westinghouse proprietary class 2 © 2011 westinghouse ...fsrug.org/presentations 2011/westinghouse -...
Post on 20-Jul-2018
267 Views
Preview:
TRANSCRIPT
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Nuclear Automation
Digital Feed Water Upgrades
Westinghouse Nuclear Automation
Digital Feed Water UpgradesExperience, Validation
& d& Lessons Learned
P fil F d iPanfilo FedericoProduct Manager, Distributed Controls and
Information SystemsInformation Systems(412) 374-6448 Office(412) 523-9959 Cell
1
( )
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Control SystemsWestinghouse Control Systems● Westinghouse uses Ovation® Distributed Control
System as highly reliable platform for non-safety t l f ti i PWR BWR & VVERcontrol functions in PWRs, BWRs & VVERs
– Eliminate plant trips– Reduce or eliminate critical path time– Eliminate single-point vulnerability– Eliminate hardware calibration time– Provide advanced diagnostics down to point level
U t d d d t l l i & h d– Use standard and proven control logic & hardware configurations
– Reduce operator burden and challengesCommon interface across control systems– Common interface across control systems applications and platform
– Advanced platform that supports the latest technologies and common designs with AP1000
2
g g
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Ovation ® Well Suited For NuclearOvation Well Suited For Nuclear• Designed for the power industry with Nuclear attributes
I t t Pl t O t Si l ti S l ti• Integrates Plant Operator Simulation Solution• Integrates System Security ModelSystem functions defined by roles & responsibilitiesy y pUser actions defined down to point level
• Alarm System Eight alarm levels (four high & four low) Eight alarm levels (four high & four low) Alarm cutout Modal alarming based on plant conditions
• Controller Application Software is in a Drawing Sheet format using SAMA symbols
• Scalable & Integrated Cyber security solution
3
• Scalable & Integrated Cyber security solution
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Ovation® ApplicationsAnd Experience
4
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Ovation® Applications in Nuclear
Control Applications (Analog/Pneumatic/Digital)
Ovation® Applications in Nuclear
pp ( g g ) NSSS Controls – Advanced Feedwater Control, Pressurizer
Level & Pressure, Chemical Volume Control Systems, Rx Temperature, Steam Dump, Rod Control Demand, Reactor Water Level, Reactor Recirculation, Reactor Pressure
BOP Controls Moisture Separator Re heater Heater drains BOP Controls – Moisture Separator Re-heater, Heater drains, Drain tanks, Waste Processing, Sampling Systems, etc.
Main Turbine and Feed Pump control & protection systems p p yincluding electro hydraulics
Vibration Monitoring System (CSI-6500 or Bently Nevada)
5
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Ovation® Applications in Nuclear (cont)
Control Applications (Analog/Pneumatic/Digital cont)
Ovation® Applications in Nuclear (cont)
Control Applications (Analog/Pneumatic/Digital cont) Rod Control Logic Comtrol Rod Position Indication SystemRod Position Indication System Bus technologies (Profibus and Foundation Fieldbus) Wireless Technologies – monitoring applicationsFlux Mapping Systems and Traverse Incore Generator Monitoring and Protection Automatic Voltage Regulator – Alterrex, WTA
6
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Ovation® Applications in Nuclear (cont)Information System Applications
S f t P t Di l S t (SPDS)
Ovation® Applications in Nuclear (cont)
Safety Parameter Display Systems (SPDS) Smart Alarm systems (Westinghouse Product) Plant Computer systems including Nuclear Application Programs Plant Computer systems including Nuclear Application Programs
Plant Simulators Stimulated Solutions – hardware based Simulated Solutions – manually coded application software Emulated Solutions – automatically generated software running
on virtual machines
7
