VERSYS CONTINUOUS ETG-STG Installation Manual, Page 1
Figure 2 Figure 3
6" OC6" OC
9/16” SLOT TEE GRID CEILING SYSTEM (STG) 15/16” EXPOSED TEE GRID CEILING SYSTEM (ETG)
Figure 1
VERSYS CONTINUOUS - ETG-STG Installation Manual
STEP 1 - CEILING PREPARATION
REMOVED CEILING TILES
CEILING TILES
6"
30", 36", 48" OR 60"RUN LENGTH
FIXTURE SLOT/OPENINGIN GRID CEILING SYSTEM
A) GRID CENTERS TO BE 6" (AS SHOWN IN FIGURE 2 AND FIGURE 3). LENGTH OF GRID OPENING HAS TO BE ACCORDING TO THE ORDERED FIXTURE OR FIXTURES RUNS.
B) BEFORE INSTALLING FIXTURES IN GRID CEILING PLEASE REMOVE CEILING TILES NEXT TO FIXTURE SLOT AS SHOWN IN FIGURE 1
VERSYS CONTINUOUS ETG-STG Installation Manual, Page 2
Figure 2 Figure 3
Figure 1
VERSYS CONTINUOUS - ETG-STG Installation Manual
STEP 2 - FIXTURE PREPARATION
1) REMOVE FIXTURE FROM PACKAGING BOX.2) FROM "BOR" AND "INT" MARKED FIXTURES REMOVE WIREWAY SIDE COVERS AND JOINING BOLTS AND NUTS AS SHOWN IN FIGURE 1.
WIREWAYSIDE COVERS
JOINING BOLTS(1/4-20 3/4"LONG)
1/4-20 HEX NUTS
#8-3/8" LONGPAN HEAD SCREW
ALIGNERBRACKET
JOINERBRACKET
THROUGHWIRE
MOUNTINGBRACKET
DETAIL "A"
IF USING "ETG"*
GRID CEILING SYSTEM
THIS TAB IS AS SHOWN
IN FIGURE 2.
IF USING FIXTURE
IN "STG"** GRID
CEILING SYSTEM
THIS TAB MUST BE
FOLDED OUT AS SHOWN
IN FIGURE 3.
* - "ETG" - 15/16" X 1 1/2" HIGH FLAT "T" GRID CEILING.** - "STG" - 9/16" BOLT "T" X 1 11/16" HIGH SCREW SLOT GRID CEILING.
DETAIL "A"
VERSYS CONTINUOUS ETG-STG Installation Manual, Page 3
Figure 2
Figure 4
"BOR" ("INT")FIXTURE
FIXTURE SLOT/OPENING
"EOR" FIXTURE
TIE WIRE(BY OTHERS) TIE WIRE
(BY OTHERS)
"EOR" FIXTURE
"BOR" ("INT")FIXTURE
C) BRING NEXT FIXTURE ("INT" OR "EOR" AS SHOWN IN FIGURE 3; SECURE FIXTURE TO PLENUM AS DESCRIBED IN PARAGRAPH "B” AND SHOWN IN FIGURE 4.
Figure 1
Figure 3
VERSYS CONTINUOUS - ETG-STG Installation Manual
STEP 3 - FIXTURE INSTALLATION
"BOR"FIXTURE
CEILINGTILE
FIXTURE SLOT/OPENINGIN GRID CEILING SYSTEM
TIRE WIRE(BY OTHERS)
FIXTURE SLOT/OPENINGIN GRID CEILING SYSTEM
"BOR"FIXTURE
CEILINGTILE
* - "IND" - INDIVIDUAL FIXTURE; ** - "BOR" - BEGINNING OF RUN FIXTURE; *** - "INT" - INTERMEDIATE IN RUN FIXTURE;
**** - "EOR - END OF RUN FIXTURE.
* - "IND" - INDIVIDUAL FIXTURE; ** - "BOR" - BEGINNING OF RUN FIXTURE; *** - "INT" - INTERMEDIATE IN RUN FIXTURE;
**** - "EOR - END OF RUN FIXTURE.
A) START INSTALLING FIXTURE FROM LEFT TO RIGHT (CLOCKWISE) STARTING WITH "BOR"** MARKED FIXTURE AS SHOWN IN FIGURE 1.B) ONCE FIXTURE IS INSTALLED IN FIXTURE SLOT/OPENING, PLEASE USE TIE WIRE (AS SHOWN IN FIGURE 2) TO SECURE FIXTURE TO PLENUM ACCORDING TO NEC, UL AND CITY CODES.
VERSYS CONTINUOUS ETG-STG Installation Manual, Page 5
ALIGNER BRACKETWITH SET SCREW
JOINER BRACKET
THROUGH WIRES
SLIDE ALIGN BRACKETTO INTERMEDIATE POSITIONAND USING SET SCREWSALIGN FIXTURE HOUSINGS
JOIN FIXTURESBY 1/4-20 BOLTSAND NUTS
WIRE NUTS
A) FIXTURES INSTALLED IN A SLOT/OPENING WILL LOOK AS SHOWNIN FIGURE 1;B) USE JOINING BOLTS AND HEX NUTS (FROM STEP 2) TO JOIN AND ALIGN FIXTURES AS SHOWN ON FIGURE 2;C) USING PROVIDED (BY NEO-RAY) QUICK CONNECTOR OR WIRE NUTS THROUGH WIRE FIXTURES AS SHOWN IN FIGURE 2.
Figure 2
Figure 1
VERSYS CONTINUOUS - ETG-STG Installation Manual
STEP 4 - CONNECTING THROUGH WIRING AND POWERING INSTALLED FIXTURESWORK FROM BELOW UTILITY COMPARTMENT TO JOIN FIXTURES IN RUN.
BEFORE DOING STEP # 4 AND STEP # 5 WHIP MUST BE WITHOUT POWER!
VERSYS CONTINUOUS ETG-STG Installation Manual, Page 6
FEED WHIP(BY OTHERS)
ACCESSPLATE
FEED WIRES
REMOVE ACCESS PLATE, ATTACH FEED WHIP TO ACCESS PLATE AND CONNECT FIXTURE FEED WIRES TO WHIP.PUT BACK ACCESS PLATE ONTO FIXTURE.
NOTE: FOR DIMMING BALLAST FULL FUNCTIONALITY CUSTOMER HAS TO HAS KEEP LAMPS "ON" MINIMUM 100 HOURS FOR PROPER FULL RANGE DIMMING AND LAMP STABILITY
WIREWAYCOVER.
CEILING TILES
UTILITYCOMPARTMENTCOVER
UTILITYCOMPARTMENT
A) INSTALL WIREWAY COVER IN UTILITY COMPARTMENT AND CLOSE COMPARTMENT BY COVER;B) CLOSE CEILING BY TILES AS SHOWN BELOW.
C) INSTALL LAMPS (NOT BY NEO-RAY).
STEP 6
VERSYS CONTINUOUS - ETG-STG Installation Manual
STEP 5 - POWERING INSTALLED FIXTURES