WASHINGTON DEPARTMENT OF FISH &
WILDLIFE
FISH PASSAGE AND FISH FISH PASSAGE AND FISH SCREENING STATUS - SCREENING STATUS -
20062006
WDFW FISH PASSAGE/FISH
SCREENING PRIORITIES
FISH PASSAGE AND SCREENING TECHNICAL ASSISTANCEPASSAGE AND SCREENING CORRECTION ON AGENCY LANDS FISH PASSAGE AND SCREENING INVENTORIESFACILITATE COMPLIANCE CORRECTIONS AT NON-AGENCY FISH SCREENS
KEY INITIATIVES
Correction of passage and screening problems on WDFW landsForest and Fish Agreement – “passage of all species and life stages” (by 2016)Aggressive WSDOT fish passage effortsFRIMA/SRFB/etc. grant programsProject partnerships with BOR, Conservation Districts, etc.
Inventories
WDFW lands inventory– Inventory complete in WWA; ~25% complete
in EWA– 58 road-related barriers and 93 non-road
barriers identified to date
WSDOT inventory– 3,112 state highway stream crossings
inventoried through March 2006– 1,136 barriers with significant habitat gain
identified through March 2006
FRIMA comprehensive watershed inventoryThird party inventories
Screen/Fishway Inspection/Maintenance
Mitchell Act– Inspect/maintain 15 fish screens and 46 fishways
BPA– Inspect/maintain 28 fish screens
State screen inspection– Inspect ~150 third-party fish screens
Fishway inspections– WSDOT – Inspect 152 WSDOT-owned fishways– WDFW – Inspect/maintain 64 agency-owned fishways– No longer have funding to inspect the additional ~400
third party fishways
YAKIMA CONSTRUCTION SHOP (YCS)
ACCOMPLISHMENTSWestern WA– Clallam Cline Diversion - intake and screen
renovation– Elwha Hatchery - water intake screen renovation– Naselle Hatchery - water intake screen renovation – Shillapoo WA - renovation of plate screen seals– Independent Diversion - intake and screen
renovation (2007)– Sequim Prairie Diversion - intake and screen
renovation (2007)– Canyon Creek - fish passage at hatchery water
intake (design completed)
YCS ACCOMPLISHMENTS
(cont.)North Central WA– Wells WA - replacement of 4 pump screens
and pumps– Methow Valley E/W Diversions -
reconstruction of drum screen facilities and passage (BOR project)
– McDevitt Diversion - replacement of screen with modular drum screen
– Hottell Diversion - replacement of screen with modular drum screen
– Jones/Shotwell - fabrication of new plate wiper screen (large)
– Aspen Meadows – screen replacement with modular plate screen
YCS ACCOMPLISHMENTS
(cont.)Yakima Basin– Fogarty Diversion – Phase 2 drum
(large) screen replacement– Lesh Diversion – installation of new
portable modular drum screen– Diversion 14 – new drum screen– Shaw Knox Diversion – Installation of
new portable modular drum screen– Shaw Knox Side Channel – prefab of
concrete weir/pool fishway – Garretson Diversion – installation of
new plate screen
YCS ACCOMPLISHMENTS
(cont.)SW WA– Tucannon Hatchery – installation
of outfall barrier screen– Ringold Hatchery – installation of
outfall barrier screen– Bergevin Williams/Old Lowden –
refurbish drum screens – Touchet Consolidation - ~$2M
future project (design completed)
YCS ACCOMPLISHMENTS
(cont.)Contract/Non-Screen Projects– Swofford Ponds – fabricate new large drum
screens for Tacoma Power– Toppenish Wildlife Refuge – fabrication of
2 belt screens and 1 paddle wheel driven belt screen
– Fabrication of hatchery pickets– Radon reduction towers – Spokane
Hatchery– Installation of crop damage fencing– Hatchery crowder screens (Lyons Ferry)
TECHNICALASSISTANCE
Guidance DevelopmentTrainingRegional and Statewide TASite or Project Specific TA – 400+/yearProject ManagementFunding Assistance