dear Sir,
PROPOSED BUILDING OF MOVENPICK CITY HOTEL AT DHARMAPALA MAWARHACOLOMBO 03 FOR SOFTLOGIC CITY HOTELS ( PVT ) LTD.
We are pleased to submit our quotation for above work. Cost for additional concrete filling in skin wall = Rs.
The above prices does not include VAT.Additional time duration for above work - minimum 10 days
We hope that our quotation will meet your requirements and waiting for your kind approval.
Thanking you,
Yours faithfully
C C Mr. Stepahn Anthonisz ( CEO ) - Softlogic City Hotels ( Pvt. ) Ltd. Prof. Chitra Weddikkara ( E.P.M.) - Qserve (Pvt) Ltd.
SummaryPROPOSED MOVENPICK CITY HOTEL PROJECT
SUMMARY
ITEM NODESCRIPTIONRATE (Rs.)
AADDITIONiAdditional concrete filling , formwork & reinforcement for basement second floor area.Total Cost of Addition0.00
BOMMISSIONReduced slab area at basement second floor.iConcrete Work
iiiReinforcement WorkTotal Cost of Ommission 0.00
Total cost for additional ( item 'A' - 'B' ) ( =10,369,924.26 - 1,449,367.20)0.00
Note :01. All above rates are exclusive of VAT.
Break DownPROPOSED MOVENPICK CITY HOTEL PROJECT
V.06 ADDITIONAL COST FOR PILE CAP INSTEAD OF CAPPING BEAM IN GROUND FLOOR FRONT SIDE. ( ALONG GRID 'L' )
Item No.DescriptionUnitQty. Rate ( Rs. )Amount (Rs.)
AAddition and ommission of front pile cap (Along Grid 'L' )iAdditional concrete for pile capm356.9317,081.00972,421.33Rate: BOQ / Concrete / item no F.040.000.00iiAdditional form work for pile capm238.951,337.0052,076.15Rate: BOQ / Formwork / item no F.1510.000.00iiiAdditional reinforcement for pile capt18.04174,640.003,150,505.60Rate: BOQ / Reinforcement / item no F.3090.00
Additional cost for pile cape instead of capping beam in ground floor front side4,175,003.08
Note :01. All above rates are exclusive of VAT.
Block A
REINFORCEMENT QUANTITY OF CAPPING BEAM( ACCORDING TO TENDER DRAWINGS )
Block B
REINFORCEMENT QUANTITY OF CAPPING BEAM( ACCORDING TO NEW DRAWINGS )
Block C
ommit
OMMISSION