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Ovation® ProjectsWestinghouse Ovation Projects U.S. Plants● AP1000™- Vogtle 3&4, VC Summer 2&3 g ,
(In Process MCR, SIM, all non-safety including FWCS )● Duke Energy – Catawba 1&2 (NSSS/FWCS, SIM)● Duke Energy – McGuire 1&2 (NSSS/ FWCS, FPCS, MTS,SIM)● Exelon – Byron 1&2; Braidwood 1&2 (TCPS TGTMS MSR MTS SIM)● Exelon Byron 1&2; Braidwood 1&2 (TCPS, TGTMS, MSR, MTS, SIM)● Exelon – Clinton (RWLCS, SIM) in process● FP&L – St. Lucie (TCPS, SIM)● Hope Creek (SPDS, SIM)
P i t B h (PCS SIM)● Point Beach (PCS, SIM)● SCE – San Onofre 2&3 (TCS, FWCS, FPCPS, CVCS, SIM)● South Texas 1&2 (PCS, AS, SIM)● South Texas 3&4 ABWR (In Process; MCR, All BOP )( )● Surry 1&2 (PCS, SIM)● SNC – Farley 1&2 (In Process, TCPS, MSR, SIM) ● SNC – Vogtle 1&2 (FWCS, SIM) delivered – not installed● Wolf Creek - (In Process TCPS FPCPS BOP MTS SIM)
8
● Wolf Creek - (In Process, TCPS, FPCPS, BOP, MTS, SIM)
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Ovation® ProjectsWestinghouse Ovation Projects Foreign Plants ● AP1000™** – China 4 Units (In process; Haiyang 1&2 Sanmen 1&2 MCR● AP1000 – China 4 Units (In process; Haiyang 1&2, Sanmen 1&2, MCR,
all non-safety, including FWCS, SIM)● Almaraz 1&2 – Spain (TCS,NSSS/FWCS, FP, BOP, MTS, SIM) PCS in Process● Angra – Brazil (AVR) FWCS in process● Asco1&2 – Spain (LEFM) PCS, NSSS/FWCS & TCPS in process:● Kozloduy 5&6 – Bulgaria (NSSS/FWCS, BOP, TCPS, PCS, SIM)● Koeberg 1&2 – South Africa (PCS, SIM)● Krsko Slovenia (TCPS SIM)● Krsko – Slovenia (TCPS, SIM)● Leningrad 3&4 RBMK; PCS● Ringhals 2 – Sweden (MCR, all non-safety including FWCS, SIM)● Qinshan 3&4 – China (TCS)Q s a 3& C a ( CS)● Shin Kori 1&2 – Korea (MCR, NSSS/FWCS, BOP, SIM)● Shin Kori 3&4** – Korea (MCR, all non-safety including FWCS, SIM)● Shin Wolsong 1&2** – Korea (MCR, all non-safety including FWCS, SIM)
9
● South Ukraine Unit 3&4 – Ukraine (PCS, SIM)
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Ovation® ProjectsWestinghouse Ovation Projects Foreign Plants (cont)● Vandellos 2 – Spain (PCS, TCPS, MSR, TGTMS, MTS, SWS, SIM) p ( , , , , , , )
FPCPS & NSSS/FWCS in process ● Yonggwang 1&2 – Korea (TCPS, MSR, MTS, SIM)● Zaporozhe VVER1000 – Russia Multi-Unit SPDS
Legend: • **- New Plant• AS - Annuciators System• ATS – Automatic Turbine Startup
• MTS – Maintenance Training System• MSR – Moisture Separator Controls• NSSS - Nuclear Steam Supply System
PCS Plant Comp ter S stem• AVR – Automatic Voltage Regulator• BOP – Balance of Plant• CVCS – Chemical Volume Control
System• FPCS Feedpump Control System
• PCS – Plant Computer System• RWLCS – Reactor Water Level Control
System• SIM – Plant Simulator• SPDS – Safety Parameter Display System• FPCS – Feedpump Control System
• FPCPS – Feedpump Control and Protection System
• FWCS – Feedwater Control System• Leading Edge Flow Meter - LEFM
SPDS Safety Parameter Display System• SWS – Service Water System• TCS – Turbine Control System• TCPS – Turbine Control Protection System• TGTMS – Turbine Generator Temperature
10
g g• MCR - Main Control Room Monitoring System
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse WDPF ProjectsWestinghouse WDPF Projects ● Ginna – (FWCS, SIM)
A 1&2 S i (TCS NSSS/FWCS FP MTS SIM)● Asco1&2 – Spain (TCS,NSSS/FWCS, FP, MTS, SIM)● Prarie Island 1&2 – (FWCS, SIM, MTS)● Ringhals 3&4 Sweden (MCR NSSS/FWCS MTS SIM)● Ringhals 3&4 – Sweden (MCR, NSSS/FWCS, MTS, SIM)● Salem 1&2 – (FWCS, PCS, SIM, MTS)● Sizewell B – England (MCR, all non-safety including FWCS, g ( , y g ,
SIM)● Temelin 1&2– Korea (MCR, all non-safety including FWCS,
SIM)SIM)
11
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Non-Safety Functional Design, o Sa ety u ct o a es g ,Plant Modeling Process
& Validation Testingg
12
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Control SystemsWestinghouse Control Systems● All control systems undergo a rigorous design - validation
process p● Extensive validation testing is performed in hierarchical levels
where each level builds upon the previous● At the heart of this process is the Software In Loop (SWIL)
