waller county transportation plan · •2019 wctp thoroughfare plan map •roadway cross-sections...

Post on 24-Jul-2020

10 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Carlene Mullins

August 15, 2018

Waller County Transportation Plan

Project Overview

Major Issues

Steering

Committee Stakeholders Public

Traffic Congestion r r r

Transit Needs r r r

Increased Heavy Truck Traffic r r r

Cyclist/Vehicle Conflicts r r r

Dangerous Road Curves r r r

Road Flooding r r

Roads without Shoulders r r r

Road Conditions r

North/South Connectivity r r r

East/West Connectivity r r r

Coordinate Ordinances/Policies r r

Widen IH 10 r r r

Widen US 290 r r r

Identified Issues

Transportation Plan

▪ Mobility Plan

• Roadway

• Transit

• Hike and Bike

▪ Thoroughfare Plan

• 2019 WCTP Thoroughfare Plan map

• Roadway cross-sections

• Revised subdivision regulations

Short-Term Recommendations

City Road Begin End

Brookshire Bains St I-10 Kellner Rd

Gassner Rd FM 359 Waller Ave

FM 1489 Gassner Rd Rheman Cutoff Rd

South St Waller Hereford Dr

Pattison Sterling St Avenue F Clapp Rd

Durkin Rd Royal Rd Clapp Rd

Hempstead Urban Rd US 290 Austin Branch Rd

Repair City Roads

Short-Term Recommendations

Short-Term Recommendations

Long-Term Recommendations

Long-Term Recommendations

Hike and Bike Recommendations

▪ Base Network

▪ Waller County Hike/Bike

Plan

Transit Recommendations

▪ Local Bus Routes

▪ Commuter Rail Stations

▪ Park and Ride Lots

▪ Intra-County Circulators

2012 Thoroughfare Plan

2019 Thoroughfare Plan - Draft

▪ Public Meetings:

- August 14 – Tuesday

Royal ISD High School – Cafeteria

- August 16 - Thursday

Waller County Community Center

▪ Finalize Thoroughfare Plan

▪ Finalize WCTP document

Next Steps

Questions

▪ Project Websitewww.hgacmpo.com/waller

▪ Carlene MullinsCarlene.Mullins@h-gac.com

top related