visit on friday 15 th march 2013. still a building site – due to open in august

Post on 14-Dec-2015

220 Views

Category:

Documents

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Visit on Friday 15th March 2013

Still a building site – due to open in August

A standard classroom

Martine Scott taking pictures for the records

A science lab – the chairs in the middle can be rearranged

Stairs that are wide with windows and outside light!

Home Economics – plenty of space

Toilets – the cubicle walls are still to be built! There will need to be discussion about the best design.

Looking into the canteen area – the steps on the right will also be an informal seating area

A high quality wooden finish in many areas with plenty of daylight throughout the building

High quality games hall. Very effective soundproofing panels and systems are used all over the school

Quality Welsh slate finish to the outside walls

top related