Validation testing which utilizes a plant specific engineeringValidation testing which utilizes a plant-specific engineering model to close the process loop– The Pressurized Water Reactors (PWR’s) SWIL plant models
have been developed and refined with over 25 years of p yexperience with successful results
– These models have been validated against multiple plants with various types of steam generatorsTh SWIL lid ti t ti th t fi ld t i d– The SWIL validation testing ensures that no field tuning and system modifications are needed during plant startup & evolution to full power.
13
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Control System Design ProcessControl System Design Process● Design Input Data Collection (Baseline Data)● Design● Design
– Functional Diagrams/Functional Requirements– Database, Control Logic Sheet & Graphics
● Modeling & AnalysisC S ( CS )– Advanced Control Simulation Language Model (ACSL)
(plant specific model configured for given application)– Setpoints List
● Control System Software TestingControl System Software Testing– Software-in-Loop (SWIL) Test , Results & Report– Phased Factory Acceptance Tests (FAT)
● SimulatorSt t● Startup– Site Acceptance Test Procedure/Guidelines– Power Ascension Test (PAT) Guideline– PAT On-site startup support
14
PAT On site startup support
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Design Input Data Collection Key SourcesKey Sources● System Information
– Characteristics of I&C Systems being • Organizational Interfaces:
- Project Managerreplaced
– Design basis (existing & upgraded)
● Process Information
Project Manager- Project Engineers- Design/Integration Engineers- Startup Engineers● Process Information
– Characteristics of Field Devices– Sensors & Control Devices
(Pumps, Valves, etc)
Startup Engineers- System Engineers (Plant
Systems, Subject Matter Experts)
– Characteristics of Process/Components– SG/Vessel, Piping, other
NSSS/BOP components
p )- Component Engineers
(SG/Vessel, Valves, Pumps)- I&C Engineersp
– Characteristics of Operation & Plant Performance– Statepoints, procedures, historical
data (plant computer)
- Operations
15
data (plant computer)
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ACSL Model Configuration OverviewACSL Model Configuration Overview● Design/operational data collected from plant, reviewed for
accuracy, completeness, consistency (i.e. no discrepancies)y, p , y ( p )● Configuration data loaded into ACSL based plant model● The plant-specific ACSL plant model is tied into ACSL based
control system models transient cases are evaluatedcontrol system models transient cases are evaluated● Adjustments are made until subject matter expert (SME) is
confident that the plant model and control system models are di tlresponding correctly
● SME peer check is also performed to ensure suitability for use● Once model review & response checks are complete, setpoint p p , p
sensitivity tests are performed● ACSL based control system model is disconnected and Ovation
control system is switched in; transients cases are re-performed
16
control system is switched in; transients cases are re performed and evaluated
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Setpoint DeterminationSetpoint Determination● Dynamic transient analysis using high-fidelity ACSL model of
process running faster than real timep g– Steam Generators or Reactor Vessel– Steam Dump or Steam Bypass – Reactor Pressure Regulation
Feed System– Feed System– Steam System– NSSS (core)
● Evaluation response over the full range of operation and operational transient conditions– Normal Operation– Contingency Operations
● Provides high confidence set of initial tunings● Provides a basis for validation of design
17
o des a bas s o a da o o des g
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Control Design Overview - Example
●S/G Model Description Example– Nodes of S/G Model
Feed Water Control Design Overview Example
