welcome - beverly hills – complete streets...

Post on 17-Jul-2020

0 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

© 2018 Iteris, Inc. All rights reserved.

WELCOME

Traffic & Parking Commission Special Meeting May 30, 2018

© 2018 Iteris, Inc. All rights reserved.

WORKSHOP #2

CONCEPTS FOR IMPROVEMENT

MAY 30, 2018

© 2018 Iteris, Inc. All rights reserved.

Agenda

1. Welcome 10 min

2. Project Presentation 25 min

3. Roundtable Dialogue 50 min

4. Report Back 30 min

5. Closing Remarks 5 min

6. Event End 8:30pm

3

© 2018 Iteris, Inc. All rights reserved.

Complete Streets for Beverly Hills

• Streets designed and operated to provide safer access for all street users

• A balanced street network offering more choices, and connecting all modes of travel

• Make Beverly Hills a better place to live

4

© 2018 Iteris, Inc. All rights reserved.

Modal Emphasis of Complete Street Network

• ALL streets are safer for all users

• Some streets prioritize one mode of travel over others

• Balanced approach citywide

5 Source: Pasadena Design Guidelines

Modal Emphasis Roadways

© 2018 Iteris, Inc. All rights reserved. 6

Community Feedback

© 2018 Iteris, Inc. All rights reserved.

Community Values + Goals

• Safety for all roadway users

• Improve quality of life

• Improve traffic flow for all

• Diversify transportation choices

TOP VALUES

• Improve walkability

• Reduce speeding

• Transit connections/access

• Green infrastructure

TOP GOALS

© 2018 Iteris, Inc. All rights reserved.

Public Input

8

Workshop #1

Farmer’s Market

© 2018 Iteris, Inc. All rights reserved.

“How would you improve mobility?”

© 2018 Iteris, Inc. All rights reserved.

Top priority Complete Streets elements

1 2

3 1 2 3

© 2018 Iteris, Inc. All rights reserved. 11

Concept improvements for consideration

Potential Pedestrian Improvements

© 2018 Iteris, Inc. All rights reserved.

Pedestrian Emphasis Improvements

12

Walk to Work (%) by Census Tract

• Crosswalks

• Pedestrian head start

(Leading Pedestrian Interval)

• Bulb-outs

• Landscaping

© 2018 Iteris, Inc. All rights reserved.

Potential Pedestrian Improvements

13

Scramble Crosswalk

Rodeo Drive/Dayton Way

Raised Crosswalk

Beverly Gardens Park

© 2018 Iteris, Inc. All rights reserved.

Pedestrian Crosswalk Policy

14

© 2018 Iteris, Inc. All rights reserved.

Pedestrian Emphasis Streets

© 2018 Iteris, Inc. All rights reserved. 16

Concept improvements for consideration

Potential Bike Improvements

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

High visibility bike lanes

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

High visibility bike box

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

Protected Bike Lane

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

Bike Boulevard

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

More bike share stations

@ key connections with transit

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Improvements

22

Reverse Angle Parking

© 2018 Iteris, Inc. All rights reserved.

Bike Emphasis Streets

© 2018 Iteris, Inc. All rights reserved. 24

Concept improvements for consideration

Potential Transit Improvements

© 2018 Iteris, Inc. All rights reserved.

Transit Emphasis Improvements

• Transit user amenities: shelters, benches

• Street operations dedicated to reliable transit travel times

• Improved signage and/or communications of stops and destinations in proximity to stops

• Safer connections for peds & bikes

25 Source: MyFigueroa

© 2018 Iteris, Inc. All rights reserved.

Microtransit

26

Low speed electric autonomous shuttle

© 2018 Iteris, Inc. All rights reserved.

Transit Emphasis Streets

27

© 2018 Iteris, Inc. All rights reserved. 28

Concept improvements for consideration

Potential Vehicle & Technology Improvements

© 2018 Iteris, Inc. All rights reserved.

Vehicle/Technology Emphasis Improvements

29

Traffic Circle at Laurel Avenue/Norton Avenue

City of West Hollywood

• Reduce cut-through traffic on non-arterials

• Traffic calming elements

― Neighborhood Traffic Circles

― Curb extensions

― Speed humps or bumps

― Turn restrictions

• Improve major arterials

― Left-turn restrictions

― Improve striping and signage visibility

― Adaptive signal coordination

© 2018 Iteris, Inc. All rights reserved.

Local Street Traffic Calming Emphasis

Reduce Speeds to reduce cut-through traffic from arterials

Traffic Calming Measures - Neighborhood Traffic Circle

30

© 2018 Iteris, Inc. All rights reserved. 31 Whitworth Drive would have 6 traffic circles

© 2018 Iteris, Inc. All rights reserved.

Concept Technology

32

5G/DSRC Street furniture + physical infrastructure enhanced

© 2018 Iteris, Inc. All rights reserved.

Concept Technology

Digitize the street with Shared Use Mobility Zones

33

© 2018 Iteris, Inc. All rights reserved.

Concept Technology

34

Smart Street Lights

© 2018 Iteris, Inc. All rights reserved.

Vehicle/Technology Emphasis Streets

© 2018 Iteris, Inc. All rights reserved. 36

• Walk Audit – June 9th RSVP at

www.beverlyhills.org/completestreets

• Workshop #3: Draft Plan Community

Feedback – August 22nd

• Fall 2018 – Final Plan to Council

Timeline + Involvement Opportunities

© 2018 Iteris, Inc. All rights reserved.

Group Working Session

1) Review + add to draft complete streets maps – 45-50 minutes

— Pedestrian Network (15 minutes)

— Bike Network (15 minutes)

— Vehicle/Technology Streets (15 minutes)

2) Report back to group - 30 minutes

— most important thing your group discussed on each network map (pedestrian, bike, vehicle/technology)

37

© 2018 Iteris, Inc. All rights reserved.

THANK YOU!

top related