Nodes of S/G Model– Primary side tubes– Secondary side tube bundle area (inside of wrapper)– Riser section (from bundle exit through primary separators)Riser section (from bundle exit through primary separators)– Upper downcomer (generally downcomer area from start of
transition cone to top of primary separators)– Lower downcomer (straight cylindrical portion of downcomer
belo transition cone)below transition cone)– Steam dome (region above top of risers or primary separators)
– Separate mass/energy balances for exit properties– Momentum balance performed to calculate change in
various section flow rates
18
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Control Design Overview - ExampleFeed Water Control Design Overview Example
●Proven Validation ApproachSWIL (S ft I L ) l d l lid ti t ti– SWIL (Software In Loop) closed loop validation testing with plant specific model ensures realistic plant operational response
– ACSL Models validated for various SG’s and now Reactor Vessels (BWR)
WestinghouseWestinghouse B&W Canada (5 Units) AREVA (5 Units) C b ti E i i (4 U it ) Combustion Engineering (4 Units)GE BWR 6 Reactor Vessel – Clinton and River Bend
19
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Control Design Overview - ExampleFeed Water Control Design Overview Example
●Proven Control Application SWIL l d l l ti t ti id lid ti– SWIL closed-loop, real-time testing provides validation, allows integration test of graphics, alarms and controls with plant operators before system is manufacturedSetpoints verified for operational transients
(determined previously with ACSL control system models))
Dynamic set points (Gain, Integral & Derivative) for PID are carefully chosen For responsiveness to transientsFor responsiveness to transients For near steady state conditions Results in no tuning during plant startup
20
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Control Systems – PWR Model Overviewy
21
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Software In Loop (SWIL)Software In Loop (SWIL)● Upon completion of setpoint analyses, the ACSL plant-
specific control model is switched to Ovation virtual controllers for real-time, closed-loop validation testing
● Verifies delivered system contains the proper setpoints and control logic as presented in the functional requirement documents
● Test performed by Subject Matter Expert along with detailed checks of control logic tuning to verify that setpoints match the intended design
22
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Application (SWIL)Feed Water Application (SWIL)● Validation of plant dynamic performance using transient test
i E lscenarios; Examples:– Ramp Load Increase from 1% Power to Turbine Synchronization Power Level at 1%/min– Turbine Synchronization and Initial Load Pickup
T bi T i With t R t T i ( t i t l l)– Turbine Trip Without Reactor Trip (at appropriate power level)– 100% Power ±10% Load Swing– 100% Power Ramp Load Decrease to 15% Power at 5%/min (bringing on various pumps at the
appropriate power)1 % 100% %/ ( ff– 15% Power Ramp Load Increase to 100% Power at 5%/min (taking off various pumps at the appropriate power level)
– Large Load Rejection (dependent upon plant design typically either 50 or 100% capability)– Loss of One Feedwater Pump– Level Setpoint Step at 5% Power– Level Setpoint Step at 100% Power– Level Setpoint Step at 50% Power with One Feedwater Pump Operating– Level Setpoint Step at 50% Power with Two Feedwater Pumps Operating.
23
p p p p g
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Application Software (SWIL)Feed Water Application Software (SWIL)● Key Customer representatives participate in testing:
– Operations, systems engineering, training, etc.● Results of the testing (trend plots, Control Builder mark-ups,
and logbook entries) are collected into a test report and archived.
● Upon successful completion of this testing, the application software is ready for loading into simulator and FAT on target plant hardware.
24
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Westinghouse Test Plan OverviewWestinghouse Test Plan Overview● Covers validation test approach.● Each test phase builds upon previous testing in an● Each test phase builds upon previous testing in an
overlapping, structured approach in the order listed below:1. Initial Software Debug Tests2. Testing of Application Software (includes dynamic SWIL tests)3. Simulator Testing4. FAT 1: Target Hardware (power up, controller/network4. FAT 1: Target Hardware (power up, controller/network
redundancy failover & I/O checkout)5. FAT 2: Base System Hardware/software (network, OWS, EWS,
AVS Domain workstation and system security configurationsAVS, Domain workstation and system security configurations6. FAT 3: Including signal validation, graphics, hardware alarms
output redundancy and application hardware )7 Site Testing site acceptance tests and po er ascension test
25
7. Site Testing – site acceptance tests and power ascension test
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water (FW) Control SystemsFeed Water (FW) Control SystemsIn delivering digital FW control systems, W ti h liWestinghouse applies:• High Quality Application Software Development
ProcessProcess– Software Requirements Document– Software Description Document
S ft Lif l Pl– Software Lifecycle Plan – Failure Modes and Affects Analysis (software and hardware)– Software Hazards Analysis
P i t t ith 10CFR50 A di B– Processes consistent with 10CFR50 Appendix Bwhere commercial grade application software can be applied in critical applications
26
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water (FW) Control SystemsFeed Water (FW) Control SystemsWestinghouse NA uses “defense in design” to ens re deli er of a high q alit prod ctensure delivery of a high quality product:• Plant Specific Models and validation testing with application in closed
loop demonstrates deterministic behavior of the application early in d idesign process
• Applications are partitioned on controllers such as not to cause failures that could add positive reactivity or effect plant design basis
• Reliance on the control network is limited controllers and associated• Reliance on the control network is limited – controllers and associated I/O can continue to function with loss of network
• I/O designed on controller loss to revert to known or benign state• For critical control component, a hard control station is provided toFor critical control component, a hard control station is provided to
operator manual control – another layer of redundancy• Redundancy of system components at all levels
27
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Reactor Water Level &eacto ate e e &Steam Generator Water Level
Control Upgradespg
28
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Existing Analog Feed Water ControlExisting Analog Feed Water Control●Historically, Steam Generator Water Level has
been difficult to control– Analog-based systems are limited– Per INPO data; second leading system for plant trip– Steam Generator (SG) shrink and swell phenomena– Steam & feedwater measurement unreliable at low power levelsSteam & feedwater measurement unreliable at low power levels– Manual control with multiple operators required to bring up unit– Prone to single points of failure Analog Inputs – no active redundancy
Manual operator action in detecting input failures Modulating Outputs single driver card
29
Modulating Outputs – single driver card
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Typical Advanced Digital Feed Water System (ADFCS) ConfigurationSystem (ADFCS) Configuration● 1,2, 3 or 4 Redundant Controllers:
HMI T O t W k t ti ith ft t l●HMI -Two Operator Workstations with soft controls– M/A Stations for FW Valve & FP Controls
●One Engineer’s/Data Base Server Workstation●One Engineer s/Data Base Server Workstation●Network Equipment – Fast Ethernet Switches ●Anti-virus Station●New Cabinets or retrofit of existing cabinets●SLIM M/A’s for Main, Bypass and Feed Pumps
30
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS Main Control RoomADFCS – Main Control Room ● Redundant operator stations & LCD
displays in MCR 59 0 PCTdisplays in MCR ● SLIM M/A’s for all modulating valves, &
feed pumpsAdd d l f d d
59.0 PCT
100
SP PV OUT
100
Added layer of redundancy upon controller failure
Works seamlessly with soft control
80
6060
80
● Remove signal selector switches● Remove select recorders – steam/feed
water, wide and narrow range level20
40
20
40
, g● Remove individual channel indicators &
replace with median● Select indicators can remain “live”
20
0
A0
20
M L
Rejectto Local
31
● Select indicators can remain liveSLIM M/A Station
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Typical ADFCS ArchitectureTypical ADFCS ArchitectureSS/EWS/DB/OWS/
Domain/OPH Server Drop 200
Security (AV) Host
IP Switch
Printer
Note 2
CISCOSYSTEMS CISC OSYSTEMS
NETWORK SWITCHESPrimary Root Switch Back-up Root Switch
MAIN CONTROLROOM
COMPUTER ROOM
CISCOSYSTEMS
PrimaryFan-outSwitch
CISCOSYSTEMS
Back-upFan-outSwitch
NETWORK SWITCHES
OperatorStation
Drop 210
OperatorStation
Drop 211
(Note 1) (Note 1)
Drop 10/62
OCR 400Controller
OCR 400ControllerDrop 11/61
3 & 4
ExtendedI/O Cabinet
L d
59.0 PCT
100
80
20
40
60
0
A
SP PV OUT
0
20
40
60
80
100
M L
Rejectto Local
59.0 PCT
100
80
20
40
60
0
A
SP PV OUT
0
20
40
60
80
100
M L
Rejectto Local
32
Loops 1 & 2 Loops 3 & 4Legend:
UTP Cable
Fiber Optic CableMedia ConverterOther T/P viaKVM Extenders
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Feed Water Overview Graphic4 Loop Plant Feed Pump Soft M/A4 Loop Plant – Feed Pump Soft M/A
33
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS – Design OverviewADFCS Design Overview
● Improved system reliability via signal selectors– Narrow Range Level– Wide Range Level– Feedwater Flow– Steam Flow– Steam Pressure– Feedwater Temperaturep– Turbine Impulse Pressure or Nuclear Power– Feedwater Header Pressure
(FP turbine runback)( )● Improve System performance by integrating feed
pump governor controls
34
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS – Design OverviewADFCS Design Overview●Proven Control Application – third generation
design consistent with AP1000design consistent with AP1000– Low and High Power ControllersBumpless Transfer between Low Power and High
P C t l M dPower Control Mode – Feedwater Temperature CompensationLow Power Level Controller gain & reset adjustedLow Power Level Controller gain & reset adjusted
based on feedwater temperatureCompensates for the effects of shrink and swell in
l l t f d t fl i tilevel response to feedwater flow variations– High Power Level Controller proportional gain and
integral time adjusted based on steam flow
35
integral time adjusted based on steam flow
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS – Design OverviewADFCS Design Overview
●Proven Control Application (cont’d)Load Index– Load Index Wide Range LevelAnticipates need for flow change at low power
Automatic transition from bypass valve to main feed– Automatic transition from bypass valve to main feed water regulation valve
– Capability of operating with one valve in manual and other in autoother in auto
– Control Valve Linearization & PerformanceCompensates for non-linearities in valve
characteristics and ensures an effective and stable control response
Position feedback provides means to detect sticking or sluggish valve response and alert the operator
36
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS – Design OverviewADFCS Design Overview
●Proven Control Application (cont’d)F d d d d i l l t d f ti f– Feed pump speed demand is calculated as a function of feed water flow demand Provide adequate pump head to ensure flow to the
steam generators is maintained during transientsCoordinated automatic control of steam driven feed
pumps when integrated into ADFCS p p g
37
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
ADFCS – Design OverviewADFCS – Design Overview●Proven Control Application (cont’d)
S it h t M l d i t l ith– Switch to Manual mode in new system only occurs with complete Narrow Range Level failure; otherwise system remains in Automatic for all other failuresSteam or feedwater flow input failure; system revertsSteam or feedwater flow input failure; system reverts
to single element control with a reduced steam generator narrow range level error input to the flow controller PID.controller PID.
Steam pressure, feedwater temperature and feedwater header pressure input failures; system uses a constant value of the signal that is grepresentative of the signal prior to the failure.
38
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Advanced Digital Feed WaterAdvanced Digital Feed Water
●Benefits– Proven 3rd Generation Design used on Westinghouse and CE plants, deployed
in eleven units with two additional in next two years; common design with AP1000
– Standardized proven and enhanced control logic used for highly reliableStandardized, proven and enhanced control logic used for highly reliable operational performance allowing operational maneuvers with no level deviation
– Auto control over full power range (1-100%), heatup/cooldown (optional)– Auto, seamless transition between main/bypass feed water regulation valves – Bumpless transition from Automatic mode to Manual mode and back– Allows Integrated governor control and protection of main feed water pump
speedPlant specific dynamic analysis per SWIL addresses plant components &– Plant-specific dynamic analysis per SWIL addresses plant components & operational conditions
– Supports transient capability with reduced risk of reactor trip– Minimized field tuning and risk of delays at startup
40
g y p
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Advanced Digital Feed WaterAdvanced Digital Feed Water Benefits (cont)
– Integrated governor control and protection of– Integrated governor control and protection of main feed water pump speed governor
– Operational maneuvers with no narrow range level deviation
– Output redundancy to control valves available that provides additional layer of protection against SPV and loss of
d d t t llredundant controllers– SLIM hard interface operates seamlessly
with Soft Control Interface graphicsA tomatics s itch to man al and alternate– Automatics switch to manual and alternate actions
– SONG’s and Almaraz have tripped a feed pump at power and stayed on line
Almaraz Feed Pump Turbine
41
pump at power and stayed on line
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Advanced Digital Feed WaterAdvanced Digital Feed Water
●Benefits (cont)– Eliminates Single Point Vulnerabilities – establish system reliabilities >
99.99%– Internal diagnostics can extend if not eliminate surveillances of the system
Advanced diagnostics making the system easier to troubleshoot and– Advanced diagnostics making the system easier to troubleshoot and maintain
– Standardization with a common platform across multiple applications simplifies spare parts, training and eliminates need for system experts
42
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Digital ADFCSLessons Learned
43
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Digital Feed Water Lessons LearnedDigital Feed Water Lessons Learned● Air Supply system to main and bypass valves should be
sized properly with enough volume so valves strokesized properly with enough volume so valves stroke smoothly in required time less than 20-30 secs Air Booster/Accumulator - stroking of any valve should
t ff t th lnot affect other valves Check Pre-load on Bypass & Main Valve actuators to
ensure spring constants have not changedp g g Check diaphragms on Bypass & Main Valves actuators
● Control valve trim should be designed/sized properly and there should be no valve sticking or bindingthere should be no valve sticking or binding New digital control system will not fix valve design issues
or operational problems
44
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Digital Feed Water Lessons LearnedDigital Feed Water Lessons Learned● Replacement Digital Positioners have internal PID control
and form an outer control loop p Positioner acts as a small control system Positioner/valve sub-loop has effective closed-loop response Overall response of outer flow/level controller is dependant upon the Overall response of outer flow/level controller is dependant upon the
sub-loop response Digital positioners have capability to significantly alter gain and/or time
response for the positioner/valve combinationp p● Utilize “experienced” personnel teams from vendor and
utility – include key stakeholders Utilize personnel that know the plant, interfaces and processesp p , p Involve plant operations personnel from the start and till the end of the
project and identify an operations focal point that “speaks” for Operation Department.
45
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Digital Feed Water Lessons LearnedDigital Feed Water Lessons Learned● Review and challenge scope of modification will fit in
outage window with minimal riskg Perform work that can be done on line to reduce risk Upgrade solutions should be designed to maximize installation
efficiencyy Use phased upgrade approach
● Carefully evaluate SPVs for cost to improvement benefits Deploy some level of output redundancy Deploy some level of output redundancy
● Take into account scenario of controller redundancy failure - human error What happens to the plant, if control processing stops What happens to the plant, if control processing stops Is there a backup layer of redundancy
● Digital Systems provide configuration management challenges – product offerings should provide levels of self
46
challenges product offerings should provide levels of self documenting
© 2011 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 2
Digital Feed Water Lessons LearnedDigital Feed Water Lessons Learned● Digital Systems provide configuration management
challenges – product offerings should provide levels of selfchallenges product offerings should provide levels of self documenting
● Utilize proven designs to minimize project and outage risks● Utilize a robust testing & validation plan that incorporatesUtilize a robust testing & validation plan that incorporates
closed loop engineering models to ensure startup tuning is not required
● With Hi-fidelity engineering models it will be very likely that y g g y ythe plant simulator models will need to be revised
● Ensure that upgrade system design meets current dynamic regulatory environment and requirementsSoftware HazardsFailure Modes and EffectsSystem Security & Cyber Security